Backfill separating and blocking device for upright post isolation construction Download PDF

Info

Publication number
CN215801783U
CN215801783U CN202121996473.3U CN202121996473U CN215801783U CN 215801783 U CN215801783 U CN 215801783U CN 202121996473 U CN202121996473 U CN 202121996473U CN 215801783 U CN215801783 U CN 215801783U
Authority
CN
China
Prior art keywords
upright post
construction
backfill soil
backfill
isolation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121996473.3U
Other languages
Chinese (zh)
Inventor
曾凡韧
张增伟
蒋卓尔
黄家同
张胥
廖纪明
雷凯
李嘉颖
陈翔
赵宇
戴喜盈
杨昀
黄和海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN202121996473.3U priority Critical patent/CN215801783U/en
Application granted granted Critical
Publication of CN215801783U publication Critical patent/CN215801783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a backfill blocking device for upright post isolation construction, which is characterized by comprising a square barrel, a pull ring arranged at the top of the square barrel, a ladder stand arranged on the inner wall and the outer wall of one surface of the square barrel, and a horizontal support plate arranged at the bottom of the square barrel and vertically connected with the inner wall of the square barrel. The utility model can isolate the position of the upright post after the foundation is excavated so as to separate and block the backfill soil, thereby reserving enough space for reinforcement binding, mold filling and pouring construction of the upright post under the condition of not influencing the backfill soil outside the upright post of the foundation, realizing the synchronous implementation of the upright post and the backfill soil construction and greatly improving the construction efficiency.

Description

Backfill separating and blocking device for upright post isolation construction
Technical Field
The utility model relates to a backfill separating and blocking device, in particular to a backfill separating and blocking device for upright post isolation construction.
Background
At present, the construction of large industrial plants becomes an effective assistance method for poverty elimination, hardness elimination and comprehensive rehabilitation realization in various cities, the demands of emerging industrial parks in various cities on the plants are increasingly strengthened, the problems of short construction period, high requirements and more process conversions generally exist in the construction process of the large plants, and the pouring of the upright columns and the ground beams is the key for the technical quality control of the plants. There are three main methods for constructing the columns and the ground beams nowadays:
1) firstly, completing all earthwork backfilling, then performing reverse excavation, and finally completing integral pouring of the stand column and the ground beam; however, in this method, the reverse excavation has a problem of repeated excavation and filling of earth, and has a high requirement for precise construction and a long construction period.
2) The second method is that firstly, the upright post pouring is completed, the ground beam steel bars are reserved, then the earthwork backfilling is carried out, the ground beam and the steel bars reserved on the upright post are dug out, then the ground beam is constructed (the steel bars are bound, the mold is filled and the pouring is carried out), and finally the residual earthwork is backfilled; however, the method has complex processes, and the processes need to be matched with each other; the waiting time of the two concreting of the upright post and the ground beam is long; the reserved ground beam reinforcing steel bar is not easy to excavate mechanically, the manual excavation work amount is large, and the efficiency is low; the steel structure anchor bolt pre-buried on the stand is destroyed easily.
3) And thirdly, firstly, completing foundation pouring, then pouring the upright posts and the ground beams, and finally backfilling earthwork after all pouring and curing are completed. However, in the method, the concrete curing time is long, and the earthwork backfilling waiting time is long; the backfill soil under the ground beam is not easy to tamp, the construction difficulty is high, and the quality of the backfill soil cannot be guaranteed.
In the method, the construction of the upright column and the backfilling of the foundation earthwork are carried out in a staggered manner, so that the construction period of the project is prolonged.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model provides a backfill soil blocking device for upright post isolation construction, which can isolate the upright post position after foundation excavation so as to block backfill soil, thereby reserving enough space for reinforcement binding, formwork filling and pouring construction of the upright post under the condition of not influencing the backfill soil outside the upright post of a foundation, realizing synchronous construction of the upright post and the backfill soil, and greatly improving the construction efficiency.
The utility model is realized by the following technical scheme.
A backfill separates fender device for construction is kept apart to stand, its characterized in that includes square barrel, sets up in the pull ring at square barrel top, sets up the cat ladder on the inner wall of one of them face of square barrel and outer wall, sets up in square barrel bottom, and the horizontal support board of being connected perpendicularly with square barrel inner wall.
As a specific technical scheme, the end of the horizontal supporting plate is provided with a bolt hole.
As a specific technical scheme, an inclined strut is arranged between the horizontal supporting plate and the inner wall of the square cylinder.
As a specific technical scheme, the square cylinder is formed by sequentially splicing four partition plates.
As a specific technical scheme, the left side and the right side of the partition plate are both provided with a buckle; the square cylinder is formed by splicing four partition plates in sequence through buckles.
As a specific technical scheme, convex edges are arranged on the left side and the right side of the partition board; the convex edge is bent inwards and forms an included angle of 135 degrees with the partition plate.
As a specific technical scheme, the partition plate is made of steel plates.
As a specific technical scheme, the outer side surface of the square cylinder body is provided with a rib.
The utility model has the beneficial effects that: the utility model has simple structure and convenient installation, can separate and block the backfill soil after the installation of the stand column, thereby reserving enough space for the reinforcement binding, the mold filling and the pouring construction of the stand column under the condition of not influencing the backfill soil outside the stand column of the foundation, realizing the synchronous implementation of the stand column and the backfill soil construction, greatly improving the construction efficiency and having better practical value.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a top view of the present invention;
FIG. 3 is a cross-sectional view taken at A-A of FIG. 2;
FIG. 4 is a state diagram of the present invention in use;
the meanings of the marks in the above figures are as follows: 1-square cylinder, 2-pull ring, 3-ladder stand, 4-horizontal support plate, 5-bolt hole, 6-diagonal brace, 7-clapboard, 8-buckle, 9-convex edge, 10-ribbed, 11-upright post, 12-foundation.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Examples
Referring to fig. 1 to 4, the backfill blocking device for the column isolation construction comprises a square cylinder 1, a pull ring 2 arranged at the top of the square cylinder 1, a ladder stand 3 arranged on the inner wall and the outer wall of one surface of the square cylinder 1, and a horizontal support plate 4 arranged at the bottom of the square cylinder 1 and vertically connected with the inner wall of the square cylinder 1; the ladder stand 3 is arranged to facilitate workers to go in and out of the square barrel 1 to carry out column construction; the horizontal support plate 4 can increase the lateral pressure resistance of the square barrel 1; the pull ring 2 can facilitate hoisting the square cylinder 1;
in this embodiment, the method of construction using the present apparatus is as follows: referring to fig. 4, after the foundation is excavated, a lifting rope can be fixed on the pull ring 2 through the lifting device, and then the lifting device is lifted and installed at the position of the upright post 11, so that the upright post 11 is enclosed by the square cylinder 1, and the foundation 12 is divided into an area inside the upright post and an area outside the upright post in the ground; because the square cylinder 1 can block the backfilled earthwork, under the condition of not influencing the backfilling outside the foundation upright column, enough space can be reserved for the reinforcement binding, the mold filling and the pouring construction of the upright column, thereby realizing the synchronous operation of the upright column and the backfilling construction; therefore, after the device is installed, the short column can be bound, molded and poured in the area in the column, namely the square cylinder 1, and the ground beam steel bars are pre-buried; therefore, simultaneously, earth backfilling is carried out in the area outside the column, namely the foundation field outside the square barrel 1, and after backfilling is completed, reverse excavation is carried out on the ground beam area, so that the ground beam construction area is formed at one time for pouring of ground beam concrete.
Further, in a preferred embodiment, referring to fig. 2 and 3, the end of the horizontal support plate 4 is provided with a bolt hole 5, so that a bolt can be driven into the bolt hole 5 to fix the horizontal support plate to the ground, and the installation of the device is more stable.
Further, in a preferred embodiment, referring to fig. 2 and 3, an inclined strut 6 is arranged between the horizontal support plate 4 and the inner wall of the square cylinder 1.
In order to facilitate the installation and transportation of the device, further, in a preferred embodiment, referring to fig. 1 to 3, the square cylinder 1 is formed by splicing four partition plates 7 in sequence.
Further, in a preferred embodiment, the left side and the right side of the partition board 7 are both provided with a buckle 8; the square cylinder 1 is formed by splicing four partition plates 7 in sequence through buckles 8.
In order to make the connection between the partition boards 7 more tightly fit to prevent the non-return filling soil from falling into the construction range of the upright column from between the partition boards 7, further, in a preferred embodiment, referring to fig. 2, the left and right sides of the partition boards 7 are provided with convex edges 9; the flange 9 is bent inwards and forms an angle of 135 degrees with the partition 7.
To improve the lateral pressure resistance and the overall strength of the device, the partition 7 is further made of a steel plate in a preferred embodiment.
In order to improve the lateral pressure resistance and the overall strength of the device, further, in a preferred embodiment, the outer side of the square cylinder 1 is provided with a rib 10.

Claims (8)

1. A backfill separates fender device for construction is kept apart to stand, its characterized in that includes square barrel (1), sets up in pull ring (2) at square barrel (1) top, sets up cat ladder (3) on the inner wall of one of them face of square barrel (1) and outer wall, sets up in square barrel (1) bottom, and with horizontal support board (4) that square barrel (1) inner wall is connected perpendicularly.
2. The backfill soil barrier device for the isolation construction of the vertical column according to claim 1, characterized in that the end of the horizontal support plate (4) is provided with a bolt hole (5).
3. The backfill soil barrier device for the isolation construction of the upright post according to claim 1, characterized in that a diagonal brace (6) is arranged between the horizontal support plate (4) and the inner wall of the square cylinder (1).
4. The backfill soil separation device for the isolation construction of the upright post according to claim 1, characterized in that the square cylinder (1) is formed by splicing four partition plates (7) in sequence.
5. The backfill soil barrier device for the isolation construction of the upright post according to claim 4, wherein the left and right sides of the clapboard (7) are provided with buckles (8); the square cylinder body (1) is formed by sequentially splicing four partition plates (7) through buckles (8).
6. The backfill soil barrier device for the isolation construction of the vertical column according to claim 4, characterized in that the left and right sides of the partition (7) are provided with flanges (9); the convex edge (9) is bent inwards and forms an included angle of 135 degrees with the partition plate (7).
7. The backfill soil barrier device for the isolation construction of the vertical column according to claim 4, characterized in that the partition (7) is made of steel plate.
8. The backfill soil separation device for the column isolation construction according to any one of claims 1 to 7, characterized in that the outer side of the square cylinder (1) is provided with a rib (10).
CN202121996473.3U 2021-08-20 2021-08-20 Backfill separating and blocking device for upright post isolation construction Active CN215801783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121996473.3U CN215801783U (en) 2021-08-20 2021-08-20 Backfill separating and blocking device for upright post isolation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121996473.3U CN215801783U (en) 2021-08-20 2021-08-20 Backfill separating and blocking device for upright post isolation construction

Publications (1)

Publication Number Publication Date
CN215801783U true CN215801783U (en) 2022-02-11

Family

ID=80150534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121996473.3U Active CN215801783U (en) 2021-08-20 2021-08-20 Backfill separating and blocking device for upright post isolation construction

Country Status (1)

Country Link
CN (1) CN215801783U (en)

Similar Documents

Publication Publication Date Title
CN211257007U (en) A supporting construction for building foundation ditch construction
CN107246016B (en) Hanging type inner support system suitable for foundation pit engineering and foundation pit construction method
CN214245383U (en) Combined die system for bent cap construction
CN107558477B (en) Supporting structure combining foundation pit and side slope and construction method
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
CN108930274B (en) Basement supporting construction method
CN215801783U (en) Backfill separating and blocking device for upright post isolation construction
CN210315253U (en) Novel aquatic tie beam bracket device
CN209779640U (en) foundation pit supporting pile top crown beam construction structure
US4232491A (en) Swimming pool deck
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN115748735A (en) Foundation pit support system with umbrella-shaped ring beam support and construction method
CN213448506U (en) Plugging structure arranged between foundation pit fender posts
CN209339172U (en) A kind of novel peg board composite foundation
CN108612129B (en) Reverse construction method based on recyclable steel platform
CN108442406B (en) Semi-reverse construction method foundation pit inner supporting structure and construction method thereof
CN113944262B (en) Construction method for foundation-column-free type deep foundation pit and outer wall integrated structure
CN217629966U (en) Face semi-reverse construction method foundation ditch inner support structure of large-span of subway
CN213204202U (en) Prefabricated assembled retaining wall of board wall separation
CN212956547U (en) Foundation ditch support tower crane basis integral type structure
CN220565709U (en) Reinforcing system of concrete pouring template of sewage treatment inclined tube sedimentation tank
CN219992483U (en) Opposite-top type river abutment foundation pit retaining structure
CN217840090U (en) Full-height inverted filter frame for pile-plate type retaining wall
CN217353838U (en) Take gabion enclosure of pipeline crane span structure
CN216948299U (en) Novel foundation pit supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant