CN207109843U - A kind of goaf transmission line foundation bracing means - Google Patents

A kind of goaf transmission line foundation bracing means Download PDF

Info

Publication number
CN207109843U
CN207109843U CN201721091335.4U CN201721091335U CN207109843U CN 207109843 U CN207109843 U CN 207109843U CN 201721091335 U CN201721091335 U CN 201721091335U CN 207109843 U CN207109843 U CN 207109843U
Authority
CN
China
Prior art keywords
foundation
foundations
steel
transmission line
fixed steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721091335.4U
Other languages
Chinese (zh)
Inventor
宰红斌
任忠
宰洪涛
张庆华
李育庆
杜云强
韩晋锋
王威扬
马春
王军龙
赵晋芳
梁永欣
庄嵩岩
高佳琦
李海峰
郭科科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Jincheng Power Supply Co of State Grid Shanxi Electric Power Co Ltd
Priority to CN201721091335.4U priority Critical patent/CN207109843U/en
Application granted granted Critical
Publication of CN207109843U publication Critical patent/CN207109843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种采空区输电线路基础加固装置,属于基础防护领域;所要解决的技术问题是提供了一种采空区输电线路中可以将普通基础联合成为整体大板基础的基础加固装置;解决该技术问题采用的技术方案为:一种采空区输电线路基础加固装置,包括四个呈矩形分布的直柱式基础,基础上表面设置有地脚螺栓,基础立柱四周设置有固定钢,基础之间设置有支架,所述固定钢两端设置有第一连接孔和第二连接孔,所述的第一连接孔设置固定钢内侧,所述的第二连接孔设置在固定钢外侧,所述固定钢在基础立柱上呈井字型排列,相对的第一连接孔之间设置有螺柱,第二连接孔与支架连接;本实用新型可广泛应用于基础加固。

The utility model discloses a goaf power transmission line foundation reinforcement device, which belongs to the field of foundation protection; the technical problem to be solved is to provide a foundation reinforcement that can combine ordinary foundations into a whole large slab foundation in goaf power transmission lines device; the technical solution adopted to solve this technical problem is: a foundation reinforcement device for transmission lines in gobs, including four rectangular foundations with vertical columns, the upper surface of the foundations is provided with anchor bolts, and the foundation columns are surrounded by fixed Steel, brackets are provided between the foundations, first connection holes and second connection holes are provided at both ends of the fixed steel, the first connection hole is set inside the fixed steel, and the second connection hole is set on the fixed steel On the outside, the fixing steels are arranged in the shape of a square on the foundation column, studs are arranged between the first connecting holes opposite to each other, and the second connecting holes are connected to the brackets; the utility model can be widely used in foundation reinforcement.

Description

一种采空区输电线路基础加固装置A reinforcement device for transmission line foundation in goaf

技术领域technical field

本实用新型一种采空区输电线路基础加固装置,属于输电线路基础防护技术领域。The utility model relates to a foundation reinforcing device for transmission lines in goafs, which belongs to the technical field of transmission line foundation protection.

背景技术Background technique

采空塌陷造成的塌陷和地表盆地移动,会造成输电杆塔基础不均匀沉降,基础不均匀沉降时产生的非荷载应力将极有可能导致杆塔构件破坏、断裂、变形等事故发生,情况严重者将导致倒塔断线,对输电线路的安全运行构成严重威胁。The subsidence caused by goaf subsidence and the movement of the surface basin will cause uneven settlement of the foundation of the transmission tower. The non-load stress generated during the uneven settlement of the foundation will most likely lead to accidents such as damage, fracture, and deformation of the tower components. Leading to tower collapse and disconnection, it poses a serious threat to the safe operation of transmission lines.

为保证基础不均匀沉降时,输电杆塔仍能安全稳定运行,目前常用的方法是采用大板基础和加长地脚螺栓。In order to ensure that the transmission tower can still operate safely and stably when the foundation is unevenly settled, the current common method is to use a large slab foundation and lengthen the anchor bolts.

实际工作中,有大部分输电线路设计投运年限早,当年设计时未采用大板基础设计,而是采用的普通基础,普通基础抗塌陷和不均匀沉降能力差,调正基础和保证安全运行非常困难。In actual work, most of the transmission lines are designed to be put into operation early. The design of the large slab foundation was not adopted in the design of that year, but the ordinary foundation was adopted. The ordinary foundation has poor resistance to subsidence and uneven settlement. It is necessary to adjust the foundation and ensure safe operation. very difficult.

实用新型内容Utility model content

本实用新型克服了现有技术存在的不足,提供了一种采空区输电线路中可以将普通基础联合成为整体大板基础的基础加固装置。The utility model overcomes the deficiencies in the prior art and provides a foundation reinforcement device which can combine ordinary foundations into an integral large slab foundation in a goaf power transmission line.

为了解决上述技术问题,本实用新型采用的技术方案为:一种采空区输电线路基础加固装置,包括四个呈矩形分布的直柱式基础,基础上表面设置有地脚螺栓,基础立柱四周设置有固定钢,基础之间设置有支架。In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is: a gob transmission line foundation reinforcement device, which includes four rectangular foundations with vertical columns, the upper surface of the foundations is provided with anchor bolts, and the foundation columns are surrounded by Fixed steel is provided, and brackets are provided between the foundations.

所述固定钢两端设置有第一连接孔和第二连接孔,所述的第一连接孔设置固定钢内侧,所述的第二连接孔设置在固定钢外侧,所述固定钢在基础立柱上呈井字型排列,相对的第一连接孔之间设置有螺柱,第二连接孔与支架连接。The two ends of the fixed steel are provided with a first connecting hole and a second connecting hole, the first connecting hole is set on the inner side of the fixed steel, the second connecting hole is set on the outer side of the fixed steel, and the fixed steel is set on the foundation column The top is arranged in a well shape, studs are arranged between the opposite first connecting holes, and the second connecting holes are connected with the bracket.

所述的螺柱为双头螺柱,所述螺柱配套设置有螺母,所述螺母为加厚螺母。The studs are double-ended studs, and the studs are matched with nuts, and the nuts are thickened nuts.

所述支架包括钢筋和箍筋。The bracket includes steel bars and stirrups.

所述的固定钢可以是槽钢,也可以为其他型钢。The fixing steel can be channel steel or other shaped steel.

本实用新型与现有技术相比具有以下有益效果:在普通直柱式基础之间设置连梁,将直柱式基础通过连梁连接为一个整体基础,增加了基础的稳定性,可以有效的避免倒塔断线等恶劣事故,有效保证线路安全运行,提高了供电的可靠性,减少了调整铁塔基础造成的人力、物力浪费,安全环保,绿色低碳。Compared with the prior art, the utility model has the following beneficial effects: connecting beams are arranged between ordinary straight column foundations, and the straight column foundations are connected into a whole foundation through connecting beams, which increases the stability of the foundation and can effectively It avoids bad accidents such as falling towers and broken lines, effectively ensures safe operation of lines, improves the reliability of power supply, reduces the waste of manpower and material resources caused by adjusting the tower foundation, is safe and environmentally friendly, and is green and low-carbon.

附图说明Description of drawings

下面结合附图对本实用新型做进一步的说明。Below in conjunction with accompanying drawing, the utility model is described further.

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1的侧视图。FIG. 2 is a side view of FIG. 1 .

图中1为基础、2为地脚螺栓、3为固定钢、4为钢筋骨架、5为螺柱、6为螺母、31为第一连接孔、32为第二连接孔。In the figure, 1 is the foundation, 2 is the anchor bolt, 3 is the fixing steel, 4 is the reinforcement frame, 5 is the stud, 6 is the nut, 31 is the first connection hole, and 32 is the second connection hole.

具体实施方式Detailed ways

如图1、图2所示,本实用新型一种采空区输电线路基础加固装置,包括四个呈矩形分布的直柱式基础1,基础1上表面设置有地脚螺栓2,基础1立柱四周设置有固定钢3,基础1之间设置有支架4;所述固定钢3两端设置有第一连接孔31和第二连接孔32,所述的第一连接孔31设置固定钢3内侧,所述的第二连接孔32设置在固定钢3外侧,所述固定钢3在基础1立柱上呈井字型排列,相对的第一连接孔31之间设置有螺柱5,第二连接孔32与支架4连接;所述的螺柱5为双头螺柱,所述螺柱5配套设置有螺母6,所述螺母6为加厚螺母;所述支架4包括钢筋和箍筋;所述的固定钢3可以是槽钢,也可以为其他型钢。As shown in Fig. 1 and Fig. 2, the utility model is a goaf power transmission line foundation reinforcement device, which includes four straight column foundations 1 distributed in a rectangular shape, the upper surface of the foundation 1 is provided with anchor bolts 2, and the foundation 1 column There are fixed steels 3 around, and brackets 4 are arranged between the foundations 1; first connecting holes 31 and second connecting holes 32 are arranged at both ends of the fixed steel 3, and the first connecting holes 31 are set inside the fixed steel 3 , the second connection hole 32 is arranged on the outside of the fixed steel 3, and the fixed steel 3 is arranged in a square shape on the column of the foundation 1, and studs 5 are arranged between the opposite first connection holes 31, and the second connection The hole 32 is connected with the support 4; the stud 5 is a double-ended stud, and the stud 5 is provided with a nut 6, and the nut 6 is a thickened nut; the support 4 includes a steel bar and a stirrup; Said fixing steel 3 can be channel steel, also can be other section steel.

本实用新型在使用时,首先按照采空区基础的设计载荷和附加载荷设计钢筋骨架的配筋与混凝土强度等级,将需要加固的铁塔基础采取安全补强措施后,沿着基础1主柱四周向下开挖用于安装支架4的沟槽,在基础1主柱四周通过螺栓5和螺母6安装固定钢3,然后在固定钢3的第二连接孔32处绑扎混凝土配筋,然后浇筑混凝土,使多个基础1连接为一个整体大板基础,在混凝土强度达到95%及以上时,回填沟槽,在混凝土强度达到100%时,拆除临时安全补强措施,恢复线路总长运行。When the utility model is in use, first design the reinforcement of the steel frame and the concrete strength level according to the design load and additional load of the foundation of the goaf, and after taking safety reinforcement measures for the iron tower foundation that needs to be reinforced, the steel tower along the foundation 1 around the main column Excavate the groove for installing the bracket 4 downwards, install the fixed steel 3 around the main column of the foundation 1 through bolts 5 and nuts 6, then bind concrete reinforcement at the second connection hole 32 of the fixed steel 3, and then pour concrete , so that multiple foundations 1 are connected into a whole large slab foundation, when the concrete strength reaches 95% and above, the grooves are backfilled, when the concrete strength reaches 100%, the temporary safety reinforcement measures are removed, and the total length of the line is restored.

上面结合附图对本实用新型的实施例作了详细说明,但是本实用新型并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本实用新型宗旨的前提下作出各种变化。The above embodiments of the utility model have been described in detail in conjunction with the accompanying drawings, but the utility model is not limited to the above-mentioned embodiments. Make various changes below.

Claims (5)

1.一种采空区输电线路基础加固装置,包括四个呈矩形分布的直柱式基础(1),其特征在于:基础(1)上表面设置有地脚螺栓(2),基础(1)立柱四周设置有固定钢(3),基础(1)之间设置有支架(4)。1. A foundation strengthening device for power transmission lines in goafs, comprising four rectangular foundations (1), characterized in that: the upper surface of the foundation (1) is provided with anchor bolts (2), the foundation (1 ) fixed steel (3) is arranged around the column, and brackets (4) are arranged between the foundations (1). 2.根据权利要求1所述的一种采空区输电线路基础加固装置,其特征在于:所述固定钢(3)两端设置有第一连接孔(31)和第二连接孔(32),所述的第一连接孔(31)设置固定钢(3)内侧,所述的第二连接孔(32)设置在固定钢(3)外侧,所述固定钢(3)在基础(1)立柱上呈井字型排列,相对的第一连接孔(31)之间设置有螺柱(5),第二连接孔(32)与支架(4)连接。2. A goaf transmission line foundation reinforcement device according to claim 1, characterized in that: the two ends of the fixing steel (3) are provided with a first connecting hole (31) and a second connecting hole (32) , the first connecting hole (31) is set on the inside of the fixing steel (3), the second connecting hole (32) is set on the outside of the fixing steel (3), and the fixing steel (3) is on the foundation (1) The uprights are arranged in a well shape, studs (5) are arranged between the opposite first connecting holes (31), and the second connecting holes (32) are connected with the brackets (4). 3.根据权利要求2所述的一种采空区输电线路基础加固装置,其特征在于:所述的螺柱(5)为双头螺柱,所述螺柱(5)配套设置有螺母(6),所述螺母(6)为加厚螺母。3. A goaf transmission line foundation reinforcement device according to claim 2, characterized in that: the stud (5) is a double-ended stud, and the stud (5) is matched with a nut ( 6), the nut (6) is a thickened nut. 4.根据权利要求1所述的一种采空区输电线路基础加固装置,其特征在于:所述支架(4)包括钢筋和箍筋。4. The foundation reinforcement device for power transmission lines in goafs according to claim 1, characterized in that: the support (4) includes steel bars and stirrups. 5.根据权利要求1所述的一种采空区输电线路基础加固装置,其特征在于:所述的固定钢(3)可以是槽钢,也可以为型钢。5. A goaf transmission line foundation strengthening device according to claim 1, characterized in that: said fixing steel (3) can be channel steel or section steel.
CN201721091335.4U 2017-08-29 2017-08-29 A kind of goaf transmission line foundation bracing means Active CN207109843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721091335.4U CN207109843U (en) 2017-08-29 2017-08-29 A kind of goaf transmission line foundation bracing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721091335.4U CN207109843U (en) 2017-08-29 2017-08-29 A kind of goaf transmission line foundation bracing means

Publications (1)

Publication Number Publication Date
CN207109843U true CN207109843U (en) 2018-03-16

Family

ID=61586456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721091335.4U Active CN207109843U (en) 2017-08-29 2017-08-29 A kind of goaf transmission line foundation bracing means

Country Status (1)

Country Link
CN (1) CN207109843U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558487A (en) * 2017-08-29 2018-01-09 国网山西省电力公司晋城供电公司 A kind of goaf transmission line foundation bracing means and reinforcement means
CN111576920A (en) * 2020-06-03 2020-08-25 中天建设集团有限公司 Reinforced foundation for building foundation and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558487A (en) * 2017-08-29 2018-01-09 国网山西省电力公司晋城供电公司 A kind of goaf transmission line foundation bracing means and reinforcement means
CN111576920A (en) * 2020-06-03 2020-08-25 中天建设集团有限公司 Reinforced foundation for building foundation and construction method thereof
CN111576920B (en) * 2020-06-03 2021-09-10 中天建设集团有限公司 Reinforced foundation for building foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN115369748A (en) Construction method of template system for integrally pouring pier and tie beam
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN204959771U (en) Prestressing force H shaped steel bearing structure
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN202672766U (en) Concrete pole repair strengthening hoop
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN103790176B (en) A construction method of pre-embedded short-leg column structure
CN207109843U (en) A kind of goaf transmission line foundation bracing means
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN206289945U (en) A kind of assembled Portable safety crosshead
CN107558487A (en) A kind of goaf transmission line foundation bracing means and reinforcement means
CN204983173U (en) Steel construction beam -column connection node
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN204343642U (en) Builder's jack corner support frame
CN208088827U (en) The detachable earth anchor of iron on floor beam
CN203755715U (en) Wall underpinning structure
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN103510521A (en) Connecting component
CN203514323U (en) Connection component
CN207812837U (en) A kind of distributed shear key suitable for steel column
CN111519931A (en) Support construction method and structure for transformation of existing building structure column
CN214884864U (en) Mounting structure of strength nature structure steel column
CN206245709U (en) A kind of outrigger wall-connecting piece
CN205012299U (en) Pressure steel pipe installation shaped steel rail set

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant