CN215950596U - Screw suspender support for building electromechanical engineering - Google Patents

Screw suspender support for building electromechanical engineering Download PDF

Info

Publication number
CN215950596U
CN215950596U CN202122627600.9U CN202122627600U CN215950596U CN 215950596 U CN215950596 U CN 215950596U CN 202122627600 U CN202122627600 U CN 202122627600U CN 215950596 U CN215950596 U CN 215950596U
Authority
CN
China
Prior art keywords
screw
sides
electromechanical engineering
fixed mounting
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122627600.9U
Other languages
Chinese (zh)
Inventor
王晓军
姚玉峰
杨文龙
刘洪萍
王昊
何旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Sijian Construction Engineering Co ltd
Original Assignee
Heilongjiang Sijian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Sijian Construction Engineering Co ltd filed Critical Heilongjiang Sijian Construction Engineering Co ltd
Priority to CN202122627600.9U priority Critical patent/CN215950596U/en
Application granted granted Critical
Publication of CN215950596U publication Critical patent/CN215950596U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a screw suspender bracket for building electromechanical engineering, which comprises a top plate and a placing frame, wherein the bottom of the top plate is fixedly provided with three connecting grooves at equal intervals, the middle position of the bottom of the placing frame is fixedly provided with the connecting grooves, the middle position of the top of the placing frame is fixedly provided with an installing rod, the top end of the installing rod is fixedly provided with a connecting plate, a second installing plate is fixedly arranged between the two sides of the inside of the placing frame, the middle position of the top of the second installing plate is fixedly provided with a bearing seat, the two sides of the inside of the second installing plate are both provided with sliding grooves, and the two sliding grooves are both internally provided with sliding blocks. The pipeline is fixed without installing a plurality of screw suspender supports.

Description

Screw suspender support for building electromechanical engineering
Technical Field
The utility model relates to the technical field, in particular to a screw suspender support for building electromechanical engineering.
Background
The building electromechanical engineering is an important component in the building engineering and mainly comprises a water supply and drainage system, a power supply system, an air-conditioning ventilation system, a weak current system, a fire-fighting system and an intelligent system. The quality of the electromechanical engineering directly influences the overall quality of the building engineering, including the operation effect, whether energy is saved or not and whether the building is practical or not when the building is really put into use.
Need carry out unsettled the putting to some jointing equipment such as pipeline in building electromechanical engineering, need effectively put through screw jib support, current screw jib support's simple structure, the pipeline is mostly direct to be placed on the bottom plate, thereby can only play the supporting role to the pipeline simple, and then there is the problem of pipeline fixed unstability, thereby the condition of rocking very easily takes place, and current screw jib support can only fix the pipeline of certain quantity, when increasing the pipeline that needs to fix in the later stage, then need install a plurality of screw jib supports, it is very inconvenient, therefore, in order to solve above-mentioned problem, we improve to this, a building electromechanical engineering screw jib support is proposed.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model provides the following technical scheme:
the utility model relates to a screw suspender bracket for building electromechanical engineering, which comprises a top plate and a placing frame, wherein the bottom of the top plate is fixedly provided with three connecting grooves at equal intervals, the middle position of the bottom of the placing frame is fixedly provided with the connecting grooves, the middle position of the top of the placing frame is fixedly provided with an installing rod, the top end of the installing rod is fixedly provided with a connecting plate, a second installing plate is fixedly arranged between the two sides of the inside of the placing frame, the middle position of the top of the second installing plate is fixedly provided with a bearing seat, the two sides of the inside of the second installing plate are both provided with sliding grooves, the two sliding grooves are both internally provided with sliding blocks, the top ends of the two sliding blocks are both fixedly provided with first installing plates, one side of the two first installing plates is both fixedly provided with a clamping plate, and a rotating shaft is arranged between the two sides of the inside of the placing frame through a bearing, the pivot is located under the second mounting panel, the surface of pivot is provided with two sections screw threads, the pivot is through two sections the internal thread cover is installed to the screw thread, two the top of internal thread cover respectively with two the bottom fixed connection of slider.
As a preferred technical scheme of the utility model, the bottoms of the four connecting grooves are all provided with a slot, and the middle positions of the two sides of the bottoms of the four connecting grooves and the two sides inside the connecting plate are both provided with second mounting holes.
According to a preferred technical scheme, side plates are fixedly arranged on two sides of the bottom of the top plate, inclined fixing rods are fixedly arranged below one side of each of the two side plates, reinforcing plates are fixedly arranged at the top ends of the two fixing rods, and first mounting holes are formed in one side of the inner portions of the two reinforcing plates and four ends of the inner portions of the top plate.
As a preferred technical scheme of the utility model, the two clamping plates are both arc-shaped structures, and the top of the bearing seat is of an arc-shaped structure.
As a preferred technical scheme, wear-resistant anti-slip pads are arranged on one sides of the two clamping plates and the top of the bearing seat, and anti-slip particles are arranged on the surfaces of the three wear-resistant anti-slip pads.
As a preferred technical scheme of the utility model, the two sections of threads are the same in length and opposite in grain direction, two limiting blocks are fixedly mounted on the surface of the rotating shaft, and the two sections of threads are respectively positioned on one side of the two limiting blocks and right below the two sliding grooves.
As a preferable technical scheme of the utility model, one end of the rotating shaft penetrates through the placing frame and is fixedly provided with a knob, and the outer surface of the knob is provided with anti-skid grains.
The utility model has the beneficial effects that:
1. this building machine electrical engineering screw jib support inserts the inside of spread groove through the connecting plate that will place the frame top, and use the bolt to be connected fixedly connecting plate and spread groove through the second mounting hole, and then can will place frame and roof and carry out erection joint, later will need fixed pipeline to insert and place the frame and place the top at the bearing seat, later it is rotatory to rotate the knob and drive the pivot, the pivot will drive the internal thread cover and remove, the internal thread cover will drive splint and press from both sides tight fixed to the both sides of pipeline, thereby the problem that the pipeline is fixed unstably can take place to rock has been solved.
2. When the pipeline that later stage increase needs to be fixed, only need prepare with the frame of placing that pipeline quantity corresponds to will place the frame and install the back through connecting plate and spread groove, again with the pipeline with place the frame install can.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic structural view of a screw boom support for construction electromechanical engineering according to the present invention;
FIG. 2 is a bottom view of the connecting slot of the screw suspension rod bracket of the electromechanical engineering of construction of the present invention;
FIG. 3 is an enlarged view of the screw suspension rod support of the electromechanical engineering of construction shown at A in FIG. 1;
FIG. 4 is an enlarged view of the screw suspension rod support of the electromechanical engineering construction of the present invention at B in FIG. 1;
in the figure: 1. connecting grooves; 2. a top plate; 3. a side plate; 4. fixing the rod; 5. a reinforcing plate; 6. a first mounting hole; 7. placing the frame; 8. a second mounting hole; 9. grooving; 10. mounting a rod; 11. a connecting plate; 12. a chute; 13. a slider; 14. a first mounting plate; 15. a wear-resistant anti-slip pad; 16. a splint; 17. a bearing seat; 18. a second mounting plate; 19. a rotating shaft; 20. a limiting block; 21. a thread; 22. an internal thread sleeve; 23. a knob.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Referring to fig. 1-4, the present invention provides a technical solution: a technical scheme of a screw suspender support for building electromechanical engineering comprises a top plate 2 and a placing frame 7, wherein three connecting grooves 1 are fixedly arranged at the bottom of the top plate 2 at equal intervals, the connecting groove 1 is fixedly arranged at the middle position of the bottom of the placing frame 7, an installing rod 10 is fixedly arranged at the middle position of the top of the placing frame 7, a connecting plate 11 is fixedly arranged at the top end of the installing rod 10, a second installing plate 18 is fixedly arranged between two sides of the inside of the placing frame 7, a bearing seat 17 is fixedly arranged at the middle position of the top of the second installing plate 18, sliding grooves 12 start to be arranged at two sides of the inside of the second installing plate 18, sliding blocks 13 are arranged in the two sliding grooves 12, first installing plates 14 are fixedly arranged at the top ends of the two sliding blocks 13, clamping plates 16 are fixedly arranged at one sides of the two first installing plates 14, and a rotating shaft 19 is arranged between two sides of the inside of the placing frame 7 through bearings, the pivot 19 is located under the second mounting panel 18, and the surface of pivot 19 is provided with two sections screw threads 21, and the internal thread cover 22 has been installed through two sections screw threads 21 to pivot 19, and the top of two internal thread covers 22 respectively with the bottom fixed connection of two sliders 13, when later stage increase needs fixed pipeline, only need prepare with the frame 7 of placing that pipeline quantity corresponds to will place the frame 7 and install the back through connecting plate 11 and spread groove 1, again with the pipeline with place the frame 7 install can.
Preferably, fluting 9 has all been seted up to the bottom of four spread grooves 1, and second mounting hole 8 has all been seted up with the inside both sides of connecting plate 11 in the intermediate position department of four spread groove 1 bottom both sides, can use the bolt to be connected connecting plate 11 and spread groove 1 fixedly through second mounting hole 8, and then can will place frame 7 and roof 2 and carry out erection joint.
Preferably, the equal fixed mounting in both sides of 2 bottoms of roof has curb plate 3, the equal fixed mounting in below of two blocks of curb plates 3 one sides has the dead lever 4 of slope, the equal fixed mounting in top of two dead levers 4 has reinforcing plate 5, first mounting hole 6 has all been seted up with roof 2 inside four ends to one side of two reinforcing plates 5 insides, through the reinforcing plate 5 that sets up, can improve roof 2's stability for roof 2 can stable installation in the position that needs.
Preferably, two splint 16 are the arc structure, and the top of bearing seat 17 is the arc structure, and the arc structure can be convenient for splint 16 and bearing seat 17 and pipeline contact, increases the area of contact between pipeline and splint 16 and the bearing seat 17.
Preferably, one side of two splint 16 and the top of bearing seat 17 all are provided with wear-resisting slipmat 15, and the surface of three wear-resisting slipmats 15 all is provided with anti-skidding granule, through or the wear-resisting slipmat 15 that sets up, the frictional force between multiplicable pipeline and splint 16 and the bearing seat 17 has increased the steadiness fixed to the pipeline.
Preferably, the two sections of threads 21 have the same length and have opposite lines and directions, two limit blocks 20 are fixedly mounted on the surface of the rotating shaft 19, the two sections of threads 21 are respectively located on one side of the two limit blocks 20 and right below the two sliding grooves 12, and the two sections of threads 21 with opposite lines can drive the two internal thread sleeves 22 to move in opposite directions after the rotating shaft 19 rotates, so that the clamping plate 16 can clamp and fix the two sides of the pipeline.
Preferably, the one end of pivot 19 is run through and is placed frame 7 and fixed mounting has knob 23, and the surface of knob 23 is provided with anti-skidding line, can drive pivot 19 rotatory through rotatory knob 23, can be convenient for rotate knob 23 through the anti-skidding line that sets up.
The working principle is as follows: before use, the safety of each structure of the utility model is checked, when the screw suspender support for the building electromechanical engineering is used, firstly, a top plate 2 and two reinforcing plates 5 are arranged at required positions by using bolts through a first mounting hole 6, then, a corresponding number of placing frames 7 are arranged according to the number of pipelines required to be fixed, after the placing frames 7 are arranged, a connecting plate 11 at the top of the placing frame 7 is inserted into a connecting groove 1, the connecting plate 11 is fixedly connected with the connecting groove 1 by using bolts through a second mounting hole 8, further, the placing frame 7 and the top plate 2 can be installed and connected, then, the pipeline required to be fixed is inserted into the placing frame 7 and placed at the top of a bearing seat 17, then, a knob 23 is rotated to drive a rotating shaft 19 to rotate, the rotating shaft 19 drives an internal thread sleeve 22 to move, the internal thread sleeve 22 drives clamping plates 16 to clamp and fix two sides of the pipeline, thereby solved the fixed unstable problem that can take place to rock of pipeline, when the later stage increases the pipeline that needs to be fixed, only need prepare with the frame 7 of placing that pipeline quantity corresponds to will place frame 7 and install the back through connecting plate 11 and spread groove 1, again with the pipeline with place frame 7 install can.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a building machinery electrical engineering screw jib support, includes roof (2) and places frame (7), its characterized in that, the equidistant fixed mounting in bottom of roof (2) has three spread groove (1), the intermediate position department fixed mounting who places frame (7) bottom has spread groove (1), the intermediate position department fixed mounting who places frame (7) top has installation pole (10), the top fixed mounting of installation pole (10) has connecting plate (11), place fixed mounting between the both sides of frame (7) inside and have second mounting panel (18), the intermediate position department fixed mounting at second mounting panel (18) top has bearing seat (17), the both sides of second mounting panel (18) inside all begin spout (12), two the inside of spout (12) all is provided with slider (13), two the top of slider (13) all enough fixed mounting have first mounting panel (14), two the equal fixed mounting in one side of first mounting panel (14) has splint (16), place and install pivot (19) through the bearing between the inside both sides of frame (7), pivot (19) are located under second mounting panel (18), the surface of pivot (19) is provided with two sections screw thread (21), pivot (19) are through two sections internal thread cover (22), two are installed in screw thread (21) the top of internal thread cover (22) respectively with two the bottom fixed connection of slider (13).
2. The screw suspension rod bracket for the building electromechanical engineering according to claim 1, wherein the bottom of each of the four connecting slots (1) is provided with a slot (9), and the middle positions of the two sides of the bottom of each of the four connecting slots (1) and the two sides inside the connecting plate (11) are provided with second mounting holes (8).
3. The screw suspender support for the building electromechanical engineering according to claim 1, wherein side plates (3) are fixedly mounted on both sides of the bottom of the top plate (2), inclined fixing rods (4) are fixedly mounted below one side of the two side plates (3), reinforcing plates (5) are fixedly mounted at the top ends of the two fixing rods (4), and first mounting holes (6) are formed in one side of the inside of the two reinforcing plates (5) and four ends of the inside of the top plate (2).
4. The screw suspension rod support for the building electromechanical engineering according to claim 1, wherein the two clamping plates (16) are both arc-shaped structures, and the top of the bearing seat (17) is an arc-shaped structure.
5. The screw suspender support for the building electromechanical engineering according to claim 1, wherein one side of the two clamping plates (16) and the top of the bearing seat (17) are provided with wear-resistant anti-slip pads (15), and the surfaces of the three wear-resistant anti-slip pads (15) are provided with anti-slip particles.
6. The screw suspender support for the building electromechanical engineering according to claim 1, wherein the two sections of the screw threads (21) have the same length and opposite grain directions, two limit blocks (20) are fixedly mounted on the surface of the rotating shaft (19), and the two sections of the screw threads (21) are respectively located on one side of the two limit blocks (20) and right below the two sliding grooves (12).
7. The screw suspension rod support for the building electromechanical engineering according to claim 1, wherein one end of the rotating shaft (19) penetrates through the placing frame (7) and is fixedly provided with a knob (23), and the outer surface of the knob (23) is provided with anti-skid lines.
CN202122627600.9U 2021-10-29 2021-10-29 Screw suspender support for building electromechanical engineering Expired - Fee Related CN215950596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122627600.9U CN215950596U (en) 2021-10-29 2021-10-29 Screw suspender support for building electromechanical engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122627600.9U CN215950596U (en) 2021-10-29 2021-10-29 Screw suspender support for building electromechanical engineering

Publications (1)

Publication Number Publication Date
CN215950596U true CN215950596U (en) 2022-03-04

Family

ID=80411602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122627600.9U Expired - Fee Related CN215950596U (en) 2021-10-29 2021-10-29 Screw suspender support for building electromechanical engineering

Country Status (1)

Country Link
CN (1) CN215950596U (en)

Similar Documents

Publication Publication Date Title
CN215950596U (en) Screw suspender support for building electromechanical engineering
CN218761864U (en) Screw suspender comprehensive support for building machinery electrical engineering
CN114108846B (en) Concrete prefabricated part connecting structure
CN215600974U (en) Electric construction engineering cable support
CN215859265U (en) Building engineering strutting arrangement
CN213906218U (en) Green building engineering electromechanical pipeline mounting structure
CN209993917U (en) Suspension device for power distribution cabinet
CN211550744U (en) Chemical pipeline supporting device convenient to save space
CN221591976U (en) Water conservancy pipeline bearing structure
CN206298894U (en) A kind of architectural engineering built pile
CN214118081U (en) Roofbolter securing device
CN220882115U (en) Water supply and drainage pipeline fixed bolster
CN210266176U (en) Pipeline fixing device for water conservancy construction
CN219137715U (en) Pipeline foundation pit supporting device
CN213418565U (en) Temporary connecting device for mounting large-span pipe truss support rod
CN216789412U (en) Underground pipe gallery pipeline laying device
CN221402036U (en) Hydraulic engineering pipeline reinforcing apparatus
CN219157975U (en) Multi-angle connecting component for building glass curtain wall
CN212336028U (en) Pile foundation safety fixing device for building engineering
CN215371281U (en) Be used for grout pipeline fixing device
CN215120061U (en) Soft packet of electric wire and cable packing support
CN219138048U (en) Building wall reinforcing structure
CN214543393U (en) Roller type cable support
CN219638116U (en) Stable steel structure engineering support
CN217601401U (en) Novel vacuum combined surcharge preloading pipeline arrangement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220304