CN215767731U - Municipal works construction soil sampling ware - Google Patents

Municipal works construction soil sampling ware Download PDF

Info

Publication number
CN215767731U
CN215767731U CN202121271407.XU CN202121271407U CN215767731U CN 215767731 U CN215767731 U CN 215767731U CN 202121271407 U CN202121271407 U CN 202121271407U CN 215767731 U CN215767731 U CN 215767731U
Authority
CN
China
Prior art keywords
wall
plate
bulldozing
rod
shaped handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121271407.XU
Other languages
Chinese (zh)
Inventor
赵倩
刘志国
郭钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121271407.XU priority Critical patent/CN215767731U/en
Application granted granted Critical
Publication of CN215767731U publication Critical patent/CN215767731U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model belongs to the technical field of building construction, and particularly relates to a municipal engineering construction soil sampler which comprises an earth drill body mainly comprising a T-shaped handle and a sampling pipe, wherein the T-shaped handle and the sampling pipe are positioned on the same vertical horizontal plane and are welded and fixed; at the bull-dozing subassembly of boring body internally mounted, be convenient for release the sample in the sampling tube, the convenient sample, through the clearance subassembly at bull-dozer plate internally mounted, conveniently clear up the sampling tube inner wall, prevent the soil adhesion, guarantee the normal clear of follow-up sample work.

Description

Municipal works construction soil sampling ware
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a municipal engineering construction soil sampler.
Background
The soil auger is the instrument that is used for acquireing the soil sample, in municipal works construction, need carry out the geological survey to the construction region, use the soil auger in the geological survey, insert ground with soil auger surface mounting's sampling pipe, take a sample to the soil of underground, when moisture is more in soil, a large amount of soil particles can the adhesion at the sampling pipe inner wall, are difficult to take out the soil sample, and cause the pollution to the sample in the subsequent soil sample, cause the inconvenience of normal use from this.
In order to solve the problem, a municipal engineering construction soil sampler is provided in the application.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a municipal engineering construction soil sampler which has the characteristics of convenience in sampling, prevention of soil adhesion and convenience in cleaning.
In order to achieve the purpose, the utility model provides the following technical scheme: the soil auger comprises an earth auger body mainly comprising a T-shaped handle and a sampling pipe, wherein the T-shaped handle and the sampling pipe are positioned on the same vertical horizontal plane and are welded and fixed, and a soil-shifting assembly is arranged in the earth auger body;
the bulldozing component comprises a vertically arranged screw rod, a sliding sleeve, a transversely arranged fixed plate, a vertically arranged fixed rod and a bulldozing plate, wherein an inner cavity is arranged on the surface of the T-shaped handle, the screw rod is inserted into the inner cavity and is rotationally connected with the inner wall of the inner cavity through a bearing, the fixed plate is sleeved on the outer side of the screw rod, the edge of the fixed plate is attached to the inner wall of the inner cavity, the sliding sleeve is preset inside the central point of the surface of the fixed plate, the outer side surface of the screw rod penetrates through the sliding sleeve and is in threaded connection with the inner wall of the sliding sleeve, through grooves are symmetrically formed in the attachment surfaces of the T-shaped handle and the sampling tube, the outer wall of the fixed rod is attached to the inner wall of the through grooves, the fixed rod is symmetrically arranged along the outer side surface of the screw rod, one end of the fixed rod is welded with the surface of the fixed plate, and the other end of the fixed rod extends into the sampling tube, and the sampling tube is welded with the surface of the bulldozing plate, and the bulldozing plate is positioned in the sampling tube and is designed in a round cake shape.
Preferably, one end of the screw rod, which is far away from the fixed rod, extends out of the outer wall of the T-shaped handle and is rotatably connected with the port of the T-shaped handle through a bearing.
Preferably, the soil sampler for municipal engineering construction further comprises sliding chutes and sliding blocks, wherein the sliding chutes and the sliding blocks are arranged on the inner side wall of the inner cavity, the sliding chutes are symmetrically arranged along the axis of the T-shaped handle, the sliding blocks are welded with two sides of the outer wall of the fixing plate, and one ends of the sliding blocks, which are far away from the fixing plate, extend into the inner cavity and are in sliding connection with the inner wall of the sliding chutes.
Preferably, the soil sampler for municipal engineering construction further comprises a holding rod, the cross section of the holding rod is in an L-shaped design, and one end of the screw rod, which is far away from the fixing rod, is welded to the surface of the holding rod.
The municipal engineering construction soil sampler preferably comprises a cleaning assembly arranged inside the bulldozing plate, wherein the cleaning assembly comprises a scraping plate, a sliding plate and a return spring, the scraping plate is transversely arranged, the sliding plate is vertically arranged, grooves are formed in the outer side wall of the bulldozing plate at intervals, the scraping plate is inserted into the grooves and welded with the surface of the sliding plate, the outer side wall of the sliding plate is attached to the inner wall of the groove of the bulldozing plate, the return spring is arranged on the side, away from the scraping plate, of the outer wall of the sliding plate, one end of the return spring is welded with the surface of the sliding plate, and the other end of the return spring is welded with the inner wall of the groove of the bulldozing plate.
Preferably, the cleaning assembly further comprises bristles and a mounting plate, the bristles are located between adjacent scraping plates and arranged on the outer side surface of the bulldozing plate, the mounting plate is located between the bristles and the bulldozing plate, the bristles are bonded with the surface of the mounting plate through an adhesive, and one side, away from the bristles, of the outer wall of the mounting plate is connected with the outer side wall of the bulldozing plate through bolts.
Compared with the prior art, the utility model has the beneficial effects that:
through the bull-dozing subassembly at the native internal installation of brill, be convenient for release the sample in the sampling tube, the convenient sample, through the clearance subassembly at bull-dozer inboard installation, conveniently clear up the sampling tube inner wall, prevent the soil adhesion, guarantee the normal clear of follow-up sample work.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic view of the internal structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the bulldozer assembly of the present invention;
FIG. 3 is a schematic view showing a connection structure of a screw, a fixing plate and a fixing rod according to the present invention;
FIG. 4 is a schematic view of the internal structure of the cleaning assembly of the present invention;
in the figure:
1. an earth drill body; 101. a T-shaped handle; 102. a sampling tube;
2. a dozing assembly; 201. a screw; 202. a sliding sleeve; 203. a fixing plate; 204. fixing the rod; 205. a bulldozer plate; 206. an inner cavity; 207. a chute; 208. a slider; 209. a holding rod;
3. cleaning the assembly; 301. a squeegee; 302. a slide plate; 303. a return spring; 304. brushing; 305. and (7) mounting the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
As shown in fig. 1, 2 and 3:
the utility model provides a municipal works construction soil sampler, includes mainly by the soil drill body 1 that T type handle 101 and sampling pipe 102 constitute, T type handle 101 and sampling pipe 102 are located same vertical horizontal plane and welded fastening.
In this embodiment: in municipal works construction, need use the soil to bore body 1 and carry out the investigation to the construction area, insert ground with soil drill body 1 surface mounting's sampling pipe 102, take a sample to the soil of underground, when moisture is more in the soil, a large amount of soil particles can the adhesion at sampling pipe 102 inner wall, are difficult to take out soil sample, cause the inconvenience of normal use from this.
On this basis, bulldozing subassembly 2 at the internal installation of current earth auger body 1 is convenient for push out the sample in sampling pipe 102, the convenient sample.
This municipal works construction soil sampler, the inside subassembly 2 that bulldozes that is provided with of soil drill body 1.
The bulldozing component 2 comprises a vertically arranged screw 201, a sliding sleeve 202, a transversely arranged fixing plate 203, a vertically arranged fixing rod 204 and a bulldozing plate 205, wherein an inner cavity 206 is arranged on the surface of a T-shaped handle 101, the screw 201 is inserted into the inner cavity 206 and is rotatably connected with the inner wall of the inner cavity 206 through a bearing, the fixing plate 203 is sleeved on the outer side of the screw 201, the corner of the fixing plate 203 is attached to the inner wall of the inner cavity 206, the sliding sleeve 202 is preset inside the central point of the surface of the fixing plate 203, the outer side surface of the screw 201 penetrates through the sliding sleeve 202 and is in threaded connection with the inner wall of the sliding sleeve 202, through grooves are symmetrically formed in the attaching surfaces of the T-shaped handle 101 and the sampling tube 102, the outer wall of the fixing rod 204 is attached to the inner wall of the through grooves, the fixing rod 204 is symmetrically arranged along the outer side surface of the screw 201, one end of the fixing rod 204 is welded with the surface of the fixing plate 203, the other end of the fixing rod 204 extends into the sampling tube 102 and is welded with the surface of the bulldozing plate 205, the blade 205 is located within the sampling tube 102 in a pie-shaped design.
In an alternative embodiment: one end of the screw 201, which is far away from the fixing rod 204, extends out of the outer wall of the T-shaped handle 101 and is rotatably connected with a port of the T-shaped handle 101 through a bearing.
In this embodiment:
based on the screw rod 201 that sets up in the inner chamber 206, can drive the sliding sleeve 202 that the screw rod 201 outside cover was established and rotate through rotating screw rod 201, predetermine in fixed plate 203 because of sliding sleeve 202 (four corners of fixed plate 203 all with the contact of inner chamber 206 inner wall), receive the limiting displacement of fixed plate 203, sliding sleeve 202 makes elevating movement along the screw rod 201 outer wall, and drive fixed plate 203 and remove, again because of dead lever 204 and fixed plate 203 downside welding, make fixed plate 203 remove and drive dead lever 204 lateral surface and lead to the inslot wall and slide, and then drive and make elevating movement with the bull dozer plate 205 of dead lever 204 bottom in sampling pipe 102, be convenient for release the sample in the sampling pipe 102 from this, make things convenient for the sample.
It should be noted that: the speed of sample withdrawal from the sampling tube 102 can be adjusted by controlling the speed of rotation of the screw 201.
Further, the method comprises the following steps:
in an alternative embodiment: the dozing subassembly 2 still includes and sets up spout 207 and slider 208 in the inside wall of inner chamber 206, and spout 207 sets up along T type handle 101 axis symmetry, and slider 208 welds with the outer wall both sides of fixed plate 203, and the one end that the slider 208 is kept away from fixed plate 203 extends inside inner chamber 206 to with the inner wall sliding connection of spout 207.
In this embodiment:
based on the sliding grooves 207 formed on the two sides of the inner wall of the inner cavity 206, because the sliding blocks 208 are welded to the two sides of the outer wall of the fixing plate 203, when the fixing plate 203 moves up and down, the sliding blocks 208 can be driven to slide in the sliding grooves 207, and the lifting of the fixing plate 203 is guaranteed to be stable.
Further, the method comprises the following steps:
in an alternative embodiment: the bulldozer assembly 2 further comprises a holding rod 209, the cross section of the holding rod 209 is in an L-shaped design, and one end of the screw 201, which is far away from the fixed rod 204, is welded with the surface of the holding rod 209.
In this embodiment:
based on the holding rod 209 of screw rod 201 top welded, the rotatory holding rod 209 of accessible drives screw rod 201 and rotates, and the transversal design of personally submitting "L" type of holding rod 209 makes things convenient for the survey crew to hold, and then makes things convenient for the survey crew to easily rotate holding rod 209 for holding rod 209 pivoted speed.
As shown in fig. 1 and 4:
with the above in mind: on this basis, at the clearance subassembly 3 of bull dozer 205 internally mounted, conveniently clear up the inner wall of sampling pipe 102, prevent the soil adhesion, guarantee the normal clear of follow-up sample work.
This municipal works construction soil sampler, still including setting up the clearance subassembly 3 in bull dozer 205 inside, clearance subassembly 3 is including the scraper blade 301 of horizontal setting, perpendicular slide 302 and the reset spring 303 that sets up, bull dozer 205 lateral wall interval is seted up flutedly, scraper blade 301 inserts in this recess, and with slide 302's surface weld, slide 302's lateral wall is laminated with the inner wall of bull dozer 205 recess mutually, one side that scraper blade 301 was kept away from to slide 302 outer wall is equipped with reset spring 303, reset spring 303's one end and slide 302's surface weld, reset spring 303's the other end and the inner wall weld of bull dozer 205 recess.
In this embodiment:
scraper blade 301 based on bull blade 205 surface interval sets up, in the process of soil sample is released to bull blade 205, bull blade 205 removes the one end and the sampling pipe 102 inner wall sliding connection that drive scraper blade 301, conveniently strike off the soil block of sampling pipe 102 inner wall adhesion, prevent soil adhesion, the accessible is rotatory screw rod 201 repeatedly and is driven scraper blade 301 and clear up sampling pipe 102 inner wall many times, improve the completion degree of clearance, when the great soil block of sampling pipe 102 inner wall adhesion, scraper blade 301 and soil block surface contact and atress withdrawal recess in (can set up the sealing washer on the contact surface of scraper blade 301 and recess, prevent that soil granule from falling into in the recess), scraper blade 301 removes and drives slide 302 and slide, and then drive and slide 302 surface welded reset spring 303 shrink, can effectively protect scraper blade 301, prevent that scraper blade 301 is impaired.
Further, the method comprises the following steps:
in an alternative embodiment: the cleaning assembly 3 further comprises bristles 304 and a mounting plate 305, the bristles 304 are located between adjacent blades 301 and are arranged on the outer side of the blade 205, the mounting plate 305 is located between the bristles 304 and the blade 205, the bristles 304 and the surface of the mounting plate 305 are bonded through an adhesive, and the side of the outer wall of the mounting plate 305, which is far away from the bristles 304, is bolted to the outer side wall of the blade 205.
In this embodiment:
based on the bristles 304 arranged between the adjacent scrapers 301, the bristles 304 can clean the positions where the scrapers 301 cannot be cleaned, the scrapers 301 are cleaned in an auxiliary manner, the cleanliness of the inner wall of the sampling tube 102 is guaranteed, and the normal operation of the subsequent sampling operation is guaranteed.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a municipal works construction soil sampler, includes mainly by soil auger body (1) that T type handle (101) and sampling pipe (102) are constituteed, T type handle (101) with sampling pipe (102) are located same vertical horizontal plane and welded fastening, its characterized in that: a bulldozing assembly (2) is arranged inside the earth drill body (1);
the bulldozing subassembly (2) comprises a vertically arranged screw rod (201), a sliding sleeve (202), a transversely arranged fixing plate (203), a vertically arranged fixing rod (204) and a bulldozing plate (205), wherein an inner cavity (206) is formed in the surface of the T-shaped handle (101), the screw rod (201) is inserted into the inner cavity (206) and is rotationally connected with the inner wall of the inner cavity (206) through a bearing, the fixing plate (203) is sleeved outside the screw rod (201), the edge of the fixing plate (203) is attached to the inner side wall of the inner cavity (206), the sliding sleeve (202) is preset inside the surface central point of the fixing plate (203), the outer side surface of the screw rod (201) penetrates through the sliding sleeve (202) and is in threaded connection with the inner wall of the sliding sleeve (202), through grooves are symmetrically formed in the attaching surfaces of the T-shaped handle (101) and the sampling tube (102), the outer wall of dead lever (204) and this lead to the inslot wall and laminate mutually, just dead lever (204) are along the lateral surface symmetry of screw rod (201) sets up, the one end of dead lever (204) with the surface weld of fixed plate (203), the other end of dead lever (204) extends into in sampling pipe (102), and with bulldozing board (205) surface weld, bulldozing board (205) are located be cake form design in sampling pipe (102).
2. The municipal construction soil sampler of claim 1, wherein: one end of the screw rod (201) far away from the fixing rod (204) extends out of the outer wall of the T-shaped handle (101) and is rotatably connected with a port of the T-shaped handle (101) through a bearing.
3. The municipal construction soil sampler of claim 1, wherein: the bulldozing assembly (2) further comprises a sliding groove (207) and a sliding block (208) which are arranged on the inner side wall of the inner cavity (206), the sliding groove (207) is symmetrically arranged along the axis of the T-shaped handle (101), the sliding block (208) is welded with two sides of the outer wall of the fixing plate (203), and one end, far away from the fixing plate (203), of the sliding block (208) extends into the inner cavity (206) and is in sliding connection with the inner wall of the sliding groove (207).
4. The municipal construction soil sampler of claim 1, wherein: the bulldozer assembly (2) further comprises a holding rod (209), the cross section of the holding rod (209) is in an L-shaped design, and one end, far away from the fixing rod (204), of the screw (201) is welded to the surface of the holding rod (209).
5. The municipal construction soil sampler of claim 1, wherein: still including setting up inside clearance subassembly (3) of bull dozer (205), clearance subassembly (3) are including horizontal scraper blade (301) that sets up, slide (302) and reset spring (303) of perpendicular setting, bull dozer (205) lateral wall interval is seted up flutedly, scraper blade (301) insert in this recess, and with the surface weld of slide (302), the lateral wall of slide (302) with the inner wall of bull dozer (205) recess is laminated mutually, slide (302) outer wall is kept away from one side of scraper blade (301) is equipped with reset spring (303), the one end of reset spring (303) with the surface weld of slide (302), the other end of reset spring (303) with the inner wall welding of bull dozer (205) recess.
6. The municipal construction soil sampler of claim 5, wherein: the cleaning assembly (3) further comprises bristles (304) and a mounting plate (305), the bristles (304) are located between the adjacent scraping plates (301) and are arranged on the outer side face of the bulldozer blade (205), the mounting plate (305) is located between the bristles (304) and the bulldozer blade (205), the bristles (304) are bonded with the surface of the mounting plate (305) through an adhesive, and the side, away from the bristles (304), of the outer wall of the mounting plate (305) is in bolted connection with the outer side wall of the bulldozer blade (205).
CN202121271407.XU 2021-06-08 2021-06-08 Municipal works construction soil sampling ware Expired - Fee Related CN215767731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121271407.XU CN215767731U (en) 2021-06-08 2021-06-08 Municipal works construction soil sampling ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121271407.XU CN215767731U (en) 2021-06-08 2021-06-08 Municipal works construction soil sampling ware

Publications (1)

Publication Number Publication Date
CN215767731U true CN215767731U (en) 2022-02-08

Family

ID=80099826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121271407.XU Expired - Fee Related CN215767731U (en) 2021-06-08 2021-06-08 Municipal works construction soil sampling ware

Country Status (1)

Country Link
CN (1) CN215767731U (en)

Similar Documents

Publication Publication Date Title
CN210786447U (en) Water saving system for green building construction
CN215767731U (en) Municipal works construction soil sampling ware
CN216948482U (en) Hopper convenient to clean for excavator
CN108871849B (en) Soil collection system with deposit and detect function
CN112718731B (en) Pipeline dredging equipment for hydraulic engineering based on remote control
CN211737052U (en) Auxiliary device for cleaning upper barrel drill of rotary drilling rig
CN218880992U (en) Excavator bucket with automatic cleaning function
CN210460573U (en) Oil scraper for thermal recovery well head
CN210369087U (en) Loader with shovel head convenient to replace
CN210358038U (en) Grit sieving mechanism for building materials
CN213417961U (en) Hydraulic engineering prevents stifled cistern
CN115162287A (en) Silt grab bucket for dam gate cleaning
CN212898117U (en) Intelligent door and window capable of automatically removing dust and cleaning
CN213600400U (en) Novel highway engineering soil sampling device
CN214284736U (en) Indoor glass cleaning device
CN114701080A (en) Grooving equipment for construction
CN211368834U (en) Hydraulic engineering is with clearance silt device
CN210659952U (en) Silt processing apparatus is used in engineering probing
CN212336131U (en) Water delivery ditch wall scraping and sweeping device
CN217580347U (en) Connect firm anti-drop's dozer blade
CN221346833U (en) Mud tank for well drilling
CN221340527U (en) Cleaning device for excavator
CN220849581U (en) Rotary drilling bit with slag removal structure
CN219863011U (en) Hydraulic engineering excavator dredging bucket
CN218119088U (en) Pipeline dredging and dirt-removing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220208