CN215758534U - Leakage blocking prevention device for civil engineering bridge construction - Google Patents
Leakage blocking prevention device for civil engineering bridge construction Download PDFInfo
- Publication number
- CN215758534U CN215758534U CN202121050381.6U CN202121050381U CN215758534U CN 215758534 U CN215758534 U CN 215758534U CN 202121050381 U CN202121050381 U CN 202121050381U CN 215758534 U CN215758534 U CN 215758534U
- Authority
- CN
- China
- Prior art keywords
- fixed
- movable
- block
- mounting
- bridge construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a leakage stoppage preventing device for civil engineering bridge construction, which comprises two fixed columns, wherein movable grooves are formed in the two fixed columns, a fixed shaft is fixedly arranged between the top and the opposite side of the bottom of each movable groove, a fixed block is fixedly arranged at the bottom of the outer surface of the fixed shaft, a buffer spring is fixedly arranged at the top of the fixed block and on the outer surface of the fixed shaft, a movable block fixedly connected with the buffer spring is movably arranged on the outer surface of the fixed shaft, and a first connecting block of which one end penetrates through and extends to the outside of the fixed columns is fixedly arranged on the opposite side of the movable block. This prevent plugging device that civil engineering bridge construction was used, through being provided with vibrating motor, when using, start vibrating motor, vibrating motor can drive the concrete in the unloader and vibrate from top to bottom to avoid the concrete to take place the problem of blockking up the funnel in the unloader, through being provided with head rod and second connecting rod.
Description
Technical Field
The utility model belongs to the technical field of bridge construction equipment, and particularly relates to a leakage stoppage preventing device for civil engineering bridge construction.
Background
Civil engineering refers to the general name of science and technology for building various land engineering facilities, and refers to the applied materials and equipment, the technical activities of surveying, designing, constructing, maintaining and repairing, and the like, and also refers to the objects of engineering construction, wherein bridge construction refers to the process of building a bridge according to the design content, and mainly refers to the contents of bridge construction technology, construction organization, construction management, construction quality and the like.
In civil engineering bridge construction, need use the concrete to pour, pour at the concrete and can transport and pour through the funnel with the operation in-process, because the unloader export is general all less, lead to the concrete extrusion together easily to the situation that causes the jam funnel influences the bridge construction process.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a leakage stoppage preventing device for civil engineering bridge construction, which aims to solve the problem of funnel blockage in the prior art.
In order to achieve the purpose of preventing the funnel from being blocked, the utility model provides the following technical scheme: the utility model provides a civil engineering bridge construction is used prevents plugging device, includes two fixed columns, two the movable groove has all been seted up to the inside of fixed column, fixed mounting has the fixed axle between the relative one side in movable groove top and bottom, the bottom fixed mounting of fixed axle surface has the fixed block, the top of fixed block and the fixed surface that is located the fixed axle fixed mounting have buffer spring, the surface movable mounting of fixed axle have with buffer spring fixed connection's movable block, the relative one side fixed mounting of movable block has one end to run through and extend to the outside first connecting block of fixed column, fixed mounting has unloader between the relative one side of first connecting block.
Preferably, two top fixed mounting between the relative one side of fixed column has the head rod, two bottom fixed mounting between the relative one side of fixed column has the second connecting rod, the quantity of head rod and second connecting rod is two and is the symmetric distribution in the front and the back of two relative one sides of fixed column.
Preferably, the first spacing hole with fixed axle size looks adaptation is seted up to the inside of movable block, the activity hole with first linkage block size looks adaptation is all seted up to the one side that the activity groove is relative, the size of movable block is greater than buffer spring's size.
Preferably, two equal movable mounting in bottom of fixed column surface has the stopper, the stopper is close to the equal fixed mounting in one side of unloader have with unloader fixed connection's second connecting block, the inside of stopper is seted up with the spacing hole of second of fixed column size looks adaptation.
Preferably, the positive top movable mounting of unloader has vibrating motor, the equal fixed mounting in top and the bottom of second connecting rod has the installation piece, the equal fixed mounting in the positive left and right sides of installation piece has one end to run through the installation piece and extend to the inside bolt of unloader, two the front of fixed column just is located the positive equal movable mounting in movable groove and has the access door.
Preferably, the front surface of the blanking device is provided with a thread groove which is matched with the bolt in size and corresponds to the bolt in position, the bolt is in threaded connection with the thread groove, and the vibration motor is fixedly connected with the blanking device through the mounting block, the bolt and the thread groove.
Compared with the prior art, the utility model has the following beneficial effects:
1. this prevent plugging device of civil engineering bridge construction usefulness through being provided with vibrating motor, when using, starts vibrating motor, and vibrating motor can drive the concrete in the unloader and vibrate from top to bottom to avoid the concrete to take place the problem of blockking up the funnel in the unloader, through being provided with head rod and second connecting rod, strengthened overall structure's stability, do benefit to actual use.
2. This prevent plugging device that civil engineering bridge construction was used, through being provided with buffer spring, unloader when the vibration, under buffer spring's elastic action, unloader about can be more violent to make and prevent the leaking stoppage effect better, through being provided with movable block, first connecting block, stopper and second connecting block, skew around making unloader can not take place has strengthened overall structure's stability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a front view structural diagram of the present invention.
In the figure: the device comprises a fixing column 1, a first connecting rod 2, a second connecting rod 3, a movable groove 4, a fixed shaft 5, a fixed block 6, a buffer spring 7, a movable block 8, a first connecting block 9, a blanking device 10, a limiting block 11, a second connecting block 12, a vibrating motor 13, an installation block 14, a bolt 15 and an access door 16.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-2, a leakage blocking prevention device for civil engineering bridge construction comprises two fixed columns 1, a first connecting rod 2 is fixedly installed at the top between opposite sides of the two fixed columns 1, a second connecting rod 3 is fixedly installed at the bottom between opposite sides of the two fixed columns 1, the number of the first connecting rod 2 and the number of the second connecting rod 3 are two and are symmetrically distributed at the front and the back of the opposite sides of the two fixed columns 1, a movable groove 4 is respectively arranged inside the two fixed columns 1, a fixed shaft 5 is fixedly installed between the top and the opposite side of the bottom of the movable groove 4, a fixed block 6 is fixedly installed at the bottom of the outer surface of the fixed shaft 5, a buffer spring 7 is fixedly installed at the top of the fixed block 6 and on the outer surface of the fixed shaft 5, a movable block 8 fixedly connected with the buffer spring 7 is movably installed at the outer surface of the fixed shaft 5, a first connecting block 9 with one end penetrating and extending to the outside of the fixed column 1 is fixedly arranged on one side opposite to the movable block 8, a first limit hole matched with the fixed shaft 5 in size is formed in the movable block 8, movable holes matched with the first connecting block 9 in size are formed in one side opposite to the movable groove 4, the size of the movable block 8 is larger than that of the buffer spring 7, a blanking device 10 is fixedly arranged between the sides opposite to the first connecting blocks 9, limiting blocks 11 are movably arranged at the bottoms of the outer surfaces of the two fixed columns 1, a second connecting block 12 fixedly connected with the blanking device 10 is fixedly arranged on one side of each limiting block 11 close to the blanking device 10, a second limit hole matched with the fixed column 1 in size is formed in the limiting block 11, a vibrating motor 13 is movably arranged at the top of the front of the blanking device 10, and mounting blocks 14 are fixedly arranged at the top and the bottom of the second connecting rod 3, the equal fixed mounting in the positive left and right sides of installation piece 14 has one end to run through installation piece 14 and extend to the inside bolt 15 of unloader 10, the equal movable mounting in the front that just is located movable groove 4 of two fixed columns 1 has access door 16, the corresponding thread groove with 15 size looks adaptations of bolt and position is seted up in the front of unloader 10, bolt 15 and thread groove threaded connection, vibrating motor 13 is through installation piece 14, bolt 15 and thread groove and unloader 10 fixed connection.
When using, start vibrating motor 13, vibrating motor 13 can drive the concrete in unloader 10 and vibrate from top to bottom to avoid the concrete to take place the problem of blockking up the funnel in unloader 10.
To sum up, this civil engineering bridge construction is used prevents plugging device through being provided with vibrating motor 13, when using, starts vibrating motor 13, and vibrating motor 13 can drive the concrete in unloader 10 and vibrate from top to bottom to avoid the concrete to take place the problem of blockking up the funnel in unloader 10, through being provided with head rod 2 and second connecting rod 3, strengthened overall structure's stability, do benefit to actual use.
And, through being provided with buffer spring 7, unloader 10 is when the vibration, under buffer spring 7's elastic action, unloader 10 about can be more violent to make prevent that the leaking stoppage effect is better, through being provided with movable block 8, first connecting block 9, stopper 11 and second connecting block 12, make unloader 10 skew around can not taking place, strengthened overall structure's stability.
Claims (6)
1. The utility model provides a civil engineering bridge construction is used prevents plugging device, includes two fixed columns (1), its characterized in that: two movable groove (4) have all been seted up to the inside of fixed column (1), fixed mounting has fixed axle (5) between movable groove (4) top and the relative one side in bottom, the bottom fixed mounting of fixed axle (5) surface has fixed block (6), the fixed surface that the top of fixed block (6) just is located fixed axle (5) installs buffer spring (7), the fixed surface movable mounting of fixed axle (5) has movable block (8) with buffer spring (7) fixed connection, the relative one side fixed mounting of movable block (8) has one end to run through and extend to fixed column (1) outside first connecting block (9), fixed mounting has unloader (10) between the relative one side of first connecting block (9).
2. The leakage stoppage device for civil engineering bridge construction according to claim 1, wherein: two top fixed mounting between the relative one side of fixed column (1) has head rod (2), two bottom fixed mounting between the relative one side of fixed column (1) has second connecting rod (3), the quantity of head rod (2) and second connecting rod (3) is two and is the front and the back of symmetric distribution in the relative one side of two fixed columns (1).
3. The leakage stoppage device for civil engineering bridge construction according to claim 1, wherein: the inside of movable block (8) is seted up with the first spacing hole of fixed axle (5) size looks adaptation, the movable hole with first connecting block (9) size looks adaptation is all seted up to one side that activity groove (4) is relative, the size of movable block (8) is greater than buffer spring (7) size.
4. The leakage stoppage device for civil engineering bridge construction according to claim 1, wherein: two equal movable mounting in bottom of fixed column (1) surface has stopper (11), the equal fixed mounting in one side that stopper (11) are close to unloader (10) has second connecting block (12) with unloader (10) fixed connection, the spacing hole of second with fixed column (1) size looks adaptation is seted up to the inside of stopper (11).
5. The leakage stoppage device for civil engineering bridge construction according to claim 2, wherein: unloader (10) positive top movable mounting has vibrating motor (13), the top and the equal fixed mounting in bottom of second connecting rod (3) have installation piece (14), the equal fixed mounting in the positive left and right sides of installation piece (14) has one end to run through installation piece (14) and extend to bolt (15) of unloader (10) inside, two the front of fixed column (1) and the equal movable mounting in front that is located movable chute (4) have access door (16).
6. The leakage stoppage device for civil engineering bridge construction according to claim 5, wherein: the front surface of the blanking device (10) is provided with a thread groove which is matched with the bolt (15) in size and corresponds to the position, the bolt (15) is in threaded connection with the thread groove, and the vibration motor (13) is fixedly connected with the blanking device (10) through the mounting block (14), the bolt (15) and the thread groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121050381.6U CN215758534U (en) | 2021-05-17 | 2021-05-17 | Leakage blocking prevention device for civil engineering bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121050381.6U CN215758534U (en) | 2021-05-17 | 2021-05-17 | Leakage blocking prevention device for civil engineering bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215758534U true CN215758534U (en) | 2022-02-08 |
Family
ID=80097346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121050381.6U Active CN215758534U (en) | 2021-05-17 | 2021-05-17 | Leakage blocking prevention device for civil engineering bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215758534U (en) |
-
2021
- 2021-05-17 CN CN202121050381.6U patent/CN215758534U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206220614U (en) | A kind of multi-point shear formula viscous damping wall | |
CN203145229U (en) | Buckling restrained brace containing viscous-elastic materials | |
CN104763066A (en) | Three-dimensional shock isolation device | |
CN106869356B (en) | The replaceable two benches power consumption sealing node damper of damping sheet | |
CN103122662A (en) | Buckling restrained brace with viscoelastic materials | |
CN215758534U (en) | Leakage blocking prevention device for civil engineering bridge construction | |
CN106836549A (en) | A kind of slip filling wall with frcition damper | |
CN208267154U (en) | A kind of recoverable function energy consumption reinforced concrete shear wall | |
CN211899618U (en) | Arc shear wall template reinforced structure | |
CN210013480U (en) | Civil engineering building templates link | |
CN208167420U (en) | High Speed Railway Subgrade body | |
CN207109843U (en) | A kind of goaf transmission line foundation bracing means | |
CN207974267U (en) | A kind of metal yield energy-consumption damper of vertical weak constraint | |
CN108678502A (en) | A kind of compound linkage damping wall | |
CN203603460U (en) | Structure capable of preventing thick liquid leakage of gap between floor formwork and precast beam component | |
CN205976051U (en) | Assembly type structure shock -absorbing structure | |
CN205348441U (en) | Viscid damping case and energy dissipation damping device who has said viscid damping case | |
CN204781413U (en) | Viscid quality damping device establishes ties | |
CN211472150U (en) | Bridge shock attenuation high damping support of preventing damage | |
CN209742120U (en) | Buckling-restrained shear type damper with strong energy consumption performance under three-dimensional stress condition | |
CN207959512U (en) | A kind of energy consumption timber structure node of encased steel plate | |
CN212743475U (en) | Special reinforcing and connecting device for building wall surface structure | |
CN206902973U (en) | A kind of damping device of civil engineering structure | |
CN206538881U (en) | A kind of reinforced column and steel beam connecting joint | |
CN108678494A (en) | Compound various dimensions damp wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |