CN215977947U - Wall stone dry hanging structure - Google Patents

Wall stone dry hanging structure Download PDF

Info

Publication number
CN215977947U
CN215977947U CN202122252631.0U CN202122252631U CN215977947U CN 215977947 U CN215977947 U CN 215977947U CN 202122252631 U CN202122252631 U CN 202122252631U CN 215977947 U CN215977947 U CN 215977947U
Authority
CN
China
Prior art keywords
stone
sign indicating
indicating number
angle sign
stone material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122252631.0U
Other languages
Chinese (zh)
Inventor
吴海峰
李仁安
王吉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Shuishi Building Decoration Engineering Co ltd
Original Assignee
Kunshan Shuishi Building Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Shuishi Building Decoration Engineering Co ltd filed Critical Kunshan Shuishi Building Decoration Engineering Co ltd
Priority to CN202122252631.0U priority Critical patent/CN215977947U/en
Application granted granted Critical
Publication of CN215977947U publication Critical patent/CN215977947U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a wall surface stone dry hanging structure, relates to the technical field of decoration engineering, and aims to solve the problem that gaps are inconsistent in size easily caused by stone dry hanging installation, and the technical scheme is characterized in that: including the main joist of vertical setting and rather than dismantling the secondary joist of being connected and level setting, can dismantle on the top surface of secondary joist and be connected with the connection angle sign indicating number, the connection angle sign indicating number is kept away from one side of main joist and can be dismantled and be connected with the stone material pendant, has between stone material pendant and the connection angle sign indicating number and hinders the gliding effort of stone material pendant along connecting angle sign indicating number direction of height, has between connection angle sign indicating number and the secondary joist and hinders the gliding effort of stone material pendant. The stone dry-hanging device can be used for pre-fixing when stone is dry-hung and installed, so that the possibility that the stone falls and is broken accidentally is reduced, and certain stone can be saved.

Description

Wall stone dry hanging structure
Technical Field
The utility model relates to the technical field of decoration engineering, in particular to a wall stone dry hanging structure.
Background
The dry hanging method of stone is also called empty hanging method. Is a novel construction process in the prior wall decoration. The method uses the metal hanging piece to directly hang the facing stone on the wall surface or hang the facing stone on the steel frame in the air, and grouting and pasting are not needed. The principle is that main stress points are arranged on a main body structure, and stone is fixed on a building through a metal hanging piece to form the stone decorative curtain wall.
In prior art, carry out the installation of large tracts of land stone material dry-hanging on the wall body and always can stay the seam processing, because the wall hangs the quality problem that the stone material goes out futilely most easily and is the unevenness in surface, out of plumb, the diagonal angle is just, and through keeping somewhere seam department and sealing treatment after, these problems of evading that can be very light fall, avoid unnecessary rework, but keep seam processing and need a workman to hold up the stone material of treating the installation, another workman carries out fixed mounting, because the manual work probably hand trembles when holding up and the stone material does not carry out the pre-fixing according to the interval needs, the gap distance between the stone material is inconsistent when leading to final installation to accomplish easily.
Therefore, a new solution is needed to solve this problem.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model aims to provide a wall surface stone dry hanging structure which can control the gap between adjacent stones during dry hanging installation.
The technical purpose of the utility model is realized by the following technical scheme: the utility model provides a wall stone material hangs structure futilely, includes the main joist of vertical setting and rather than dismantling the secondary joist of being connected and the level setting, can dismantle on the top surface of secondary joist and be connected with the connection angle sign indicating number, the one side that the main joist was kept away from to the connection angle sign indicating number can be dismantled and be connected with stone material pendant, its characterized in that: the stone pendant and the connection angle sign indicating number between have and hinder the gliding effort of stone pendant along connection angle sign indicating number direction of height, be present between connection angle sign indicating number and the secondary joist and hinder the gliding effort of stone pendant downwards.
Through adopting above-mentioned technical scheme, utilize the stone material pendant to come to be connected and fix on connecting the angle sign indicating number with the stone material, make main joist and secondary joist carry out the bearing to the stone material of carrying out the installation, avoid the stone material to drop, because there is the gliding effort of hindering the stone material pendant along connecting angle sign indicating number direction of height between stone material pendant and the connection angle sign indicating number, make can play certain pre-fixing effect when carrying out the stone material installation, although still need the manpower to lift up the stone material, but the error when can reduce the installation, thereby it is even to guarantee the gap size between the adjacent stone material, because there is the effort that hinders the downward slip of stone material pendant between connection angle sign indicating number and the secondary joist, make can further strengthen the pre-fixing effect to the stone material.
The utility model is further configured to: connect and can dismantle between angle sign indicating number and the secondary joist and be connected with the subassembly of fixing in advance, the subassembly of fixing in advance exerts the effort that hinders its gliding downwards to the stone material pendant.
Through adopting above-mentioned technical scheme, utilize the fixed subassembly in advance between connection angle sign indicating number and the secondary joist to strengthen the fixed effect in advance when the stone material is installed, error when reducing the installation lets the gap size between the adjacent stone material even.
The utility model is further configured to: the length of stone material pendant is greater than the length of connecting the angle sign indicating number, the subassembly of fixing in advance is greater than the one end of connecting the angle sign indicating number length and is exerted the effort that hinders stone material pendant gliding downwards on the one side of connecting the angle sign indicating number to stone material pendant length.
Through adopting above-mentioned technical scheme, because the length of stone material pendant is greater than the length of connecting the angle sign indicating number for the pre-fixing subassembly that is located between connecting angle sign indicating number and the secondary joist can play certain pre-fixing effect towards connecting the angle sign indicating number and not with the position of connecting the angle sign indicating number contact to the stone material pendant, the workman that lifts the stone material when avoiding the stone material installation as far as can appear the error because the hand trembles the mounted position that leads to.
The utility model is further configured to: the pre-fixing assembly comprises a connecting plate detachably connected between a connecting corner brace and a secondary keel, connecting rods which are abutted to stone hangers are rotatably connected to two sides of the connecting plate, and elastic restoring force exists at the rotating connection positions of the connecting rods and the connecting plate.
Through adopting above-mentioned technical scheme, the connecting rod that utilizes to be located the connecting plate between connection angle sign indicating number and the secondary joist comes to offset with the stone material pendant to play certain fixed effect in advance to the stone material pendant, utilize the elastic restoring force of connecting rod and connecting plate rotation junction, let the connecting rod can keep its position, still can play fixed effect in advance when the adjustment of stone material position.
The utility model is further configured to: the rotation junction cover of connecting rod and connecting plate is equipped with the torsional spring, the one end and the connecting rod fixed connection of torsional spring, the other end and the connecting plate fixed connection of torsional spring.
Through adopting above-mentioned technical scheme, utilize connecting rod and connecting plate to rotate the torsional spring that the junction cover was established for the connecting rod can keep offsetting with the stone material pendant, thereby strengthens the fixed effect in advance of fixed subassembly, lets the installation of stone material more stable difficult appearance error.
The utility model is further configured to: connect the angle sign indicating number and keep away from protruding first of fixedly connected with on the one side of main joist, the stone material pendant is towards fixedly connected with and protruding two of the meshing on the one side of connecting the angle sign indicating number.
Through adopting above-mentioned technical scheme, utilize protruding two on the protruding one on the connection angle sign indicating number and the stone material pendant for the connection angle sign indicating number can hinder the stone material pendant rather than taking place the relative slip, lets the error of stone material mounted position littleer.
The utility model is further configured to: one end of the connecting rod facing the stone pendant is meshed with the second bulge.
Through adopting above-mentioned technical scheme for the connecting rod has certain power that hinders stone material pendant gliding downwards, avoids stone material pendant and connection angle sign indicating number to take place the installation error that relative slip leads to, thereby lets the gap between the adjacent stone material more even.
In conclusion, the utility model has the following beneficial effects:
come to be connected and fix on connecting the angle sign indicating number with the stone material through the stone material pendant, make main joist and secondary joist can carry out the bearing to the stone material of carrying out the installation, avoid the stone material to drop, because protruding one and protruding two intermeshing exert the gliding effort of hindrance stone material pendant along connecting the angle sign indicating number direction of height, make can play certain pre-fixing effect when carrying out the stone material installation, although still need the manpower to lift up the stone material, but the error when can reducing the installation, thereby guarantee that the gap size between the adjacent stone material is even, because the connecting rod can exert the effort that hinders stone material pendant gliding downwards, make pre-fixing effect when the stone material installation further strengthen.
Drawings
FIG. 1 is a first schematic structural diagram of the present invention;
FIG. 2 is an enlarged view taken at A in FIG. 1;
FIG. 3 is a second schematic structural view of the present invention;
fig. 4 is an enlarged view at B in fig. 3.
In the figure: 1. a main keel; 2. a secondary keel; 3. connecting corner connectors; 4. a stone pendant; 5. a connecting plate; 6. a connecting rod; 7. a first bulge; 8. and a second bulge.
Detailed Description
The utility model is described in detail below with reference to the figures and examples.
Example (b):
as shown in figure 1 and figure 2, a wall stone material hangs structure futilely, including the main joist 1 of vertical setting and rather than dismantling the secondary joist 2 of being connected and the level setting, can dismantle on the top surface of secondary joist 2 and be connected with the connection angle sign indicating number 3 that is the L font, the one side of connecting angle sign indicating number 3 and keeping away from main joist 1 can be dismantled and be connected with the stone material pendant 4 that is the K font, there is the gliding effort of hindering stone material pendant 4 along connecting 3 direction of height of angle sign indicating number between stone material pendant 4 and the connection angle sign indicating number 3, there is the gliding effort that hinders stone material pendant 4 between connection angle sign indicating number 3 and the secondary joist 2.
As shown in fig. 3 and 4, the length of stone material pendant 4 is greater than the length of connecting angle sign indicating number 3, connect angle sign indicating number 3 and keep away from the protruding 7 of fixedly connected with in the one side of main joist 1, fixedly connected with and protruding two 8 of 7 meshing on the one side of connecting angle sign indicating number 3 are connected towards stone material pendant 4, connect and to dismantle between angle sign indicating number 3 and the secondary joist 2 and be connected with pre-fixing subassembly, pre-fixing subassembly is including dismantling the connecting plate 5 of connection between connecting angle sign indicating number 3 and secondary joist 2, the both sides of connecting plate 5 are rotated and are connected with the connecting rod 6 that offsets with stone material pendant 4, the rotation junction cover of connecting rod 6 and connecting plate 5 is equipped with the torsional spring, the one end and the connecting rod 6 fixed connection of torsional spring, the other end and the connecting plate 5 fixed connection of torsional spring, connecting rod 6 meshes with protruding two 8 towards the one end of stone material pendant 4.
When people use the structure to dry-hang and install the stone, firstly, a main keel 1 and a secondary keel 2 are built on a wall surface needing to be installed, then a connecting plate 5 and a connecting angle code 3 are sequentially placed on the top surface of the secondary keel 2 and screwed up by using bolts, then bolts are penetrated into a stone pendant 4 and slide into the stone, a second bulge 8 on the stone pendant 4 can be meshed with a first bulge 7 on the connecting angle code 3, a constructor is helped to position the stone, meanwhile, a connecting rod 6 on the connecting plate 5 is meshed with a second bulge 8 on the stone pendant 4, the pre-fixing effect can be enhanced after the constructor adjusts the stone position up and down, the bolts on the stone pendant 4 are screwed up after the installation position is determined, the stone pendant 4 is tightly attached to the connecting angle code 3, and the stone can be installed and fixed.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the utility model may occur to those skilled in the art without departing from the principle of the utility model, and are considered to be within the scope of the utility model.

Claims (7)

1. The utility model provides a wall stone material hangs structure futilely, includes main joist (1) of vertical setting and rather than can dismantle secondary joist (2) of being connected and level setting, can dismantle on the top surface of secondary joist (2) and be connected with connection angle sign indicating number (3), one side that main joist (1) was kept away from in connection angle sign indicating number (3) can be dismantled and be connected with stone material pendant (4), its characterized in that: the stone hanging piece is characterized in that an acting force for preventing the stone hanging piece (4) from sliding along the height direction of the connecting corner connector (3) exists between the stone hanging piece (4) and the connecting corner connector (3), and an acting force for preventing the stone hanging piece (4) from sliding downwards exists between the connecting corner connector (3) and the secondary keel (2).
2. The wall stone dry-hanging structure of claim 1, characterized in that: connect and can dismantle between angle sign indicating number (3) and secondary joist (2) and be connected with the subassembly of fixing in advance, the subassembly of fixing in advance is to applying the effort that hinders its gliding downwards stone material pendant (4).
3. The wall stone dry-hanging structure of claim 2, characterized in that: the length of stone material pendant (4) is greater than the length of connecting angle sign indicating number (3), the subassembly is fixed in advance to stone material pendant (4) length be greater than the one end of connecting angle sign indicating number (3) length and apply the effort that hinders stone material pendant (4) gliding down towards on the one side of connecting angle sign indicating number (3).
4. The wall stone dry-hanging structure of claim 3, characterized in that: the pre-fixing component comprises a connecting plate (5) detachably connected between a connecting corner connector (3) and a secondary keel (2), connecting rods (6) which are abutted to stone hangers (4) are rotatably connected to two sides of the connecting plate (5), and elastic restoring force exists at the rotating connection positions of the connecting rods (6) and the connecting plate (5).
5. The wall stone dry-hanging structure of claim 4, characterized in that: the rotation junction cover of connecting rod (6) and connecting plate (5) is equipped with the torsional spring, the one end and connecting rod (6) fixed connection of torsional spring, the other end and connecting plate (5) fixed connection of torsional spring.
6. The wall stone dry-hanging structure of claim 4, characterized in that: connect angle sign indicating number (3) and keep away from protruding (7) of fixedly connected with on the one side of main joist (1), stone material pendant (4) are towards connecting protruding two (8) of fixedly connected with and protruding (7) meshing on the one side of angle sign indicating number (3).
7. The wall stone dry-hanging structure of claim 6, characterized in that: one end of the connecting rod (6) facing the stone pendant (4) is meshed with the second bulge (8).
CN202122252631.0U 2021-09-16 2021-09-16 Wall stone dry hanging structure Active CN215977947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122252631.0U CN215977947U (en) 2021-09-16 2021-09-16 Wall stone dry hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122252631.0U CN215977947U (en) 2021-09-16 2021-09-16 Wall stone dry hanging structure

Publications (1)

Publication Number Publication Date
CN215977947U true CN215977947U (en) 2022-03-08

Family

ID=80463502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122252631.0U Active CN215977947U (en) 2021-09-16 2021-09-16 Wall stone dry hanging structure

Country Status (1)

Country Link
CN (1) CN215977947U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961058A (en) * 2022-06-20 2022-08-30 广东万方建设有限公司 Stone curtain wall mounting structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114961058A (en) * 2022-06-20 2022-08-30 广东万方建设有限公司 Stone curtain wall mounting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN215977947U (en) Wall stone dry hanging structure
CN101492988B (en) Opening window for glass curtain wall
CN210507943U (en) Fine-adjustable point-supported glass curtain wall
CN210395771U (en) Mounting structure convenient to dismantle building curtain
CN215563607U (en) Aluminum plate curtain wall mounting structure
CN108643420A (en) A kind of aluminum facade mounting structure
CN214739069U (en) Indoor display screen installation component of energy-saving building
CN210797998U (en) Dry hanging type stone curtain wall structure
ATE83830T1 (en) DEVICE FOR ADJUSTABLE MECHANICAL SUPPORT OF CONTINUOUS GLASS FAÇADES FOR HOUSES AND MULTI-STOREY BUILDINGS.
CN212295204U (en) Green anti-pollution building outer glass curtain wall
CN219732827U (en) Supporting device for building curtain wall construction
CN214885392U (en) Hanging flower basket auxiliary stabilizing device for construction
JP2503750B2 (en) Elevator hall device
CN109532986A (en) Construction robot is used in a kind of carrying of cladding glass
CN214941162U (en) Concrete prefabricated component slab joint adjustment structure for architectural design
CN208792575U (en) A kind of stealth frame glass curtain wall
CN216840341U (en) Prevent to construct accessory device of caulking strip dislocation
CN111549967B (en) Novel ceiling board connecting structure and construction process thereof
CN214473366U (en) Road and bridge concrete structure real-time detection device
CN218508987U (en) Hanging flower basket convenient to location is used in construction of building outer wall face
CN213683268U (en) Building curtain wall mounting and fixing support
CN218205541U (en) Ceramic tile installation auxiliary structure
CN210976591U (en) Automatic flat plate formwork that climbs
CN212478495U (en) Hanging rack turning plate device for building construction aluminum alloy climbing rack
CN113700180B (en) Quick installation buckle of light partition wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant