CN215909359U - Air deflector installation assembly and heat exchange equipment with same - Google Patents

Air deflector installation assembly and heat exchange equipment with same Download PDF

Info

Publication number
CN215909359U
CN215909359U CN202121989877.XU CN202121989877U CN215909359U CN 215909359 U CN215909359 U CN 215909359U CN 202121989877 U CN202121989877 U CN 202121989877U CN 215909359 U CN215909359 U CN 215909359U
Authority
CN
China
Prior art keywords
clamping
air deflector
hook
boss
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121989877.XU
Other languages
Chinese (zh)
Inventor
王琨瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
GD Midea Air Conditioning Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GD Midea Air Conditioning Equipment Co Ltd filed Critical GD Midea Air Conditioning Equipment Co Ltd
Priority to CN202121989877.XU priority Critical patent/CN215909359U/en
Application granted granted Critical
Publication of CN215909359U publication Critical patent/CN215909359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air-Flow Control Members (AREA)

Abstract

The utility model discloses an air deflector installation component and heat exchange equipment with the same, wherein the air deflector installation component comprises: the hook is arranged on the machine body of the heat exchange equipment and is provided with a first clamping part; the air deflector is provided with a second clamping portion, and the first clamping portion is clamped and matched with the second clamping portion. According to the air deflector installation assembly, the clamping matching of the hook and the air deflector is realized by arranging the clamping part, the structure of the air deflector installation assembly is simplified, the number of parts between the hook and the air deflector is reduced, the assembly difficulty between the hook and the air deflector is reduced, the assembly efficiency is improved, the hook and the air deflector are directly matched in a clamping manner, the problem that air outlet at the air deflector is blocked can be avoided, the air outlet quantity of the air deflector is favorably improved, and the user experience is improved.

Description

Air deflector installation assembly and heat exchange equipment with same
Technical Field
The utility model relates to the technical field of heat exchange equipment, in particular to an air deflector installation assembly and heat exchange equipment with the same.
Background
In the correlation technique, and through the latch connection between aviation baffle and the couple, realize the aviation baffle and dismantle to roll off about through the bolt, but such mode of setting up, need set up structure such as bolt alone, lead to the number of connected parts between its aviation baffle and the couple to increase, its manufacturing efficiency is low, the assembly degree of difficulty between the two has been improved, especially, when the aviation baffle guides the wind direction, the bolt can block the air-out, make the amount of wind reduce, and the bolt that leaks influences the aesthetic property of product, user's experience sense has been reduced, there is improved space.
SUMMERY OF THE UTILITY MODEL
The present invention is directed to solving at least one of the problems of the prior art. Therefore, one object of the present invention is to provide an air deflector installation assembly, in which a hook is in clamping fit with an air deflector, so as to reduce the assembly difficulty between the air deflector and the air deflector, and avoid the problem that the air outlet at the air deflector is blocked, thereby facilitating the improvement of the air outlet amount of the air deflector and improving the user experience.
An air deflection assembly according to an embodiment of the present invention includes: the hook is arranged on the machine body of the heat exchange equipment and is provided with a first clamping part; the air deflector is provided with a second clamping portion, and the first clamping portion is clamped and matched with the second clamping portion.
According to the air deflector installation assembly provided by the embodiment of the utility model, the hook and the air deflector are in clamping fit by arranging the clamping part, the structure of the air deflector installation assembly is simplified, the number of parts between the hook and the air deflector is reduced, the assembly difficulty between the hook and the air deflector is reduced, the assembly efficiency is improved, and the hook and the air deflector are directly in clamping fit, so that the problem that the air outlet at the air deflector is blocked can be avoided, the air outlet quantity of the air deflector is favorably improved, and the user experience is improved.
According to the air deflector mounting assembly of some embodiments of the present invention, one of the first clamping portion and the second clamping portion is configured as a clamping cavity, and the other is configured as a clamping boss, and the clamping boss is in clamping fit with the clamping cavity.
According to the air deflector installation assembly provided by some embodiments of the utility model, the clamping cavity is formed on the end face of one end of the hook, and the clamping boss is arranged on one side of the air deflector.
According to the air deflector installation assembly of some embodiments of the utility model, the clamping boss is provided with a clamping interface, the clamping interface is provided with a clamping hook at least partially protruding towards one side of the clamping boss, the peripheral wall of the clamping cavity is provided with a clamping hole, and the clamping hook is in clamping fit with the clamping hole when the clamping boss extends into the clamping cavity.
According to the air deflector installation assembly of some embodiments of the utility model, the clamping hook comprises a connecting plate and a clamping protrusion, one end of the connecting plate is fixedly connected with the clamping protrusion, the other end of the connecting plate is connected with the inner peripheral wall of the clamping interface, and the clamping protrusion protrudes towards one side of the clamping boss and is suitable for extending into the clamping hole.
According to the air deflector mounting assembly of some embodiments of the present invention, both side edges of the connecting plate are spaced apart from the inner peripheral wall of the clamping interface and define a weakening gap, so that the clamping protrusion can selectively extend out of or retract back into the clamping hole.
According to the air deflector mounting assembly of some embodiments of the present invention, the clamping cavity and the clamping boss are designed to follow the shape, and the width dimension of the clamping boss is configured to gradually decrease from the end close to the air deflector to the end far away from the air deflector.
According to the air deflector mounting assembly of some embodiments of the present invention, the clamping boss is disposed in a middle region of one side of the air deflector.
According to the air deflector installation assembly of some embodiments of the utility model, one end of the hook, which is far away from the air deflector, is provided with a connecting hole, and the connecting hole is used for being in power connection with a driving piece in the machine body.
The utility model also provides heat exchange equipment.
According to the heat exchange equipment provided by the embodiment of the utility model, the air deflector installation assembly in any one of the embodiments is arranged.
Compared with the prior art, the heat exchange equipment and the air deflector installation assembly have the same advantages, and are not described again.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the utility model.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic structural view of an air deflection assembly according to an embodiment of the present invention;
FIG. 2 is an enlarged view at A in FIG. 1;
FIG. 3 is a schematic view of a structure of an air deflection assembly according to an embodiment of the present invention (from another perspective);
fig. 4 is an enlarged view at B in fig. 3.
Reference numerals:
the air deflection plate mounting assembly 100 is shown,
aviation baffle 1, couple 2, joint hole 31, joint boss 4, joint interface 41, pothook 42, connecting plate 421, joint arch 422, connecting hole 5.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the accompanying drawings are illustrative only for the purpose of explaining the present invention, and are not to be construed as limiting the present invention.
The air deflector installation assembly 100 according to the embodiment of the utility model is described below with reference to fig. 1 to 4, the air deflector installation assembly 100 improves the connection mode between the existing hook 2 and the air deflector 1, and the hook 2 and the air deflector 1 are respectively provided with the first clamping portion and the second clamping portion, so that the hook 2 can be in clamping fit with the air deflector 1, thereby eliminating the design of a bolt, reducing the number of parts between the two, and the two are directly in clamping fit, so that the problem that the air outlet at the air deflector 1 is blocked can be avoided, thereby being beneficial to improving the air outlet amount of the air deflector 1, facilitating the reduction of the installation and disassembly difficulty between the hook 2 and the air deflector 1, improving the production efficiency and reducing the maintenance cost.
Optionally, first joint portion and second joint portion can be for fixed cooperation or also can be for movable cooperation, and fixed cooperation can do benefit to and make the installation of couple and aviation baffle more reliable to improve aviation baffle installation component 100's installation reliability, movable cooperation can make the user dismantle more easily, realizes easy dismouting structure. The two matching modes can be specifically set according to actual requirements, and are not limited herein.
As shown in fig. 1, an air deflection assembly 100 according to an embodiment of the present invention includes: a hook 2 and an air deflector 1.
Couple 2 keeps away from one end detachably of aviation baffle 1 and installs in indirect heating equipment's organism, is convenient for with couple 2 fixed mounting on indirect heating equipment, strengthens couple 2's structural stability, and couple 2's the other end and aviation baffle 1 assemble, and couple 2 sets up between organism and aviation baffle 1 promptly to install aviation baffle 1 on the organism through couple 2, and then lead through aviation baffle 1 to indirect heating equipment's air-out.
Wherein, first joint portion sets up in the one end that the organism was kept away from to couple 2, and second joint portion sets up in the one side that aviation baffle 1 is close to couple 2, and second joint portion can realize the joint cooperation with first joint portion. It can be understood that, in the installation of reality, can install couple 2 on the organism earlier, then the joint cooperation through two joint portions, with 1 joint of aviation baffle in couple 2, be convenient for reduce the assembly degree of difficulty between the two, and can avoid the air-out of 1 department of aviation baffle to appear being blockked the problem, simultaneously, when needs are changed aviation baffle 1, be convenient for dismantle aviation baffle 1, reduced the maintenance degree of difficulty and cost of maintenance.
Specifically, second joint portion can with 1 integrated into one piece of aviation baffle, be convenient for the manufacturing of the two, and first joint portion also can be integrated into one piece with couple 2, therefore, the joint cooperation of the first joint portion of accessible and second joint portion, realize being connected of aviation baffle 1 and couple 2, compared in prior art and cancelled the design of bolt, aviation baffle installation component 100 structure has been simplified, part quantity between the two has been reduced, and the two is direct to be fixed through the joint, do not need to set up other fixed knot again alone, be convenient for reduce part quantity between the two, do benefit to the lightweight design of aviation baffle installation component 100, and can avoid the problem that is blockked to appear in the air-out of aviation baffle 1 department, thereby do benefit to the air output that improves aviation baffle 1.
According to the air deflector installation assembly 100 provided by the embodiment of the utility model, the hook 2 and the air deflector 1 are in clamping fit by arranging the clamping part, the structure of the air deflector installation assembly 100 is simplified, the number of parts between the two is reduced, the assembly difficulty between the two is reduced, the assembly efficiency is improved, and the air deflector installation assembly 100 and the air deflector 1 are directly in clamping fit, so that the problem that the air outlet at the air deflector 1 is blocked can be avoided, the air outlet quantity of the air deflector 1 is favorably improved, and the user experience is improved.
In some embodiments, one of the second clamping portion and the first clamping portion can be configured as a clamping cavity, the other of the second clamping portion and the first clamping portion can be configured as a clamping boss 4, and the clamping cavity and the clamping boss 4 realize clamping fit, that is, the first clamping portion can be configured as a clamping cavity, the second clamping portion can be configured as a clamping boss 4, or the first clamping part can be arranged as the clamping boss 4, the second clamping part can be arranged as the clamping cavity, therefore, when the air deflector 1 and the hook 2 are assembled, the clamping boss 4 extends into the clamping cavity, so that the clamping boss 4 is clamped in the clamping cavity to realize the clamping fit of the air deflector 1 and the hook 2, through the arrangement, other connecting structures do not need to be arranged independently, the number of parts between the air guide plate 1 and the hook 2 is easy to reduce, and the assembly difficulty of the air guide plate 1 and the hook 2 is reduced.
Simultaneously, through such structural setting for joint boss 4 can stretch to the joint intracavity, does not occupy extra installation space, is convenient for reduce its overall structure size, and when realizing the joint cooperation, joint boss 4's structure is not directly visible, easily strengthens the aesthetic property of structure, promotes user's experience and feels.
Of course, in other embodiments, one of the first clamping portion and the second clamping portion may be a buckle, the other of the first clamping portion and the second clamping portion is a clamping hole, and the buckle and the clamping hole are in clamping fit, or both the first clamping portion and the second clamping portion may be a buckle, which is not limited herein.
In some embodiments, the end surface of the end of the hook 2 away from the machine body may be provided with a clamping cavity (not shown), for example, the clamping cavity may be formed by inward recessing along the axial direction of the hook 2, so as to facilitate utilization of the original structure of the hook 2 and reduce the production cost, one side of the air deflector 1 close to the hook 2 is provided with a clamping boss 4, that is, the clamping cavity is formed on the end surface of the end of the hook 2 adjacent to the air deflector 1 and is recessed towards the direction away from the clamping boss 4, the clamping boss 4 is provided on the side surface of the air deflector 1 close to the side of the hook 2, and the clamping boss 4 protrudes towards the direction close to the clamping cavity, therefore, when the air deflector 1 is installed on the hook 2, the clamping boss 4 extends into the clamping cavity to realize the clamping fit between the air deflector 1 and the hook 2, through such an arrangement, no other connecting structure is required to be separately provided, the number of parts between the air deflector 1 and the hook 2 is easily reduced, the assembly difficulty of the air deflector 1 and the hook 2 is reduced.
The clamping bosses 4 and the hooks 2 can be arranged in a plurality of modes, namely the clamping bosses 4 and the hooks 2 can be flexibly arranged according to actual installation requirements, and the clamping bosses 4 and the hooks 2 correspond to one another one by one. As shown in fig. 1, two clamping bosses 4 are provided, wherein the two clamping bosses 4 are arranged at intervals in the length direction of the air deflector 1, and the two clamping bosses 4 are symmetrically arranged at the same side of the air deflector 1, meanwhile, two hooks 2 are also arranged, the hooks 2 correspond to the clamping bosses 4 one by one, namely, the number of the hooks 2 is the same as that of the clamping bosses 4, so that when in specific installation, the hooks can be simultaneously clamped with the two hooks 2 through the two clamping bosses 4, then the hook 2 is fixedly arranged on the machine body to realize the installation between the air deflector 1 and the machine body, therefore, through the arrangement, the stability of the air deflector 1 can be enhanced through the respective clamping of the two hooks 2 and the two clamping bosses 4, and when air flows out through the air guide plate 1, the air guide plate 1 is prevented from shaking due to overlarge air volume, and the balance and stability of the air guide plate 1 are enhanced.
As shown in fig. 2, the locking boss 4 further has a locking interface 41, and a hook 42 is further disposed at the locking interface 41.
Pothook 42's at least part can be towards the one side protrusion setting of joint boss 4, in order to form protruding structure in the side of joint boss 4, and joint hole 31 link up the perisporium in joint chamber, thereby when joint boss 4 and joint chamber joint cooperation, joint boss 4 can stretch to joint intracavity portion, at this moment, pothook 42's at least part stretches out from joint hole 31, in order to cooperate with the perisporium joint with joint hole 31, therefore, the joint cooperation of accessible pothook 42 and the perisporium of joint hole 31, be fixed in the joint intracavity with joint boss 4, prevent that joint boss 4 from droing in the joint intracavity, strengthen joint boss 4 and the joint stability in joint chamber.
As shown in fig. 2, the hook 42 may include a clamping protrusion 422 and a connecting plate 421, and the clamping protrusion 422 and the connecting plate 421 may be integrally formed, so as to reduce the processing difficulty and the production cost.
Specifically, protruding 422 of joint can be fixed with the one end of connecting plate 421 and link to each other, the protruding 422 of joint separates the setting with the perisporium of joint interface 41 apart from, and the other end of connecting plate 421 can link to each other with the internal perisporium of joint interface 41, that is to say, the protruding 422 of joint locates the one end that connecting plate 421 does not link to each other with the internal perisporium of joint interface 41, the protruding 422 of joint locates the free end of connecting plate 421 promptly, therefore, in actual installation, the protruding 422 of joint sets up in the protruding one side protrusion of joint boss 4, so that joint boss 4 can stretch to the inside of joint hole 31, and then the perisporium through joint hole 31 plays spacing effect to the protruding 422 of joint, prevent that the protruding 422 of joint from following joint hole 31 and drop, thereby guarantee the structural stability between couple 2 and the aviation baffle 1.
As shown in fig. 2, both sides of the connecting plate 421 are spaced apart from the inner peripheral wall of the card interface 41, and a space between the peripheral wall of the card interface 41 and both sides of the connecting plate 421 is used to define a weakening gap, that is, both sides of the connecting plate 421 are spaced apart from the inner peripheral wall of the card interface 41, so as to ensure the mobility of the connecting plate 421, and thus the card protrusions 422 can selectively extend out of or retract into the card holes 31. It should be noted that, when the installation of couple 2 and aviation baffle 1 is being carried out, can extend the joint boss 4 of aviation baffle 1 department to the joint intracavity earlier, at this moment, the internal perisporium in joint chamber plays the effort of a compression to spacing arch, and then when the protruding 422 motion of joint is just right with joint hole 31, the protruding 422 department of joint stretches out from joint hole 31 under the effect that self resumes deformation, therefore, can realize the joint cooperation between the protruding 422 of joint and joint hole 31, the part quantity between the two has been reduced, the assembly degree of difficulty between the two has been reduced, and be convenient for strengthen the stability between the protruding 422 of joint and the joint hole 31.
When needs are dismantled aviation baffle 1, the user can use hard thing to press the protruding 422 portion that stretches out in joint hole 31 department of joint externally for pothook 42 can be in the regional direction motion of keeping away from joint hole 31 of weakening, in order to remove the joint cooperation between joint boss 4 and the joint chamber of joint, thereby be convenient for when needs are more smooth or maintenance aviation baffle 1, be convenient for reduce the maintenance degree of difficulty, reduce cost of maintenance.
As shown in fig. 1 and fig. 2, the clamping boss 4 and the clamping cavity are designed along with the shape, that is, the outer contour of the part of the clamping boss 4 stretching into the clamping cavity can be the same as the shape of the cavity wall of the clamping cavity, so that when the clamping boss 4 is clamped with the clamping cavity, the clamping boss 4 can directly stretch into the clamping cavity, the contact area between the clamping boss and the clamping cavity is increased, and the stability of clamping fit of the clamping boss and the clamping cavity is enhanced.
Specifically, joint boss 4 can be constructed as the trapezium structure, its width dimension can be constructed as and is reduced gradually from the one end that joint boss 4 is close to aviation baffle 1 to the one end that joint boss 4 kept away from aviation baffle 1, the width dimension in joint chamber can be constructed as and is reduced gradually from couple 2 terminal surface orientation that is close to aviation baffle 1 one end and keeps away from aviation baffle 1, the joint chamber also can be constructed as the cavity structures of trapezoidal promptly, thereby when installing aviation baffle 1 with couple 2, can carry out circumference spacing to joint boss 4 through the joint chamber, prevent that pivoted problem from appearing in joint boss 4, strengthen the stability of its joint. Of course, the clamping boss 4 and the clamping cavity can be constructed into other same structural shapes, so that the processing difficulty and the production cost are reduced.
As shown in fig. 1 and fig. 3, the middle region of one side of the air deflector 1 close to the hook 2 can be located by the clamping boss 4, so that the clamping boss 4 can be better installed with the clamping cavity, and when the air deflector 1 is installed on the hook 2 through the clamping boss 4, the weights of the air deflectors 1 on two sides of the clamping boss 4 located in the middle of the air deflector 1 are the same, which is beneficial to balancing the weights on two sides of the clamping boss 4, further enhancing the clamping stability between the clamping boss 4 and the clamping cavity, and facilitating the change of the position of the air deflector 1 through the hook 2 after the hook 2 and the air deflector 1 are clamped, avoiding the problem of unbalanced weight of the air deflectors 1 on two sides of the clamping boss 4, enhancing the balance thereof, of course, the setting position of the clamping boss 4 can also be flexibly adjusted according to the specific installation requirements, and is not limited herein.
It should be noted that the above "middle region" refers to the position of the non-end portion of the wind deflector 1, and does not refer to the central position of the wind deflector 1. The joint boss 4 can set up in the middle part region of the width direction of aviation baffle 1, perhaps, refer to fig. 2, joint boss 4 also can be located the length direction's of aviation baffle 1 central zone, wherein, aviation baffle 1 can be constructed as the arc, and the face of aviation baffle 1 can be the arcwall face promptly, and the orientation is kept away from the direction protrusion of couple 2, so set up, can increase the area of the air-out face of aviation baffle 1, further improve the air output of aviation baffle 1.
As shown in fig. 2 and 4, in some embodiments, the hook 2 is further provided with a connecting hole 5, and the connecting hole 5 is disposed at an end of the hook 2 away from the air deflector 1, that is, the connecting hole 5 is disposed at an end of the hook 2 connected to the machine body, so that the hook 2 is fixed to the machine body through the connecting hole 5 by using a connecting member, and power connection between the hook 2 and a driving member in the machine body is realized. It can be understood that, in concrete installation, realize linking to each other between couple 2 and the driving piece through the connecting piece to the driving piece can drive couple 2 motion, and then couple 2 drives aviation baffle 1 motion, and with the position through changing aviation baffle 1, adjusts the air current direction of aviation baffle 1 department, thereby can be according to the nimble position of adjusting aviation baffle 1 of user's demand, improves user's use and experiences.
The utility model also provides heat exchange equipment. Alternatively, the heat exchange device may be an air conditioner, a heat exchanger, or the like.
According to the heat exchange equipment provided by the embodiment of the utility model, the air deflector installation component 100 is provided with the air deflector installation component 100, the air deflector installation component 100 is provided with the clamping part, so that the hook 2 and the air deflector 1 are clamped and matched, the number of parts between the hook and the air deflector 1 is reduced, the assembly difficulty between the hook and the air deflector is reduced, and the hook and the air deflector can be directly clamped and matched, so that the problem that the air outlet at the air deflector 1 is blocked can be avoided, the air outlet quantity of the air deflector 1 is favorably improved, and the user experience is improved.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the utility model and to simplify the description, and are not intended to indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the utility model.
In the description of the present invention, "the first feature" and "the second feature" may include one or more of the features.
In the description of the present invention, "a plurality" means two or more.
In the description of the present invention, the first feature being "on" or "under" the second feature may include the first and second features being in direct contact, and may also include the first and second features being in contact with each other not directly but through another feature therebetween.
In the description of the utility model, "above", "over" and "above" a first feature in a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is higher in level than the second feature.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an illustrative embodiment," "an example," "a specific example," or "some examples" or the like mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the utility model have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the utility model, the scope of which is defined by the claims and their equivalents.

Claims (10)

1. An air deflection mounting assembly (100), comprising:
the hook (2) is arranged on the machine body of the heat exchange equipment, and the hook (2) is provided with a first clamping part;
the air guide plate (1) is provided with a second clamping portion, and the first clamping portion is matched with the second clamping portion in a clamping mode.
2. The air deflection mounting assembly (100) of claim 1, wherein one of the first and second clamping portions is configured as a clamping cavity and the other is configured as a clamping boss (4), the clamping boss (4) being in clamping engagement with the clamping cavity.
3. The air deflector mounting assembly (100) according to claim 2, wherein the clamping cavity is formed on an end face of one end of the hook (2), and the clamping boss (4) is arranged on one side of the air deflector (1).
4. The air deflector mounting assembly (100) according to claim 2 or 3, wherein the clamping boss (4) has a clamping interface (41), a clamping hook (42) at least partially protruding toward one side of the clamping boss (4) is arranged at the clamping interface (41), a clamping hole (31) is arranged on the peripheral wall of the clamping cavity, and the clamping hook (42) is in clamping fit with the clamping hole (31) when the clamping boss (4) extends into the clamping cavity.
5. The air deflector mounting assembly (100) according to claim 4, wherein the hook (42) comprises a connecting plate (421) and a clamping protrusion (422), one end of the connecting plate (421) is fixedly connected with the clamping protrusion (422), the other end of the connecting plate (421) is connected with the inner peripheral wall of the clamping interface (41), and the clamping protrusion (422) protrudes towards one side of the clamping boss (4) and is adapted to extend into the clamping hole (31).
6. The air deflection mounting assembly (100) of claim 5, wherein both sides of the connecting plate (421) are spaced from an inner peripheral wall of the snap-in interface (41) and define a weakened gap such that the snap-in projection (422) can be selectively extended or retracted from the snap-in hole (31).
7. The air deflection mounting assembly (100) according to any one of claims 2 to 6, wherein the snap-fit cavity is conformal with the snap-fit projection (4), and the width dimension of the snap-fit projection (4) is configured to gradually decrease from an end near the air deflection (1) to an end far away from the air deflection (1).
8. The air deflection mounting assembly (100) according to any one of claims 2-6, wherein the snap-fit boss (4) is provided in a middle region of one side of the air deflection (1).
9. The air deflection mounting assembly (100) according to any one of claims 1-6, wherein an end of the hook (2) facing away from the air deflection (1) is provided with a connection hole (5), the connection hole (5) being adapted for powered connection with a driving member in the housing.
10. A heat exchange device, characterized in that a wind deflector mounting assembly (100) according to any of claims 1-9 is provided.
CN202121989877.XU 2021-08-23 2021-08-23 Air deflector installation assembly and heat exchange equipment with same Active CN215909359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121989877.XU CN215909359U (en) 2021-08-23 2021-08-23 Air deflector installation assembly and heat exchange equipment with same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121989877.XU CN215909359U (en) 2021-08-23 2021-08-23 Air deflector installation assembly and heat exchange equipment with same

Publications (1)

Publication Number Publication Date
CN215909359U true CN215909359U (en) 2022-02-25

Family

ID=80292578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121989877.XU Active CN215909359U (en) 2021-08-23 2021-08-23 Air deflector installation assembly and heat exchange equipment with same

Country Status (1)

Country Link
CN (1) CN215909359U (en)

Similar Documents

Publication Publication Date Title
EP2169327B1 (en) Air delivery unit
CN103712328B (en) Multi-function wall air-conditioning wallboard
CN215909359U (en) Air deflector installation assembly and heat exchange equipment with same
CN105737279A (en) Outdoor device of air conditioner
CN205037443U (en) Air conditioner indoor machine and air conditioner with air conditioner indoor machine
CN103148656A (en) Refrigeration device
CN215260486U (en) Panel for air conditioner indoor unit and air conditioner indoor unit
CN209926574U (en) Chassis and wall-mounted air conditioner
CN204730529U (en) Evaporator assemblies, air-conditioner and the fixing card for air-conditioner
CN108954566B (en) Air conditioner outdoor unit and air conditioner
CN203216192U (en) Refrigeration equipment
CN210861641U (en) Air conditioner, rear box body and air inlet grille
CN215260475U (en) Rear box body of air conditioner and air conditioner
CN216953261U (en) Air conditioner
CN217274774U (en) Panel assembly and air conditioner
CN217558629U (en) Volute of centrifugal fan
CN219063714U (en) Air outlet frame of air conditioner and air conditioner
CN204345878U (en) Air-conditioner
CN220287592U (en) Return air frame structure and air conditioning equipment
CN209926458U (en) Wall-mounted air conditioner
CN217952617U (en) Cabinet air outlet assembly and cabinet air conditioner with same
CN210861647U (en) Air conditioner indoor unit and face frame thereof
CN215260523U (en) Air conditioner
CN215260491U (en) Panel assembly of air conditioner and air conditioner with same
CN209689146U (en) Mounting bracket and air conditioner for air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant