CN215800844U - Roadbed partition board capable of being installed quickly - Google Patents

Roadbed partition board capable of being installed quickly Download PDF

Info

Publication number
CN215800844U
CN215800844U CN202120390541.5U CN202120390541U CN215800844U CN 215800844 U CN215800844 U CN 215800844U CN 202120390541 U CN202120390541 U CN 202120390541U CN 215800844 U CN215800844 U CN 215800844U
Authority
CN
China
Prior art keywords
baffle
partition
fixed
plate
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120390541.5U
Other languages
Chinese (zh)
Inventor
王毓晋
张文瑜
宋冰泉
裘松立
申洛岑
张锦涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Communication Engineering Construction Group Co Ltd
Original Assignee
Ningbo Communication Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communication Engineering Construction Group Co Ltd filed Critical Ningbo Communication Engineering Construction Group Co Ltd
Priority to CN202120390541.5U priority Critical patent/CN215800844U/en
Application granted granted Critical
Publication of CN215800844U publication Critical patent/CN215800844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a roadbed partition board capable of being installed quickly. The quickly installed subgrade partition comprises a first partition; the greening structure is fixed on the side wall of the first partition plate; the locking structure is abutted against the top surface of the first partition plate and comprises a second partition plate, a locking groove, a positioning table, a sliding block, a first sliding groove, a first baffle plate, a connecting rod, a first spring, a limiting rod and a second spring; the connecting structure is fixed on the side wall of the other side of the second partition plate and comprises a slide way, a right-angle plate, a second chute, a second baffle, a limiting plate and a limiting hole; the stabilizing structure is fixed on the tops of the side walls of the first partition plate and the second partition plate and comprises a grabbing plate and a grabbing head. The quickly-installed roadbed partition provided by the utility model has the advantages of convenience and stability in splicing.

Description

Roadbed partition board capable of being installed quickly
Technical Field
The utility model relates to the technical field of roadbed clapboards, in particular to a roadbed clapboard capable of being installed quickly.
Background
At present, more and more building muck is produced in engineering construction. In order to solve the problem of disposing a large amount of residual soil, fluidized solidified residual soil is considered to be used for pouring and filling the roadbed. The pouring type roadbed needs a special clapboard to form a template in a surrounding mode, so that the solidified soil in the flow state can be paved inside, a plurality of layers of the roadbed are paved, and the next layer can be paved after each layer of the pouring type roadbed is solidified.
Traditional roadbed baffle is connected loaded down with trivial details about the lower floor, and the junction is not hard up easily moreover, and is firm inadequately, because flow state solidification dregs can lead to the fact certain lateral pressure to the baffle, and traditional upper strata baffle position squints easily to lead to solidification soil side to move, unevenness scheduling problem influences the road bed quality.
Therefore, there is a need to provide a new road bed partition that can be installed quickly to solve the above-mentioned technical problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides the roadbed partition board which is convenient, stable and fast to splice and install.
The utility model provides a quickly installed subgrade separator comprising: a first separator; the greening structure is fixed on the side wall of the first partition plate; the locking structure, the locking structure is contradicted the top surface of first baffle, the locking structure includes second baffle, locking groove, location platform, slider, first spout, first baffle, connecting rod, first spring, gag lever post and second spring, the bottom surface of second baffle is contradicted the top surface of first baffle, the locking groove is fixed in the lateral wall top of first baffle and second baffle, the location platform is fixed in the another side lateral wall top of first baffle and second baffle, first spout is located the top surface of location platform, slider sliding connection in the first spout, first baffle is fixed in the top surface edge of location platform, the connecting rod sliding connection in the second baffle with the inside of location platform, first spring mounting in the inside of location platform, just the one end of first spring is contradicted the inside of location platform, the other end of the second spring abuts against the side wall of the connecting rod, the limiting rod is connected inside the second partition plate in a sliding mode, the bottom end of the connecting rod is fixed to the side wall of the limiting rod, the second spring is installed inside the second partition plate, one end of the second spring is fixed to one end of the limiting rod, and the other end of the second spring abuts against the inner wall of the second partition plate; the connecting structure is fixed on the other side wall of the second partition plate and comprises a slide way, a right-angle plate, a second slide groove, a second baffle plate, a limiting plate and a limiting hole, the slide way is fixed on the other side wall of the second partition plate, the top side wall of the right-angle plate is in sliding connection with the slide way, the second slide groove is formed in the top surface of the right-angle plate, the slide block is in sliding connection with the second slide groove, the second baffle plate is fixed on the top surface of the first partition plate, the limiting plate is fixed on the bottom surface of the second partition plate, the limiting plate is in sliding connection with the inner portion of the locking groove, the limiting hole penetrates through the bottom end of the limiting plate, and the limiting rod is in clamping connection with the limiting hole; the fixing structure comprises a grabbing plate and a grabbing head, the grabbing plate is fixed at the top of the side wall of the first partition plate and the top of the side wall of the second partition plate in an equidistant mode, the grabbing head is perpendicularly fixed to the other end of the grabbing plate, and the grabbing head is fixed to the top of the side wall of the first partition plate and the top of the side wall of the second partition plate.
Preferably, a plurality of connecting holes are formed in two ends of the first partition plate.
Preferably, the greening structure comprises a greening box, water leakage holes, a fixing plate and fixing holes, the side wall of the greening box is fixed on the side wall of the first partition plate, the water leakage holes are equidistantly formed in the bottom surface of the greening box, the fixing plate is fixed at the bottom of the side wall of the greening box, and the fixing holes are equidistantly formed in the surface of the fixing plate.
Preferably, the locking groove with the axis of location platform is in same straight line, just the other end sliding connection of gag lever post in the inside of locking groove.
Preferably, the connecting structure further comprises two triangular plates, and the two triangular plates are fixed on the top surfaces of the right-angle plates.
Preferably, the bottom of right-angle plate is contradicted respectively the top surface of first baffle, second baffle and location platform, just the bottom lateral wall of right-angle plate is contradicted respectively first baffle with the second baffle.
Compared with the related art, the roadbed partition board which is quickly installed has the following beneficial effects:
the utility model provides a quickly-installed roadbed partition plate, wherein an US coupling limiting plate at the bottom of an upper layer of a second partition plate is inserted into and matched with a locking groove on the side wall of a lower layer of the second partition plate, and meanwhile, a sliding block slides to drive a limiting rod to be clamped with the limiting hole, so that the upper layer of the second partition plate is fixed, and the sliding block abuts against a right-angle plate and the first baffle and the second baffle, so that the stability and the anti-toppling capability of the second partition plate are greatly improved, and the anti-side pressure capability of the second partition plate is greatly improved, and the second partition plate is not easy to displace and deform.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of a quick-install roadbed partition according to the present invention;
FIG. 2 is a schematic cross-sectional view of a connection between two second separators shown in FIG. 1;
fig. 3 is an enlarged schematic view of the portion a shown in fig. 2.
Reference numbers in the figures: 1. first baffle, 2, connecting hole, 3, afforestation structure, 31, afforestation case, 32, the hole that leaks, 33, the fixed plate, 34, the fixed orifices, 4, locking structure, 41, the second baffle, 42, the locking groove, 43, the location platform, 44, the slider, 45, first spout, 46, first baffle, 47, the connecting rod, 48, first spring, 49, the gag lever post, 49a, the second spring, 5, connection structure, 51, the slide, 52, the right-angle plate, 53, the set-square, 54, the second spout, 55, the second baffle, 56, the limiting plate, 57, spacing hole, 6, firm structure, 61, grab the board, 62, grab the head.
Detailed Description
The utility model is further described with reference to the following figures and embodiments.
Referring to fig. 1, fig. 2 and fig. 3, fig. 1 is a schematic structural diagram of a preferred embodiment of a rapid-installation roadbed partition according to the present invention; FIG. 2 is a schematic cross-sectional view of a connection between two second separators shown in FIG. 1; fig. 3 is an enlarged schematic view of the portion a shown in fig. 2. A quickly installed subgrade separator comprising: a first separator 1; a greening structure 3, wherein the greening structure 3 is fixed on the side wall of the first partition board 1; locking structure 4, locking structure 4 contradicts the top surface of first baffle 1, locking structure 4 includes second baffle 41, locking groove 42, location platform 43, slider 44, first spout 45, first baffle 46, connecting rod 47, first spring 48, gag lever post 49 and second spring 49a, the bottom surface of second baffle 41 contradicts the top surface of first baffle 1, locking groove 42 is fixed in the lateral wall top of first baffle 1 and second baffle 41, location platform 43 is fixed in the another side wall top of first baffle 1 and second baffle 41, the top surface of location platform 43 is located to first spout 45, slider 44 sliding connection in first spout 45, first baffle 46 is fixed in the top surface edge of location platform 43, connecting rod 47 sliding connection in the inside of second baffle 41 and location platform 43, the first spring 48 is installed inside the positioning table 43, one end of the first spring 48 abuts against the inside of the positioning table 43, the other end of the first spring abuts against the side wall of the connecting rod 47, the limiting rod 49 is slidably connected inside the second partition plate 41, the bottom end of the connecting rod 47 is fixed to the side wall of the limiting rod 49, the second spring 49a is installed inside the second partition plate 41, one end of the second spring 49a is fixed to one end of the limiting rod 49, and the other end of the second spring abuts against the inner wall of the second partition plate 41; a connecting structure 5, wherein the connecting structure 5 is fixed on the other side wall of the second clapboard 41, the connecting structure 5 comprises a slideway 51, a right-angle plate 52, a second sliding chute 54, a second baffle 55, a limit plate 56 and a limit hole 57, the slideway 51 is fixed on the other side wall of the second partition board 41, the top end side wall of the right-angle plate 52 is connected with the slideway 51 in a sliding manner, the second chute 54 is arranged on the top surface of the right-angle plate 52, the sliding block 44 is slidably connected with the second sliding groove 54, the second baffle 55 is fixed on the top surface of the first partition board 1, the limit plate 56 is fixed on the bottom surface of the second partition board 41, the limiting plate 56 is connected with the inside of the locking groove 42 in a sliding manner, the limiting hole 57 penetrates through the bottom end of the limiting plate 56, and the limiting rod 49 is connected with the limiting hole 57 in a clamping manner; firm structure 6, firm structure 6 is fixed in first baffle 1 with the lateral wall top of second baffle 41, firm structure 6 is including grabbing board 61 and grabbing head 62, a plurality of grab board 61's one end equidistance is fixed in first baffle 1 with the lateral wall top of second baffle 41, grab head 62 vertical fixation in grab the other end of board 61.
In a specific implementation process, as shown in fig. 1, a plurality of connection holes 2 are formed at two ends of the first partition board 1, so that the plurality of first partition boards 1 are connected to each other conveniently, thereby forming a whole.
In the specific implementation, as shown in fig. 1, the greening structure 3 comprises a greening box 31, a water leakage hole 32, a fixing plate 33 and a fixing hole 34, the side wall of the greening box 31 is fixed on the side wall of the first partition board 1, a plurality of water leakage holes 32 are equidistantly penetrated through the bottom surface of the greening box 31, the fixing plate 33 is fixed at the bottom of the sidewall of the greening box 31, and a plurality of fixing holes 34 are equidistantly arranged on the surface of the fixing plate 33, so that in order to reasonably utilize the space, green plants can be planted when the roadbed partition is installed, and the need of soil filling and planting in the later period to increase the greening is avoided, has positive effect on beautifying municipal environment, has low price and high cost performance, meanwhile, the greening box 31 is filled with soil, the lateral force resistance of the first partition plate 1 is improved by using the weight of the soil, and the stability of the first partition plate 1 is improved.
In the specific implementation process, as shown in fig. 1 and 2, the locking groove 42 is located on the same straight line with the central axis of the positioning table 43, and the other end of the limiting rod 49 is slidably connected to the inside of the locking groove 42, when the second partition plate 41 is stacked for the upper layer, the limiting plate 56 on the bottom surface of the second partition plate 41 on the upper layer can be just inserted into the lower layer in the locking groove 42, and the limiting plate 56 is conveniently locked by the limiting rod 49 controlled by the slider 44.
In a specific implementation process, as shown in fig. 1 and fig. 2, the connecting structure 5 further includes triangular plates 53, and two of the triangular plates 53 are fixed on the top surfaces of the rectangular plates 52, so as to improve the strength of the rectangular plates 52, thereby improving the supporting capability of the rectangular plates 52, and further improving the stability of the second partition plate 41.
In a specific implementation process, as shown in fig. 1 and fig. 2, the bottom ends of the right-angle plates 52 respectively abut against the top surfaces of the first partition plate 1, the second partition plate 41 and the positioning table 43, and the bottom side walls of the right-angle plates 52 respectively abut against the first baffle plate 46 and the second baffle plate 55, so that the right-angle plates 52 are pressed by the sliders 44, and the second partition plate 41 on the upper layer is stably connected and is not easily deformed by the limitation of the first baffle plate 46, the second baffle plate 55, the locking groove 42 and the like, and meanwhile, the second partition plate 41 is conveniently installed.
The working principle of the quickly-installed roadbed partition plate provided by the utility model is as follows:
firstly, fixing the first partition board 1 with the greening box 31 in a proper position, using bolts to penetrate through the fixing holes 34 to stabilize the first partition board 1 and the greening box 31, then connecting a plurality of first partition boards 1 through the connecting holes 2, after the first partition board 1 is installed, pouring fluid solidified soil into a space enclosed by the first partition board 1, and processing the surface of the solidified soil to be flat, wherein the grabbing plate 61 at the top of the side wall of the first partition board 1 is positioned at the top of the solidified soil, the grabbing head 62 is inserted into the solidified soil, and as the fluid solidified soil residue can cause a certain lateral pressure to the partition board, the grabbing plate 61 and the grabbing head 62 are matched to pull the solidified soil, so that a part of lateral pressure borne by the first partition board 1 can be offset; after waiting for the solidification of solidified soil, continuously installing an upper-layer clapboard: firstly sliding the sliding block 44 on the top surface of the first partition board 1, the sliding block 44 driving the connecting rod 47 to slide in the first partition board 1 and compressing the first spring 48 and simultaneously driving the limiting rod 49 to slide in the first partition board 1, the second spring 49a being compressed, then aligning the bottom surface of the second partition board 41 with the top surface of the first partition board 1, simultaneously inserting the limiting plate 56 on the bottom surface of the second partition board 41 into the corresponding locking groove 42 on the sidewall of the first partition board 1, when the limiting plate 56 just enters the locking groove 42, the bottom surface of the right-angle plate 52 on the bottom of the other sidewall of the second partition board 41 just abuts against the top surface of the first partition board 1, and the sidewall of the right-angle plate 52 and the second baffle 55 on the top surface of the first partition board 1 abut against each other, and then loosening the sliding block 44, under the urging of the first spring 48 and the second spring 49a, the limiting rod 49 slides from inside the first partition board 1 into the locking groove 42 and is inserted into the limiting hole 57 on the limiting plate 56, so as to fix the limiting plate 56 inside the locking groove 42, thereby stably fixing the second partition board 41 on the top surface of the first partition board 1, and simultaneously the connecting rod 47 drives the sliding block 44 to slide into the second sliding groove 54 on the right-angle plate 52 and abut against the right-angle plate 52 through the sliding block 44, so as to stabilize the right-angle plate 52; after the second partition plate 41 is installed, the fluid-state solidified soil can be continuously poured, and the upper partition plate can be continuously installed after being processed and leveled in the above manner and being solidified; when removing, it is only necessary to slide the slide block 44 on the top surface of the second partition plate 41 from the upper layer, the sliding block 44 slides out from the right-angle plate 52 on the side wall of the second partition plate 41 on the first layer, and simultaneously drives the connecting rod 47 to slide in the second partition plate 41, and presses the first spring 48, and at the same time, the connecting rod 47 drives the limiting rod 49 to slide, the limiting rod 49 slides out of the limiting hole 57 on the limiting plate 56, and enters the inside of the first separator 1, at which time the second separator 41 of the uppermost layer is unrestrained, and is separated from the second separator 41 of the second layer and the locking groove 42 by pulling the second separator 41 of the uppermost layer upward, the second partition 41 can thus be removed quickly, and all partitions can be removed by operating in sequence in the manner described above.
Compared with the related art, the roadbed partition board which is quickly installed has the following beneficial effects:
the utility model provides a roadbed partition board capable of being quickly installed, wherein a U-shaped limiting plate 56 at the bottom of an upper layer of a second partition board 41 is inserted and matched with a locking groove 42 on the side wall of the lower layer of the second partition board 41, a sliding block 44 is used for sliding to drive a limiting rod 49 to be clamped with a limiting hole 57, so that the upper layer of the second partition board 41 is fixed, and the stability and the anti-falling capacity of the second partition board 41 are greatly improved by the interference of the sliding block 44 on a right-angle plate 52 and the interference of a first baffle 46 and a second baffle 55, and the side pressure resistance capacity of the second partition board 41 is greatly improved, so that the second partition board is not easy to displace and deform.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (6)

1. A quickly installed subgrade partition, comprising:
a first separator (1);
the greening structure (3), the greening structure (3) is fixed on the side wall of the first partition board (1);
locking structure (4), locking structure (4) contradict the top surface of first baffle (1), locking structure (4) include second baffle (41), lock groove (42), location platform (43), slider (44), first spout (45), first baffle (46), connecting rod (47), first spring (48), gag lever post (49) and second spring (49 a), the bottom surface of second baffle (41) contradicts the top surface of first baffle (1), lock groove (42) are fixed in the lateral wall top of first baffle (1) and second baffle (41), location platform (43) are fixed in the another side wall top of first baffle (1) and second baffle (41), the top surface of location platform (43) is located in first spout (45), slider (44) sliding connection in first spout (45), the first baffle (46) is fixed at the edge of the top surface of the positioning table (43), the connecting rod (47) is connected to the second partition plate (41) and the inside of the positioning table (43) in a sliding manner, the first spring (48) is installed inside the positioning table (43), one end of the first spring (48) abuts against the inside of the positioning table (43), the other end of the first spring abuts against the side wall of the connecting rod (47), the limiting rod (49) is connected to the inside of the second partition plate (41) in a sliding manner, the bottom end of the connecting rod (47) is fixed at the side wall of the limiting rod (49), the second spring (49 a) is installed inside the second partition plate (41), one end of the second spring (49 a) is fixed at one end of the limiting rod (49), and the other end of the second spring abuts against the inner wall of the second partition plate (41);
connection structure (5), connection structure (5) are fixed in the another side lateral wall of second baffle (41), connection structure (5) include slide (51), right angle board (52), second spout (54), second baffle (55), limiting plate (56) and spacing hole (57), slide (51) are fixed in the another side lateral wall of second baffle (41), the top lateral wall of right angle board (52) with sliding connection between slide (51), second spout (54) are located the top surface of right angle board (52), just slider (44) with sliding connection between second spout (54), second baffle (55) are fixed in the top surface of first baffle (1), limiting plate (56) are fixed in the bottom surface of second baffle (41), just limiting plate (56) with the inside sliding connection who locks groove (42), the limiting hole (57) penetrates through the bottom end of the limiting plate (56), and the limiting rod (49) is connected with the limiting hole (57) in a clamping manner;
firm structure (6), firm structure (6) are fixed in first baffle (1) with the lateral wall top of second baffle (41), firm structure (6) are including grabbing board (61) and grabbing head (62), a plurality of grab the one end equidistance of board (61) and be fixed in first baffle (1) with the lateral wall top of second baffle (41), grab head (62) vertical fixation in grab the other end of board (61).
2. A quickly installed roadbed partition according to claim 1, wherein the first partition (1) is provided with a plurality of connection holes (2) at both ends.
3. A fast-installed roadbed partition according to claim 1, wherein the greening structure (3) comprises a greening box (31), water leakage holes (32), a fixing plate (33) and fixing holes (34), the side wall of the greening box (31) is fixed on the side wall of the first partition (1), a plurality of the water leakage holes (32) are equidistantly penetrated through the bottom surface of the greening box (31), the fixing plate (33) is fixed on the bottom of the side wall of the greening box (31), and a plurality of the fixing holes (34) are equidistantly penetrated through the surface of the fixing plate (33).
4. A quickly installed roadbed partition according to claim 1, characterized in that the locking groove (42) is in line with the centre axis of the positioning table (43), and the other end of the limiting rod (49) is slidably connected inside the locking groove (42).
5. A quickly installed subgrade clapboard according to claim 1, wherein the connecting structure (5) further comprises triangular plates (53), and the two triangular plates (53) are fixed on the top surfaces of the right-angle plates (52).
6. A quickly installed subgrade partition according to claim 1, characterized in that the bottom ends of said gussets (52) abut the top surfaces of said first partition (1), second partition (41) and positioning block (43), respectively, and the bottom end side walls of said gussets (52) abut said first baffle (46) and said second baffle (55), respectively.
CN202120390541.5U 2021-02-22 2021-02-22 Roadbed partition board capable of being installed quickly Active CN215800844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120390541.5U CN215800844U (en) 2021-02-22 2021-02-22 Roadbed partition board capable of being installed quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120390541.5U CN215800844U (en) 2021-02-22 2021-02-22 Roadbed partition board capable of being installed quickly

Publications (1)

Publication Number Publication Date
CN215800844U true CN215800844U (en) 2022-02-11

Family

ID=80161730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120390541.5U Active CN215800844U (en) 2021-02-22 2021-02-22 Roadbed partition board capable of being installed quickly

Country Status (1)

Country Link
CN (1) CN215800844U (en)

Similar Documents

Publication Publication Date Title
JP5616925B2 (en) Steel double camber and seismic isolation load exchange method using the same
CN215800844U (en) Roadbed partition board capable of being installed quickly
CN202532021U (en) Movable pipeline buttress
KR101295331B1 (en) Connection pin of soil bag
CN209923938U (en) Assembled supporting construction of small-size rectangle foundation ditch
KR101978500B1 (en) Slip form apparatus using tower structure and method for forming vertical structure
CN116137114A (en) Urban and rural planning sand table display stacking device
KR20150034322A (en) Braced Wall That Construction is Easy, and Construction Method
CN212294427U (en) Roadblock awl for municipal works with stably pile up function
CN213980025U (en) Thermal insulation building block for thermal insulation layer transformed from old city
JP3015646U (en) Concrete block for earth retaining
CN206883880U (en) A maintenance frame for standard curing room
CN211396605U (en) Adjustable template reinforcing apparatus
CN217806141U (en) Freezing storage box for placing freezing storage pipe
CN207004016U (en) A kind of horizon adjustable binder template stationary fixture
CN2467297Y (en) Forming apparatus for concrete floorslab headspace open
CN219497235U (en) Roadbed design model based on highway design
CN215770434U (en) Engineering progress display device for building engineering management
CN212854589U (en) Mobilizable basketball court
CN219886863U (en) Foundation pit supporting device
CN213741171U (en) Building construction foundation strutting arrangement
CN217331171U (en) Forced centering rod for measuring control point
CN210263017U (en) Tubular pile convenient to pile up
CN220620119U (en) Thin steel template assembly based on soil core backfill
CN106320611B (en) steel bar splicing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant