CN215926665U - Hanging basket for plastering exterior wall of constructional engineering - Google Patents

Hanging basket for plastering exterior wall of constructional engineering Download PDF

Info

Publication number
CN215926665U
CN215926665U CN202122414554.4U CN202122414554U CN215926665U CN 215926665 U CN215926665 U CN 215926665U CN 202122414554 U CN202122414554 U CN 202122414554U CN 215926665 U CN215926665 U CN 215926665U
Authority
CN
China
Prior art keywords
plate
hanging
hanging basket
basket body
flower basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122414554.4U
Other languages
Chinese (zh)
Inventor
甘静艳
周剑
王月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Industry Polytechnic College
Original Assignee
Zhejiang Industry Polytechnic College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Industry Polytechnic College filed Critical Zhejiang Industry Polytechnic College
Priority to CN202122414554.4U priority Critical patent/CN215926665U/en
Application granted granted Critical
Publication of CN215926665U publication Critical patent/CN215926665U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model relates to the technical field of hanging baskets, in particular to a hanging basket for plastering an outer wall of a building engineering. The utility model solves the problems that the existing hanging basket only provides a platform for workers and lacks a protection device, the hanging basket generally works aloft, and constructors in the hanging basket are dangerous if the hanging basket drops from the high altitude.

Description

Hanging basket for plastering exterior wall of constructional engineering
Technical Field
The utility model relates to the technical field of hanging baskets, in particular to a hanging basket for plastering an outer wall of constructional engineering.
Background
The hanging basket is required to be used in high-altitude operations such as outer wall construction, curtain wall installation, heat preservation construction, maintenance and cleaning of the outer wall and the like of a high-rise building, and constructors can walk on a hanging basket bottom plate to perform operation.
When many high-rise building outer walls need to be painted and other protection operations, a building unit can use the hanging basket for operation, but the existing hanging basket usually only provides a platform for workers and lacks a protection device, and the hanging basket generally works aloft, so that the constructors in the hanging basket can be dangerous if falling from the high altitude.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problem that the display screen is easily scratched when an existing land area measuring instrument is placed in a pocket, and provides a hanging basket for plastering an outer wall of a building engineering.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides a building engineering outer wall whitewashes uses hanging flower basket, includes hanging flower basket body and protector, the surperficial swing joint of hanging flower basket body has the switch door, the top fixed surface of hanging flower basket body installs two bracing pieces, the surface of bracing piece is rotated and is connected with the guard plate, the surface of hanging flower basket body is equipped with protector, protector includes two risers, two the riser symmetric distribution is at the top surface of hanging flower basket body, the surface of riser is seted up flutedly, the one end fixed surface that the bracing piece was kept away from to the guard plate installs two fixture blocks, the one end that the guard plate was kept away from to the fixture block is located the inside of recess. The setting of bracing piece has played the effect of supporting the guard plate, and the setting of guard plate has played the effect that prevents that the high altitude junk from directly pounding constructor in the hanging flower basket, and the setting of fixture block and recess has played the effect that makes the guard plate cover in the hanging flower basket body top.
Preferably, the side fixed mounting of riser has two slide bars, the surperficial sliding connection of slide bar has the slider, two fixed mounting has the fixed plate between the slider. The slide bar is arranged to play a role in supporting the slide block, and the slide block is arranged to play a role in supporting the fixing plate.
Preferably, the fixed surface of the fixed plate is fixedly provided with an inserting rod, the surface of the clamping block is provided with a jack, and one end of the inserting rod, which is far away from the fixed plate, is located inside the jack. The arrangement of the inserted bar and the insertion hole has the effect of fixing the fixture block in the groove.
Preferably, the surface fixed mounting of fixed plate has the spring, the one end and the riser fixed connection that the fixed plate was kept away from to the spring, the one end fixed mounting that the spring was kept away from to the fixed plate has the handle that draws. The spring is arranged to limit the position of the fixing plate, and the pull handle is arranged to drive the fixing plate to move.
Preferably, the side of hanging flower basket body is equipped with auxiliary device, auxiliary device includes the backup pad, the side of backup pad and hanging flower basket body rotates the connection, the bottom surface sliding connection of backup pad has two swinging arms. The setting of backup pad has played the effect of conveniently placing construction tool, and the setting of swinging arms has played and has driven backup pad pivoted effect.
Preferably, the side of hanging flower basket body has seted up the spout, the inside fixed mounting of spout has electronic liter telescopic link, the output fixed mounting of electronic liter telescopic link has the slide. The arrangement of the electric telescopic rod plays a role in driving the sliding plate to move in the sliding groove.
Preferably, a transverse plate is fixedly mounted on the surface of the sliding plate, and one end, far away from the supporting plate, of the swinging rod is hinged with the transverse plate. The arrangement of the transverse plate has the effect of supporting the swinging rod. The transverse plate and the swinging rod are hinged to achieve the effect that the transverse plate can drive the swinging rod to rotate when moving.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. in the utility model, through arranging the protective device, when workers in the hanging basket body need to be protected, the pull handle is pulled firstly, the pull handle drives the fixed plate to move, the fixed plate moves to drive the spring to stretch and simultaneously drive the sliding block to slide on the surface of the sliding rod, meanwhile, the fixed plate also drives the inserted rod to move, the inserted rod moves to enable the inserted rod to move out of the groove, then the protective plate is rotated, a clamping block on the surface of the protective plate is clamped into the groove, when the clamping block is clamped into the clamping groove, the pull handle is loosened, the inserted rod is inserted into the jack by utilizing the resilience force of the spring, the clamping block is firmly fixed in the groove by the inserted rod and the jack, the clamping block and the groove are fixed, and the protective plate is covered above the hanging basket body, when objects at high altitude drop, the inserted rod firstly falls into the protective plate, and the constructors in the hanging basket are prevented from being directly hit by the objects at high altitude, the safety hanging basket brings harm to the body of constructors, and the safety of the constructors in the construction in the hanging basket is further improved.
2. According to the tool bag, the auxiliary device is arranged, when tools required by construction need to be placed, the electric lifting and contracting rod is opened and drives the sliding plate to move upwards in the sliding groove, the sliding plate moves upwards in the sliding groove and drives the transverse plate to move, the transverse plate moves and drives the swinging rod to push the supporting plate to rotate, so that the supporting plate rotates from a vertical state to a horizontal state, when the supporting plate is in the horizontal state, the electric lifting and contracting rod is closed, tools required by construction can be placed on the surface of the supporting plate, through the matching of the structure, the construction tools in the tool bag can be placed on the surface of the supporting plate conveniently, the tools are prevented from being placed in the tool bag in a mess manner, a large amount of time is required when the tools are found, and further adverse influence is brought to the construction progress.
Drawings
FIG. 1 is a schematic perspective view of a hanging basket for plastering exterior walls of construction engineering according to the present invention;
FIG. 2 is a schematic structural view of the other side of a hanging basket for plastering exterior walls of construction engineering provided by the utility model;
FIG. 3 is a schematic structural view of a hanging basket for painting an exterior wall of a construction project at A in FIG. 1;
fig. 4 is a schematic structural view of a hanging basket for plastering exterior walls of construction engineering shown in the position B in fig. 2.
Illustration of the drawings:
1. a basket body; 2. opening and closing the door; 3. a support bar; 4. a protection plate; 5. a guard; 501. a vertical plate; 502. a groove; 503. a clamping block; 504. a jack; 505. a slide bar; 506. a slider; 507. a fixing plate; 508. inserting a rod; 509. a spring; 510. pulling a handle; 6. an auxiliary device; 61. a support plate; 62. a chute; 63. an electric telescopic rod; 64. a slide plate; 65. a transverse plate; 66. a swing lever.
Detailed Description
In order that the above objects, features and advantages of the present invention can be more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and thus the present invention is not limited to the specific embodiments of the present disclosure.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a building engineering outer wall whitewashes uses hanging flower basket, includes hanging flower basket body 1 and protector 5, and the surperficial swing joint of hanging flower basket body 1 has switch door 2, and the fixed surface in top of hanging flower basket body 1 installs two bracing pieces 3, and the surface of bracing piece 3 rotates and is connected with guard plate 4, and the surface of hanging flower basket body 1 is equipped with protector 5.
The specific arrangement and function of the guard 5 and the auxiliary device 6 will be described in detail below.
In this embodiment: protector 5 includes two risers 501, and two risers 501 symmetric distribution are at the top surface of hanging flower basket body 1, and recess 502 is seted up on riser 501's surface, and protection plate 4 keeps away from the one end fixed surface of bracing piece 3 and installs two fixture blocks 503, and the one end that protection plate 4 was kept away from to fixture block 503 is located the inside of recess 502.
In this embodiment: the setting of bracing piece 3 has played the effect of supporting guard plate 4, and the setting of guard plate 4 has played the effect that prevents that the high altitude junk from directly pounding constructor in the hanging flower basket, and the setting of fixture block 503 and recess 502 has played the effect that makes guard plate 4 can cover in hanging flower basket body 1 top.
Specifically, two sliding rods 505 are fixedly mounted on the side surfaces of the vertical plates 501, sliding blocks 506 are slidably connected to the surfaces of the sliding rods 505, and a fixing plate 507 is fixedly mounted between the two sliding blocks 506.
In this embodiment: the slide bar 505 is provided to have an effect of supporting the slider 506, and the slider 506 is provided to have an effect of supporting the fixing plate 507.
Specifically, an insertion rod 508 is fixedly mounted on the surface of the fixing plate 507, an insertion hole 504 is formed in the surface of the fixture block 503, and one end of the insertion rod 508, which is far away from the fixing plate 507, is located inside the insertion hole 504. The provision of plunger 508 and socket 504 provides the effect of securing latch 503 within recess 502.
Specifically, a spring 509 is fixedly mounted on the surface of the fixing plate 507, one end of the spring 509, which is far away from the fixing plate 507, is fixedly connected with the vertical plate 501, and one end of the fixing plate 507, which is far away from the spring 509, is fixedly mounted with a pull handle 510. The spring 509 is arranged to limit the position of the fixing plate 507, and the pull handle 510 is arranged to drive the fixing plate 507 to move.
In this embodiment: the side of hanging flower basket body 1 is equipped with auxiliary device 6, and auxiliary device 6 includes backup pad 61, and backup pad 61 and the side of hanging flower basket body 1 rotate to be connected, and two swinging arms 66 are connected to the bottom surface sliding connection of backup pad 61.
Specifically, the side of the hanging basket body 1 is provided with a sliding groove 62, an electric telescopic rod 63 is fixedly mounted inside the sliding groove 62, and a sliding plate 64 is fixedly mounted at the output end of the electric telescopic rod 63.
In this embodiment: the arrangement of the electric telescopic rod 63 has the effect of driving the sliding plate 64 to move in the sliding groove 62.
Specifically, a transverse plate 65 is fixedly mounted on the surface of the sliding plate 64, and one end of the swinging rod 66 far away from the supporting plate 61 is hinged with the transverse plate 65.
In this embodiment: the provision of the cross plate 65 has the effect of supporting the swing lever 66. The transverse plate 65 and the swinging rod 66 are hinged to each other, so that the transverse plate 65 can move to drive the swinging rod 66 to rotate.
The working principle is as follows: by arranging the protection device 5, when workers in the hanging basket body 1 need to be protected, firstly, the pull handle 510 is pulled, the pull handle 510 drives the fixing plate 507 to move, the fixing plate 507 moves to drive the spring 509 to stretch and simultaneously drive the sliding block 506 to slide on the surface of the sliding rod 505, meanwhile, the fixing plate 507 moves to drive the inserting rod 508 to move, the inserting rod 508 moves to enable the inserting rod 508 to move out of the groove 502, at the moment, the protection plate 4 rotates to enable the fixture block 503 on the surface of the protection plate 4 to be clamped into the groove 502, when the fixture block 503 is clamped into the groove, the pull handle 510 is loosened, the inserting rod 508 is inserted into the insertion hole 504 by utilizing the resilience force of the spring 509, the fixture block 503 is firmly fixed in the groove 502 by the insertion of the inserting rod 508 and the insertion hole 504, the fixture block 503 and the groove 502 are fixed, and the protection plate 4 is covered above the hanging basket body 1 by the matching of the structures, when an object falls from the high altitude, the object can fall into the protection plate 4 firstly, so that the problem that the object falls from the high altitude directly hits constructors in the hanging basket is avoided, harm is brought to the health of the constructors, and the construction safety of the constructors in the hanging basket is further improved. When tools required by construction need to be placed, the electric telescopic rod 63 is opened, the electric telescopic rod 63 drives the sliding plate 64 to move upwards in the sliding groove 62, the sliding plate 64 moves upwards in the sliding groove 62 to drive the transverse plate 65 to move, the transverse plate 65 moves to drive the swinging rod 66 to push the supporting plate 61 to rotate, the supporting plate 61 is enabled to rotate to a horizontal state from a vertical state, when the supporting plate 61 is in the horizontal state, the electric telescopic rod 63 is closed, the tools required by construction can be placed on the surface of the supporting plate 61, through the matching of the structure, the construction tools in the tool kit can be placed on the surface of the supporting plate 61 conveniently, the tools are prevented from being placed in the tool kit in a mess, a large amount of time is needed when the tools are found, and further adverse effects are brought to the construction progress.
The above description is only a preferred embodiment of the present invention, and not intended to limit the present invention in other forms, and any person skilled in the art may apply the above modifications or changes to the equivalent embodiments with equivalent changes, without departing from the technical spirit of the present invention, and any simple modification, equivalent change and change made to the above embodiments according to the technical spirit of the present invention still belong to the protection scope of the technical spirit of the present invention.

Claims (7)

1. The utility model provides a building engineering outer wall whitewashes uses hanging flower basket, includes hanging flower basket body (1) and protector (5), its characterized in that: the surperficial swing joint of hanging flower basket body (1) has switch door (2), the top fixed surface of hanging flower basket body (1) installs two bracing pieces (3), the surface of bracing piece (3) is rotated and is connected with guard plate (4), the surface of hanging flower basket body (1) is equipped with protector (5), protector (5) include two riser (501), two riser (501) symmetric distribution is at the top surface of hanging flower basket body (1), the surface of riser (501) is seted up flutedly (502), the one end fixed surface that bracing piece (3) were kept away from in guard plate (4) installs two fixture blocks (503), the one end that guard plate (4) were kept away from in fixture block (503) is located the inside of recess (502).
2. The hanging basket for plastering exterior walls of constructional engineering as claimed in claim 1, wherein: two slide bars (505) are fixedly mounted on the side surface of the vertical plate (501), a slide block (506) is connected to the surface of each slide bar (505) in a sliding manner, and a fixing plate (507) is fixedly mounted between the slide blocks (506).
3. The hanging basket for plastering exterior walls of constructional engineering as claimed in claim 2, wherein: an inserting rod (508) is fixedly installed on the surface of the fixing plate (507), an inserting hole (504) is formed in the surface of the clamping block (503), and one end, far away from the fixing plate (507), of the inserting rod (508) is located inside the inserting hole (504).
4. The hanging basket for plastering exterior walls of constructional engineering as claimed in claim 2, wherein: the fixed surface mounting of fixed plate (507) has spring (509), the one end and riser (501) fixed connection that fixed plate (507) were kept away from in spring (509), the one end fixed mounting that spring (509) were kept away from in fixed plate (507) has pull handle (510).
5. The hanging basket for plastering exterior walls of constructional engineering as claimed in claim 1, wherein: the side of hanging flower basket body (1) is equipped with auxiliary device (6), auxiliary device (6) are including backup pad (61), the side of backup pad (61) and hanging flower basket body (1) is rotated and is connected, the bottom surface sliding connection of backup pad (61) has two swinging arms (66).
6. The hanging basket for plastering exterior walls of constructional engineering as claimed in claim 5, wherein: the hanging basket is characterized in that a sliding groove (62) is formed in the side face of the hanging basket body (1), an electric lifting and contracting rod (63) is fixedly mounted inside the sliding groove (62), and a sliding plate (64) is fixedly mounted at the output end of the electric lifting and contracting rod (63).
7. The hanging basket for plastering exterior walls of constructional engineering as claimed in claim 6, wherein: and a transverse plate (65) is fixedly arranged on the surface of the sliding plate (64), and one end of the swinging rod (66) far away from the supporting plate (61) is hinged with the transverse plate (65).
CN202122414554.4U 2021-10-08 2021-10-08 Hanging basket for plastering exterior wall of constructional engineering Expired - Fee Related CN215926665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122414554.4U CN215926665U (en) 2021-10-08 2021-10-08 Hanging basket for plastering exterior wall of constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122414554.4U CN215926665U (en) 2021-10-08 2021-10-08 Hanging basket for plastering exterior wall of constructional engineering

Publications (1)

Publication Number Publication Date
CN215926665U true CN215926665U (en) 2022-03-01

Family

ID=80407134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122414554.4U Expired - Fee Related CN215926665U (en) 2021-10-08 2021-10-08 Hanging basket for plastering exterior wall of constructional engineering

Country Status (1)

Country Link
CN (1) CN215926665U (en)

Similar Documents

Publication Publication Date Title
CN215926665U (en) Hanging basket for plastering exterior wall of constructional engineering
CN207538034U (en) A kind of small movable piling machine
CN214834620U (en) Supporting platform for lighting well
CN115122292A (en) Auxiliary tool box for maintenance
CN216893416U (en) Building construction safety device
CN216553148U (en) Safety device for construction
CN214365084U (en) Ground safety device for construction
CN214089499U (en) Circular pier stud reinforced concrete construction platform of bridge
CN211396526U (en) Building external climbing type building construction operation platform
CN209799297U (en) Scaffold for interior decoration
CN210067410U (en) Support device for climbing scaffold
CN210051683U (en) Dustproof test box
CN209924389U (en) Mechanized high-efficient construction equipment of view wall
CN216272546U (en) Cage protection device for civil engineering construction
CN218990831U (en) Wall masonry equipment
CN212288190U (en) Breaker for architectural decoration engineering
CN205383788U (en) Hanging furnace
CN218149691U (en) Anti-falling device for building curtain wall construction
CN219298726U (en) Hanging basket for constructional engineering
CN219557121U (en) Curtain washs with adjustable string inserted bar that hangs
CN210105233U (en) Auxiliary device for assembling shutter
CN218502473U (en) Wax matrix fire retardant coating spraying mechanism
CN212978221U (en) Aerated concrete block vertical drilling device
CN218340567U (en) A clearance instrument for pre-buried line box of roof
CN213576498U (en) Shock-absorbing device of civil air defense equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220301