CN215671373U - Reinforcing bar processing canopy - Google Patents
Reinforcing bar processing canopy Download PDFInfo
- Publication number
- CN215671373U CN215671373U CN202120530791.4U CN202120530791U CN215671373U CN 215671373 U CN215671373 U CN 215671373U CN 202120530791 U CN202120530791 U CN 202120530791U CN 215671373 U CN215671373 U CN 215671373U
- Authority
- CN
- China
- Prior art keywords
- shed according
- reinforcement processing
- processing shed
- base
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model discloses a steel bar processing shed, which is used for processing steel bars and relates to the technical field of constructional engineering; the foldable shed comprises a base, upright columns and a ceiling, wherein the tops of the upright columns are provided with combined connecting frames, the two upright columns on the same side are connected through the combined connecting frames, the ceiling comprises a ceiling beam and a top plate, the top plate is provided with a discharge port, a telescopic canopy is arranged on the discharge port, a container is arranged right below the discharge port, and the base is provided with four foldable universal wheels; the utility model is safe and reliable, convenient to carry, labor and material saving, high-efficient and portable.
Description
Technical Field
The utility model discloses a steel bar processing shed, which is used for processing steel bars and relates to the technical field of constructional engineering.
Background
Along with the continuous improvement of current architectural design horizontally, the gradual expansion of engineering scale to and the promotion of building practical function requirement, the on-the-spot needs to be bigger and bigger to the material processing, and is more and more, consequently every construction site all need build reinforcing bar processing canopy and come the on-the-spot processing operation that carries out different demands to the reinforcing bar.
The existing reinforcing steel bar processing shed which is temporarily built on the site of a construction site is inconvenient to transfer due to flexibility check, brings huge manpower and cost investment for processing building materials, is large in material quantity required by the existing reinforcing steel bar processing shed, is troublesome to manufacture, cannot be recycled after being used up, and causes great resource waste.
Simultaneously, at current building site, the staff usually sends the reinforcing bar of processing well through the different reinforcing bar of manual transport, and the special tower crane point of rethread is sent the reinforcing bar to go, has consumeed a large amount of manpowers and has carried, and not only the cost is long, and work efficiency is low moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: the reinforcing steel bar processing shed is safe, reliable, convenient to carry, efficient and light, and labor and material resources are saved.
The technical scheme adopted by the utility model is as follows: the utility model provides a steel bar processing canopy, includes base, stand and ceiling, the top of stand is equipped with built-up connection frame and passes through between the coexistence post on the same side the built-up connection frame links to each other, the ceiling includes ceiling roof beam and roof, be equipped with the discharge gate on the roof, be equipped with flexible canopy on the discharge gate, be equipped with the packing box under the discharge gate, be equipped with four collapsible universal wheels on the base.
The working principle of the utility model is as follows: according to the utility model, after the integral device is conveyed to a construction site through the foldable universal wheels, the universal wheels are retracted, the telescopic canopy is opened, the container is fixed on the base through the mounting clamping groove, when processed steel bars need to be conveyed, the hooks of the tower crane hook the lifting lugs on two sides of the container, the container is conveyed out from the discharge hole on the top plate, and the container is returned through the discharge hole on the top plate after the conveying is finished. If be under construction in the rainy day, can expand flexible canopy, avoid the rainwater to fall from the discharge gate, influence staff's normal operation.
The combined connecting frame comprises cross beams, vertical beams and oblique beams, and every two adjacent beams are fixed through welding.
And lifting lugs for lifting are arranged on the container.
And the base is provided with an installation clamping groove for fixing the container.
The top plate is provided with a buffer layer for reducing the impact force of falling objects.
The upright posts, the combined connecting frames and the ceiling beams are all made of light aluminum alloy materials.
The top plate is made of light materials.
The foldable universal wheel is detachably connected with the base.
An inclined angle is formed between the top plates.
In summary, due to the adoption of the technical scheme, the utility model has the beneficial effects that:
the foldable universal wheels are used, so that the movement of the whole device can be realized, the carrying is easy, and the recycling property of the steel bar processing shed is improved; due to the arrangement of the container and the discharge port, the labor amount of constructors can be reduced, the container can be conveyed out from the top plate, and reinforcing steel bars with different specifications can be conveyed at one time; the upright posts, the ceiling beams and the combined connecting frames are all made of light aluminum alloy materials, so that the supporting frame is firm and reliable, has light weight and can be easily carried; the roof is equipped with the buffer layer, can slow down the impact force that weighs down the thing, avoids causing the injury to the constructor in the processing canopy.
Drawings
The utility model will now be described, by way of example, with reference to the accompanying drawings, in which:
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the present invention at A;
labeled as: 1-base, 2-upright post, 3-top plate, 4-discharge port, 5-telescopic canopy, 6-oblique beam, 7-lifting lug, 8-cargo box, 9-foldable universal wheel, 10-ceiling beam, 11-cross beam and 12-vertical beam.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-2, a steel bar processing shed comprises a base 1, stand columns 2 and a ceiling, wherein the top of each stand column 2 is provided with a combined connecting frame, the stand columns 2 are connected with each other through the combined connecting frames, the ceiling comprises a ceiling beam 10 and a top plate 3, a discharge port 4 is formed in the top plate 3, a telescopic canopy 5 is arranged on the discharge port 4, a container 8 is arranged under the discharge port 4, and four foldable universal wheels 9 are arranged on the base 1.
The working principle of the utility model is as follows: according to the utility model, after the integral device is conveyed to a construction site through the foldable universal wheels 9, the universal wheels are collected, the telescopic canopy 5 is opened, the container 8 is fixed on the base 1 through the mounting clamping groove, when processed steel bars need to be conveyed, hooks of a tower crane hook lifting lugs 7 on two sides of the container 8, the container 8 is conveyed out from the discharge hole 4 on the top plate 3, and the container 8 is returned through the discharge hole 4 on the top plate 3 after the conveying is finished. If in the rainy day construction, can expand flexible canopy 5, avoid the rainwater to fall from discharge gate 4, influence staff's normal operation.
The combined connecting frame comprises cross beams 11, vertical beams 12 and oblique beams 6, every two adjacent beams are fixed by welding, the stability of the structure can be guaranteed by the triangular structure, and meanwhile, the whole structure is more durable.
The lifting lugs 7 for lifting are arranged on the container 8, the container 8 can be directly lifted through the lifting lugs 7, constructors are omitted from carrying the container 8, labor time is saved, and labor intensity is reduced.
The base 1 is provided with an installation clamping groove for fixing the container 8, the container 8 can be accurately fixed under the discharge port 4 through the installation clamping groove, adjustment is not carried out by naked eyes, and damage to the top plate 3 due to position misalignment in the lifting process is avoided.
Roof 3 is equipped with the buffer layer that is used for reducing the object impact force that falls, prevents that the object that falls from high altitude from smashing broken roof 3, causes the personal danger to constructor.
The upright posts 2, the combined connecting frame and the ceiling beam 10 are all made of light aluminum alloy materials, so that the whole device is safe, reliable, light in weight and rust-resistant.
The top plate 3 is made of light materials, has attractive appearance and is corrosion-resistant.
The foldable universal wheels 9 are detachably connected with the base 1, the universal wheels can be replaced, the abrasion degree of each wheel is basically the same, and the service life of the device is prolonged.
An inclined angle is formed between the top plates 3, so that rainwater is prevented from accumulating in rainy days.
The foldable universal wheels 9 are used, so that the movement of the whole device can be realized, the carrying is easy, and the recycling performance of the steel bar processing shed is improved; due to the arrangement of the container 8 and the discharge hole 4, the labor amount of constructors can be reduced, the container 8 can be conveyed out of the top plate 3, and reinforcing steel bars with different specifications can be conveyed at one time; the upright posts 2, the ceiling beam 10 and the combined connecting frame are all made of light aluminum alloy materials, so that the ceiling beam is firm and reliable, has light weight and can be easily carried; roof 3 is equipped with the buffer layer, can slow down the impact force of falling object, avoids causing the injury to the constructor in the processing canopy.
The above description is only a preferred embodiment of the present invention, and not intended to limit the present invention, the scope of the present invention is defined by the appended claims, and all structural changes that can be made by using the contents of the description and the drawings of the present invention are intended to be embraced therein.
Claims (9)
1. The utility model provides a steel bar processing canopy, includes base (1), stand (2) and ceiling, its characterized in that, the top of stand (2) is equipped with built-up connection frame and passes through between coexistence post (2) on the same side the built-up connection frame links to each other, the ceiling includes ceiling roof beam (10) and roof (3), be equipped with discharge gate (4) on roof (3), be equipped with flexible canopy (5) on discharge gate (4), be equipped with packing box (8) under discharge gate (4), be equipped with four collapsible universal wheels (9) on base (1).
2. A reinforcement processing shed according to claim 1, wherein the built-up connection frame comprises a cross beam (11), a vertical beam (12) and an oblique beam (6), and every two adjacent beams are fixed by welding.
3. A reinforcement processing shed according to claim 1, characterized in that the cargo box (8) is provided with lifting lugs (7) for lifting.
4. A reinforcement processing shed according to claim 1, wherein the base (1) is provided with mounting slots for securing the cargo box (8).
5. A reinforcement processing shed according to claim 1, wherein the top plate (3) is provided with a cushioning layer for reducing the impact force of a falling object.
6. A reinforcement processing shed according to claim 1, wherein the columns (2), the connecting frames and the roof beams (10) are made of light aluminum alloy.
7. A reinforcement processing shed according to claim 1, wherein the top plate (3) is of lightweight material.
8. A reinforcement processing shed according to claim 1, wherein the collapsible castor (9) is removably attached to the base (1).
9. A reinforcement processing shed according to claim 1, wherein the roof panels (3) are inclined at an angle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120530791.4U CN215671373U (en) | 2021-03-12 | 2021-03-12 | Reinforcing bar processing canopy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120530791.4U CN215671373U (en) | 2021-03-12 | 2021-03-12 | Reinforcing bar processing canopy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215671373U true CN215671373U (en) | 2022-01-28 |
Family
ID=79969196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120530791.4U Active CN215671373U (en) | 2021-03-12 | 2021-03-12 | Reinforcing bar processing canopy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215671373U (en) |
-
2021
- 2021-03-12 CN CN202120530791.4U patent/CN215671373U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201580914U (en) | Monospar trackless combination gantry crane | |
CN206032726U (en) | Modular pipe truss coal transporting trestle | |
CN2828210Y (en) | Movable lifting working platform | |
CN215671373U (en) | Reinforcing bar processing canopy | |
CN210421887U (en) | Hanging basket using purline as support | |
CN204126297U (en) | A kind of temporary support of steel truss roof | |
CN213328707U (en) | Thin-wall pier high-altitude operation combined platform | |
CN211736308U (en) | Self-sliding hanging frame device for mounting steel structure factory building roof inner plate | |
CN202882375U (en) | Elevator shaftway tool type scaffold operation platform | |
CN215671327U (en) | Can assemble formula removal reinforcing bar protection canopy | |
CN214462401U (en) | Double-layer protection frame with novel structure | |
CN210316599U (en) | A curtain ring rail for roofing truss beam position | |
CN210067397U (en) | Intelligent integrated all-steel attached lifting scaffold | |
CN201961992U (en) | High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns | |
CN112227762A (en) | Passage structure for transporting materials to high-rise building | |
CN217839706U (en) | Steel truss girder stiffening chord member connecting operation platform | |
CN221029641U (en) | High key Shi Ningping platform of suspension bridge combination beam | |
CN210067577U (en) | Combined hangar door frame structure | |
CN210684492U (en) | Simple tensioning operation platform | |
CN219638439U (en) | Dam concrete panel slope surface steel bar transportation device | |
CN213204925U (en) | Supporting structure of attached lifting protection platform | |
CN202848922U (en) | Space truss tower crane | |
CN216332094U (en) | A auxiliary transportation instrument for dismouting of eminence photovoltaic board | |
CN219344183U (en) | Turnover type light finished product processing shed | |
CN213509741U (en) | Steel bar processing shed with single-side support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |