CN215926223U - Anti-blocking green building drainage device - Google Patents

Anti-blocking green building drainage device Download PDF

Info

Publication number
CN215926223U
CN215926223U CN202122478069.3U CN202122478069U CN215926223U CN 215926223 U CN215926223 U CN 215926223U CN 202122478069 U CN202122478069 U CN 202122478069U CN 215926223 U CN215926223 U CN 215926223U
Authority
CN
China
Prior art keywords
camera
pipe
waterproof cover
inspection
inspection shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122478069.3U
Other languages
Chinese (zh)
Inventor
庄修伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122478069.3U priority Critical patent/CN215926223U/en
Application granted granted Critical
Publication of CN215926223U publication Critical patent/CN215926223U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an anti-blocking green building drainage device which comprises a drainage pipe, a camera and a light supplementing lamp, wherein a waterproof cover is arranged at the top end inside the drainage pipe, the waterproof cover is connected with the drainage pipe through a bolt, the camera is arranged inside the waterproof cover, and the camera is connected with the waterproof cover through a bolt. Has the advantages that: according to the utility model, the camera, the light supplementing lamp and the waterproof cover are arranged, and the camera is arranged in the sewage pipe to monitor the accumulation condition of the dirt in the sewage pipe in real time, so that a worker can watch external display equipment at any time to clean the dirt in time, the light supplementing lamp can illuminate the sewage pipe so that the camera can shoot a clear picture, and the waterproof cover prevents water vapor in the sewage pipe from corroding the camera, so that the blocking frequency of the sewage pipe can be reduced.

Description

Anti-blocking green building drainage device
Technical Field
The utility model relates to the technical field of green building drainage devices, in particular to an anti-blocking green building drainage device.
Background
The important ring in the building drainage construction process, the waste water that produces in production and the life all will be through discharging, and can carry partial filth at the discharge process to make sewage pipes form the jam easily, consequently need the green building drainage device who prevents blockking up.
Present building drainage device is in the use, the condition is piled up to the filth in the blow-off pipe can't in time be learnt to the staff, thereby can't in time carry out the cleaning work to the blow-off pipe, and then the frequency that the blow-off pipe blockked up has been increased, in addition, current building drainage device is in the use, when the staff gets into the blow-off pipe and maintains work, because it is old and rotten material to be most in the blow-off pipe, thereby generate peculiar smell gas easily and pile up in the device, after the staff inhales peculiar smell gas, make staff's health uncomfortable easily, and then the protective capacities of device to staff's health has been reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art not enough, now propose the green building drainage device who prevents blockking up, current building drainage device has been solved in the use, the staff can't in time learn the filth in the blow-off pipe and pile up the condition, thereby can't in time carry out the cleaning work to the blow-off pipe, and then increased the frequency that the blow-off pipe blockked up, and current building drainage device is in the use, when the staff gets into the blow-off pipe and carries out maintenance work, because be mostly old rotten material in the blow-off pipe, thereby produce peculiar smell gas easily and pile up in the device, after the staff inhales peculiar smell gas, make staff's health uncomfortable easily, and then reduced the problem of the device to the healthy protective capacities of staff.
(II) technical scheme
The utility model is realized by the following technical scheme: the utility model provides an anti-blocking green building drainage device which comprises a drainage pipe, a camera and a light supplementing lamp, wherein a waterproof cover is arranged at the top end inside the drainage pipe, the waterproof cover is connected with the drainage pipe through a bolt, the camera is arranged inside the waterproof cover, the camera is connected with the waterproof cover through a bolt, the light supplementing lamp is arranged on one side of the camera, and the light supplementing lamp is connected with the waterproof cover through a bolt.
Through adopting above-mentioned technical scheme, through the camera comes right the filth condition of piling up in the sewage pipes carries out real time monitoring to make the staff can watch outside display device at any time and observe, so that in time clear up the filth, the light filling lamp then can be right throw light on in the sewage pipes, so that comparatively clear picture can be shot to the camera, the buckler then prevents that the steam in the sewage pipes is right the camera causes the erosion.
Further, the blow off pipe top is provided with the inspection shaft, the inspection shaft with the blow off pipe bonds through mortar, a side wall mounting of inspection shaft has the air duct, the air duct with the inspection shaft bonds through mortar, the filter is installed to the air duct end, the filter with the air duct passes through threaded connection.
By adopting the technical scheme, the peculiar smell gas can pass through the air guide pipe row to the outside, and outside sundries can pass through the filter plate for filtering, so that the sundries are prevented from entering the air guide pipe to cause blockage.
Further, the well seat is installed to inspection shaft top, the well seat with the inspection shaft bonds through the mortar, the well lid is installed to well seat top, the well lid with the well seat rotates to be connected.
Through adopting above-mentioned technical scheme, through the well seat can make the well lid rotates to make the staff can open the well lid gets into inspection shaft.
Furthermore, an installation plate is arranged on the inner side wall of the inspection shaft, the installation plate is connected with the inspection shaft through bolts, an inspection ladder stand is arranged on one side wall of the installation plate, and the inspection ladder stand is welded with the installation plate.
By adopting the technical scheme, the inspection crawling ladder can be arranged on the inner wall of the inspection vertical shaft through the mounting plate so that workers can enter the inspection vertical shaft.
Furthermore, be provided with the slipmat on the inspection cat ladder lateral wall, the slipmat with the inspection cat ladder bonds, be provided with the non-skid protrusions on the slipmat, the non-skid protrusions shaping in on the slipmat.
By adopting the technical scheme, the friction force of the inspection crawling ladder can be increased by the anti-skid pad, and the anti-skid effect of the anti-skid pad can be increased by the anti-skid protrusions.
Furthermore, a filling layer is arranged on the outer side of the sewage discharge pipe, and a cushion layer is laid below the filling layer.
Through adopting above-mentioned technical scheme, the filling layer is the gravel material, the bed course is the concrete material, through the filling layer and the bed course can be used for reducing the influence that the differential settlement that the blowdown pipe formed brought.
(III) advantageous effects
Compared with the prior art, the utility model has the following beneficial effects:
1. in order to solve the problems that in the use process of the existing building drainage device, a worker cannot timely know the accumulation condition of dirt in a drain pipe, so that the drain pipe cannot be cleaned in time, and the frequency of blockage of the drain pipe is increased, the utility model monitors the accumulation condition of the dirt in the drain pipe in real time by arranging the camera, the light supplementing lamp and the waterproof cover and installing the camera in the drain pipe, so that the worker can watch external display equipment at any time to observe the dirt in time, the dirt can be cleaned in time, the light supplementing lamp can illuminate the drain pipe, so that the camera can shoot a clear picture, and the waterproof cover prevents water vapor in the drain pipe from corroding the camera, so that the frequency of blockage of the drain pipe can be reduced;
2. in order to solve the problems that when the existing building drainage device is used and a worker enters a drain pipe for maintenance work, as the inside of the sewage discharge pipe is mostly stale substances, peculiar smell gas is easy to generate and accumulate in the device, and the worker is easy to feel uncomfortable after inhaling the peculiar smell gas, the utility model further reduces the problem of the protection capability of the device to the health of workers, and by arranging the air duct and the filter plate and installing the air duct on the side wall of the inspection shaft, thereby leading the peculiar smell gas to be discharged to the outside through the air duct, and foreign matters to be filtered through the filter plate, preventing the foreign matters from entering the air duct to cause blockage, therefore, the accumulated peculiar smell gas in the device can be reduced, the uncomfortable feeling of the workers entering the device to suck the peculiar smell gas is reduced, and the protection capability of the device to the health of the workers is improved.
Drawings
FIG. 1 is a front view of the anti-clogging green building drain of the present invention;
FIG. 2 is a front cross-sectional view of the anti-clogging green building drain of the present invention;
FIG. 3 is an enlarged view of the anti-clogging green building drain at A in accordance with the present invention;
fig. 4 is an enlarged view of the drain at B of the green building against clogging according to the present invention.
The reference numerals are explained below:
1. a blow-off pipe; 2. a camera; 3. a light supplement lamp; 4. a waterproof cover; 5. a cushion layer; 6. a filling layer; 7. checking a vertical shaft; 8. an air duct; 9. a filter plate; 10. inspecting the crawling ladder; 11. mounting a plate; 12. a non-slip mat; 13. anti-skid projections; 14. a well cover; 15. and (4) well seat.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
As shown in fig. 1-4, the anti-clogging drainage device for green buildings in the embodiment comprises a drain pipe 1, a camera 2 and a light supplement lamp 3, wherein a waterproof cover 4 is installed at the top end inside the drain pipe 1, the waterproof cover 4 is connected with the drain pipe 1 through a bolt, the camera 2 is installed inside the waterproof cover 4, the camera 2 is connected with the waterproof cover 4 through a bolt, the light supplement lamp 3 is installed on one side of the camera 2, the light supplement lamp 3 is connected with the waterproof cover 4 through a bolt, the dirt accumulation condition in the drain pipe 1 is monitored through the camera 2 in real time, so that a worker can watch an external display device at any time to observe so as to clean dirt in time, the light supplement lamp 3 can illuminate the drain pipe 1 so that the camera 2 can shoot a clear picture, and the waterproof cover 4 prevents water vapor in the drain pipe 1 from eroding the camera 2, 1 top of blow off pipe is provided with inspection shaft 7, inspection shaft 7 bonds through the mortar with blow off pipe 1, 7 side wall mountings of inspection shaft have air duct 8, air duct 8 bonds through the mortar with inspection shaft 7, filter 9 is installed to 8 ends of air duct, filter 9 passes through threaded connection with air duct 8, make peculiar smell gas arrange to the external world through air duct 8, and external debris can filter through filter 9, prevent that debris from getting into air duct 8 and causing the jam.
As shown in fig. 1-4, in this embodiment, a well seat 15 is installed above the inspection shaft 7, the well seat 15 is bonded to the inspection shaft 7 through mortar, a well lid 14 is installed above the well seat 15, the well lid 14 is rotatably connected to the well seat 15, the well lid 14 can be rotated through the well seat 15, so that a worker can open the well lid 14 to enter the inspection shaft 7, an installation plate 11 is arranged on the inner side wall of the inspection shaft 7, the installation plate 11 is connected to the inspection shaft 7 through a bolt, an inspection ladder 10 is arranged on one side wall of the installation plate 11, the inspection ladder 10 is welded to the installation plate 11, and the inspection ladder 10 can be installed on the inner wall of the inspection shaft 7 through the installation plate 11, so that the worker can enter the inspection shaft 7.
As shown in fig. 1-4, in this embodiment, an anti-slip mat 12 is arranged on the outer side wall of the inspection ladder stand 10, the anti-slip mat 12 is bonded to the inspection ladder stand 10, an anti-slip protrusion 13 is arranged on the anti-slip mat 12, the anti-slip protrusion 13 is formed on the anti-slip mat 12, the friction force of the inspection ladder stand 10 can be increased through the anti-slip mat 12, the anti-slip effect of the anti-slip mat 12 can be increased through the anti-slip protrusion 13, a filling layer 6 is arranged on the outer side of the sewage pipe 1, a cushion layer 5 is laid below the filling layer 6, the filling layer 6 is made of gravel materials, the cushion layer 5 is made of concrete materials, and the influence caused by uneven settlement of the sewage pipe 1 can be reduced through the filling layer 6 and the cushion layer 5.
The specific implementation process of this embodiment is as follows: in the operation process of the device, the camera 2 can monitor the dirt accumulation condition in the drain pipe 1 in real time, so that a worker can watch an external display device at any time to observe the dirt, the dirt can be cleaned in time, the blockage of the drain pipe 1 is prevented, the light supplement lamp 3 can illuminate the interior of the drain pipe 1, so that the camera 2 can shoot a clear picture, the water shield 4 can prevent water vapor in the drain pipe 1 from corroding the camera 2, peculiar smell gas generated by the dirt can be discharged to the outside through the air duct 8, the body discomfort caused by the suction of a large amount of peculiar smell gas when the worker enters the inspection shaft 7 is avoided, the filter plate 9 at the tail end of the air duct 8 can filter outside sundries, the blockage caused by the accumulation of the sundries in the air duct 8 is prevented, and after the worker rotates the well lid 14 along the well seat 15, can widely open well lid 14, so that the staff gets into inspection shaft 7 through inspection cat ladder 10, thereby maintain and clear up blow off pipe 1, slipmat 12 on the inspection cat ladder 10 can increase the frictional force of inspection cat ladder 10, antiskid bulge 13 can increase the anti-skidding effect of slipmat 12, thereby prevent that the staff foot is unexpected to skid, and the filling layer 6 in the blow off pipe 1 outside is the gravel material, bed course 5 is the concrete material, can be used for reducing the influence that the inhomogeneous settlement that blow off pipe 1 formed brought through filling layer 6 and bed course 5.
The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and do not limit the spirit and scope of the present invention. Various modifications and improvements of the technical solutions of the present invention may be made by those skilled in the art without departing from the design concept of the present invention, and the technical contents of the present invention are all described in the claims.

Claims (6)

1. Prevent green building drainage device of jam, its characterized in that: including blow off pipe (1), camera (2) and light filling lamp (3), waterproof cover (4) are installed on the inside top of blow off pipe (1), waterproof cover (4) with blow off pipe (1) passes through bolted connection, waterproof cover (4) internally mounted have camera (2), camera (2) with waterproof cover (4) pass through bolted connection, install camera (2) one side light filling lamp (3), light filling lamp (3) with waterproof cover (4) pass through bolted connection.
2. The anti-clogging green building drainage device according to claim 1, wherein: blow off pipe (1) top is provided with inspection shaft (7), inspection shaft (7) with blow off pipe (1) bonds through the mortar, inspection shaft (7) a side wall mounting has air duct (8), air duct (8) with inspection shaft (7) bond through the mortar, filter (9) are installed to air duct (8) end, filter (9) with air duct (8) pass through threaded connection.
3. The anti-clogging green building drainage device according to claim 2, characterized in that: well seat (15) are installed to inspection shaft (7) top, well seat (15) with inspection shaft (7) bond through the mortar, well lid (14) are installed to well seat (15) top, well lid (14) with well seat (15) rotate to be connected.
4. The anti-clogging green building drainage device according to claim 3, wherein: be provided with mounting panel (11) on inspection shaft (7) inside wall, mounting panel (11) with inspection shaft (7) pass through bolted connection, be provided with inspection cat ladder (10) on mounting panel (11) a lateral wall, inspection cat ladder (10) with mounting panel (11) welding.
5. The anti-clogging green building drainage device according to claim 4, wherein: be provided with slipmat (12) on inspection cat ladder (10) lateral wall, slipmat (12) with inspection cat ladder (10) bond, be provided with on slipmat (12) non-slip raised (13), non-slip raised (13) take shape in on slipmat (12).
6. The anti-clogging green building drainage device according to claim 5, wherein: a filling layer (6) is arranged on the outer side of the sewage draining pipe (1), and a cushion layer (5) is laid below the filling layer (6).
CN202122478069.3U 2021-10-14 2021-10-14 Anti-blocking green building drainage device Active CN215926223U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122478069.3U CN215926223U (en) 2021-10-14 2021-10-14 Anti-blocking green building drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122478069.3U CN215926223U (en) 2021-10-14 2021-10-14 Anti-blocking green building drainage device

Publications (1)

Publication Number Publication Date
CN215926223U true CN215926223U (en) 2022-03-01

Family

ID=80404334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122478069.3U Active CN215926223U (en) 2021-10-14 2021-10-14 Anti-blocking green building drainage device

Country Status (1)

Country Link
CN (1) CN215926223U (en)

Similar Documents

Publication Publication Date Title
US20120107137A1 (en) Portable steel-reinforced hdpe pump station
CN211922150U (en) Town road drainage system with quick drainage function
CN112726647B (en) Underground pipe gallery water accumulation well and water level monitoring system thereof
CN104631547A (en) Rainwater collecting system
KR100959373B1 (en) A scale exhausting apparatus of a water supply pipe
CN215926223U (en) Anti-blocking green building drainage device
CN206570913U (en) A kind of grid trash-racking well for integrated prefabricated pumping plant
CN204023770U (en) A kind of integrated prefabricated pumping plant
CN210194852U (en) Integrated pump station with sludge separation function
KR20110007829A (en) Clog detecting device of apparatus for draining subsurface water
CN208056242U (en) A kind of anti-clogging blow-off line component
CN207608988U (en) A kind of building anti-clogging drainage arrangement
CN212984387U (en) Roof siphon drainage system
CN211172290U (en) Gutter inlet filtering and dirt-intercepting hanging basket capable of improving discharged water quality and easy to clean
CN209669694U (en) A kind of self-locking anti-block apparatus of bridge on highway drain hole
CN114352354A (en) Construction process for treating drainage diseases of railway tunnel
CN207331917U (en) A kind of town road drainage arrangement
CN215562992U (en) Construction structure of temporary fire-fighting water pump house
CN218608711U (en) Active carbon deodorization device for sewage well
CN211646552U (en) Irrigation system is collected to town road rainwater
CN218581653U (en) Horizontal automatic water drainage device of mine underground compressed air pipeline
CN214934166U (en) Moisture-containing coal collecting device along belt conveyor
CN2140398Y (en) Building sewer clog-proof self-cleaner
KR102236628B1 (en) Double screen type sewage pumping station
CN215842054U (en) Sewage damming and lifting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant