CN215717065U - Steel construction toll station decorates engineering construction work platform - Google Patents

Steel construction toll station decorates engineering construction work platform Download PDF

Info

Publication number
CN215717065U
CN215717065U CN202121765060.4U CN202121765060U CN215717065U CN 215717065 U CN215717065 U CN 215717065U CN 202121765060 U CN202121765060 U CN 202121765060U CN 215717065 U CN215717065 U CN 215717065U
Authority
CN
China
Prior art keywords
steel
toll station
channel
work platform
scaffold board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121765060.4U
Other languages
Chinese (zh)
Inventor
王宇廷
赵铁拓
刘春杰
杨思功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Terlu Beijing Technology Co ltd
Beijing Iugon Road Maintenance Co ltd
Original Assignee
Terlu Beijing Technology Co ltd
Beijing Iugon Road Maintenance Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Terlu Beijing Technology Co ltd, Beijing Iugon Road Maintenance Co ltd filed Critical Terlu Beijing Technology Co ltd
Priority to CN202121765060.4U priority Critical patent/CN215717065U/en
Application granted granted Critical
Publication of CN215717065U publication Critical patent/CN215717065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the field of building construction, and particularly relates to a construction operation platform for decoration engineering of a steel structure toll station. The steel structure toll station decoration engineering construction operation platform is hung below a steel beam of a toll station main body structure and comprises a U-shaped round steel hanging bracket, a channel steel and a scaffold board; the U-shaped round steel hanging bracket is sleeved and hung on a steel beam of a main body structure of the toll station, and the opening end of the U-shaped round steel hanging bracket is arranged downwards; the U-shaped steel hanger is connected with the bottom of the U-shaped steel hanger to form support for the scaffold board, and the U-shaped steel extends in parallel with the steel beam; the scaffold board is placed on the channel steel, and the extending direction of the long edge of the scaffold board is perpendicular to the extending direction of the channel steel. The whole structure is simple. From this, this steel construction toll station decorates engineering construction work platform and sets up the cycle short to the cost has been saved, the design of hoist and mount need not to set up the support bed-jig in construction work platform below in addition, has realized reserving the space for the ground construction, has wholly improved the purpose of engineering overall progress.

Description

Steel construction toll station decorates engineering construction work platform
Technical Field
The utility model belongs to the field of building construction, and particularly relates to a construction operation platform for decoration engineering of a steel structure toll station.
Background
The toll station decoration refers to the external shape of the toll station, the positions of non-main structures such as a suspended ceiling and the like, in the decoration construction, the scaffold refers to various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site, and is mainly used for outer wall, interior decoration or places which are high in floor height and cannot be directly constructed on a building site. Among them, in the construction of suspended ceiling with high floor height, the full framing scaffold, also called full framing scaffold, is a construction process for building scaffold in common use. The full hall scaffold is dense more than other scaffold systems, and more firm. At present, a full scaffold is generally erected as a construction platform when the aluminum plate of the steel structure toll station is decorated and constructed.
Conventional full hall scaffold frame is full steel pipe scaffold frame, and it is longer to set up the cycle, takes a lot of work and time, and the expense is high, sets up the completion back moreover, and ground construction position is blocked, and ground construction will not go on to influence overall construction progress. The prior art uses the support bed-jig in the below, but the support operation platform that current support bed-jig can not the full coverage, and stability is not good, has great potential safety hazard.
Disclosure of Invention
Technical problem to be solved
In order to solve the problems in the prior art, the utility model provides the steel structure toll station decoration engineering construction work platform, and a support jig frame is not required to be arranged below the construction work platform, so that a space is reserved for ground construction, and the overall progress of the engineering is integrally improved.
(II) technical scheme
In order to achieve the purpose, the utility model adopts the main technical scheme that:
the utility model provides a construction operation platform for decorative engineering of a steel structure toll station, which is hung below a steel beam of a main body structure of the toll station and comprises a U-shaped round steel hanging bracket, a channel steel and a scaffold board; the U-shaped round steel hanging bracket is sleeved and hung on a steel beam of a main body structure of the toll station, and the opening end of the U-shaped round steel hanging bracket is arranged downwards; the U-shaped steel hanger is connected with the bottom of the U-shaped steel hanger to form support for the scaffold board, and the U-shaped steel extends in parallel with the steel beam; the scaffold board is placed on the channel steel, and the extending direction of the long edge of the scaffold board is perpendicular to the extending direction of the channel steel.
Furthermore, the U-shaped round steel hangers sleeved on the same steel beam are arranged at equal intervals.
Furthermore, the channel steel connected with the same U-shaped round steel hanger is a pair of channel steel.
Further, the bottom of the U-shaped round steel hanging bracket is provided with threads.
Furthermore, channel steel through holes matched with the U-shaped round steel hanging bracket are formed in the upper channel steel waist and the lower channel steel waist of the channel steel.
Further, the U-shaped round steel hanger penetrates through the channel steel through hole and is fixed with the channel steel through nuts, and the nuts are arranged on the upper channel steel waist and below the lower channel steel waist.
Further, arrange side by side between the girder steel, a passageway is formed in the middle of two adjacent U type round steel gallows of same position on all girder steels.
Further, the scaffold board is wooden scaffold board, and the scaffold board is kept flat in the passageway bottom and is supported by the channel-section steel, and a scaffold board is put to every passageway.
And the safety net is enclosed and enclosed around the steel structure toll station decoration engineering construction operation platform, and the lower edge of the safety net is in seamless connection with the edge of the scaffold board.
(III) advantageous effects
The utility model has the beneficial effects that:
according to the construction work platform for the decoration project of the steel structure toll station, the U-shaped round steel hanging bracket is hung on the steel beam, the channel steel is arranged below the U-shaped round steel hanging bracket, the scaffold board is paved on the channel steel, and the construction work platform is formed.
Drawings
FIG. 1 is a side view of a construction platform for decoration engineering of a steel structure toll station;
FIG. 2 is a front view of a construction platform of a decoration project of a steel structure toll station;
FIG. 3 is a top view of a construction platform for decoration engineering of a steel structure toll station;
FIG. 4 is an enlarged view of A in FIG. 1;
fig. 5 is an enlarged view of B in fig. 1.
[ description of reference ]
1: a U-shaped round steel hanging bracket; 11: a thread; 12: a nut;
2: channel steel; 21: steel waist of upper groove; 22: a lower channel steel waist; 23: channel steel through holes;
3: a scaffold board; 4: a steel beam; 5: a channel; 6: a safety net is provided.
Detailed Description
In order to better understand the above technical solutions, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the utility model are shown in the drawings, it should be understood that the utility model can be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the utility model to those skilled in the art.
As shown in fig. 1-5, the embodiment provides a steel structure toll station decoration engineering construction work platform, which is hung below a steel beam 4 of a toll station main body structure, and the design of the hanging leaves an operation space for the lower part, so that the decoration engineering construction can be performed simultaneously with the ground engineering construction, the embodiment includes a U-shaped round steel hanger 1, a channel steel 2 and a scaffold plate 3, and the channel steel 2 is selected as a support platform because the channel steel 2 has good bearing capacity; as shown in fig. 4, the U-shaped round steel hanger 1 is hung on the steel beam 4 of the main structure of the toll station, and the open end thereof is arranged downward.
As shown in fig. 2, since the length and width of the scaffold board 3 are fixed in a standard manner, the U-shaped round steel hangers 1 sleeved on the same steel beam 4 are equidistantly arranged with the width of the scaffold board 3 as a standard; as shown in fig. 1, channel-section steel 2 connects in the open end of U type round steel gallows 1 bottom to 3 support that form of scaffold board, and channel-section steel 2 extends in a parallel with girder steel 4, supporting plane is formed to all channel-section steels 2, then place qualified standard scaffold board 3 on the supporting plane that channel-section steel 2 formed, and the extending direction perpendicular to channel-section steel 2's extending direction on 3 long limits of scaffold board, and at this moment, all scaffold boards 3 form a holistic construction platform, the workman is current in the construction of being convenient for, or the material transports.
As shown in fig. 5, the channel steel 2 connected with the same U-shaped round steel hanger 1 is a pair of channel steel 2, and the openings of each pair of channel steel 2 are arranged in opposite directions and in the same direction as the steel beam 4, so that the overall stress is balanced, and the stability of the platform is ensured; the upper channel steel waist 21 and the lower channel steel waist 22 of the channel steel 2 are provided with channel steel through holes 23 matched with the U-shaped round steel hanging bracket 1, the bottom of the U-shaped round steel hanging bracket 1 is provided with threads 11, and the U-shaped round steel hanging bracket 1 penetrates through the channel steel through holes 23 and is fixed with the channel steel 2 through nuts 12. In this embodiment, two nuts 12 are arranged on the upper channel steel waist 21, and one nut 12 is arranged below the lower channel steel waist 22, so that the nut 12 can be reinforced and prevented from falling off.
As shown in fig. 3, the steel beams 4 are arranged in parallel, a channel 5 is formed between two adjacent U-shaped round steel hangers 1 at the same position on all the steel beams 4, the scaffold boards 3 are flatly placed at the bottom of the channel 5 and supported by the channel steel 2, one scaffold board 3 is placed in each channel 5, and the scaffold boards 3 are wooden scaffold boards 3. As shown in figures 1 and 2, the safety net 6 is enclosed and enclosed around the construction work platform of the decoration project of the steel structure toll station, the lower edge of the safety net 6 is tightly bound on the scaffold plate 3 by 18 # lead wires, and the effect of seamless connection with the edge of the scaffold plate 3 is achieved.
In the description of the present invention, it is to be understood that the terms "first", "second" and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium; either as communication within the two elements or as an interactive relationship of the two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, a first feature may be "on" or "under" a second feature, and the first and second features may be in direct contact, or the first and second features may be in indirect contact via an intermediate. Also, a first feature "on," "above," and "over" a second feature may be directly or obliquely above the second feature, or simply mean that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the second feature, or may simply mean that the first feature is at a lower level than the second feature.
In the description herein, the description of the terms "one embodiment," "some embodiments," "an embodiment," "an example," "a specific example" or "some examples" or the like, means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
Although embodiments of the present invention have been shown and described above, it should be understood that the above embodiments are illustrative and not restrictive, and that those skilled in the art may make changes, modifications, substitutions and alterations to the above embodiments without departing from the scope of the present invention.

Claims (9)

1. The utility model provides a steel construction toll station decorates engineering construction work platform which characterized in that: the steel structure toll station decoration engineering construction operation platform is hung below a steel beam (4) of a toll station main body structure and comprises a U-shaped round steel hanging bracket (1), a channel steel (2) and a scaffold board (3);
the U-shaped round steel hanger (1) is sleeved and hung on the steel beam (4) of the toll station main body structure, and the opening end of the U-shaped round steel hanger is arranged downwards;
the channel steel (2) is connected to the opening end of the bottom of the U-shaped round steel hanger (1) to support the scaffold board (3), and the channel steel (2) extends in parallel to the steel beam (4);
the scaffold board (3) is placed on the channel steel (2), and the extending direction of the long edge of the scaffold board (3) is perpendicular to the extending direction of the channel steel (2).
2. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 1, wherein: the U-shaped round steel hanging frames (1) which are sleeved and hung on the same steel beam (4) are arranged at equal intervals.
3. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 1, wherein: the channel steel (2) connected with the same U-shaped round steel hanger (1) is a pair of channel steel (2).
4. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 1, wherein: the bottom of the U-shaped round steel hanger (1) is provided with a thread (11).
5. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 3, wherein: and channel steel through holes (23) matched with the U-shaped round steel hanging bracket (1) are formed in the upper channel steel waist (21) and the lower channel steel waist (22) of the channel steel (2).
6. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 5, wherein: the U-shaped round steel hanger (1) penetrates through the channel steel through hole (23) and is fixed with the channel steel (2) through a nut (12), and the nut (12) is arranged on the upper channel steel waist (21) and below the lower channel steel waist (22).
7. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 1, wherein: the steel beams (4) are arranged in parallel, and a channel (5) is formed between every two adjacent U-shaped round steel hanging frames (1) at the same position on the steel beams (4).
8. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 7, wherein: the scaffold board (3) is wooden scaffold board (3), scaffold board (3) are kept flat passageway (5) bottom and by channel-section steel (2) support, every one is put in passageway (5) scaffold board (3).
9. The construction work platform for the decoration project of the steel structure toll station as claimed in claim 1, wherein: still include safety net (6), safety net (6) are sealed and are enclosed steel construction toll station decorates engineering construction work platform all around, safety net (6) lower limb with scaffold board (3) edge seamless connection.
CN202121765060.4U 2021-07-30 2021-07-30 Steel construction toll station decorates engineering construction work platform Active CN215717065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121765060.4U CN215717065U (en) 2021-07-30 2021-07-30 Steel construction toll station decorates engineering construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121765060.4U CN215717065U (en) 2021-07-30 2021-07-30 Steel construction toll station decorates engineering construction work platform

Publications (1)

Publication Number Publication Date
CN215717065U true CN215717065U (en) 2022-02-01

Family

ID=79991249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121765060.4U Active CN215717065U (en) 2021-07-30 2021-07-30 Steel construction toll station decorates engineering construction work platform

Country Status (1)

Country Link
CN (1) CN215717065U (en)

Similar Documents

Publication Publication Date Title
CN109184061B (en) Space structure overhanging eave suspended ceiling system structure and construction method
CN206320918U (en) Air conditioner support for multi-storey building
CN211200793U (en) Green energy-saving building curtain wall suitable for multiple places
CN215717065U (en) Steel construction toll station decorates engineering construction work platform
CN206948242U (en) A kind of flexible photovoltaic support for roof
CN204216516U (en) Anti-seismic base-supporting chute
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN210202666U (en) Single greenhouse
CN203626357U (en) Novel communication tower
CN212641767U (en) Cross box bucket arch node
CN206462646U (en) One kind leans on the hanging cabinet of wall
CN203878957U (en) Protective screen module unit
CN208028203U (en) Flooring antenna assembled box-type steel structure base
CN207053113U (en) A kind of support meanss for crane span structure
CN205946464U (en) Network cabinet that can 19 inches 21 inches installations of on --spot change
CN213774434U (en) Steel scaffold board for scaffold
CN220440299U (en) Steel construction cable bridge structure
CN209011525U (en) Suspension type steel platform and suspension type steel plateform system
CN203947753U (en) A kind of hanging-type construction support
CN214884703U (en) Outer hanging installation device of super large glass curtain wall
CN215803090U (en) Hanging basket support frame
CN218752294U (en) Tower machine balance arm rack
CN219863947U (en) Steel construction platform is used in structure entrance to a cave department
CN210432248U (en) Rack mounting bracket
CN205348738U (en) Inserted lift scaffold's lifting pedestal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant