CN215680024U - Engineering project progress management device for construction - Google Patents

Engineering project progress management device for construction Download PDF

Info

Publication number
CN215680024U
CN215680024U CN202121906806.9U CN202121906806U CN215680024U CN 215680024 U CN215680024 U CN 215680024U CN 202121906806 U CN202121906806 U CN 202121906806U CN 215680024 U CN215680024 U CN 215680024U
Authority
CN
China
Prior art keywords
placing frame
supporting seat
fixedly connected
building construction
front surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121906806.9U
Other languages
Chinese (zh)
Inventor
王曼娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhang Zhuangju
Original Assignee
Zhang Zhuangju
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhang Zhuangju filed Critical Zhang Zhuangju
Priority to CN202121906806.9U priority Critical patent/CN215680024U/en
Application granted granted Critical
Publication of CN215680024U publication Critical patent/CN215680024U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of building construction, and discloses a project progress management device for building construction, which comprises a placing frame, wherein two limiting grooves are transversely formed in the front surface of the placing frame, a shielding mechanism is arranged on the front side of the placing frame, a supporting seat is arranged below the placing frame, a controller is fixedly connected to the front surface of the supporting seat, anti-skidding blocks are fixedly connected to the front surface and the rear surface of the supporting seat, and a driving mechanism is arranged in the supporting seat. Can shelter from the front surface of placing the frame through sheltering from the mechanism to protect the show cloth of placing on the frame front surface, prevent that the external force touching from leading to the show cloth damaged, ensured the normal observation of show cloth, can adjust the use height that the frame was placed to the top according to actual need through actuating mechanism, make things convenient for the crowd of different heights to watch and use, can also carry out nimble adjustment according to actual installation environment simultaneously, application scope obtains increasing.

Description

Engineering project progress management device for construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a project progress management device for building construction.
Background
Along with the rapid development of society, the speed of people's life rhythm carries out planned management to present construction progress, can improve work efficiency effectively, and rational planning time limit for a project improves construction quality simultaneously, accelerates the construction progress, guides the workman, reduces the construction risk, improves safe construction consciousness, accomplishes reasonable orderly construction, carries out construction progress management now and adopts the computer to print more, then directly adheres to and places the frame on and demonstrate.
Chinese patent discloses a project progress management device (No. CN 209880090U) for building construction, which can rapidly complete installation by arranging a clamping mechanism and a limiting mechanism, the display cloth is convenient to replace when needing to be adjusted, and can be finished by one person, the displacement mechanism and the reminding mechanism are arranged, the reminding mechanism can be moved in any row and any column to a place which needs special attention corresponding to the display cloth, and a good reminding effect is achieved, however, the engineering project progress management device is not easy to adjust the use height of the placing frame according to the actual requirement, is inconvenient for people with different heights to watch and use, and after being used, be difficult to shelter from the show cloth of placing on the frame, lead to the show cloth damage easily after receiving external force touching to influence normal observation. Therefore, those skilled in the art provide a project progress management device for building construction to solve the problems set forth in the background art.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an engineering project progress management device for building construction, which can shield the front surface of a placing frame through a shielding mechanism, thereby protecting display cloth on the front surface of the placing frame, preventing the display cloth from being damaged due to external force touch, ensuring normal observation of the display cloth, being capable of being opened automatically when in use, being easy to use in practice, being capable of adjusting the use height of the placing frame above according to practical requirements through a driving mechanism, being convenient for people with different heights to watch and use, being capable of flexibly adjusting according to practical installation environments, increasing the application range, being adjusted through a mechanical mode, and being more time-saving and labor-saving.
In order to achieve the purpose, the utility model provides the following technical scheme:
the engineering project progress management device for building construction comprises a placing frame, wherein two limiting grooves are transversely formed in the front surface of the placing frame, a shielding mechanism is installed on the front side of the placing frame, a supporting seat is installed below the placing frame, a controller is fixedly connected to the front surface of the supporting seat, anti-skidding blocks are fixedly connected to the front surface and the rear surface of the supporting seat, and a driving mechanism is installed inside the supporting seat;
actuating mechanism is including adjusting pole, threaded rod, pinion, gear wheel and servo motor, the servo motor rigid coupling is in the inside of supporting seat, and is connected with the gear wheel on servo motor's the drive end, and the both sides of gear wheel all mesh has the pinion, two the inside of pinion is all fixed to be run through threaded rod, two the equal thread bush in top of threaded rod has adjusted the pole.
As a still further scheme of the utility model: the top ends of the two adjusting rods movably penetrate through the top of the supporting seat and are fixedly connected to two sides of the lower surface of the placing frame respectively.
As a still further scheme of the utility model: two the bottom of threaded rod all rotates through the bearing and connects in the inside of supporting seat.
As a still further scheme of the utility model: the inside corner rigid coupling of supporting seat has the battery.
As a still further scheme of the utility model: the thread directions of the two threaded rods are the same.
As a still further scheme of the utility model: the shielding mechanism comprises an installation block, an electric push rod, a shielding plate and a limiting block, the rear surface of the shielding plate is fixedly connected with the installation block and the limiting block, and the installation block is fixedly connected with the electric push rod.
As a still further scheme of the utility model: the fixed end of the electric push rod is fixedly connected to the outer side wall of the placing frame, and the telescopic end of the electric push rod is fixedly connected to the mounting block.
As a still further scheme of the utility model: the limiting block is connected inside the limiting groove in a sliding mode.
As a still further scheme of the utility model: the length of the shielding plate is greater than that of the placing frame, and the shielding plate is located on the front side of the placing frame.
Compared with the prior art, the utility model has the beneficial effects that:
1. the front surface of the placing frame can be shielded through the shielding mechanism, so that the display cloth on the front surface of the placing frame is protected, the display cloth is prevented from being damaged due to external force touch, normal observation of the display cloth is guaranteed, and the display cloth can be opened automatically when needing to be used, so that the display cloth is easy to use in practice;
2. can adjust the use height that the frame was placed to the top according to actual need through actuating mechanism, make things convenient for the crowd of different heights to watch and use, can also carry out nimble adjustment according to actual installation environment simultaneously, application scope obtains increasing, adjusts through mechanical system moreover, labour saving and time saving more.
Drawings
FIG. 1 is a schematic structural view of a construction project progress management apparatus for building construction;
FIG. 2 is a schematic structural diagram of a driving mechanism in the project progress management apparatus for construction;
fig. 3 is a schematic structural view of a shielding mechanism in the project progress management apparatus for building construction.
In the figure: 1. a limiting groove; 2. placing the frame; 3. adjusting a rod; 4. a supporting seat; 5. a controller; 6. anti-skid blocks; 7. a threaded rod; 8. a pinion gear; 9. a bull gear; 10. a servo motor; 11. a drive mechanism; 12. mounting blocks; 13. an electric push rod; 14. a shielding plate; 15. a limiting block; 16. a shielding mechanism.
Detailed Description
Example 1
Referring to fig. 1 and 3, an engineering project progress management device for building construction includes a placing frame 2, two limiting grooves 1 are transversely formed on a front surface of the placing frame 2, a shielding mechanism 16 is installed on a front side of the placing frame 2, the shielding mechanism 16 includes an installation block 12, an electric push rod 13, a shielding plate 14 and a limiting block 15, a rear surface of the shielding plate 14 is fixedly connected with the installation block 12 and the limiting block 15, the installation block 12 is fixedly connected with the electric push rod 13, a fixed end of the electric push rod 13 is fixedly connected to an outer side wall of the placing frame 2, a telescopic end of the electric push rod 13 is fixedly connected to the installation block 12, the limiting block 15 is slidably connected to an inner portion of the limiting groove 1, the length of the shielding plate 14 is greater than that of the placing frame 2, the shielding plate 14 is located on the front side of the placing frame 2, the front surface of the placing frame 2 can be shielded by the shielding mechanism 16, so as to protect display cloth on the front surface of the placing frame 2, prevent that external force touching from leading to the show cloth damage, ensured the normal observation of show cloth, can also open easily in actual use by oneself when needing to use moreover.
In fig. 1 and 2, a supporting seat 4 is installed below a placing frame 2, a controller 5 is fixedly connected to the front surface of the supporting seat 4, anti-skid blocks 6 are fixedly connected to the front surface and the rear surface of the supporting seat 4, a driving mechanism 11 is installed inside the supporting seat 4, the driving mechanism 11 comprises an adjusting rod 3, a threaded rod 7, a pinion 8, a gear 9 and a servo motor 10, the servo motor 10 is fixedly connected inside the supporting seat 4, the driving end of the servo motor 10 is connected with the gear 9, both sides of the gear 9 are respectively engaged with the pinion 8, the insides of the two pinions 8 are respectively fixedly penetrated with the threaded rod 7, the adjusting rods 3 are respectively in threaded sleeve connection with the top ends of the two threaded rods 7, the top ends of the two adjusting rods 3 movably penetrate through the top of the supporting seat 4 and are respectively fixedly connected to both sides of the lower surface of the placing frame 2, the bottom ends of the two threaded rods 7 are rotatably connected inside the supporting seat 4 through bearings, the inside corner rigid coupling of supporting seat 4 has the battery, and the screw thread direction of two threaded rods 7 is the same, can adjust the use height that frame 2 was placed to the top according to actual need through actuating mechanism 11, makes things convenient for the crowd of different heights to watch and use, can also carry out nimble adjustment according to actual installation environment simultaneously, and application scope obtains increasing, adjusts labour saving and time saving more through mechanical means moreover.
When in use, the servo motor 10 is controlled to work by the controller 5, the servo motor 10 drives the gearwheel 9 to rotate forwards when rotating forwards, then the two pinions 8 can be driven to rotate backwards, the two pinions 8 can drive the two threaded rods 7 to rotate backwards after rotating backwards, then the two adjusting rods 3 above can be driven to move upwards continuously, the height of the frame 2 above is increased, similarly, the servo motor 10 drives the gearwheel 9 to rotate backwards when rotating backwards, then the two pinions 8 can be driven to rotate forwards, the two threaded rods 7 can be driven to rotate forwards after rotating forwards, then the two adjusting rods 3 above can be driven to move downwards continuously, the height of the frame 2 above is reduced, therefore, the use height of the frame 2 above can be adjusted by the driving mechanism 11 according to actual needs, the use height of people with different heights can be conveniently watched and used, and meanwhile, the flexible adjustment can be carried out according to actual installation environment, application scope obtains increasing, and adjust through mechanical system, labour saving and time saving more, bond the show cloth that the computer was printed out in placing frame 2 after that, after the show cloth on placing frame 2 used, shorten through controller 5 control electric putter 13, can drive installation piece 12 and move to the right this moment, and then drive shielding plate 14 and move to the right, can shelter from the show cloth this moment, when the show cloth needs to be used, control electric putter 13 extension, can drive installation piece 12 and shielding plate 14 and move to the left this moment, so can shelter from the front surface of placing frame 2 through sheltering from mechanism 16, thereby protect the show cloth of placing on the frame 2 front surface, prevent that external force touching from leading to the show cloth damage, the normal observation of show cloth has been ensured, and can also open by oneself when needing to use, easily in-service use.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed.

Claims (9)

1. The project progress management device for the building construction comprises a placing frame (2), and is characterized in that two limiting grooves (1) are transversely formed in the front surface of the placing frame (2), a shielding mechanism (16) is installed on the front side of the placing frame (2), a supporting seat (4) is installed below the placing frame (2), a controller (5) is fixedly connected to the front surface of the supporting seat (4), anti-skidding blocks (6) are fixedly connected to the front surface and the rear surface of the supporting seat (4), and a driving mechanism (11) is installed inside the supporting seat (4);
actuating mechanism (11) are including adjusting pole (3), threaded rod (7), pinion (8), gear wheel (9) and servo motor (10), servo motor (10) rigid coupling is in the inside of supporting seat (4), and is connected with gear wheel (9) on the drive end of servo motor (10), and pinion (8) have all been meshed to the both sides of gear wheel (9), two the inside of pinion (8) is all fixed and is penetrated threaded rod (7), two the equal screw thread in top of threaded rod (7) has cup jointed regulation pole (3).
2. The project progress management device for building construction according to claim 1, wherein the top ends of the two adjusting rods (3) movably penetrate through the top of the supporting seat (4) and are fixedly connected to two sides of the lower surface of the placing frame (2) respectively.
3. The project schedule management device for building construction according to claim 1, characterized in that, the bottom ends of the two threaded rods (7) are rotatably connected inside the supporting base (4) through bearings.
4. The project schedule management system for building construction according to claim 1, characterized in that the inner corners of the supporting base (4) are fixedly connected with storage batteries.
5. The project schedule management apparatus for construction according to claim 1, wherein the two threaded rods (7) have the same thread direction.
6. The project progress management device for building construction according to claim 1, wherein the shielding mechanism (16) comprises an installation block (12), an electric push rod (13), a shielding plate (14) and a limiting block (15), the installation block (12) and the limiting block (15) are fixedly connected to the rear surface of the shielding plate (14), and the electric push rod (13) is fixedly connected to the installation block (12).
7. The project schedule management device for building construction according to claim 6, characterized in that the fixed end of the electric push rod (13) is fixedly connected to the outer side wall of the placing frame (2), and the telescopic end of the electric push rod (13) is fixedly connected to the mounting block (12).
8. The project progress management device for building construction according to claim 6, wherein the limiting block (15) is slidably connected inside the limiting groove (1).
9. The project schedule management apparatus for building construction according to claim 6, wherein the length of the shielding plate (14) is greater than the length of the placing frame (2), and the shielding plate (14) is located at the front side of the placing frame (2).
CN202121906806.9U 2021-08-16 2021-08-16 Engineering project progress management device for construction Expired - Fee Related CN215680024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121906806.9U CN215680024U (en) 2021-08-16 2021-08-16 Engineering project progress management device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121906806.9U CN215680024U (en) 2021-08-16 2021-08-16 Engineering project progress management device for construction

Publications (1)

Publication Number Publication Date
CN215680024U true CN215680024U (en) 2022-01-28

Family

ID=79952428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121906806.9U Expired - Fee Related CN215680024U (en) 2021-08-16 2021-08-16 Engineering project progress management device for construction

Country Status (1)

Country Link
CN (1) CN215680024U (en)

Similar Documents

Publication Publication Date Title
CN215569495U (en) Real-time monitoring device for mine safety management
CN211349792U (en) Novel training board is read to portable english
CN112562542A (en) Computer software teaching show shelf
CN112747726A (en) Surveying instrument positioning device convenient to adjust for surveying and mapping of constructional engineering
CN215680024U (en) Engineering project progress management device for construction
CN210988788U (en) A workstation for engineering cost
CN214296064U (en) Transfer device for robot driving device
CN221613497U (en) Liftable ultra-thin OLED transparent display screen
CN218819374U (en) Large-scale comprehensive medical information management equipment
CN217184425U (en) Floating type oxygen supply equipment for salmon culture
CN217875123U (en) Special measuring device of building engineering design
CN213683367U (en) Safety protection device for broadcast television equipment
CN215807528U (en) Information acquisition device
CN214947550U (en) Device for displaying three-dimensional animation design
CN221296025U (en) Low chassis electric motor car frame erection equipment
CN218032248U (en) Construction management device based on BIM
CN216486400U (en) Improved capacitive touch screen
CN219510503U (en) Remote sensing monitoring device for soil and water conservation
CN220791287U (en) Working face coal-proof wall caving support device
CN215933013U (en) Model display device for garden planning
CN214467327U (en) Display device for hybrid teaching
CN218152726U (en) Pipeline supporting bracket
CN221507654U (en) Sand table for architectural design
CN221415984U (en) Grinding tool for machining horizontal shaft rectangular table surface grinding machine
CN219976008U (en) New forms of energy booster station auxiliary monitoring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220128