CN219137715U - Pipeline foundation pit supporting device - Google Patents

Pipeline foundation pit supporting device Download PDF

Info

Publication number
CN219137715U
CN219137715U CN202320241462.7U CN202320241462U CN219137715U CN 219137715 U CN219137715 U CN 219137715U CN 202320241462 U CN202320241462 U CN 202320241462U CN 219137715 U CN219137715 U CN 219137715U
Authority
CN
China
Prior art keywords
supporting
pipeline
pipe
foundation pit
supporting beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320241462.7U
Other languages
Chinese (zh)
Inventor
黄莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Fengerda Power Installation Co ltd
Original Assignee
Shanghai Fengerda Power Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Fengerda Power Installation Co ltd filed Critical Shanghai Fengerda Power Installation Co ltd
Priority to CN202320241462.7U priority Critical patent/CN219137715U/en
Application granted granted Critical
Publication of CN219137715U publication Critical patent/CN219137715U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/72Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps in street lighting

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline foundation pit supporting device, which has the technical scheme that: the support device comprises four connecting pipes, wherein a plurality of support steel pipes are arranged on one side of each two connecting pipes, and a plurality of support cross beams are arranged between each two connecting pipes; the adjusting part, installation component sets up between two connecting pipes for adjust supporting beam, through setting up the link, when needing the installation pipeline, supporting beam can hinder the pipeline pit down, and the staff can lift supporting beam, makes clamping groove and the fixture block separation of supporting beam bottom, then after the pipeline installation is accomplished, has put supporting beam again, has made things convenient for the staff to carry out the installation of pipeline greatly, through setting up the connecting block, and when the pipeline foundation ditch is longer, needs a plurality of connecting pipes to link together, supports the foundation ditch, can make on the connecting groove card of one of them connecting pipe go into the connecting block on another connecting pipe, thereby improves the holistic compressive resistance of device.

Description

Pipeline foundation pit supporting device
Technical Field
The utility model relates to the technical field of pipeline installation, in particular to a pipeline foundation pit supporting device.
Background
When the pipeline is installed, the foundation pit can be dug in advance in pipeline engineering, after the foundation pit is formed, the side walls of the foundation pit are all fresh soil, and when the pipeline is not installed in time, foundation pit supports can be used for supporting.
According to the application number: the Chinese patent of CN202221481038.1 discloses a foundation pit supporting structure for municipal pipeline construction, which comprises supporting plates, supporting rods, lower supporting feet and lower supporting plates, wherein the supporting plates are arranged on two side walls of a foundation pit, the supporting rods are supported between the upper ends of the two supporting plates, the lower supporting plates are arranged at the bottom of the foundation pit, the lower supporting rods are connected between the supporting plates and the lower supporting plates, and the foundation pit supporting structure further comprises two symmetrically arranged arc plates, the lower ends of the two arc plates extend and are inserted at the bottom of the foundation pit in opposite directions, and the upper ends of the two arc plates penetrate through the lower supporting plates and extend to the upper sides of the lower supporting plates; the upper end and the lower end of the lower supporting rod are respectively hinged with an upper supporting seat and a lower supporting seat, the upper supporting seat is connected with a supporting plate, the lower supporting seat is arranged on the lower supporting plate, and the extending ends of the arc plates are inserted into the lower supporting seat and locked and fixed.
At present, a foundation pit supporting structure for municipal pipeline construction has some defects, such as: some heavy pipelines can be placed in a foundation pit through a crane, and supporting beams between supporting plates can prevent the pipelines from being placed and installed.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a pipeline foundation pit supporting device, which solves the problems that a pipeline can be placed into a foundation pit through a crane due to heavier pipelines, and supporting beams between supporting plates possibly prevent the pipeline from being placed and installed.
The technical aim of the utility model is realized by the following technical scheme:
a pipe foundation pit support device, comprising: the four connecting pipes, one side of each two connecting pipes is provided with a plurality of supporting steel pipes, and a plurality of supporting cross beams are arranged between each two connecting pipes; and the adjusting assembly is arranged between the two connecting pipes and used for adjusting the supporting beam.
Through adopting above-mentioned technical scheme, through setting up installation component, when carrying out the pipeline installation during operation, in order to prevent that soil around the foundation ditch from loosening and collapsing, support the soil on foundation ditch both sides through supporting the steel pipe, in order to improve the support compressive resistance of supporting the steel pipe, can install supporting beam, but supporting beam can prevent the installation of pipeline sometimes, through adjusting part, can carry out the lifting to supporting beam.
Preferably, the channel assembly includes: the mounting device comprises a plurality of mounting blocks, wherein the mounting blocks are fixedly mounted on one side of a left-side connecting pipe, the right side is provided with a plurality of connecting frames, the top surface of a supporting beam is provided with clamping grooves, one side of each mounting block is fixedly provided with a clamping block, the clamping blocks are movably clamped with the clamping grooves, two sides of each connecting frame are provided with connecting holes, two sides of each supporting beam are fixedly provided with connecting columns, and the connecting columns are rotatably sleeved with the connecting holes.
Through adopting above-mentioned technical scheme, through setting up the link, when the installation pipeline is needed, supporting beam can hinder the pipeline pit down, and the staff can lift supporting beam, makes draw-in groove and the fixture block separation of supporting beam bottom, then after the pipeline installation is accomplished, puts supporting beam down again, has made things convenient for the staff to carry out the installation of pipeline greatly.
Preferably, the top surface of the supporting beam is fixedly adhered with an anti-slip pad.
Through adopting above-mentioned technical scheme, through setting up the slipmat, general foundation ditch is longer, when the staff need go the another side from one side, either detour or walk from the foundation ditch bottom, and is very inconvenient, and some staff can walk supporting beam, through the slipmat, in order to prevent that the staff's foot of walking on supporting beam from sliding, falls from supporting beam.
Preferably, a plurality of first fixing holes are formed in one side of the connecting pipe, a second fixing hole is formed in one side of the supporting steel pipe, a connecting bolt is connected to the inner threads of the second fixing hole, and the connecting bolt is connected with the first fixing holes in a threaded mode.
Through adopting above-mentioned technical scheme, through setting up connecting bolt, after pipeline work is accomplished, the staff can screw out connecting bolt from the second fixed orifices, then makes support steel pipe and connecting pipe break away from to the convenience transports the device.
Preferably, the connecting groove is formed in the bottom surface of the connecting pipe, a connecting block is fixedly arranged on one side of the connecting pipe, and the connecting block is movably clamped with the connecting groove.
Through adopting above-mentioned technical scheme, through setting up the connecting block, when the pipeline foundation ditch is longer, need a plurality of connecting pipes to link together, support the foundation ditch, can make on the connecting block on another connecting pipe of spread groove card income of one of them to improve the holistic compressive resistance of device.
Preferably, one side of the connecting pipe is fixedly provided with a plurality of solar LED lamps.
Through adopting above-mentioned technical scheme, through setting up solar energy LED lamp, when working night, can open solar energy LED lamp, provide the illumination for work.
In summary, the utility model has the following advantages:
through setting up the link, when the pipeline is installed to needs, supporting beam can hinder the pipeline pit down, and the staff can lift supporting beam, makes clamping groove and the fixture block separation of supporting beam bottom, then after the pipeline installation was accomplished, put supporting beam down again, has made things convenient for the staff to carry out the installation of pipeline greatly.
Through setting up the connecting block, when the pipeline foundation ditch is longer, need a plurality of connecting pipes to link together, support the foundation ditch, can make on the connecting block on another connecting pipe of the spread groove card of connecting pipe one of them to improve the holistic compressive property of device.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
FIG. 2 is a schematic view of a connecting pipe structure according to the present utility model;
FIG. 3 is a schematic view of the support beam structure of the present utility model;
fig. 4 is a schematic view of the structure of the mounting block of the present utility model.
Reference numerals: 1. a connecting pipe; 2. supporting the steel pipe; 3. a mounting block; 4. a connecting frame; 5. a support beam; 6. a clamping groove; 7. a clamping block; 8. a connecting column; 9. a connection hole; 10. an anti-slip pad; 11. a first fixing hole; 12. a second fixing hole; 13. a connecting bolt; 14. a connecting groove; 15. a connecting block; 16. solar energy LED lamp.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, a pipe foundation pit supporting device includes: the four connecting pipes 1, wherein one side of each two connecting pipes 1 is provided with a plurality of supporting steel pipes 2, and a plurality of supporting cross beams 5 are arranged between each two connecting pipes 1; the adjusting part sets up between two connecting pipes 1 for adjust supporting beam 5, through setting up installation component, when carrying out the pipeline installation during operation, in order to prevent that soil around the foundation ditch from collapsing, support the soil on foundation ditch both sides through supporting steel pipe 2, in order to improve the support compressive resistance of supporting steel pipe 2, can install supporting beam 5, but supporting beam 5 can prevent the installation of pipeline sometimes, through adjusting part, can carry out the lifting to supporting beam 5.
Referring to fig. 2, 3 and 4, the adjustment assembly includes: the utility model provides a plurality of installation piece 3, a plurality of installation piece 3 fixed mounting is in the one side that is located left connecting pipe 1, one side fixed mounting that is located right connecting pipe 1 has a plurality of link 4, draw-in groove 6 has been seted up to the top surface of supporting beam 5, one side fixed mounting of installation piece 3 has fixture block 7, fixture block 7 and draw-in groove 6 movable joint are in the same place, connecting hole 9 has all been seted up to the both sides of link 4, connecting post 8 is all fixed mounting in both sides of supporting beam 5, connecting post 8 and connecting hole 9 rotate the cover and establish together, through setting up link 4, when the installation pipeline is required, supporting beam 5 can hinder the pipeline pit, the staff can lift supporting beam 5, make the draw-in groove 6 and the fixture block 7 separation of supporting beam 5 bottom, then the pipeline installation is accomplished the back, supporting beam 5 has been put down again, the installation of staff's pipeline has been made things convenient for greatly, slipmat 10 is fixed to the top surface of supporting beam 5, through setting up slipmat 10, general longer foundation ditch, when staff need follow another side, either bypass or walk from foundation ditch bottom, very inconvenient, staff can walk some supporting beam 5, drop down at 5 through supporting beam 5, in order to prevent that staff from walking at 5.
Referring to fig. 1 and 2, a plurality of first fixed holes 11 are formed in one side of the connecting pipe 1, a second fixed hole 12 is formed in one side of the supporting steel pipe 2, a connecting bolt 13 is connected to the inner threads of the second fixed hole 12, the connecting bolt 13 is connected with the first fixed hole 11 in a threaded mode, through the arrangement of the connecting bolt 13, after the pipeline work is completed, a worker can unscrew the connecting bolt 13 from the second fixed hole 12, and then the supporting steel pipe 2 is separated from the connecting pipe 1, so that the device is convenient to transport, a connecting groove 14 is formed in the bottom surface of the connecting pipe 1, a connecting block 15 is fixedly arranged on one side of the connecting pipe 1, the connecting block 15 is movably clamped with the connecting groove 14, through the arrangement of the connecting block 15, when a pipeline foundation pit is longer, a plurality of connecting pipes 1 are required to be connected together, the connecting groove 14 of one connecting pipe 1 is clamped into the connecting block 15 on the other connecting pipe 1, accordingly the whole pressure resistance of the device is improved, a plurality of solar LED lamps 16 are fixedly arranged on one side of the connecting pipe 1, the solar LED lamps 16 are not repeated in the structure, and the solar LED lamps 16 can be used for lighting at night when the solar LED lamps 16 are arranged, and the solar LED lamps can be started at night.
Working principle: referring to fig. 1-4, after the supporting steel pipe 2 is inserted into two side walls of the foundation pit by a worker, the connecting pipe 1 is connected to the supporting steel pipe 2 through the connecting bolt 13, when the foundation pit is longer, the connecting groove 14 of one connecting pipe 1 can be clamped into the connecting block 15 on the other connecting pipe 1, so that the overall compression resistance of the device is improved, when a pipeline is required to be installed, the supporting beam 5 can obstruct the pit under the pipeline, the supporting beam 5 can be lifted by the worker, the clamping groove 6 at the bottom of the supporting beam 5 is separated from the clamping block 7, then the supporting beam 5 is placed after the pipeline is installed, the installation of the pipeline by the worker is greatly facilitated, the solar LED lamp 16 can be started when the worker works at night to provide illumination for the work, and after the pipeline work is completed, the connecting bolt 13 can be screwed out from the second fixing hole 12 by the worker, and then the supporting steel pipe 2 is separated from the connecting pipe 1, so that the device is convenient to transport.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A pipe foundation pit supporting device, comprising:
the four connecting pipes (1), wherein one side of each two connecting pipes (1) is provided with a plurality of supporting steel pipes (2), and a plurality of supporting cross beams (5) are arranged between each two connecting pipes (1);
the adjusting component is arranged between the two connecting pipes (1) and used for adjusting the supporting cross beam (5).
2. The pipe foundation pit support device of claim 1, wherein the adjustment assembly comprises:
the utility model provides a connecting hole (9) have all been seted up to one side that a plurality of installation piece (3), a plurality of installation piece (3) fixed mounting is in one side that is located left connecting pipe (1), is located the right side one side fixed mounting of connecting pipe (1) has a plurality of link (4), draw-in groove (6) have been seted up to the top surface of supporting beam (5), one side fixed mounting of installation piece (3) has fixture block (7), fixture block (7) and draw-in groove (6) movable joint together, connecting hole (9) have all been seted up to the both sides of link (4), all fixed mounting has spliced pole (8) in both sides of supporting beam (5), spliced pole (8) are in the same place with connecting hole (9) rotation cover.
3. A pipe foundation pit supporting device according to claim 1, characterized in that the top surface of the supporting beam (5) is fixedly adhered with an anti-slip pad (10).
4. The pipe foundation pit supporting device according to claim 1, wherein a plurality of first fixing holes (11) are formed in one side of the connecting pipe (1), a second fixing hole (12) is formed in one side of the supporting steel pipe (2), a connecting bolt (13) is connected to the second fixing hole (12) through internal threads, and the connecting bolt (13) is connected with the first fixing hole (11) through threads.
5. The pipe foundation pit supporting device according to claim 1, wherein the bottom surface of the connecting pipe (1) is provided with a connecting groove (14), one side of the connecting pipe (1) is fixedly provided with a connecting block (15), and the connecting block (15) is movably clamped with the connecting groove (14).
6. A pipe foundation pit supporting device according to claim 1, characterized in that a plurality of solar LED lamps (16) are fixedly mounted on one side of the connecting pipe (1).
CN202320241462.7U 2023-02-17 2023-02-17 Pipeline foundation pit supporting device Active CN219137715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320241462.7U CN219137715U (en) 2023-02-17 2023-02-17 Pipeline foundation pit supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320241462.7U CN219137715U (en) 2023-02-17 2023-02-17 Pipeline foundation pit supporting device

Publications (1)

Publication Number Publication Date
CN219137715U true CN219137715U (en) 2023-06-06

Family

ID=86594943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320241462.7U Active CN219137715U (en) 2023-02-17 2023-02-17 Pipeline foundation pit supporting device

Country Status (1)

Country Link
CN (1) CN219137715U (en)

Similar Documents

Publication Publication Date Title
CN107477259A (en) A kind of water conservancy construction pipeline fixing device
CN219137715U (en) Pipeline foundation pit supporting device
CN101806151A (en) Iron tower main material replacing device
CN213439564U (en) Civil engineering pipe fitting placing equipment
CN201635416U (en) Device for replacing principle materials of iron tower
CN108843117B (en) Method and device for quickly replacing main material of transmission line iron tower
CN207354189U (en) Photovoltaic panel component
CN214738756U (en) Steel construction building connecting device
CN211693772U (en) Support connecting device that hydraulic engineering pipeline was used
CN214302188U (en) Assembled node structure
CN213393915U (en) Gas pipeline wears floor bearing strutting arrangement
CN212107205U (en) Water conservancy pipeline supports connection structure
CN211423688U (en) A fixed protection device for hydraulic engineering drainage pipe
CN208503655U (en) A kind of Anti-seismic pipeline elevator
CN110469111A (en) A kind of cast-in-place concrete assembled template support construction
CN110714653A (en) Tower structure and method for distribution line water area emergency training
CN206962401U (en) A kind of electrically pipe well composite material cable rack
CN206748385U (en) A kind of construction tool rack easy to use
CN111519913A (en) Steel bar truss building carrier plate for assembly type building
CN220882115U (en) Water supply and drainage pipeline fixed bolster
CN219366993U (en) Slope control device for indoor same-layer drain pipe
CN215330647U (en) Supporting device lower joist for installing shock insulation support on building cut column
CN216690456U (en) Building construction faces limit protection frame fixing device
CN214034843U (en) Large-span steel structure roof supporting structure
CN210423987U (en) Pipeline embedding device for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: Room 2036, 2nd Floor, No. 1336 and 1338 Sixian Road, Songjiang District, Shanghai, 200000

Patentee after: Shanghai Fengerda Power Installation Co.,Ltd.

Address before: Room D302, Floor 5, No. 1500 Tingwei Road, Shanyang Town, Jinshan District, Shanghai, 200000

Patentee before: Shanghai Fengerda Power Installation Co.,Ltd.

CP02 Change in the address of a patent holder