CN215758551U - Device is pour to affiliated three walls of movable bridge floor - Google Patents

Device is pour to affiliated three walls of movable bridge floor Download PDF

Info

Publication number
CN215758551U
CN215758551U CN202122042219.6U CN202122042219U CN215758551U CN 215758551 U CN215758551 U CN 215758551U CN 202122042219 U CN202122042219 U CN 202122042219U CN 215758551 U CN215758551 U CN 215758551U
Authority
CN
China
Prior art keywords
wall pouring
template
pouring
wall
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122042219.6U
Other languages
Chinese (zh)
Inventor
成勇
周培军
董晓康
魏德忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN202122042219.6U priority Critical patent/CN215758551U/en
Application granted granted Critical
Publication of CN215758551U publication Critical patent/CN215758551U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a movable bridge deck attached three-wall pouring device, which comprises a support frame body and a pouring unit, wherein the support frame body consists of three hollow rectangular frames; the device also comprises a plurality of slideways and three pulleys matched with the slideways, wherein the slideways are transversely arranged on the two vertically-arranged hollow rectangular frames in parallel; the tops of the three-wall pouring templates are respectively hoisted through a steel wire rope and a pulley of each slide way, the hoisted three-wall pouring templates are parallel to each other, and the buckles are arranged on the tops of the three-wall pouring templates; the support rods are arranged at the bottom of the three-wall pouring template. According to the utility model, the supporting frame which can be conveniently moved is arranged, and then the template which can be quickly moved is hoisted on the supporting frame, so that the template can be conveniently and quickly moved and disassembled and assembled when being periodically and alternately used, the construction progress is accelerated, the safety is ensured, the quality is improved, and the engineering cost is reduced.

Description

Device is pour to affiliated three walls of movable bridge floor
Technical Field
The utility model relates to the technical field of bridge construction, in particular to a movable type bridge deck attached three-wall pouring device.
Background
At present, three attached walls of a bridge deck system are simultaneously erected and formwork is poured simultaneously, a fixing buckle adjusting formwork is installed every 1 centimeter, and a cover plate is installed smoothly after construction is finished, so that the standard requirement is met.
The construction of three walls of a high-speed railway and a bridge is separated, and the construction quality and the construction progress influence the subsequent CPIII joint survey and the subsequent construction procedure of a ballastless track. The existing construction adopts a process forklift for transportation, namely, the mold poured by the three walls is transported at intervals through the process forklift, the whole process is high in cost and has great limitation, and the difficulty in operation of the process forklift is greatly increased in a place with a narrow bridge deck, so that the existing device which is not suitable and simple can enable the mold to be conveniently and quickly transferred to the next construction site after construction is omitted.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a movable three-wall pouring device attached to a bridge deck, which can quickly move a three-wall pouring template to the next pouring position for pouring operation without limiting the use environment, saves the cost, greatly shortens the construction time, and can be conveniently disassembled, assembled and transported.
The technical scheme adopted by the utility model is as follows:
a movable three-wall pouring device attached to a bridge deck comprises a support frame body and a pouring unit, wherein the support frame body is composed of three hollow rectangular frames, and the pouring unit comprises three-wall pouring templates, buckles and support rods; the two hollow rectangular frames are respectively and vertically and fixedly arranged at two sides of the other horizontally arranged hollow rectangular frame, the device also comprises a plurality of slideways and three pulleys matched with the slideways, and the slideways are transversely arranged on the two vertically arranged hollow rectangular frames in parallel; the top of each three-wall pouring template is respectively hoisted through a steel wire rope and a pulley of each slide way, the hoisted three-wall pouring templates are parallel to each other, and the buckles are arranged at the top of the three-wall pouring templates and used for carrying out width positioning on three templates in the three-wall pouring templates; the support rods are arranged at the bottom of the three-wall pouring template and used for carrying out width positioning on the space between the three templates in the three-wall pouring template.
The universal wheel with the lock is arranged at the bottom of the horizontally placed hollow rectangular frame.
The three-wall pouring formwork further comprises a lifting mechanism, and the lifting mechanism is used for providing power for the displacement change of the three-wall pouring formwork in the vertical direction.
The traction mechanism is used for moving and drawing the support frame.
The traction mechanism comprises an electric pulley and a traction rope, wherein the electric pulley is arranged in the advancing direction of the support frame and is fixedly connected with the support frame through the traction rope.
The two pouring units are arranged in parallel.
According to the utility model, the supporting frame which can be conveniently moved is arranged, and then the template which can be quickly moved is hoisted on the supporting frame, so that the template can be conveniently and quickly moved and disassembled and assembled when being periodically and alternately used, the construction progress is accelerated, the safety is ensured, the quality is improved, and the engineering cost is reduced. The hoisting tool is invented through the construction characteristics of the tunnel cable trough and the field practice in the construction process, so as to meet the field requirements. The installation template lifting appliance is simple to machine and low in manufacturing cost. The method has the advantages of requiring less workers to erect the template quickly, recycling, having extremely high comprehensive utilization rate and reducing the investment cost of equipment. In the process of installing the template, the template is hoisted quickly, three workers can operate the template in anticipation, the template is installed once, the template is dismantled and moved along with the hoisting, and the template is installed simply and quickly. And construction interference among the crossed processes is reduced. The special hoisting sling occupies small space and does not influence other operation procedures.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a top view of the present invention;
fig. 2 is a side view of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1 and 2, the three-wall hollow-out rectangular frame support comprises a support frame body consisting of three hollow-out rectangular frames and a pouring unit, wherein the pouring unit comprises three-wall pouring templates, a buckle 9 and a support rod 11; the three-wall pouring template comprises a protective wall template consisting of a first template 1 and a second template 2, a B wall template consisting of a third template 3 and a fourth template 4, and an A wall template consisting of a fifth template 5 and a sixth template 6, wherein the A wall template is arranged closely to the shading plate 10, and can be arranged according to the actual requirements on site during actual use.
Two hollow rectangular frames in the support frame body are respectively vertically and fixedly arranged on two sides of the hollow rectangular frame placed on another level, so that the body structure of the support frame can be formed, the support and the subsequent transfer can be realized, and the lifting and the moving of the template can be facilitated. The device also comprises a plurality of slideways 12 and three pulleys matched with the slideways 12, wherein the slideways 12 are transversely arranged on two vertically-arranged hollow rectangular frames in parallel; the top of each three-wall pouring template is hoisted through a steel wire rope 14 and a pulley of each slide way, the hoisted three-wall pouring templates are parallel to each other, and the buckle 9 is arranged at the top of each three-wall pouring template and used for carrying out width positioning on three templates in the three-wall pouring templates; the support rods 11 are arranged at the bottoms of the three-wall pouring formworks and are used for carrying out width positioning on the intervals among the three formworks in the three-wall pouring formworks.
Through foretell setting, lateral shifting between the time template that can be nimble is fixed to template when conveniently pouring is fixed, and then after pouring, through horizontal removal back, on the position of avoiding causing the influence to the wall body of pouring when making the template can move the support frame and remove, has avoided removing the destruction that brings, has realized the recycling of the template after pouring simultaneously.
Still including hoist mechanism, hoist mechanism be used for pouring the template to three walls and carry out the displacement change and provide power in vertical direction, the hoist mechanism picture in not seeing, in-service use can adopt the electric block, pours the mould to three walls through wire rope and carries out the pulling of direction from top to bottom, conveniently like this changes the height of template, for the error that brings because bottom terminal surface unevenness eliminates and provides power, also provides power when dismantling simultaneously, uses manpower sparingly.
The universal wheel with the lock is characterized by further comprising universal wheels 7 with the lock, wherein the universal wheels 7 with the lock are respectively arranged at the bottoms of the horizontally placed hollow rectangular frames. The traction mechanism is used for moving and drawing the support frame. The traction mechanism comprises an electric pulley 8 and a traction rope 13, wherein the electric pulley 8 is arranged in the advancing direction of the support frame and is fixedly connected with the support frame through the traction rope. Through setting up drive mechanism, can fix electric pulley on the steel reinforcement frame of waiting to pour the wall body in the direction of traction during pouring, then wait to pour and finish the back, pull, labour saving and time saving carries out the preparation work that next station was pour fast'
The two pouring units are arranged in parallel. Through setting up two units of pouring, can realize pouring of bridge body both sides and go on in step, increase efficiency that can be further like this, reduction of erection time.
According to the utility model, the supporting frame which can be conveniently moved is arranged, and then the template which can be quickly moved is hoisted on the supporting frame, so that the template can be conveniently and quickly moved and disassembled and assembled when being periodically and alternately used, the construction progress is accelerated, the safety is ensured, the quality is improved, and the engineering cost is reduced. The hoisting tool is invented through the construction characteristics of the tunnel cable trough and the field practice in the construction process, so as to meet the field requirements. The installation template lifting appliance is simple to machine and low in manufacturing cost. The method has the advantages of requiring less workers to erect the template quickly, recycling, having extremely high comprehensive utilization rate and reducing the investment cost of equipment. In the process of installing the template, the template is hoisted quickly, three workers can operate the template in anticipation, the template is installed once, the template is dismantled and moved along with the hoisting, and the template is installed simply and quickly. And construction interference among the crossed processes is reduced. The special hoisting sling occupies small space and does not influence other operation procedures.
In the description of the present invention, it is to be noted that, for the orientation words, there are terms such as "center", "lateral", "longitudinal", and the like
The terms "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," and the like are used to designate an orientation or positional relationship that is based on the orientation or positional relationship shown in the drawings for purposes of descriptive convenience and simplicity of description, and are not intended to indicate or imply that the device or element so designated must have a particular orientation, be constructed and operated in a particular orientation, and are not to be construed as limiting the specific scope of the utility model.
It is noted that the terms "first", "second", and the like in the description and claims of the present application are used for
Similar objects are distinguished and not necessarily used to describe a particular order or sequence. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
It is to be noted that the foregoing is only illustrative of the preferred embodiments of the present invention and the application of the principles of the technology. It will be understood by those skilled in the art that the present invention is not limited to the particular embodiments described herein, but is capable of various obvious changes, rearrangements and substitutions as will now become apparent to those skilled in the art without departing from the scope of the utility model. Therefore, although the present invention has been described in greater detail by the above embodiments, the present invention is not limited to the specific embodiments described herein, and may include more effective embodiments without departing from the spirit of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims (6)

1. The utility model provides a device is pour to affiliated three walls of movable bridge floor, its characterized in that: the support frame comprises a support frame body and a pouring unit, wherein the support frame body consists of three hollowed rectangular frames, and the pouring unit comprises a three-wall pouring template, a buckle and a support rod; the two hollow rectangular frames are respectively and vertically and fixedly arranged at two sides of the other horizontally arranged hollow rectangular frame, the device also comprises a plurality of slideways and three pulleys matched with the slideways, and the slideways are transversely arranged on the two vertically arranged hollow rectangular frames in parallel; the top of each three-wall pouring template is respectively hoisted through a steel wire rope and a pulley of each slide way, the hoisted three-wall pouring templates are parallel to each other, and the buckles are arranged at the top of the three-wall pouring templates and used for carrying out width positioning on three templates in the three-wall pouring templates; the support rods are arranged at the bottom of the three-wall pouring template and used for carrying out width positioning on the space between the three templates in the three-wall pouring template.
2. The movable three-wall pouring device attached to the bridge deck as claimed in claim 1, wherein: the universal wheel with the lock is arranged at the bottom of the horizontally placed hollow rectangular frame.
3. The movable three-wall pouring device attached to the bridge deck as claimed in claim 1, wherein: the three-wall pouring formwork further comprises a lifting mechanism, and the lifting mechanism is used for providing power for the displacement change of the three-wall pouring formwork in the vertical direction.
4. The movable three-wall pouring device attached to the bridge deck as claimed in claim 1, wherein: the traction mechanism is used for moving and drawing the support frame.
5. The movable three-wall pouring device for attaching the bridge deck to the bridge deck as claimed in claim 4, wherein: the traction mechanism comprises an electric pulley and a traction rope, wherein the electric pulley is arranged in the advancing direction of the support frame and is fixedly connected with the support frame through the traction rope.
6. The movable three-wall pouring device for attaching bridge decks according to any one of claims 1 to 5, wherein: the two pouring units are arranged in parallel.
CN202122042219.6U 2021-08-27 2021-08-27 Device is pour to affiliated three walls of movable bridge floor Expired - Fee Related CN215758551U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122042219.6U CN215758551U (en) 2021-08-27 2021-08-27 Device is pour to affiliated three walls of movable bridge floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122042219.6U CN215758551U (en) 2021-08-27 2021-08-27 Device is pour to affiliated three walls of movable bridge floor

Publications (1)

Publication Number Publication Date
CN215758551U true CN215758551U (en) 2022-02-08

Family

ID=80079479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122042219.6U Expired - Fee Related CN215758551U (en) 2021-08-27 2021-08-27 Device is pour to affiliated three walls of movable bridge floor

Country Status (1)

Country Link
CN (1) CN215758551U (en)

Similar Documents

Publication Publication Date Title
CN109267490B (en) Long guide beam type movable formwork and construction method thereof
CN110918838A (en) Spatial three-dimensional reinforcing mesh flexible manufacturing production line and production process thereof
CN109869164B (en) Construction method for pouring porous separation type tunnel by combined type hydraulic template trolley
CN218053236U (en) Cross sliding type steel bar binding clamping fixture
CN111409185A (en) Movable integrated device for producing precast concrete plates and production process
CN117620566B (en) Automatic welding jig frame for steel reinforcement cage of box girder and prefabricating method
CN210031910U (en) Movable formwork supporting system for underground comprehensive pipe gallery
CN208293613U (en) A kind of city integrated piping lane Quick Release die set device of running type
CN215758551U (en) Device is pour to affiliated three walls of movable bridge floor
CN112030777B (en) Descending movable formwork support bracket crossing type transfer construction method
CN111604444B (en) Be used for prefabricated reinforcement production line of segmental beam
CN215593730U (en) Hanging basket for parasitic support with beam plate on wide body of cable-stayed bridge with cantilever pouring double-side box
CN210966786U (en) Flexible manufacturing production line for spatial three-dimensional reinforcing mesh
CN202000263U (en) Descending type movable die frame structure
CN212835507U (en) Concrete reinforcement cage ligature and conversion equipment
CN115110765A (en) Construction method and device for shear wall at deformation joint
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN210636798U (en) Creeping formwork structure applied to vertical wall and frame column of wind tunnel corner section
CN112195802A (en) Variable-section U-shaped hollow thin-wall pier steel bar partition prefabricated jig frame and partition installation method
CN110883920A (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN212421717U (en) Movable integrated device for producing precast concrete plates
CN211469163U (en) Prefabricated plate storage facilities that stews
CN218624216U (en) Shaft door slot construction equipment
CN218090550U (en) Bridge deck system construction formwork structure
CN221779075U (en) Movable steel bar machining shed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220208