CN215830097U - Detachable modular temporary buttress - Google Patents

Detachable modular temporary buttress Download PDF

Info

Publication number
CN215830097U
CN215830097U CN202122379840.1U CN202122379840U CN215830097U CN 215830097 U CN215830097 U CN 215830097U CN 202122379840 U CN202122379840 U CN 202122379840U CN 215830097 U CN215830097 U CN 215830097U
Authority
CN
China
Prior art keywords
parallel connection
steel pipes
fixedly connected
steel
long parallel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122379840.1U
Other languages
Chinese (zh)
Inventor
郑勇
潘强
庾艺凡
余财文
曹桂荣
吴建成
朱华平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Province Transportation Engineering Construction Bureau
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
Jiangsu Province Transportation Engineering Construction Bureau
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Province Transportation Engineering Construction Bureau, No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd, CCCC First Highway Engineering Co Ltd filed Critical Jiangsu Province Transportation Engineering Construction Bureau
Priority to CN202122379840.1U priority Critical patent/CN215830097U/en
Application granted granted Critical
Publication of CN215830097U publication Critical patent/CN215830097U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a detachable modular temporary buttress, which comprises steel pipes, wherein a long parallel connection is vertically and symmetrically fixedly connected between two steel pipes on one side, a short parallel connection is vertically and symmetrically fixedly connected between two steel pipes on the other side, holes are reserved at the end positions of the short parallel connection and the long parallel connection, screw sleeves are fixedly connected to the side walls of the steel pipes, the screw sleeves are fixed on the steel pipes in a welding mode, inserting rods are arranged on the holes and the screw sleeves, nuts are connected to the upper ends of the inserting rods in a threaded mode, and rubber pads are fixedly connected to the upper long parallel connection. The device has the advantages of simple structure, rapid assembly of modules, convenient processing, turnover and recovery of materials, little investment of device manufacturing personnel and materials, substantial cost saving, extremely high economical efficiency and extremely obvious economic and social benefits.

Description

Detachable modular temporary buttress
Technical Field
The utility model relates to the field of temporary buttresses, in particular to a detachable modular temporary buttress.
Background
With the rapid development of steel structure engineering in China, the application of steel structures in various fields such as buildings, bridges and the like is more extensive. But the steel beam has poor corrosion resistance, can not be directly placed on the ground and needs temporary support. But the defects of high cost, long construction time consumption and the like of the traditional temporary support are obvious.
The device is temporary support for steel beam rod pieces during storage and splicing. The device simple structure, each module can be assembled fast and form, and processing is convenient, and required material is the material that contains of construction production line, and the material all can have enough to meet the need, retrieves, promotes sustainable development, and device producer, material input are few, practice thrift the cost by a wide margin, and the economic nature is high, has created very obvious economy and social.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a detachable modular temporary buttress.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides a dismantlement formula modularization buttress temporarily, includes the steel pipe, the steel pipe bilateral symmetry is provided with four, the long parallel connection of longitudinal symmetry fixedly connected with between two steel pipes of one side, the short parallel connection of longitudinal symmetry fixedly connected with between two steel pipes of opposite side, short parallel connection, long parallel connection reserve the hole in end position, the steel pipe lateral wall is the fixedly connected with swivel nut all, the swivel nut is fixed on the steel pipe through the welded mode, be provided with the inserted bar on hole and the swivel nut, threaded connection has the nut on the inserted bar, the inserted bar passes hole and swivel nut, all fixedly connected with rubber pad in the long parallel connection of top, the rubber pad is pasted in long parallel connection upper end.
As a further description of the above technical solution:
the steel pipes are cylindrical, the steel pipes are vertically communicated, and the positions of the four steel pipes are in square distribution.
As a further description of the above technical solution:
the short parallel connection and the long parallel connection can be made of steel plates or section steel.
The utility model has the following beneficial effects:
1. the device has a simple structure, all modules can be quickly assembled, the processing is convenient, the required materials are materials contained in a construction production line, and the materials can be recycled, so that the sustainable development is promoted.
2. In the utility model, the investment of device manufacturing personnel and materials is very little, the cost is greatly saved, the economical efficiency is extremely high, and extremely obvious economic and social benefits are created.
Drawings
FIG. 1 is a perspective view of a demountable modular temporary pier proposed by the present invention;
FIG. 2 is a front view of a demountable modular temporary pier of the present invention;
FIG. 3 is a side view of a demountable modular temporary pier of the present invention;
FIG. 4 is a top view of a demountable modular temporary pier of the present invention;
fig. 5 is a schematic structural diagram of a point a in fig. 1 according to the present invention.
Illustration of the drawings:
1. a steel pipe; 2. short parallel connection; 3. long parallel connection; 4. inserting a rod; 5. a threaded sleeve; 6. a rubber pad; 7. and a nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, one embodiment of the present invention is provided: a detachable modular temporary buttress comprises steel pipes 1, wherein the steel pipes 1 are used for temporary support when steel beam rods are stored and spliced, four steel pipes 1 are arranged in bilateral symmetry, a long parallel connection 3 is fixedly connected between two steel pipes 1 on one side in an up-down symmetry manner, the long parallel connection 3 on the upper side is a direct bearing structure, a short parallel connection 2 is fixedly connected between two steel pipes 1 on the other side in an up-down symmetry manner, holes are reserved at the end positions of the short parallel connection 2 and the long parallel connection 3, the holes are used for inserting insertion rods 4, the side walls of the steel pipes 1 are fixedly connected with screw sleeves 5, the screw sleeves 5 are used for fixing insertion rods 4, the screw sleeves 5 are fixed on the steel pipes 1 in a welding manner, the 5 screw sleeves are welded with the steel pipes 1, the welding must be fully welded, the welding quality is ensured, the insertion rods 4 are arranged on the holes and the screw sleeves 5, the insertion rods 4 are used for fixing the short parallel connection 2 and the long parallel connection 3, the upper ends of the insertion rods 4 are connected with nuts 7 through threads, the nut 7 is used for fixing the inserted link 4, the inserted link 4 passes through the hole and the threaded sleeve 5, the rubber pad 6 is fixedly connected to the upper long flat connector 3, the rubber pad 6 is in flexible contact with the steel beam rod piece, the influence on the steel beam rod piece is reduced, and the rubber pad 6 is adhered to the upper end of the long flat connector 3.
The steel pipe 1 is the cylinder form, and steel pipe 1 link up from top to bottom, and the position of four steel pipes 1 is the square distribution, is the square distribution and makes the support more effective, and the material of short parallel connection 2, long parallel connection 3 can be steel sheet or shaped steel, and if for shaped steel then the parallel connection preformed hole position should the preferred selection to the less position of atress influence, all shaped steel models, size and bolt quantity are confirmed by structural calculation.
The working principle is as follows: firstly, holes are reserved in each parallel connection according to design, an inserting rod 4 is placed in each parallel connection, then the steel pipe 1 and the threaded sleeve 5 are welded, after the steel pipe is firmly welded, the inserting rod 4 is inserted into the threaded sleeve, the nut 7 is screwed, and the rubber pad 6 is adhered to the upper long parallel connection 3. After the device construction was accomplished, directly will correspond the girder steel member and hang and put in device rubber pad 6 tops, reach the purpose that butt joint was assembled to slight regulation girder steel member, this practical dismantlement formula modularization buttress the device is deposited, the interim support when splicing for the girder steel member. The device simple structure, each module can be assembled fast and form, and processing is convenient, and required material is the material that contains of construction production line, and the material all can have enough to meet the need, retrieves, promotes sustainable development, and device producer, material input are few, practice thrift the cost by a wide margin, and the economic nature is high, has created very obvious economy and social.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the utility model.

Claims (3)

1. The utility model provides a temporary buttress of dismantlement formula modularization, includes steel pipe (1), its characterized in that: the steel pipe (1) bilateral symmetry is provided with four, the long parallel connection of longitudinal symmetry fixedly connected with (3) between two steel pipes (1) of one side, the short parallel connection of longitudinal symmetry fixedly connected with (2) between two steel pipes (1) of opposite side, short parallel connection (2), long parallel connection (3) reserve the hole in the end position, steel pipe (1) lateral wall all fixedly connected with swivel nut (5), swivel nut (5) are fixed on steel pipe (1) through the welded mode, be provided with inserted bar (4) on hole and swivel nut (5), threaded connection has nut (7) on inserted bar (4), inserted bar (4) pass hole and swivel nut (5), all fixedly connected with rubber pad (6) on the long parallel connection (3) in top, rubber pad (6) are pasted in long parallel connection (3) upper end.
2. A demountable modular temporary pier as set forth in claim 1, wherein: the steel pipes (1) are cylindrical, the steel pipes (1) are vertically communicated, and the positions of the four steel pipes (1) are in square distribution.
3. A demountable modular temporary pier as set forth in claim 1, wherein: the short parallel connection (2) and the long parallel connection (3) can be made of steel plates or section steel.
CN202122379840.1U 2021-09-29 2021-09-29 Detachable modular temporary buttress Expired - Fee Related CN215830097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122379840.1U CN215830097U (en) 2021-09-29 2021-09-29 Detachable modular temporary buttress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122379840.1U CN215830097U (en) 2021-09-29 2021-09-29 Detachable modular temporary buttress

Publications (1)

Publication Number Publication Date
CN215830097U true CN215830097U (en) 2022-02-15

Family

ID=80201632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122379840.1U Expired - Fee Related CN215830097U (en) 2021-09-29 2021-09-29 Detachable modular temporary buttress

Country Status (1)

Country Link
CN (1) CN215830097U (en)

Similar Documents

Publication Publication Date Title
CN205348573U (en) Modularization steel pipe truss
CN113737987A (en) Prefabricated high-strength fiber cement formwork superposed shear wall
CN201649771U (en) Node structure for electric power tower
CN215830097U (en) Detachable modular temporary buttress
CN208073013U (en) A kind of anti-offset positioning supporting frame of prestressing force bellows positioning
CN216195708U (en) Prefabricated high-strength fiber cement formwork superposed shear wall
CN215760403U (en) Steel pipe outrigger pole extension connecting piece
CN202152442U (en) Assembling type steel tube-vertical post system
CN208545688U (en) One kind being used for railway engineering line warning mark device
CN208046148U (en) Wall connecting bracket under a kind of crane span structure
CN217500591U (en) Reinforced assembled special-shaped column-steel beam full-bolt connection node structure
CN214784738U (en) Assembled steel structure connected node device
CN212715594U (en) Primary and secondary purline connecting structure
CN217679651U (en) Single-limb insertion type connecting node structure of reinforced concrete frame in high earthquake region
CN211572014U (en) Steel structure beam column node
CN217026645U (en) Prevent throwing device on steel temporary bridge
CN218612486U (en) Be used for member tip welded to revolve formula of twisting construction platform
CN220908127U (en) Beret piece convenient to assemble
CN215104710U (en) Strutting arrangement is used in continuous beam bridge construction
CN207295987U (en) A kind of steel building of hexagonal crystal system formula
CN217760043U (en) Simple steel pipe truss template reinforcing structure
CN211172368U (en) Assembled steel bar processing shed
CN218434601U (en) Marine booster station davit shelf
CN218843430U (en) Supporting wall structure
CN214784715U (en) Rigid connection device for H-shaped steel beam and H-shaped steel column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220215

CF01 Termination of patent right due to non-payment of annual fee