CN215926262U - Assembled prefabricated house that building engineering used - Google Patents

Assembled prefabricated house that building engineering used Download PDF

Info

Publication number
CN215926262U
CN215926262U CN202121889263.4U CN202121889263U CN215926262U CN 215926262 U CN215926262 U CN 215926262U CN 202121889263 U CN202121889263 U CN 202121889263U CN 215926262 U CN215926262 U CN 215926262U
Authority
CN
China
Prior art keywords
fixing
column
fixing column
plate
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121889263.4U
Other languages
Chinese (zh)
Inventor
牟子文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Henglida Steel Structure Co ltd
Original Assignee
Weifang Henglida Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Henglida Steel Structure Co ltd filed Critical Weifang Henglida Steel Structure Co ltd
Priority to CN202121889263.4U priority Critical patent/CN215926262U/en
Application granted granted Critical
Publication of CN215926262U publication Critical patent/CN215926262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses an assembled movable board house for constructional engineering, which comprises a bottom pillar, wherein a positioning plate is arranged outside the bottom pillar, a positioning hole is formed in the middle of the positioning plate, a nut is arranged at one end of the bottom pillar, a first fixing hole is formed in the middle of a first fixing plate, a second fixing hole is formed in one end of the first fixing hole, mounting structures are arranged in the first fixing hole and the second fixing hole, a wall body is arranged in each mounting structure, a perforating block is arranged at one end of each mounting structure, a steel wire rope is arranged in each perforating block, a placing groove is formed in the top of each mounting structure, a top plate is arranged in each placing groove, and a second fixing plate is arranged on one side of each top plate. The utility model discloses a be provided with first bottom plate, locating plate and foundation etc. make its activity board house installation back more fixed to the condition that follow-up activity board house probably sinks has been prevented.

Description

Assembled prefabricated house that building engineering used
Technical Field
The utility model relates to the related technical field of constructional engineering, in particular to an assembled movable board house for constructional engineering.
Background
The board house is an environment-friendly economical movable board house which is a brand-new concept and takes light steel as a framework, a sandwich board as a surrounding material and a standard modulus series for space surrounding, can be assembled and disassembled, realizes the universal standardization of temporary buildings, and establishes the building concepts of environment protection, energy conservation, rapidness and high efficiency, but the following problems exist in the use process of the existing movable board house.
1. The existing assembled movable plank house needs to be paved with cement ground as an installation bottom surface before installation, the preparation working time is long, the working strength is high, and the cement ground is removed and recycled, so that the environmental protection property of the plank house is reduced;
2. the current assembly type activity needs a large amount of screws for fastening, so that the time required by installation is long, and the wall body cannot be tightly connected, so that the wall body is easy to loosen.
We therefore propose an assembled portable housing for construction work to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an assembled movable board house for constructional engineering, which solves the problems that the assembled movable board house in the market at present needs to be paved with cement ground as an installation bottom surface before installation, the preparation working time is long, the working strength is high, the cement ground is dismantled and recycled, the environmental protection performance of the board house is reduced, and a large amount of screws are needed for fastening during assembly, so that the installation time is long, the wall bodies cannot be tightly connected, and the wall bodies are easy to loosen.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an assembled movable plate house that building engineering used, includes the foundation, the foundation outside is provided with the locating plate, and is provided with the locating hole in the middle of the locating plate to foundation one end is provided with the nut, be provided with first bottom plate and second bottom plate below the nut, and be provided with the tarpaulin below the first bottom plate to be provided with first fixed plate above the first bottom plate, be provided with first fixed orifices in the middle of the first fixed plate, and first fixed orifices one end is provided with the second fixed orifices to be provided with mounting structure in first fixed orifices and the second fixed orifices, be provided with the wall body in the mounting structure, and mounting structure one end is provided with the piece of perforating to be provided with wire rope in the piece of perforating, the mounting structure top is provided with the standing groove, and is provided with the roof in the standing groove to roof one side is provided with the second fixed plate.
Preferably, the bottom pillar is internally provided with positioning holes at equal intervals, one end of the bottom pillar is a pointed end, and the other end of the bottom pillar is provided with threads.
Preferably, the first bottom plate is symmetrically provided with two first fixing holes, the first fixing holes and the second fixing columns are identical in shape, and the first bottom plate and the second bottom plate are in contact with each other.
Preferably, the mounting structure is composed of a first fixing column, a second fixing column, a third fixing column and a fourth fixing column, the second fixing column is arranged on one side of the first fixing column, and the third fixing column and the fourth fixing column are arranged behind the first fixing column and the second fixing column.
Preferably, first fixed column, second fixed column, third fixed column and fourth fixed column one side all are provided with the perforation piece, wire rope passes the perforation piece and fixes with the locker to first fixed column one end is provided with the spacing screw.
Preferably, the first fixing column and the second fixing column are higher than the third fixing column and the fourth fixing column, one ends of the first fixing column, the second fixing column, the third fixing column and the fourth fixing column are pointed ends, and the first fixing column and the third fixing column are identical in shape.
Compared with the prior art, the utility model has the beneficial effects that: the assembled movable plank house for the construction engineering,
1. the positioning plate is arranged outside the bottom column and provided with positioning holes, so that the positioning plate can be fixed outside the bottom column through pins, and can be fixed to different positions without paving cement lands to avoid subsequent disassembly work, and the positioning plate has the function of preventing the movable board house from sinking;
2. be provided with first fixed column, second fixed column, third fixed column, fourth fixed column on first bottom plate and the second bottom plate, make its activity board house reduce the use of a large amount of screws, and do benefit to through the repetition of first bottom plate and second bottom plate for the board house is green more, the installation cost of saving, and be provided with spacing screw on the first fixed column, can promote the wall to the opposite side after the rotation, makes its wall body more firm.
Drawings
FIG. 1 is a schematic view of the overall front cross-sectional structure of the present invention;
FIG. 2 is a left side view of the present invention;
FIG. 3 is a schematic view of the overall top cross-sectional structure of the present invention;
FIG. 4 is a schematic view of a connection structure of a first base plate and a second base plate according to the present invention;
FIG. 5 is a schematic perspective view of a bottom pillar according to the present invention;
in the figure: 1. a bottom pillar; 2. positioning a plate; 3. positioning holes; 4. waterproof cloth; 5. a nut; 6. a first base plate; 7. a second base plate; 8. a first fixing plate; 9. a mounting structure; 91. a first fixed column; 92. a second fixed column; 93. a third fixing column; 94. a fourth fixed column; 10. a top plate; 11. a wall body; 12. a limiting screw; 13. a wire rope; 14. perforating blocks; 15. a placement groove; 16. a second fixing plate; 17. a first fixing hole; 18. and a second fixing hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: an assembled movable board house for constructional engineering, which comprises a bottom pillar 1, a positioning plate 2 arranged outside the bottom pillar 1, a positioning hole 3 arranged in the middle of the positioning plate 2, and one end of the bottom column 1 is provided with a nut 5, a first bottom plate 6 and a second bottom plate 7 are arranged below the nut 5, a waterproof cloth 4 is arranged below the first bottom plate 6, and the first bottom plate 6 is provided with a first fixing plate 8, a first fixing hole 17 is arranged in the middle of the first fixing plate 8, one end of the first fixing hole 17 is provided with a second fixing hole 18, and the first fixing hole 17 and the second fixing hole 18 are internally provided with an installation structure 9, the installation structure 9 is internally provided with a wall body 11, one end of the installation structure 9 is provided with a perforation block 14, and a steel wire rope 13 is arranged in the perforation block 14, a placing groove 15 is arranged at the top of the mounting structure 9, and a top plate 10 is provided in the placing groove 15, and a second fixing plate 16 is provided at one side of the top plate 10.
1 inside equidistant locating hole 3 that is provided with of foundation column, and 1 one end of foundation column is the tip setting to the 1 other end of foundation column is provided with the screw thread, makes in 1 tip setting of its foundation column more inserts soil, more easy to assemble, and locating hole 3 can accurate installation locating plate 2.
The symmetry is provided with two first fixed orificess 17 on the first bottom plate 6, and first fixed orificess 17 is the same with second fixed column 92 shape, and first bottom plate 6 and the contact of second bottom plate 7 are connected for second fixed column 92 inserts first fixed orificess 17 and can not remove, makes overall structure more stable, and the setting of first bottom plate 6 and second bottom plate 7, makes need not lay cement ground, makes it can repeatedly do benefit to, has increased the feature of environmental protection of board house.
The mounting structure 9 is composed of a first fixing column 91, a second fixing column 92, a third fixing column 93 and a fourth fixing column 94, the second fixing column 92 is arranged on one side of the first fixing column 91, and the third fixing column 93 and the fourth fixing column 94 are arranged behind the first fixing column 91 and the second fixing column 92, so that the mounting is more convenient, and the firmness degree is further improved after the mounting.
The first fixing column 91, the second fixing column 92, the third fixing column 93 and the fourth fixing column 94 are respectively provided with a perforated block 14 on one side, the steel wire rope 13 penetrates through the perforated block 14 and is fixed through a locker, and one end of the first fixing column 91 is provided with a limiting screw 12, so that the positions of the first fixing column 91, the second fixing column 92, the third fixing column 93 and the fourth fixing column 94 are fixed by tightening the steel wire rope 13, and the whole structure is firmer.
The first fixing column 91 and the second fixing column 92 are higher than the third fixing column 93 and the fourth fixing column 94, one end of each of the first fixing column 91, the second fixing column 92, the third fixing column 93 and the fourth fixing column 94 is in a pointed end arrangement, the first fixing column 91 and the third fixing column 93 are identical in shape, the pointed end arrangement is easier to insert into soil, the first fixing column 91 and the second fixing column 92 are higher than the third fixing column 93 and the fourth fixing column 94, the top plate 10 is an inclined plane during installation, and drainage is facilitated.
The working principle is as follows: firstly, after an installer transports materials to a place needing installation, the installer inserts the bottom pillar 1 into the soil deeply according to the position needed by installation, meanwhile, the installer ensures that one end of the bottom pillar 1 is flush, then the bottom pillar 1 is placed on the bottom pillar through a hole on the positioning plate 2, after the positioning plate 2 contacts the ground, a pin is inserted into the positioning hole 3 to prevent the subsequent sinking of the prefabricated house, so that the house is safer, after the operation is finished, the installer installs the waterproof cloth 4 at one end of the bottom pillar 1, then installs the first bottom plate 6 and the second bottom plate 7 on the waterproof cloth 4, then screws one end of the bottom pillar 1 on the nut 5 to fix the positions of the first bottom plate 6 and the second bottom plate 7, then fixes the first fixing plate 8 on the first bottom plate 6 and the second bottom plate 7 through screws, and after the fixation is finished, the operator uses equipment to sequentially fix the first fixing column 91, The second fixing column 92, the third fixing column 93 and the fourth fixing column 94 are deeply inserted into the soil through the first fixing hole 17 and the second fixing hole 18, then the wall 11 is installed inside the first fixing column 91, the second fixing column 92, the third fixing column 93 and the fourth fixing column 94 by using equipment, after the installation is finished, an installer rotates the limiting screw 12 to push the wall 11 to the other side, so that the wall 11 is more stable, the limiting screw 12 is rotated down, the subsequent disassembly is more convenient, then the steel wire rope 13 passes through the hole penetrating block 14 and is tightened by using a locker, after the tightening is finished, the top plate 10 is installed on the first fixing column 91, the second fixing column 92, the third fixing column 93 and the fourth fixing column 94 through the placing groove 15 by using equipment, finally the second fixing plate 16 is fixed outside the placing groove 15 by using screws, the movement of the top plate 10 is prevented, at this time, the operation and installation are finished, when the disassembly is needed, the movable board house is convenient to disassemble, the first fixing column 91, the second fixing column 92, the third fixing column 93 and the fourth fixing column 94 can be sequentially pulled out by sleeving the ropes on the placing groove 15, then the bottom columns 1 are pulled out by sleeving the ropes below the positioning plate 2, so that the disassembling efficiency is higher, the size of the movable board house can be increased or reduced by increasing or reducing corresponding parts of the second bottom plate 7, and the content which is not described in detail in the specification belongs to the prior art which is known by technicians in the field.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides an assembled portable house that building engineering used, includes foundation (1), its characterized in that: the outer part of the bottom pillar (1) is provided with a positioning plate (2), the middle of the positioning plate (2) is provided with a positioning hole (3), one end of the bottom pillar (1) is provided with a nut (5), a first bottom plate (6) and a second bottom plate (7) are arranged below the nut (5), a waterproof cloth (4) is arranged below the first bottom plate (6), a first fixing plate (8) is arranged above the first bottom plate (6), a first fixing hole (17) is arranged in the middle of the first fixing plate (8), a second fixing hole (18) is arranged at one end of the first fixing hole (17), installation structures (9) are arranged in the first fixing hole (17) and the second fixing hole (18), a wall body (11) is arranged in the installation structures (9), a perforation block (14) is arranged at one end of the installation structures (9), and a steel wire rope (13) is arranged in the perforation block (14), a placing groove (15) is formed in the top of the mounting structure (9), a top plate (10) is arranged in the placing groove (15), and a second fixing plate (16) is arranged on one side of the top plate (10).
2. The assembled prefabricated house for construction engineering according to claim 1, wherein: locating holes (3) are formed in the bottom column (1) at equal intervals, one end of the bottom column (1) is arranged in a pointed manner, and threads are arranged at the other end of the bottom column (1).
3. The assembled prefabricated house for construction engineering according to claim 1, wherein: two first fixing holes (17) are symmetrically formed in the first bottom plate (6), the first fixing holes (17) are the same as the second fixing columns (92), and the first bottom plate (6) is in contact with the second bottom plate (7).
4. The assembled prefabricated house for construction engineering according to claim 1, wherein: the mounting structure (9) is composed of a first fixing column (91), a second fixing column (92), a third fixing column (93) and a fourth fixing column (94), the second fixing column (92) is arranged on one side of the first fixing column (91), and the third fixing column (93) and the fourth fixing column (94) are arranged behind the first fixing column (91) and the second fixing column (92).
5. The assembled prefabricated house for construction engineering according to claim 4, wherein: first fixed column (91), second fixed column (92), third fixed column (93) and fourth fixed column (94) one side all are provided with perforation piece (14), wire rope (13) pass perforation piece (14) and fix with the locker to first fixed column (91) one end is provided with spacing screw (12).
6. The assembled prefabricated house for construction engineering according to claim 4, wherein: the first fixing column (91) and the second fixing column (92) are higher than the third fixing column (93) and the fourth fixing column (94), one ends of the first fixing column (91), the second fixing column (92), the third fixing column (93) and the fourth fixing column (94) are arranged as pointed ends, and the first fixing column (91) and the third fixing column (93) are identical in shape.
CN202121889263.4U 2021-08-12 2021-08-12 Assembled prefabricated house that building engineering used Active CN215926262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121889263.4U CN215926262U (en) 2021-08-12 2021-08-12 Assembled prefabricated house that building engineering used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121889263.4U CN215926262U (en) 2021-08-12 2021-08-12 Assembled prefabricated house that building engineering used

Publications (1)

Publication Number Publication Date
CN215926262U true CN215926262U (en) 2022-03-01

Family

ID=80422868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121889263.4U Active CN215926262U (en) 2021-08-12 2021-08-12 Assembled prefabricated house that building engineering used

Country Status (1)

Country Link
CN (1) CN215926262U (en)

Similar Documents

Publication Publication Date Title
CN111305456A (en) Assembled wall and construction process thereof
CN215926262U (en) Assembled prefabricated house that building engineering used
CN213174179U (en) Assembled building protective wall
CN105401656A (en) Assembling type flexible building structure prefabricated part nodes connection method
CN105672496A (en) CLT (Cross Laminated Timber) wall-board connecting structure and connecting method thereof
CN105544743A (en) Light weight wallboard pre-stress connection method
CN212715736U (en) Building outer wall decorative wallboard
CN212001705U (en) Wallboard is used in civil engineering construction
CN210195448U (en) Prefabricated enclosure of assembled concrete
CN210104957U (en) Assembled steel construction building
CN112431302A (en) Fabricated building and fabricated building construction method
CN215926748U (en) Assembly type building structure
CN219773269U (en) Assembled support frame
CN215054523U (en) Assembled building board with side lock catch reinforcing structure
CN211775042U (en) Assembled concrete wall
CN220539066U (en) Heat preservation decorative board for construction
CN213509613U (en) Novel civil construction structure is energy-conserving device
CN210713576U (en) Assembled house that can install fast
CN219732611U (en) Positioning and mounting device for assembled factory building external wall panel
CN220167148U (en) Assembled steel structure building
CN220247275U (en) Assembled rammed earth wall structure
CN217269056U (en) Wall body reinforced structure is used in transformation of old district
CN219430811U (en) Assembled building foundation structure
CN214402186U (en) Building structure's reinforcement connecting device
CN219886834U (en) Secondary grouting formwork supporting structure for fan foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant