CN215675568U - High-efficient dust device is built in room - Google Patents
High-efficient dust device is built in room Download PDFInfo
- Publication number
- CN215675568U CN215675568U CN202121339508.6U CN202121339508U CN215675568U CN 215675568 U CN215675568 U CN 215675568U CN 202121339508 U CN202121339508 U CN 202121339508U CN 215675568 U CN215675568 U CN 215675568U
- Authority
- CN
- China
- Prior art keywords
- support
- air
- water pipe
- air inlet
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Separation Of Particles Using Liquids (AREA)
Abstract
The utility model discloses a high-efficiency dust-settling device for building, which comprises: the air exhaust device comprises an air exhaust support, an upper end air extractor and a lower end air extractor are respectively arranged at the upper end and the lower end of the air exhaust support, a filter is fixedly arranged on the air exhaust support, and the upper end air extractor and the lower end air extractor are connected with the filter through an air exhaust pipe; the air conditioner comprises an air inlet support, wherein an upper end air inlet device and a lower end air inlet device are respectively arranged at the upper end and the lower end of the air inlet support, a heat exchanger is fixedly arranged on the air inlet support, and the heat exchanger is connected with the upper end air inlet device and the lower end air inlet device through a cold air pipe; the water pipe support is arranged outdoors, at least three water pipes are arranged on the water pipe support from bottom to top, and at least 3 atomizers are arranged on each water pipe; the efficient dust fall to indoor, outdoor has been realized, the pollution to the environment is reduced simultaneously.
Description
Technical Field
The utility model relates to the technical field of dust settling equipment, in particular to a high-efficiency dust settling device for house construction.
Background
In the construction process or the dust spraying process of a building, a large amount of dust is difficult to avoid, the dust is harmful to the surrounding environment and constructors, and toxic gas such as formaldehyde is volatilized in the processes of painting and repairing the wall.
However, the existing indoor dust settling device generally settles dust by sprinkling water and disperses toxic gas by passing through, but the toxic gas directly enters the environment and is harmful to pedestrians, the ventilation time is long, and toxic gas is easy to accumulate in corners.
Outdoor dust settling devices generally reduce dust emission by directly sprinkling water and spraying water to the sky, and the efficiency of water resource utilization is low. In addition, in the actual construction process, partial processes or stacked raw materials cannot be affected with damp, and the existing dust settling device cannot achieve a good dust settling effect.
Therefore, a need exists for a house building high-efficiency dust settling device that can solve one or more of the above problems.
SUMMERY OF THE UTILITY MODEL
In order to solve one or more problems in the prior art, the utility model provides a high-efficiency dust settling device for a house building. The technical scheme adopted by the utility model for solving the problems is as follows: a high-efficient dust device is built in room, it includes: the air exhaust support is fixedly provided with a filter, the upper end air extractor and the lower end air extractor are connected with the filter through an air exhaust pipe, the upper end air extractor and the lower end air extractor are hermetically connected with the air exhaust pipe, and the air exhaust support is arranged at the lee position of a construction building;
the upper end and the lower end of the air inlet support are respectively provided with an upper air inlet device and a lower air inlet device, a heat exchanger is fixedly mounted on the air inlet support, the heat exchanger is connected with the upper air inlet device and the lower air inlet device through a cold air pipe, and the air inlet support is arranged at the windward part of the construction building;
the water pipe support, the water pipe support sets up outdoors, install three piece at least water pipes, every from the bottom up on the water pipe support install 3 atomizers on the water pipe at least, one side of water pipe support is provided with water tank, water pump, the water pump with the water tank is connected, the water pipe with the water pump is connected.
Furthermore, a smoke sensor is arranged in the atomizer, and a water economizer is arranged at the joint of the water pipe and the atomizer.
Further, the water pipe is hung and installed on the water pipe support.
Further, the filter includes: the bottom of the liquid storage bottle is provided with a first connecting port, a second connecting port and a liquid discharging port, the first connecting port and the second connecting port are used for being connected with the exhaust pipe, and the liquid discharging port is used for discharging filtered liquid;
the cover is installed at the upper end of the liquid storage bottle, and a lateral air exhaust hole is formed in the cover.
Furthermore, an observation window is arranged on the side wall of the liquid storage bottle, and the observation window is sealed by transparent glass.
Further, a detector is mounted on the cover and used for detecting whether the discharged gas reaches the standard or not.
Further, the water pipe is transversely installed on the water pipe support, and the atomizer is movably installed on the water pipe.
The beneficial effects obtained by the utility model are as follows: according to the utility model, the air extractor, the air extraction support, the air inlet device, the air inlet support and other components are connected together through a smart structure and are arranged in corresponding places, so that air extraction and dust fall in a room are realized, the extracted gas is treated, the influence on the surrounding environment is reduced, meanwhile, the temperature of the gas entering the room can be reduced at the air inlet position, and the solubility of part of toxic gas in a filtering liquid is improved; the air exchange is carried out at the upper end and the lower end of the air inlet support and the air draft support, so that the indoor and outdoor air exchange efficiency can be effectively improved, and the air inlet support is arranged at the windward position, so that the air inlet device cannot greatly aggravate indoor raised dust; the outdoor dust is treated at fixed points and fixed heights through the atomizer and the smoke sensor outdoors, so that the spraying efficiency is improved, and water resources are saved. The practical value of the utility model is greatly improved.
Drawings
FIG. 1 is a schematic view of an air inlet bracket and an air draft bracket of the high-efficiency dust-settling device for building construction of the utility model;
FIG. 2 is a schematic view of a water pipe support of the high-efficiency dust-settling device for the building construction of the utility model;
FIG. 3 is a perspective view of a filter of the high-efficiency dust-settling device for housing construction of the present invention;
fig. 4 is a cross-sectional view of a filter of the high-efficiency dust settling device for building construction.
[ reference numerals ]
101. air draft support
110. upper end air extractor
120. lower end air extractor
130. exhaust pipe
201 filter
210. liquid storage bottle
211. observation window
212. first connection port
213. the second connection port
214. liquid discharge outlet
220. lid
221. air exhaust hole
222. detector
301. air inlet support
310. upper end air inlet device
320. lower end air inlet device
330. heat exchanger
340. cold air pipe
401 water pipe support
410. water pipe
420. atomizer
501. water pump
510. water tank.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
As shown in fig. 1-4, the utility model discloses a high-efficiency dust-settling device for a house, which comprises: the air draft support 101 is characterized in that an upper end air draft 110 and a lower end air draft 120 are respectively arranged at the upper end and the lower end of the air draft support 101, a filter 201 is fixedly arranged on the air draft support 101, the upper end air draft 110 and the lower end air draft 120 are connected with the filter 201 through an air draft pipe 130, the upper end air draft 110 and the lower end air draft 120 are hermetically connected with the air draft 110 pipe, and the air draft support 101 is arranged at the lee position of a construction building;
the air inlet support 301 is characterized in that the upper end and the lower end of the air inlet support 301 are respectively provided with an upper end air inlet device 310 and a lower end air inlet device 320, a heat exchanger 330 is fixedly mounted on the air inlet support 301, the heat exchanger 330 is connected with the upper end air inlet device 310 and the lower end air inlet device 320 through a cold air pipe 340, and the air inlet support 301 is arranged at the windward part of a construction building;
It should be noted that the air extractor, the air inlet device, the heat exchanger and the water pump are powered by the mains supply, and the operation process is controlled by the MCU. The upper and lower end air extractors are provided with anti-reverse locking devices to prevent the liquid of the filter from being extracted and prevent dust attached to the fan blades from being blown into a room when the fan blades are reversed. Convulsions support 101 the air inlet support 301 reaches water pipe support 401 is detachable support, simultaneously water pipe 410 is generally hung to establish and is installed on water pipe support 401. The air exhaust support 101 is used for partially sealing the air outlet through the plastic baffle. Generally, a smoke sensor is arranged in the atomizer 420, and a water economizer is arranged at the joint of the water pipe 410 and the atomizer 420 to improve the dust settling efficiency and save water; the water pipe 410 is transversely installed on the water pipe support 401, the atomizer 420 is movably installed on the water pipe 410, the spraying angle can be conveniently adjusted, and water leakage can be reduced when the atomizer 420 moves through the cooperation of the water economizer.
Specifically, as shown in fig. 3 to 4, the filter 201 includes: a liquid storage bottle 210, wherein a first connecting port 212, a second connecting port 213 and a liquid discharging port 214 are arranged at the bottom of the liquid storage bottle 210, the first connecting port 212 and the second connecting port 213 are used for connecting with the exhaust pipe 130, and the liquid discharging port 214 is used for discharging a filtrate; the cover 220 is arranged at the upper end of the liquid storage bottle 210, and the cover 220 is provided with a lateral air exhaust hole 221 to prevent objects and dust from falling from the upper part and further protect the liquid storage bottle. Generally, an observation window 211 is arranged on the side wall of the liquid storage bottle 210, and the observation window 211 is sealed by transparent glass and used for observing the filtering state and the state of the filtrate, so that the filtrate can be replaced in time; the cover 220 is mounted with a detector 220, and the detector 220 is used for detecting whether the discharged gas reaches the standard.
It should be noted that the heat exchanger 330 may be any one of a cold row, a refrigerator, etc., and the connection of the cold air pipe 340 with the upper air inlet 310 and the lower air inlet 320 is not generally sealed. The purpose is to reduce the temperature of the gas flowing into the room, avoid the indoor temperature from rising, influence the construction, and influence the filtration.
In conclusion, the air extractor, the air extracting support, the air inlet device, the air inlet support and other components are connected together through ingenious structures and are arranged in corresponding places, so that air extraction and dust fall in a room are realized, extracted gas is treated at the same time, the influence on the surrounding environment is reduced, meanwhile, the temperature of the gas entering the room can be reduced at the air inlet position, and the solubility of part of toxic gas in a filtering liquid is improved; the air exchange is carried out at the upper end and the lower end of the air inlet support and the air draft support, so that the indoor and outdoor air exchange efficiency can be effectively improved, and the air inlet support is arranged at the windward position, so that the air inlet device cannot greatly aggravate indoor raised dust; the outdoor dust is treated at fixed points and fixed heights through the atomizer and the smoke sensor outdoors, so that the spraying efficiency is improved, and water resources are saved. The practical value of the utility model is greatly improved.
The above-described examples merely represent one or more embodiments of the present invention, which are described in greater detail and detail, but are not to be construed as limiting the utility model. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the spirit of the utility model, which falls within the scope of the utility model. Therefore, the protection scope of the present invention should be subject to the appended claims.
Claims (7)
1. The utility model provides a high-efficient dust device is built in room which characterized in that includes: the air exhaust support is fixedly provided with a filter, the upper end air extractor and the lower end air extractor are connected with the filter through an air exhaust pipe, the upper end air extractor and the lower end air extractor are hermetically connected with the air exhaust pipe, and the air exhaust support is arranged at the lee position of a construction building;
the upper end and the lower end of the air inlet support are respectively provided with an upper air inlet device and a lower air inlet device, a heat exchanger is fixedly mounted on the air inlet support, the heat exchanger is connected with the upper air inlet device and the lower air inlet device through a cold air pipe, and the air inlet support is arranged at the windward part of the construction building;
the water pipe support, the water pipe support sets up outdoors, install three piece at least water pipes, every from the bottom up on the water pipe support install 3 atomizers on the water pipe at least, one side of water pipe support is provided with water tank, water pump, the water pump with the water tank is connected, the water pipe with the water pump is connected.
2. The efficient dust falling device for the house building according to claim 1, wherein a smoke sensor is arranged in the atomizer, and a water economizer is arranged at the joint of the water pipe and the atomizer.
3. The efficient dust settling device for the house building according to claim 1, wherein the water pipe is hung and installed on the water pipe support.
4. The house building high-efficiency dust settling device according to claim 1, wherein the filter comprises: the bottom of the liquid storage bottle is provided with a first connecting port, a second connecting port and a liquid discharging port, the first connecting port and the second connecting port are used for being connected with the exhaust pipe, and the liquid discharging port is used for discharging filtered liquid;
the cover is installed at the upper end of the liquid storage bottle, and a lateral air exhaust hole is formed in the cover.
5. The efficient dust settling device for houses and buildings according to claim 4, wherein an observation window is arranged on the side wall of the liquid storage bottle, and the observation window is sealed by transparent glass.
6. The high-efficiency dust falling device for the house building of claim 4, wherein a detector is mounted on the cover and used for detecting whether the discharged gas reaches the standard.
7. The device for efficiently reducing dust in a building according to claim 1, wherein the water pipe is transversely installed on the water pipe support, and the atomizer is movably installed on the water pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121339508.6U CN215675568U (en) | 2021-06-16 | 2021-06-16 | High-efficient dust device is built in room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121339508.6U CN215675568U (en) | 2021-06-16 | 2021-06-16 | High-efficient dust device is built in room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215675568U true CN215675568U (en) | 2022-01-28 |
Family
ID=79975492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121339508.6U Active CN215675568U (en) | 2021-06-16 | 2021-06-16 | High-efficient dust device is built in room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215675568U (en) |
-
2021
- 2021-06-16 CN CN202121339508.6U patent/CN215675568U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208059181U (en) | A kind of communications equipment room intelligent fresh air air-conditioning system | |
CN101788175A (en) | Phase-change energy storage type air handling unit | |
CN210705214U (en) | A exhaust gas purification device for wood cutting dust fall | |
CN215675568U (en) | High-efficient dust device is built in room | |
CN110748986A (en) | Hoist and mount formula central dehumidifier with new trend purification performance | |
CN205295379U (en) | Converter roof cubic dust pelletizing system | |
CN202008201U (en) | Phase-change energy-storage type air handling unit | |
CN212962029U (en) | Clear wind air inlet unit of intelligence building | |
CN212323638U (en) | Intelligent heat dissipation device for terminal box of transformer substation | |
CN109301786A (en) | A kind of cable channel cover plate of energy automatic dehumidifying | |
CN109974187A (en) | A kind of new blower of wall hanging | |
CN204888292U (en) | Ecological house deodorization system of breeding of beasts and birds | |
CN201897274U (en) | Dustless-water cooled fresh air system | |
CN203771588U (en) | Smaze intelligent purifying system during welding of large industrial building | |
CN202902511U (en) | Evaporative air conditioner | |
CN209623169U (en) | A kind of air source heat pump defroster | |
CN210292131U (en) | Novel full heat exchange type wall-mounted fresh air machine | |
CN208011988U (en) | The ventilating system of communication base station room | |
CN205208815U (en) | Utilize solution formula air conditioning system of solar energy | |
CN210399333U (en) | External wet curtain | |
CN212274115U (en) | Small-size integral frequency conversion rack air conditioner of no condensation phenomenon | |
CN213268272U (en) | Indoor sewage water-collecting well computer lab collection moulding piece | |
CN208320303U (en) | A kind of environment friendly dedusting device | |
CN212974585U (en) | Energy-saving dust removal device for air purification | |
CN212178918U (en) | A tub of discharging fume for flue gas desulfurization's clearance of being convenient for |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |