CN215737583U - Construction engineering management project budget drawing device - Google Patents

Construction engineering management project budget drawing device Download PDF

Info

Publication number
CN215737583U
CN215737583U CN202122258166.1U CN202122258166U CN215737583U CN 215737583 U CN215737583 U CN 215737583U CN 202122258166 U CN202122258166 U CN 202122258166U CN 215737583 U CN215737583 U CN 215737583U
Authority
CN
China
Prior art keywords
gear
sleeve
plate
bearing
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122258166.1U
Other languages
Chinese (zh)
Inventor
楼洪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122258166.1U priority Critical patent/CN215737583U/en
Application granted granted Critical
Publication of CN215737583U publication Critical patent/CN215737583U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction engineering management project budget drawing device which comprises a base, a lifting assembly and an adjusting assembly, wherein the lifting assembly consists of a limiting sleeve, a rocker, a bearing block, a bearing plate, a gear A, a gear B, a fixed plate, a rotating shaft, a sliding ring and a supporting barrel, the limiting sleeve is installed at the top of the base, the sleeve is inserted into the limiting sleeve, the rocker is installed on the side wall of the sleeve, the gear A is installed at the bottom of the inner side of the sleeve, the rocker is inserted into the gear A, the gear A is vertically meshed with the gear B, the fixed plate is installed at the top of the gear A, the gear B is installed at the bottom of the fixed plate, and the rotating shaft is installed at the top of the gear B. The height of the measuring plate is controlled through the lifting assembly to adapt to the working of drawing personnel with different heights, and the angle between the measuring plate and the bearing plate is convenient to control through the adjusting assembly, so that the drawing personnel can work conveniently.

Description

Construction engineering management project budget drawing device
Technical Field
The utility model relates to the technical field of engineering budget, in particular to a construction engineering management engineering budget drawing device.
Background
Project planning is the planning of the income and expense of a project over a period of time in the future. The method can evaluate the investment of engineering projects in a currency form and reflect the economic effect of the engineering. The construction planning method is a basis for strengthening enterprise management, carrying out economic accounting, assessing engineering cost and compiling construction plan, is also a main basis for bidding and quotation of engineering bidding and determining construction cost, and can be divided into preliminary design approximate calculation and construction diagram budget according to different design phase division and construction project budget, which is called basic construction budget or construction budget for short.
Patent number CN202110260460.8 discloses a budget drawing device for construction engineering management engineering, which comprises a drawing board, wherein the upper surface of one side of the drawing board is provided with a control button, the other side of the drawing board is provided with a placing board, the placing board is movably mounted on the drawing board, and the placing board can be retracted into the drawing board through sliding; the utility model is suitable for engineering management, one side of the drawing board is movably provided with a placing board, the placing board is used for placing drawing pens, the placing board can be contracted into the drawing board through sliding, so that the drawing pens cannot be leaked when the drawing board is transported or carried, the outer end of the placing board is provided with a push plate, the inner sides of the two ends of the push plate are provided with magnetic suction sheets, and the drawing board cannot slide out abnormally when being taken in the drawing board and used.
The budget drawing device for the construction engineering management project has the following defects: when drawing the project budget, the height of the device is not convenient to adjust; when drawing the engineering budget, the angle of the device is not convenient to adjust, and the working efficiency of operators is affected.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a construction engineering management project budget drawing device which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
a construction engineering management project budget drawing device comprises a base, a lifting assembly and an adjusting assembly, wherein the lifting assembly comprises a limiting sleeve, a rocker, a bearing block, a bearing plate, a gear A, a gear B, a fixed plate, a rotating shaft, a sliding ring and a supporting barrel, the limiting sleeve is installed at the top of the base, the sleeve is inserted into the limiting sleeve, the rocker is installed on the side wall of the sleeve, the gear A is installed at the bottom of the inner side of the sleeve, the rocker is inserted into the gear A, the gear A is vertically meshed with the gear B, the fixed plate is installed at the top of the gear A, the gear B is installed at the bottom of the fixed plate, the rotating shaft is installed at the top of the gear B, penetrates through the fixed plate and is inserted into the supporting barrel, the sliding ring is installed on the surface of the rotating shaft, the sliding ring is located at the bottom of the supporting barrel, the bearing block is installed at the top of the supporting barrel, and the top of the bearing block is provided with a bearing plate.
Furthermore, the adjusting assembly consists of a bearing plate, a surveying and mapping plate, a sliding rod, a driving block, a connecting rod, an adjusting block and a limiting block, wherein the surveying and mapping plate is mounted on the surface of the bearing plate, a sliding groove is formed in the bearing plate, the sliding rod is inserted in the sliding groove, the driving block is mounted at one end of the sliding rod, the connecting rod is mounted at the top of the driving block, the other end of the connecting rod is inserted in the adjusting block, the other end of the adjusting block is mounted at the bottom of the surveying and mapping plate, and the limiting block is mounted at the other end of the sliding rod; through adjusting part, be convenient for control survey and drawing board and the angle of bearing board, the personnel of being convenient for draw work.
Furthermore, a thread groove A is formed in the sliding ring, threads are carved on the outer wall of the rotating shaft, and the threads are matched with the thread groove A; the rotating shaft drives the sliding ring through the thread groove A in the rotating process, and the sliding ring drives the supporting cylinder to enable the supporting cylinder to vertically move.
Furthermore, a thread groove B is formed in the limiting block, threads are carved on the outer wall of the sliding rod, and the threads are matched with the thread groove B; the limiting block is inserted into the slide bar, the surface of the slide bar is rotated through the thread groove B, and the slide bar is limited after the limiting block is attached to the side wall of the bearing plate.
Furthermore, a limiting column is arranged in the bearing plate, and the other end of the limiting column is inserted into the end part of the surveying and mapping plate; spacing post is spacing to the survey and drawing board, and the survey and drawing board angle of being convenient for is adjusted.
Compared with the prior art, the utility model has the following beneficial effects:
1. when the height of the surveying and mapping plate needs to be adjusted, a rocker is adjusted, the rocker drives a gear A when rotating, the gear A is vertically meshed with a gear B, the gear A drives the gear B to rotate, a fixing plate limits the gear B, the gear B drives a rotating shaft when rotating, the rotating shaft drives a sliding ring in the rotating process, the sliding ring drives a supporting cylinder to vertically move upwards, the supporting cylinder vertically moves upwards in a sleeve, the supporting cylinder pushes a bearing block, the bearing block drives a bearing plate to vertically move upwards, the rocker is reversely adjusted to drive the rocker, the rocker drives the gear B through the gear A, the gear B drives the supporting cylinder through the rotating shaft to vertically move downwards, the bearing plate on the bearing block vertically moves downwards, and the height of the measuring plate is controlled through a lifting assembly to adapt to drawing personnel with different heights to work.
2. After the height is adjusted, the limiting block is rotated, the limiting block is taken down from the sliding rod, the sliding rod is pushed, the sliding rod slides in the sliding groove, the driving block pushes the connecting rod when moving, the connecting rod pushes the surveying and mapping plate while adjusting the angle in the adjusting block, the limiting column is inserted at the other end of the surveying and mapping plate, the limiting column limits the surveying and mapping plate, the angle of the surveying and mapping plate is convenient to adjust, when the surveying and mapping plate is adjusted to a proper angle, the limiting block is inserted on the sliding rod, the surface of the sliding rod is rotated through the thread groove B, when the limiting block is attached to the side wall of the bearing plate, the sliding rod is limited, the angle between the surveying and mapping plate and the bearing plate is convenient to control through the adjusting assembly, and a person who conducts work is convenient to draw.
Drawings
FIG. 1 is a front view of a budget drawing device for construction engineering management according to the present invention;
FIG. 2 is a schematic diagram of the expansion of the interior of the sleeve of the budget plotting apparatus for construction engineering management according to the present invention;
fig. 3 is an expanded view of a bearing plate of the drawing device for budget of construction engineering management of the present invention.
In the figure: 1. a base; 2. a limiting sleeve; 3. a sleeve; 4. a rocker; 5. a bearing block; 6. a support plate; 7. a limiting column; 8. a surveying plate; 9. a limiting block; 10. a gear A; 11. a gear B; 12. a fixing plate; 13. a rotating shaft; 14. a slip ring; 15. a thread groove A; 16. a support cylinder; 17. a chute; 18. a slide bar; 19. a drive block; 20. a connecting rod; 21. an adjusting block; 22. a thread groove B; 23. a lifting assembly; 24. an adjustment assembly.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in fig. 1-3, a construction engineering management engineering budget drawing device includes a base 1, and further includes a lifting assembly 23 and an adjusting assembly 24, where the lifting assembly 23 includes a position-limiting sleeve 2, a sleeve 3, a rocker 4, a bearing block 5, a bearing plate 6, a gear a10, a gear B11, a fixing plate 12, a rotating shaft 13, a sliding ring 14 and a support cylinder 16, the top of the base 1 is provided with the position-limiting sleeve 2, the position-limiting sleeve 2 is inserted with the sleeve 3, the side wall of the sleeve 3 is provided with the rocker 4, the bottom of the inner side of the sleeve 3 is provided with the gear a10, the rocker 4 is inserted in the gear a10, the gear a10 is vertically engaged with the gear B11, the top of the gear a10 is provided with the fixing plate 12, the bottom of the fixing plate 12 is provided with the gear B11, the top of the gear B11 is provided with the rotating shaft 13, the rotating shaft 13 penetrates through the fixing plate 12 and is connected in the support cylinder 16, the surface of the rotating shaft 13 is provided with a sliding ring 14, the sliding ring 14 is positioned at the bottom of the supporting cylinder 16, the top of the supporting cylinder 16 is provided with a bearing block 5, and the top of the bearing block 5 is provided with a bearing plate 6.
The adjusting assembly 24 comprises a bearing plate 6, a surveying and mapping plate 8, a sliding rod 18, a driving block 19, a connecting rod 20, an adjusting block 21 and a limiting block 9, the surveying and mapping plate 8 is mounted on the surface of the bearing plate 6, a sliding groove 17 is formed in the bearing plate 6, the sliding rod 18 is inserted in the sliding groove 17, the driving block 19 is mounted at one end of the sliding rod 18, the connecting rod 20 is mounted at the top of the driving block 19, the other end of the connecting rod 20 is inserted in the adjusting block 21, the other end of the adjusting block 21 is mounted at the bottom of the surveying and mapping plate 8, and the limiting block 9 is mounted at the other end of the sliding rod 18; through adjusting part 24, be convenient for control survey and drawing board 8 and the angle of bearing board 6, the personnel of being convenient for draw work.
A thread groove A15 is formed in the sliding ring 14, threads are carved on the outer wall of the rotating shaft 13, and the threads are matched with the thread groove A15; the rotating shaft 13 drives the sliding ring 14 through the screw groove a15 during rotation, and the sliding ring 14 drives the support cylinder 16 to vertically move the support cylinder 16.
A thread groove B22 is formed in the limiting block 9, threads are carved on the outer wall of the sliding rod 18, and the threads are matched with the thread groove B22; the limiting block 9 is inserted on the sliding rod 18 and rotates on the surface of the sliding rod 18 through the thread groove B22, and when the limiting block 9 is attached to the side wall of the bearing plate 6, the sliding rod 18 is limited.
Wherein, a limit column 7 is arranged in the bearing plate 6, and the other end of the limit column 7 is inserted at the end part of the surveying and mapping plate 8; spacing post 7 is spacing to survey and drawing board 8, the survey and drawing board 8 angular adjustment of being convenient for.
It should be noted that the utility model is a construction engineering management engineering budget drawing device, when the height of a surveying and mapping plate 8 needs to be adjusted, a rocker 4 is adjusted, a gear a10 is driven when the rocker 4 rotates, a gear a10 is vertically meshed with a gear B11, a gear a10 drives a gear B11, a gear B11 rotates, a fixed plate 12 limits a gear B11, a gear B11 drives a rotating shaft 13 when rotating, the rotating shaft 13 drives a sliding ring 14 during rotation, the sliding ring 14 drives a support cylinder 16, the support cylinder 16 moves vertically upwards in a sleeve 3, the support cylinder 16 pushes a bearing block 5, the bearing block 5 drives a bearing plate 6 to move vertically upwards, the rocker 4 is reversely adjusted, the rocker 4 drives the gear B11 through the gear a10, the gear B11 drives the support cylinder 16 through the rotating shaft 13, the support cylinder 16 moves vertically downwards, and the bearing plate 6 on the bearing block 5 moves vertically downwards, through the lifting component 23, the height of the measuring plate is controlled to adapt to the working of drawing personnel with different heights, after the height is adjusted, the limiting block 9 is rotated, the limiting block 9 is taken down from the slide rod 18, the slide rod 18 is pushed, the slide rod 18 slides in the sliding groove 17, the slide rod 18 pushes the driving block 19, the driving block 19 pushes the connecting rod 20 when moving, the connecting rod 20 simultaneously pushes the surveying and mapping plate 8 by adjusting the angle in the adjusting block 21, the limiting column 7 is inserted at the other end of the surveying and mapping plate 8, the limiting column 7 limits the surveying and mapping plate 8, the angle adjustment of the surveying and mapping plate 8 is convenient, when the surveying and mapping plate 8 is adjusted to a proper angle, the limiting block 9 is inserted on the slide rod 18 and rotates on the surface of the slide rod 18 through the thread groove B22, when the limiting block 9 is attached to the side wall of the bearing plate 6, the slide rod 18 is limited, through the adjusting component 24, the angle between the surveying and mapping plate 8 and the bearing plate 6 is convenient to control, the drawing staff can work conveniently.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. The construction engineering management engineering budget drawing device comprises a base (1) and is characterized by further comprising a lifting assembly (23) and an adjusting assembly (24), wherein the lifting assembly (23) consists of a limiting sleeve (2), a sleeve (3), a rocker (4), a bearing block (5), a bearing plate (6), a gear A (10), a gear B (11), a fixing plate (12), a rotating shaft (13), a sliding ring (14) and a supporting cylinder (16), the limiting sleeve (2) is installed at the top of the base (1), the sleeve (3) is inserted into the limiting sleeve (2), the rocker (4) is installed on the side wall of the sleeve (3), the gear A (10) is installed at the bottom of the inner side of the sleeve (3), the rocker (4) is inserted into the gear A (10), the gear A (10) is meshed with the gear B (11) to be vertical, the fixing plate (12) is installed at the top of the gear A (10), the supporting device is characterized in that a gear B (11) is installed at the bottom of the fixing plate (12), a rotating shaft (13) is installed at the top of the gear B (11), the rotating shaft (13) penetrates through the fixing plate (12) and is inserted into the supporting cylinder (16), a sliding ring (14) is installed on the surface of the rotating shaft (13), the sliding ring (14) is located at the bottom of the supporting cylinder (16), a bearing block (5) is installed at the top of the supporting cylinder (16), and a bearing plate (6) is installed at the top of the bearing block (5).
2. The budget drawing device for the construction engineering management project according to claim 1, wherein: adjusting part (24) comprises bearing board (6), survey and drawing board (8), slide bar (18), driving block (19), connecting rod (20), regulating block (21) and stopper (9), bearing board (6) surface mounting has survey and drawing board (8), inside spout (17) of having seted up of bearing board (6), it has slide bar (18) to peg graft in spout (17), driving block (19) are installed to slide bar (18) one end, connecting rod (20) are installed at driving block (19) top, connecting rod (20) other end is pegged graft in regulating block (21), install in survey and drawing board (8) bottom regulating block (21) other end, stopper (9) are installed to slide bar (18) other end.
3. The budget drawing device for the construction engineering management project according to claim 1, wherein: thread groove A (15) are formed in the sliding ring (14), threads are carved on the outer wall of the rotating shaft (13), and the threads are matched with the thread groove A (15).
4. The budget drawing device for the construction engineering management project according to claim 2, wherein: the limiting block (9) is internally provided with a thread groove B (22), and the outer wall of the sliding rod (18) is carved with threads which are matched with the thread groove B (22).
5. The budget drawing device for the construction engineering management project according to claim 1, wherein: the bearing plate (6) is internally provided with a limiting column (7), and the other end of the limiting column (7) is inserted into the end part of the surveying and mapping plate (8).
CN202122258166.1U 2021-09-17 2021-09-17 Construction engineering management project budget drawing device Expired - Fee Related CN215737583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122258166.1U CN215737583U (en) 2021-09-17 2021-09-17 Construction engineering management project budget drawing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122258166.1U CN215737583U (en) 2021-09-17 2021-09-17 Construction engineering management project budget drawing device

Publications (1)

Publication Number Publication Date
CN215737583U true CN215737583U (en) 2022-02-08

Family

ID=80088649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122258166.1U Expired - Fee Related CN215737583U (en) 2021-09-17 2021-09-17 Construction engineering management project budget drawing device

Country Status (1)

Country Link
CN (1) CN215737583U (en)

Similar Documents

Publication Publication Date Title
CN206509729U (en) A kind of automatic drilling tapping integrated machine
CN115541581A (en) Mini-LED dispensing detection equipment and dispensing detection method
CN209412075U (en) A kind of glass processing device
CN215737583U (en) Construction engineering management project budget drawing device
CN208818089U (en) It is a kind of can rapid abutting joint target seeker LASER Target Simulator
CN208929646U (en) A kind of oil cylinder installation auxiliary locator
CN208251649U (en) A kind of rail mounted vertical prestressing tensioning equipment
CN218864979U (en) Building energy conservation engineering quality flatness detection device
CN208766883U (en) A kind of mobile Drawing of Curve device of Higher Mathematics Teaching
CN215488826U (en) Building engineering management bid inviting device
CN214308775U (en) Building mapping device for construction
CN214684776U (en) Laser marking machine
CN113273806A (en) Drawing workstation for architectural design
CN210155129U (en) Quality of water heavy metal detection device
CN206855058U (en) One kind automation drilling machine clamping device
CN219200376U (en) Detection device of singlechip
CN112450612A (en) Intelligent building engineering cost platform based on BIM technology
CN220583366U (en) Measuring device for landscape planning design
CN221111034U (en) High-precision metal wire drawing equipment
CN205672889U (en) Automatically control reactor positioner
CN212918431U (en) Height-adjustable machine tool linear module
CN213481351U (en) Support frame for engineering survey
CN221274477U (en) Automatic pipe fitting feeding and positioning device
CN217812559U (en) BIM-based supporting device for building structure
CN219075042U (en) Rotating shaft adjusting assembly for machine tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220208