CN215807111U CN202121206600.5U CN202121206600U CN215807111U CN 215807111 U CN215807111 U CN 215807111U CN 202121206600 U CN202121206600 U CN 202121206600U CN 215807111 U CN215807111 U CN 215807111U
Authority
CN
China
Prior art keywords
support
rubber ring
activity
elastic frame
transverse support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121206600.5U
Other languages
Chinese (zh)
Inventor
梁永江
王利苹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yuze Electromechanical Engineering Co ltd
Original Assignee
Guangzhou Yuze Electromechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yuze Electromechanical Engineering Co ltd filed Critical Guangzhou Yuze Electromechanical Engineering Co ltd
Priority to CN202121206600.5U priority Critical patent/CN215807111U/en
Application granted granted Critical
Publication of CN215807111U publication Critical patent/CN215807111U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

The utility model belongs to the technical field of pipeline anti-seismic supports, and discloses a building pipeline anti-seismic support hanger which comprises main supports, a transverse support and connecting pieces, wherein two ends of the transverse support are welded at the bottoms of the two main supports, the connecting pieces are fixedly connected to the tops of the main supports, two ends of an inner cavity of the transverse support are fixedly connected with guide rods, a fixed block is arranged in the middle of the inner cavity of the transverse support, two sliding blocks and an elastic support are arranged on two sides of the fixed block, and the sliding blocks and the elastic support are sleeved on the guide rods. The pedestrian buffering structure is formed by the guide rod, the fixed block, the damping spring, the sliding block and the elastic frame, two movable supporting points are formed at the bottom of the movable plate, the movable plate can move up and down on the elastic frame simultaneously, and when an earthquake longitudinal wave arrives, a certain up-down interaction space is provided for a pipeline, so that buffering is implemented, damage caused by rigid vibration is reduced, and the pedestrian buffering structure has effective resistance to the earthquake longitudinal wave.

Description

Building pipeline antidetonation gallows
Technical Field
The utility model belongs to the technical field of pipeline anti-seismic supports, and particularly relates to a building pipeline anti-seismic support and hanger.
Background
The fire pipeline of building, the core part that its pipeline was arranged generally all is located the basement of building, and the top of each floor also hoists there is the fire pipeline, and the pipeline bracket just is one of the main instrument of hoist and mount pipeline.
The existing pipeline support is simple in structure, basically welded by a plurality of steel structure columns, and then rigidly fixed on a wall top through expansion screws, but the support is simple in structure, but the anti-seismic performance is poor, and the support is easy to loosen due to vibration in an earthquake and damaged, and the earthquake is divided into transverse waves and longitudinal waves, so that the support can be rocked left and right and can fluctuate up and down respectively, therefore, a common support is generally lower than the earthquake attack of a larger grade, the support is collapsed, pipelines are damaged, and the damage is caused, even danger occurs.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems and provides an earthquake-resistant support and hanger for building pipelines, which has the advantage of resisting earthquake transverse waves and longitudinal waves at the same time.
In order to achieve the purpose, the utility model provides the following technical scheme: a building pipeline anti-seismic support and hanger comprises main supports, a cross support and a connecting piece, wherein two ends of the cross support are welded at the bottoms of the two main supports, the length of the cross support can be cut, when pipelines needing to be installed do not need to be many, the length of the cross support can be cut short properly, the connecting piece is fixedly connected to the tops of the main supports, guide rods are fixedly connected to two ends of an inner cavity of the cross support, a fixed block is arranged in the middle of the inner cavity of the cross support, two sliding blocks and an elastic frame are arranged on two sides of the fixed block respectively, the sliding blocks and the elastic frame are sleeved on the guide rods, the top of each sliding block is hinged with an elastic frame, the elastic frames are hinged in pairs to form a herringbone shape, the two sliding blocks at two ends of the cross support are elastically supported on the inner wall of the cross support through the elastic frames, and the two sliding blocks relatively positioned in the middle of the cross support are elastically supported on the fixed block through the elastic frames, the articulated position between the slider still articulates there is the fly leaf, the top fixed mounting of fly leaf has the pipeline, the top fixed mounting of main support has movable part.
As a preferred technical scheme of the utility model, the movable part comprises a support cover, a movable device is movably sleeved in an inner cavity of the support cover, a chassis is fixedly mounted at the bottom of the support cover, the bottom end of the movable device penetrates through the chassis to extend to the lower part and is fixedly sleeved with a connecting piece, the top of the support cover is fixedly mounted with a wall top through a collision screw, and the structure is integrally lifted.
As a preferred technical scheme of the utility model, the mobilizer comprises a swing part, a first rubber ring is movably sleeved on the periphery of the swing part, an intermediate lantern ring is movably sleeved on the periphery of the first rubber ring, a second rubber ring is movably sleeved on the periphery of the intermediate lantern ring, and the second rubber ring is movably sleeved in an inner cavity of the support cover and attached to the inner cavity wall of the support cover.
According to a preferred technical scheme, the bottom of the swinging part is provided with a fixed rod with two positioning holes, the fixed rod of the swinging part extends out of the chassis and is fixedly connected with the connecting piece through bolts, the fixed rod of the swinging part is sleeved in the connecting piece, the positioning holes are aligned due to the fact that the connecting piece is provided with the positioning holes corresponding to the fixed rod of the swinging part, and two groups of bolts penetrate through the positioning holes to be fixed.
As a preferred technical scheme of the utility model, the bottom of the chassis is provided with a through hole, a gap is reserved between the outer surface of the fixed rod of the swing part and the through hole of the chassis, the circle center of the swing part is superposed with the circle center of the chassis, the gap is the shaking range of the fixed rod at the bottom of the swing part in the circular hole of the chassis, when earthquake transverse waves come, the support is shaken in the horizontal direction by the vibration waves, the first rubber ring and the second rubber ring positioned in the inner cavity of the support cover start to be elastically deformed by the vibration extrusion and the moving trend, so that a swinging space of the swing part is provided, and the fixed rod of the swing part can also swing in the through hole at the bottom of the chassis, and the swinging range is the gap.
As a preferred technical scheme of the utility model, the top and the bottom of the swing part and the middle lantern ring are respectively provided with an extension edge, the extension edges of the swing part and the middle lantern ring respectively clamp the first rubber ring and the second rubber ring, when the first rubber ring is installed, the first rubber ring is sleeved on the swing part, two outer edges of the swing part are determined to be respectively clamped at the top and the bottom of the inner ring of the first rubber ring, the installation of the second rubber ring is the same, and the extension edges of the middle lantern ring are required to be clamped at the top and the bottom of the inner ring of the second rubber ring.
Compared with the prior art, the utility model has the following beneficial effects:
1. the pedestrian buffering structure is formed by the guide rod, the fixed block, the damping spring, the sliding block and the elastic frame, two movable supporting points are formed at the bottom of the movable plate, the movable plate can move up and down on the elastic frame simultaneously, and when an earthquake longitudinal wave arrives, a certain up-down interaction space is provided for a pipeline, so that buffering is implemented, damage caused by rigid vibration is reduced, and the pedestrian buffering structure has effective resistance to the earthquake longitudinal wave.
2. The utility model uses the movable device as a buffer component for resisting transverse waves, and the movable device is integrally designed into a horizontal round shape, so that the movable device can cope with the horizontal transverse wave vibration in any direction through the second rubber ring and the first rubber ring, and the swing of a small amplitude is carried out by driving the bracket through the swing part.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is an exploded view of the movable element of the present invention;
FIG. 4 is an exploded view of the mobilizer according to the present invention;
FIG. 5 is a top view of the mobilizer configuration of the present invention;
fig. 6 is a bottom view of the movable member of the present invention.
In the figure: 1. a main support; 2. a transverse bracket; 3. a connecting member; 4. a movable part; 41. a support housing; 42. a mobilizer; 421. a decoration piece; 422. a first rubber ring; 423. an intermediate collar; 424. a second rubber ring; 43. a chassis; 5. a guide bar; 6. a fixed block; 7. a damping spring; 8. a slider; 9. an elastic frame; 10. a movable plate; 11. a pipeline.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 6, the present invention provides a building pipeline anti-seismic support and hanger, which comprises main brackets 1, a transverse bracket 2 and a connecting piece 3, wherein two ends of the transverse bracket 2 are welded at the bottom of the two main brackets 1, the length of the transverse bracket 2 can be cut, when a pipeline 11 to be installed does not need to be much, the length of the transverse bracket 2 can be cut short appropriately, the connecting piece 3 is fixedly connected at the top of the main brackets 1, two ends of the inner cavity of the transverse bracket 2 are fixedly connected with guide rods 5, the middle part of the inner cavity of the transverse bracket 2 is provided with a fixed block 6, two sides of the fixed block 6 are provided with two sliding blocks 8 and an elastic frame 9, the sliding blocks 8 and the elastic frame 9 are sleeved on the guide rods 5, the top of the sliding blocks 8 are hinged with the elastic frames 9, the elastic frames 9 are hinged in a herringbone shape, the two sliding blocks 8 at two ends of the transverse bracket 2 are elastically supported on the inner wall of the transverse bracket 2 through the elastic frame 9, the two sliding blocks 8 relatively positioned at the middle part of the transverse bracket 2 are elastically supported on the fixed block 6 through the elastic frame 9, a movable plate 10 is hinged at the hinged part between the sliding blocks 8, a pipeline 11 is fixedly installed at the top of the movable plate 10, and a movable part 4 is fixedly installed at the top of the main support 1.
Wherein, the movable part 4 includes supporting cover 41, and the inner chamber activity of supporting cover 41 has cup jointed the activity ware 42, and the bottom fixed mounting of supporting cover 41 has chassis 43, and chassis 43 is passed to the bottom of activity ware 42 and extends to the below and cup joints with connecting piece 3 is fixed, and collision screw fixed mounting and wall top are passed through to the top of supporting cover 41, and this structure wholly adopts the mode of hoist and mount.
Wherein, the activity ware 42 includes goods of furniture for display rather than for use 421, the periphery activity of goods of furniture for display rather than for use 421 has cup jointed first rubber ring 422, lantern ring 423 in the middle of the periphery activity of first rubber ring 422 has been cup jointed, the periphery activity of middle lantern ring 423 has been cup jointed second rubber ring 424, the activity of second rubber ring 424 is cup jointed in the inner chamber of supporting cover 41 and with the laminating of 41 inner chamber walls of supporting cover, the main objective of the above-mentioned sandwich type installation of design is for improving the stability of structure, also be simultaneously for the holistic deformation range of control activity ware 42, suitably improve the rigidity, prevent because the unresponsive rock more fast that can make the support damage along with the shock wave deformation brought by a wide margin.
Wherein, the bottom of goods of furniture for display rather than for use 421 is the dead lever of seting up two locating holes on it, and the dead lever of goods of furniture for display rather than for use 421 extends chassis 43 and passes through bolt fixed connection with connecting piece 3, and the dead lever of goods of furniture for display rather than for use 421 is cup jointed in connecting piece 3, owing to set up the locating hole that corresponds with goods of furniture for display rather than for use 421 dead lever on the connecting piece 3, aligns the locating hole, and it can to use two sets of bolts to pass the locating hole implementation fixed.
Wherein, a through-hole has been seted up to the bottom of chassis 43, leave the clearance between the surface of the dead lever of goods of furniture for display rather than for use 421 and the through-hole of chassis 43, the centre of a circle of goods of furniture for display rather than for use 421 and the centre of a circle coincidence of chassis 43, this clearance is exactly the rocking range size of the dead lever of goods of furniture for display rather than for use 421 bottom in the chassis 43 circular hole, when the earthquake transverse wave comes, the support receives the shock wave and has rocked in the horizontal direction, be located the first rubber ring 422 and the second rubber ring 424 of support cover 41 inner chamber and begin to receive vibrations extrusion and move trend and elastic deformation, provide goods of furniture for display rather than for use 421 swing space, then the dead lever of goods of furniture for display rather than for use 421 also can be in the bottom through-hole swing of chassis 43, and the wobbling scope is this clearance.
Wherein, the top and the bottom of the lantern ring 423 in the middle of the goods of furniture for display rather than for use 421, the outer limit of the lantern ring 423 in the middle of the goods of furniture for display rather than for use 421 blocks first rubber ring 422 and second rubber ring 424 respectively, when installing first rubber ring 422, overlap first rubber ring 422 on the goods of furniture for display rather than for use 421, it can all block respectively at the top and the bottom of first rubber ring 422 inner ring on two outer edges of goods of furniture for display rather than for use 421, the installation of second rubber ring 424 is like this equally, need block the top and the bottom at second rubber ring 424 inner ring with the outer limit of extending of middle lantern ring 423.
The working principle and the using process of the utility model are as follows:
when earthquake waves reach the bottom surface, the earthquake waves firstly deal with the coming longitudinal waves, the longitudinal waves can enable the building to vertically undulate including the pipeline support, then the herringbone elastic frame 9 is arranged at the position and matched with the damping spring 7 and the sliding block 8 below, a moving space can be provided for the vertical undulation of the movable plate 10 and the pipeline 11, when the pipeline 11 is pressed downwards, the included angle of the two elastic frames 9 is inevitably increased due to the increase of pressure, the length of the elastic frame 9 along the transverse support 2 in the horizontal direction is inevitably increased, then the damping spring 7 is extruded by moving the extrusion sliding block 8 to shrink, energy is offset, when the pipeline 11 is lifted upwards, the motion state of the elastic frame 9 is opposite, the included angle is changed, the length in the vertical direction is increased, but the movable plate 10 is finally pulled to avoid the separation of the movable plate 10 due to the hinge joint with the movable plate 10;
when the transverse wave comes temporarily, the support receives the shock wave and rocks in the horizontal direction, and the first rubber ring 422 and the second rubber ring 424 that are arranged in the inner cavity of the supporting cover 41 begin to receive the vibration extrusion and the movement trend and elastically deform to provide the swing space of the swing part 421, so that the fixing rod of the swing part 421 can also swing in the through hole at the bottom of the chassis 43, and the whole support can also move to a certain extent along the horizontal direction.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building pipeline antidetonation gallows, includes main support (1), horizontal bracket (2) and connecting piece (3), the both ends of horizontal bracket (2) weld in the bottom of two main supports (1), connecting piece (3) fixed connection is in the top of main support (1), its characterized in that: guide rods (5) are fixedly connected to two ends of an inner cavity of the transverse support (2), a fixed block (6) is arranged in the middle of the inner cavity of the transverse support (2), two sliders (8) and an elastic frame (9) are arranged on two sides of the fixed block (6), the sliders (8) and the elastic frame (9) are sleeved on the guide rods (5), the elastic frame (9) is hinged to the top of each slider (8), the elastic frames (9) are hinged in pairs to form a herringbone shape, the two sliders (8) at two ends of the transverse support (2) are elastically supported on the inner wall of the transverse support (2) through the elastic frame (9), the two sliders (8) relatively positioned in the middle of the transverse support (2) are elastically supported on the fixed block (6) through the elastic frame (9), a movable plate (10) is hinged between the sliders (8), and a pipeline (11) is fixedly mounted at the top of the movable plate (10), the top of the main bracket (1) is fixedly provided with a movable part (4).
2. An earthquake-resistant support and hanger for building pipelines according to claim 1, which is characterized in that: the movable part (4) is including supporting cover (41), the inner chamber activity of supporting cover (41) has cup jointed activity ware (42), the bottom fixed mounting that supports cover (41) has chassis (43), the bottom of activity ware (42) is passed chassis (43) and is extended to the below and cup jointed with connecting piece (3) are fixed, the top of supporting cover (41) is through collision screw fixed mounting and wall crown.
3. A building pipe earthquake-resistant support and hanger as claimed in claim 2, wherein: the activity ware (42) is including goods of furniture for display rather than for use (421), the periphery activity of goods of furniture for display rather than for use (421) has cup jointed first rubber ring (422), lantern ring (423) in the middle of the periphery activity of first rubber ring (422) has cup jointed, the periphery activity of middle lantern ring (423) has cup jointed second rubber ring (424), second rubber ring (424) activity cup joints in the inner chamber that supports cover (41) and with support the laminating of cover (41) inner chamber wall.
4. A building pipe earthquake-resistant support and hanger as claimed in claim 3, wherein: the bottom of the swing part (421) is a fixed rod provided with two positioning holes, and the fixed rod of the swing part (421) extends out of the chassis (43) and is fixedly connected with the connecting piece (3) through a bolt.
5. A building pipeline antidetonation props up gallows according to claim 4, characterized in that: a through hole is formed in the bottom of the base plate (43), a gap is reserved between the outer surface of the fixing rod of the swing part (421) and the through hole of the base plate (43), and the circle center of the swing part (421) coincides with the circle center of the base plate (43).
6. A building pipe earthquake-resistant support and hanger as claimed in claim 3, wherein: the top and the bottom of goods of furniture for display rather than for use (421) and middle lantern ring (423) all are equipped with the extension limit, the first rubber ring (422) and second rubber ring (424) are blocked respectively to the extension limit of goods of furniture for display rather than for use (421) and middle lantern ring (423).
CN202121206600.5U 2021-06-01 2021-06-01 Building pipeline antidetonation gallows Active CN215807111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121206600.5U CN215807111U (en) 2021-06-01 2021-06-01 Building pipeline antidetonation gallows

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121206600.5U CN215807111U (en) 2021-06-01 2021-06-01 Building pipeline antidetonation gallows

Publications (1)

Publication Number Publication Date
CN215807111U true CN215807111U (en) 2022-02-11

Family

ID=80174775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121206600.5U Active CN215807111U (en) 2021-06-01 2021-06-01 Building pipeline antidetonation gallows

Country Status (1)

Country Link
CN (1) CN215807111U (en)

Similar Documents

Publication Publication Date Title
CN215807111U (en) Building pipeline antidetonation gallows
CN109395929B (en) Automobile front bumper spraying hanger
CN208918056U (en) A kind of wall damper
CN213329807U (en) Position-adjustable vertical keel device with buffering and damping functions
CN105346946A (en) Conveying device
CN105366292A (en) Vibrating conveyor
CN211075509U (en) Engine support with buffer function
CN220268640U (en) Round metal pipeline anti-seismic support and hanger
CN216713896U (en) Support arrangement is used in construction of green assembled building interior wall
CN204475567U (en) A kind of Anti-seismic building structure seam structure
CN216215722U (en) Electromechanical pipeline sleeve pipe support with protect function
CN214476813U (en) Damping base of power transformer
CN214459178U (en) Effectual head box of shock attenuation
JP2001082001A (en) Damping device for vibration control
CN214197789U (en) Shock attenuation shale shaker structure
CN110894898A (en) Portable adjustable pump pipe supporting system
CN220668910U (en) Display screen bracket
CN217401909U (en) Assembly type refrigeration machine room equipment pipeline supporting structure based on BIM
CN210034751U (en) Combined side longitudinal anti-seismic support
CN215444363U (en) Water pump shock attenuation platform structure and stop device thereof
CN215806832U (en) Pipeline spring support and hanger
CN215858220U (en) Novel antidetonation steel construction
CN215410535U (en) Fire fighting pipeline fixing frame for fire fighting engineering
CN209324100U (en) A kind of architectural vibration-insulation structural system
CN221030669U (en) Damping structure of movable house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant