CN215948210U - Anchoring combined device for foundation pit support - Google Patents

Anchoring combined device for foundation pit support Download PDF

Info

Publication number
CN215948210U
CN215948210U CN202122123278.6U CN202122123278U CN215948210U CN 215948210 U CN215948210 U CN 215948210U CN 202122123278 U CN202122123278 U CN 202122123278U CN 215948210 U CN215948210 U CN 215948210U
Authority
CN
China
Prior art keywords
anchor
supporting
anchor cable
foundation pit
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122123278.6U
Other languages
Chinese (zh)
Inventor
闫鹏程
舒蓉
杨全兵
金娅莉
张宗盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Cib Construction Ltd
Original Assignee
Gansu Cib Construction Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Cib Construction Ltd filed Critical Gansu Cib Construction Ltd
Priority to CN202122123278.6U priority Critical patent/CN215948210U/en
Application granted granted Critical
Publication of CN215948210U publication Critical patent/CN215948210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of foundation pit engineering, and discloses an anchoring combination device for foundation pit support, which aims to solve the technical problem that the anchoring effect in the foundation pit support in the prior art cannot be fully exerted or fails. According to the anchoring combination device, the plurality of supporting mechanisms are arranged in the drill hole at intervals, the anchor cable is limited and supported through the supporting mechanisms, so that the position of the anchor cable is stable, the anchoring effect of the anchor cable can be fully exerted, the anchor cable is ensured to be always positioned at the position with the unchanged distance between the centers of the drill holes when entering the drill hole, the grouting pipe is pulled out while grouting is carried out, and the grouting quality of the anchoring section is improved. Thereby ensuring the full play of the anchor section of the anchor cable.

Description

Anchoring combined device for foundation pit support
Technical Field
The utility model relates to the technical field of foundation pit engineering, in particular to an anchoring combined device for foundation pit supporting.
Background
Pile-anchor support and composite soil-nailed wall support measures are often adopted in a support system of foundation pit engineering, and steel strands are mostly adopted as anchor cables in the two support measures. The anchor cable is an active supporting mode which is used for arranging the anchor cable in surrounding rock around the foundation pit, reinforcing rock mass around the foundation pit, enabling the anchor cable to have self-stability and bearing capacity and keeping stability of the surrounding rock around the foundation pit. When the anchor cable enters the drilled hole, the plastic disc is often adopted for centering the anchor cable, the plastic disc is easy to incline or damage, so that the body of the anchor cable body is attached to the hole wall, the anchor cable cannot be centered in the drilled hole, the anchoring effect of the anchor cable cannot be fully exerted or fails, and the technical problem cannot be solved in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problems in foundation pit support in the prior art and provides an anchoring combined device for foundation pit support.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides an anchor composite set for among excavation supporting, includes many anchor ropes, a plurality of supporting mechanism are equipped with at the interval on the many anchor ropes, supporting mechanism is used for spacing and struts the anchor rope, and the one end of many anchor ropes is spacing on spacing dish, and the other end of many anchor ropes is fixed on the direction cap.
Furthermore, the supporting mechanism comprises a circular supporting frame, a plurality of supporting beams are arranged on the supporting frame at intervals along the circumferential direction, and each anchor cable is arranged on one side of each supporting beam.
Furthermore, the inner side of the support frame is provided with a primary grouting pipe.
Further, a secondary grouting pipe is arranged on the side of one of the supporting beams.
Furthermore, the support beams are wave-shaped steel bars welded on the support frame at intervals along the circumferential direction of the support frame.
Furthermore, the support beams are arc-shaped steel bars welded on the support frame at intervals in the circumferential direction of the support frame.
Further, the supporting beams for mounting the secondary grouting pipes are symmetrical arc-shaped reinforcing steel bars.
Further, two groups of arc-shaped reinforcing steel bars are arranged at intervals along the axial direction of the support frame.
Furthermore, a plurality of anchor cable holes for penetrating anchor cables are formed in the limiting disc at intervals along the circumferential direction.
Compared with the prior art, the utility model has the following beneficial effects:
according to the anchoring combination device, the plurality of supporting mechanisms are arranged in the drill hole at intervals, and the anchor cable is limited and supported through the supporting mechanisms, so that the position of the anchor cable is stable, the anchor cable is ensured to be always positioned at the position with the unchanged interval between the centers of the drill holes when entering the drill hole, and the anchoring effect of the anchor cable can be fully exerted.
The grouting pipe and the anchor cable supporting mechanism are effectively combined, and the grouting pipe is pulled out while grouting in the grouting process, so that the grouting quality of the anchoring section is improved, and the full play of the function of the anchor cable anchoring section is ensured.
The anchor cable pile head structure is simple in structure, quick to manufacture, convenient and applicable, low in cost and safe in structure, multipurpose steel pipes and reinforcing steel bar stub bars are manufactured, a new scheme is provided for improving centering of anchor cables in drilled holes and guaranteeing grouting quality, and a good foundation is laid for development of pile anchor supporting and composite soil nailing wall supporting systems.
The anchor cables are spread by the circular support frame, so that the distance between each anchor cable and the center of the drill hole is consistent, and then the support beam and the anchor cables are fixed in a binding mode. The stability of the anchor cable is guaranteed.
According to the utility model, the primary grouting pipe is freely installed in the circular support frame, the secondary grouting pipe is installed on the side part of the support beam, the support beam plays a role of supporting the secondary grouting pipe, and the primary grouting pipe is combined with the secondary grouting pipe, so that the grouting pipe can be pulled out while grouting is changed in the grouting process, and the grouting quality is ensured.
The support beam is a wave-shaped steel bar welded on the support frame at intervals, so that the support beam is convenient to fix with the support frame and is convenient to bind with the anchor cable. And the wavy reinforcing steel bars can be ensured to be contacted with the wall of the drilled hole to slide more easily when the anchor cable is inserted into the drilled hole.
The supporting beams can also be steel bar groups with radians welded on the supporting frame at intervals, so that the anchor cable can be well limited, and the supporting beams at the positions where the secondary grouting pipes are installed are symmetrical radian-type steel bar groups, so that the secondary grouting pipes can be limited under the condition that the anchor cable is limited and bound, and the stability of the secondary grouting pipes is ensured. The limiting disc is used for tensioning the anchor cable after grouting is completed.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a front view of the support mechanism of the present invention.
Fig. 3 is a side view of the support mechanism of the present invention.
Fig. 4 is a schematic view of the position relationship between the support mechanism and the anchor cable according to the present invention.
Fig. 5 is a schematic view of another structure of the supporting mechanism of the present invention.
Fig. 6 is a schematic view of the position relationship between the support mechanism and the anchor cable in fig. 5.
Fig. 7 is a schematic structural view of the limiting plate of the present invention.
The reference numerals have the following meanings: 1. a limiting disc; 2. an anchor cable; 3. a support mechanism; 4. a primary grouting pipe; 5. a guide cap; 6. a support frame; 7. a support beam; 8. a secondary grouting pipe; 9. anchor cable holes; 10. and (4) arc-shaped reinforcing steel bars.
Detailed Description
The utility model is further described with reference to the following figures and detailed description.
Example 1:
as shown in fig. 1-4 and 7, an anchoring combination device for foundation pit support comprises a plurality of anchor cables 2, a plurality of supporting mechanisms 3 are mounted on the plurality of anchor cables 2 at intervals, the supporting mechanisms 3 are used for limiting and opening the anchor cables 2, one ends of the plurality of anchor cables 2 are limited on a limiting disc 1, and the other ends of the plurality of anchor cables 2 are fixed on a guide cap 5. A plurality of anchor cable holes 9 for penetrating the anchor cables 2 are formed in the limiting disc 1 at intervals along the circumferential direction.
The supporting mechanism 3 comprises a circular supporting frame 6, a plurality of supporting beams 7 are arranged on the supporting frame 6 at intervals along the circumferential direction, each anchor cable 2 is arranged on one side of each supporting beam 7, and a primary grouting pipe 4 is arranged on the inner side of the supporting frame 6. And a secondary grouting pipe 8 is arranged on the side part of one of the supporting beams 7. The supporting beams 7 are wave-shaped steel bars welded on the supporting frame 6 at intervals along the circumferential direction of the supporting frame 6.
Correspondingly binding each anchor cable 2 on a supporting beam 7, fixing the end part of each anchor cable 2 on a guide cap 5, then installing a supporting mechanism 3 with the anchor cables 2 into a drilled hole, then installing a primary grouting pipe 4 and a secondary grouting pipe 8, wherein the primary grouting pipe 4 is positioned in a supporting frame 6, the secondary grouting pipe 8 is positioned on the supporting beam 7 outside the supporting frame 6, and the primary grouting pipe 4 and the secondary grouting pipe 8 are pulled out while grouting in the grouting process. After grouting, the anchor cable 2 is tensioned after penetrating through the limiting disc 1, and then the anchor is sealed by using concrete.
Example 2:
this embodiment is the same as embodiment 1 except for the structure of the support beam 7.
In this embodiment, as shown in fig. 5 to 6, the supporting beams 7 are arc-shaped reinforcing bars 10 welded to the supporting frame 6 at intervals along the circumferential direction of the supporting frame 6, the supporting beams 7 for installing the secondary grouting pipes 8 are symmetrical arc-shaped reinforcing bars 12, and two sets of the arc-shaped reinforcing bars 12 are arranged at intervals along the axial direction of the supporting frame 6.

Claims (9)

1. An anchor composite set for in excavation supporting, includes many anchor ropes (2), characterized by: a plurality of supporting mechanisms (3) are arranged on the anchor cables (2) at intervals, the supporting mechanisms (3) are used for limiting and opening the anchor cables (2), one ends of the anchor cables (2) are limited on the limiting disc (1), and the other ends of the anchor cables (2) are fixed on the guide cap (5).
2. An anchor assembly as claimed in claim 1, wherein: the supporting mechanism (3) comprises a circular supporting frame (6), a plurality of supporting beams (7) are arranged on the supporting frame (6) at intervals along the circumferential direction, and each anchor cable (2) is arranged on one side of each supporting beam (7).
3. An anchor assembly as claimed in claim 2, wherein: the inner side of the support frame (6) is provided with a primary grouting pipe (4).
4. An anchor assembly as claimed in claim 3, wherein: and a secondary grouting pipe (8) is also arranged on the side part of one of the supporting beams (7).
5. An anchor assembly as claimed in claim 4, wherein: the supporting beams (7) are wave-shaped reinforcing steel bars welded on the supporting frame (6) at intervals along the circumferential direction of the supporting frame (6).
6. An anchor assembly as claimed in claim 4, wherein: the supporting beam (7) is arc-shaped reinforcing steel bars (10) welded on the supporting frame (6) at intervals in the circumferential direction of the supporting frame (6).
7. An anchor assembly as claimed in claim 6, wherein: the supporting beams (7) used for installing the secondary grouting pipes (8) are symmetrical arc-shaped reinforcing steel bars (12).
8. An anchor assembly as claimed in claim 7, wherein: two groups of arc-shaped reinforcing steel bars (12) are arranged at intervals along the axial direction of the support frame (6).
9. An anchor assembly as claimed in claim 4 or claim 8, wherein: a plurality of anchor cable holes (9) used for penetrating the anchor cables (2) are formed in the limiting disc (1) at intervals along the circumferential direction.
CN202122123278.6U 2021-09-03 2021-09-03 Anchoring combined device for foundation pit support Active CN215948210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122123278.6U CN215948210U (en) 2021-09-03 2021-09-03 Anchoring combined device for foundation pit support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122123278.6U CN215948210U (en) 2021-09-03 2021-09-03 Anchoring combined device for foundation pit support

Publications (1)

Publication Number Publication Date
CN215948210U true CN215948210U (en) 2022-03-04

Family

ID=80431559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122123278.6U Active CN215948210U (en) 2021-09-03 2021-09-03 Anchoring combined device for foundation pit support

Country Status (1)

Country Link
CN (1) CN215948210U (en)

Similar Documents

Publication Publication Date Title
CN210164206U (en) High steep rock slope scaffold puts up conversion equipment
CN112081613B (en) Roadway surrounding rock supporting method capable of applying pretightening force in grading manner
CN211849482U (en) Cable-stayed overhanging type column-free deep foundation pit inner supporting system
CN108005097B (en) High-steep slope top construction/building anchor raft foundation structure and construction method
CN109235471A (en) Quick anchoring component and quick anchoring structure
CN215948210U (en) Anchoring combined device for foundation pit support
CN215594044U (en) Double-row pile supporting system
CN215747863U (en) Assembled engineering steel drilling clamping device
CN215106223U (en) Be used for quick mounting structure of prefabricated wall body
CN209053106U (en) Quick anchoring component and quick anchoring structure
CN210082074U (en) Prestress tension counterforce device for manufacturing pretensioning method prestress double T-shaped beam
CN218622247U (en) Connecting device for circular underground parking garage assembled ring beam
CN219343532U (en) T-shaped open-pore embedded part
CN220668023U (en) Flange connection structure and end support of flexible photovoltaic system
CN204982880U (en) Embedded anchor of prestressed anchorage cable
CN214940330U (en) Support structure of high pile cap in mountain area steep ground
CN221052618U (en) Water stopping device for foundation pit support
CN111236256A (en) Diagonal-pulling overhanging type column-free deep foundation pit inner support system and installation method
CN217231868U (en) Double-row pile supporting construction under complicated geology
CN219825239U (en) Prestressed anchorage cable with disconnect-type direction cap
CN217267432U (en) Novel anchor cable centering support
CN221052564U (en) Full pile casing engaged pile reinforcing cage
CN214883690U (en) Assembled steel shotcrete is connected with fender pile and is used prestressing force node means
CN219411523U (en) Raft steel bar supports auxiliary fixing frame
CN220978034U (en) Deep foundation pit supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 730070 no.516, Beibinhe West Road, Anning District, Lanzhou City, Gansu Province

Patentee after: GANSU CIB CONSTRUCTION LTD.

Address before: 730050 No. 575, Xijin East Road, Qilihe District, Lanzhou, Gansu.

Patentee before: GANSU CIB CONSTRUCTION LTD.