CN215671047U - Creeping formwork construction device for columnar building construction - Google Patents

Creeping formwork construction device for columnar building construction Download PDF

Info

Publication number
CN215671047U
CN215671047U CN202022891827.XU CN202022891827U CN215671047U CN 215671047 U CN215671047 U CN 215671047U CN 202022891827 U CN202022891827 U CN 202022891827U CN 215671047 U CN215671047 U CN 215671047U
Authority
CN
China
Prior art keywords
sliding
wall
climbing
fixedly connected
stabilizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022891827.XU
Other languages
Chinese (zh)
Inventor
俞佳晖
柏梦娜
张�杰
沈永敏
姚红飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Juehe Construction Engineering Co ltd
Original Assignee
Shanghai Juehe Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Juehe Construction Engineering Co ltd filed Critical Shanghai Juehe Construction Engineering Co ltd
Priority to CN202022891827.XU priority Critical patent/CN215671047U/en
Application granted granted Critical
Publication of CN215671047U publication Critical patent/CN215671047U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a creeping formwork construction device for columnar building construction, which relates to the technical field of columnar building construction equipment, and adopts the technical scheme that: the climbing formwork construction device comprises a climbing formwork construction device body, a hanging device, a climbing device, a first sliding stabilizer and a second sliding stabilizer, wherein a formwork is installed at the top of the climbing formwork construction device body, the bottom of the formwork is fixedly connected with a first electric slide rail, the bottom of the first electric slide rail is provided with the hanging device, the inner wall of one side of the hanging device is fixedly connected with a second hydraulic cylinder, one side of the hanging device is provided with a second electric slide rail, and one side of the second electric slide rail is fixedly connected with the climbing device.

Description

Creeping formwork construction device for columnar building construction
Technical Field
The utility model relates to the technical field of columnar building construction equipment, in particular to a creeping formwork construction device for columnar building construction.
Background
At present, a building traditional construction mode is that a scaffold is required to be erected in advance according to a modeling structure of the building before the building is constructed, the height of the scaffold is enabled to correspond to the height of the building, transverse frames are arranged on the scaffold at intervals for supporting feet, a great amount of materials and labor hour are consumed on the whole, and the scaffold is required to be erected and erected by being hoisted by a crane higher than the scaffold; in addition, after the building is finished, the building can be dismantled in sequence. The materials, articles and ready-mixed concrete required by high building construction also need to be hoisted and transported by a crane, so that the construction difficulty is high, the speed is low, the cost is high and the safety is poor.
The prior art has the following defects: when the existing creeping formwork construction device is constructed in a windy and earthquakes area, the existing creeping formwork construction device is easily affected by natural factors such as wind power or earthquakes to shake, so that accidents are easily caused, and the fence where workers work does not have good sun-shading measures, so that the workers are easily sunstroke and dangerous.
Therefore, it is necessary to provide a creeping formwork construction apparatus for constructing a columnar building.
SUMMERY OF THE UTILITY MODEL
Therefore, the utility model provides a climbing formwork construction device for columnar building construction, which is provided with two groups of hydraulic cylinders I, two hydraulic cylinders II, a sliding stabilizer I, three groups of damping springs and damping air bags, a formwork is in sliding connection with a suspension device through an electric slide rail I, a climbing device is in sliding connection with the suspension device, and a rotating frame is in rotating connection with the sliding stabilizer through a gear I and a gear II, so that the problems in the background technology are solved.
In order to achieve the above purpose, the utility model provides the following technical scheme: a creeping formwork construction device for columnar building construction comprises a creeping formwork construction device body, a hanging device, a climbing device, a first sliding stabilizer and a second sliding stabilizer, wherein a formwork is installed at the top of the creeping formwork construction device body, the bottom of the formwork is fixedly connected with a first electric slide rail, the bottom of the first electric slide rail is provided with the hanging device, the inner wall of one side of the hanging device is fixedly connected with a first hydraulic cylinder, the one side of the hanging device is provided with a second electric slide rail, one side of the second electric slide rail is fixedly connected with the climbing device, the inner wall of the climbing device is fixedly connected with the first sliding stabilizer, the inner wall of the first sliding stabilizer is provided with a sliding plate, the one side of the sliding stabilizer is fixedly connected with a triangular fixed plate, one side of the triangular fixed plate is provided with a slot, and the inner wall of the triangular fixed plate is provided with a rotating rod, the utility model discloses a solar energy collector, including dwang, sliding plate, linkage, suspension, guardrail, fixed connection gear motor, output fixed connection gear I, gear I one side meshing connection gear II, revolving frame is installed at two tops of gear, the sun-proof toughened glass of revolving frame inner wall fixed connection, limit stop is installed to guardrail top inner wall.
Preferably, the template is connected with the suspension device in a sliding mode through a first electric sliding rail.
Preferably, the first hydraulic cylinders are uniformly arranged on the inner wall of the suspension device, and the first hydraulic cylinders are arranged into two groups.
Preferably, climbing device and linkage sliding connection, slide stabilizer one and evenly install at climbing device inner wall, the quantity that slides stabilizer one sets up to two sets of, the live-rollers passes through the dwang and is connected with the rotation of triangle fixed plate, the steady roll passes through the axis of rotation and slides stabilizer one and rotate and be connected, damping spring evenly installs at the sliding plate top, damping spring's quantity sets up to three groups, pneumatic cylinder two evenly installs at climbing device one side inner wall, the quantity of pneumatic cylinder two sets up to two sets of.
Preferably, the rotating frame is rotatably connected with the sliding stabilizer through a first gear and a second gear.
Preferably, the two inner walls of the sliding stabilizer are provided with damping air bags, the damping air bags are fixedly connected with the top of the sliding plate, the damping air bags are uniformly arranged on the top of the sliding plate, and the number of the damping air bags is three.
The utility model has the beneficial effects that:
1. when the template climbing construction device body climbs the template, firstly, the electric slide rail I is started to separate the template from the columnar building, then, two groups of hydraulic cylinders II on the inner wall of the climbing device are started to fix the climbing device on the outer wall of the columnar building to play a supporting role, then, the electric slide rail II is started to jack the hanging device and the template upwards for a certain distance, then, two groups of hydraulic cylinders I on the inner wall of the hanging device are started to fix the template climbing construction device body on the columnar building, then, two groups of hydraulic cylinders II are started again to separate the two groups of hydraulic cylinders II from the columnar building, at the moment, the two groups of hydraulic cylinders play a hanging role together, then, the electric slide rail II is started again to extend and retract the climbing device and the guardrail upwards until the state before climbing is recovered, and then, the two groups of hydraulic cylinders II are started to fix the climbing device and the guardrail on the columnar building, finally, starting the electric sliding rail I to attach the template to the columnar building to finish the climbing formwork in a stable state;
2. the first hydraulic cylinders are uniformly arranged on the inner wall of the hanging device and are arranged into two groups, and the two groups of hydraulic cylinders are used for hanging when the electric slide rail II is started to enable the climbing device and the guardrail to extend upwards;
3. the climbing device is connected with the hanging device in a sliding mode, the first sliding stabilizers are uniformly arranged on the inner wall of the climbing device, the first sliding stabilizers are arranged into two groups, the rotating rollers are rotatably connected with the triangular fixing plate through rotating rods, the stabilizing rollers are rotatably connected with one sliding stabilizer through rotating shafts, the damping springs are uniformly arranged on the top of the sliding plate, the damping springs are arranged into three groups, the second hydraulic cylinders are uniformly arranged on the inner wall of one side of the climbing device, the two hydraulic cylinders are arranged into two groups, when the electric sliding rail II is started to enable the climbing device and the guardrail to extend upwards, the stabilizing rollers on the first two groups of sliding stabilizers are always attached to the outer surface of the columnar building, the stabilizing effect of the climbing formwork construction device body is achieved, the sliding rods and the sliding plate are connected with the first two groups of sliding stabilizers in a sliding mode, and at the moment, the elastic forces of the three groups of damping springs provide damping effects for the first sliding stabilizers, when the creeping formwork construction device body is not in creeping formwork, one of the two groups of sliding stabilizers is always attached to the outer surface of the columnar building, so that the creeping formwork construction device has the functions of shaking resistance and stabilization;
4. the rotating frame is rotatably connected with the guardrail through a first gear and a second gear, when a worker enters the guardrail, the gear motor is started to rotate the rotating frame and the sun-proof toughened glass through the first gear and the second gear, the rotating frame and the sun-proof toughened glass abut against the limit stop block to finish automatic closing of the sun-proof toughened glass, sun-proof protection is performed on the worker, when the worker needs to leave the guardrail, the rotating frame and the sun-proof toughened glass are returned to original positions through the rotation of the rotating frame and the sun-proof toughened glass through the first gear and the second gear by starting the gear motor, and a passage of the worker is opened;
5. two inner walls of stabilizer that slide are equipped with the shock attenuation gasbag, shock attenuation gasbag and sliding plate top fixed connection, the shock attenuation gasbag is evenly installed at the sliding plate top, the quantity of shock attenuation gasbag sets up to three groups, laminate always at the column building external surface through two sets of stabilizer that slide on two, play the stabilizing effect of creeping formwork construction device body, slide bar and sliding plate and two sets of two sliding connection of stabilizer that slide, the elasticity of three group shock attenuation gasbags provides the shock attenuation effect for sliding stabilizer two this moment.
Drawings
Fig. 1 is a schematic structural diagram of a creeping formwork construction device body according to embodiment 1 of the present invention;
FIG. 2 is a side view of a body of a creeping formwork construction apparatus according to an embodiment 1 of the present invention;
FIG. 3 is an enlarged view of A in FIG. 1 according to example 1 of the present invention;
FIG. 4 is a bottom view of the triangular fixing plate and the sliding stabilizer according to embodiment 1 of the present invention;
FIG. 5 is a side view of a body of a creeping formwork construction apparatus according to an embodiment 2 of the present invention;
fig. 6 is an enlarged view of B in fig. 5 according to embodiment 2 of the present invention.
In the figure: the climbing formwork construction device comprises a climbing formwork construction device body 1, a formwork 2, a first electric slide rail 3, a hanging device 4, a second electric slide rail 5, a first hydraulic cylinder 6, a climbing device 7, a second hydraulic cylinder 8, a first sliding stabilizer 9, a guardrail 10, a speed reduction motor 11, a first gear 12, a second gear 13, a rotating frame 14, sun-proof toughened glass 15, a limit stop 16, a triangular fixing plate 17, a rotating roller 18, a rotating rod 19, a rotating shaft 20, a stabilizing roller 21, a rubber pad 22, a sliding rod 23, a sliding plate 24, a damping spring 25, a groove 26, a second sliding stabilizer 27 and a damping air bag 28.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Example 1:
referring to the attached drawings 1-5, the creeping formwork construction device for columnar building construction provided by the utility model comprises a creeping formwork construction device body 1, a suspension device 4, a climbing device 7, a first sliding stabilizer 9 and a second sliding stabilizer 27, wherein a formwork 2 is installed at the top of the creeping formwork construction device body 1, a first electric sliding rail 3 is fixedly connected to the bottom of the formwork 2, the suspension device 4 is installed at the bottom of the first electric sliding rail 3, a first hydraulic cylinder 6 is fixedly connected to the inner wall of one side of the suspension device 4, the second electric sliding rail 5 is installed at one side of the suspension device 4, the climbing device 7 is fixedly connected to one side of the second electric sliding rail 5, a second hydraulic cylinder 8 is installed on the inner wall of the climbing device 7, the first sliding stabilizer 9 is fixedly connected to the inner wall of the first sliding stabilizer 9, a sliding plate 24 is arranged on the inner wall of the first sliding stabilizer 9, and a triangular fixing plate 17 is fixedly connected to one side of the first sliding stabilizer 9, one side of the triangular fixed plate 17 is provided with a slot 26, the inner wall of the triangular fixed plate 17 is provided with a rotating rod 19, the outer surface of the rotating rod 19 is sleeved with the rotating roller 18, the bottom of the sliding plate 24 is fixedly connected with a sliding rod 23, a rotating shaft 20 is arranged on the inner wall of one side, a stabilizing roller 21 is sleeved on the outer surface of the rotating shaft 20, the outer surface of the stabilizing roller 21 is sleeved with a rubber pad 22, the top of the sliding plate 24 is fixedly connected with a damping spring 25, a guardrail 10 is arranged at one side of the hanging device 4, a speed reducing motor 11 is fixedly connected with the inner wall at one side of the guardrail 10, the output end of the speed reducing motor 11 is fixedly connected with a first gear 12, one side of the first gear 12 is meshed with a second gear 13, a rotating frame 14 is installed at the top of the second gear 13, the inner wall of the rotating frame 14 is fixedly connected with sun-proof toughened glass 15, and a limit stop 16 is installed on the inner wall of the top of the guardrail 10.
Further, the template 2 is connected with the hanging device 4 in a sliding mode through the electric sliding rail I3, when the template climbing construction device body 1 climbs the template, the electric sliding rail I3 is started firstly to separate the template 2 from the columnar building, then the two groups of hydraulic cylinders II 8 on the inner wall of the climbing device 7 are started to fix the climbing device 7 on the outer wall of the columnar building to play a supporting role, then the electric sliding rail II 5 is started to jack the hanging device 4 and the template 2 upwards for a certain distance, then the two groups of hydraulic cylinders I6 on the inner wall of the hanging device 4 are started to fix the template climbing construction device body 1 on the columnar building, then the two groups of hydraulic cylinders II 8 are started again to separate the two groups of hydraulic cylinders II 8 from the columnar building, at the moment, the two groups of hydraulic cylinders I6 play a hanging role, then the electric sliding rail II 5 is started again to extend and retract the climbing device 7 and the guardrail 10 upwards until the state before climbing is recovered, and then starting two sets of hydraulic cylinders II 8 to fix the climbing device 7 and the guardrail 10 on the columnar building, and finally starting the electric slide rail I3 to attach the template 2 to the columnar building so as to complete the climbing formwork in a stable state.
Further, 6 uniform installations are in 4 inner walls of linkage, and the pneumatic cylinder 6 sets up to two sets of, and the effect of two sets of pneumatic cylinders 6 is for the effect of hanging when starting electronic slide rail two 5 will climb device 7 and guardrail 10 upwards flexible.
Furthermore, the climbing device 7 is in sliding connection with the hanging device 4, the first sliding stabilizers 9 are uniformly installed on the inner wall of the climbing device 7, the number of the first sliding stabilizers 9 is two, the rotating rollers 18 are in rotating connection with the triangular fixing plate 17 through the rotating rods 19, the stabilizing rollers 21 are in rotating connection with the first sliding stabilizers 9 through the rotating shafts 20, the damping springs 25 are uniformly installed on the top of the sliding plate 24, the number of the damping springs 25 is three, the hydraulic cylinders 8 are uniformly installed on the inner wall of one side of the climbing device 7, the number of the hydraulic cylinders 8 is two, when the electric sliding rails 5 are started to enable the climbing device 7 and the guardrail 10 to extend upwards, the stabilizing rollers 21 on the first two sliding stabilizers 9 are always attached to the outer surface of the columnar building to play a role in stabilizing the climbing construction device body 1, and the sliding rods 23 and the sliding plate 24 are in sliding connection with the first two sliding stabilizers 9, at this moment, the elastic force of the three groups of damping springs 25 provides a damping effect for the first sliding stabilizer 9, and when the creeping formwork construction device body 1 is not in creeping formwork, the two groups of first sliding stabilizers 9 are always attached to the outer surface of the columnar building, so that the anti-shaking and stabilizing effects are achieved.
Further, the rotating frame 14 is rotatably connected with the guardrail 10 through the first gear 12 and the second gear 13, after a worker enters the guardrail 10, the speed reduction motor 11 is started to rotate the rotating frame 14 and the sun-proof toughened glass 15 through the first gear 12 and the second gear 13, the rotating frame 14 and the sun-proof toughened glass 15 abut against the limit stop 16, the sun-proof toughened glass 15 is automatically closed, sun-proof protection is performed on the worker, and when the worker needs to leave the guardrail 10, the rotating frame 14 and the sun-proof toughened glass 15 are rotated through the first gear 12 and the second gear 13 by starting the speed reduction motor 11, so that the rotating frame 14 and the sun-proof toughened glass 15 are restored to original positions, and a passage of the worker is opened.
The using process of the utility model is as follows: when the climbing formwork construction device body 1 climbs the formwork, firstly, the electric slide rail I3 is started to separate the formwork 2 from the columnar building, then, the two groups of hydraulic cylinders II 8 on the inner wall of the climbing device 7 are started to fix the climbing device 7 on the outer wall of the columnar building to play a supporting role, then, the electric slide rail II 5 is started to jack the suspension device 4 and the formwork 2 upwards for a certain distance, then, the two groups of hydraulic cylinders I6 on the inner wall of the suspension device 4 are started to fix the climbing formwork construction device body 1 on the columnar building, then, the two groups of hydraulic cylinders II 8 are started again to separate the two groups of hydraulic cylinders II 8 from the columnar building, at the moment, the two groups of hydraulic cylinders I6 play a suspension role, then, the electric slide rail II 5 is started again to extend and retract the climbing device 7 and the guardrail 10 upwards until the state before climbing is recovered, then, the two groups of hydraulic cylinders II 8 are started to fix the climbing device 7 and the guardrail 10 on the columnar building, and finally, starting the electric sliding rail I3 to attach the template 2 to the columnar building to finish the climbing formwork in a stable state, wherein the two groups of hydraulic cylinders I6 are used for hanging when starting the electric sliding rail II 5 to extend and retract the climbing device 7 and the guardrail 10 upwards, the two groups of sliding stabilizers I9 are always attached to the outer surface of the columnar building through the stabilizing rollers 21 on the two groups of sliding stabilizers I9 to play a role in stabilizing the climbing formwork construction device body 1, the sliding rod 23 and the sliding plate 24 are in sliding connection with the two groups of sliding stabilizers I9, the elasticity of the three groups of damping springs 25 provides a damping effect for the sliding stabilizers I9, when the climbing formwork construction device body 1 is not in climbing formwork, the two groups of sliding stabilizers I9 are also always attached to the outer surface of the columnar building to play roles in resisting shaking and stabilizing, and after a worker enters the guardrail 10, the starting speed reduction motor 11 rotates the rotating frame 14 and the sun-proof toughened glass 15 through the first gear 12 and the second gear 13, the rotating frame 14 and the sun-proof toughened glass 15 abut against the limit stop 16, the automatic closing of the sun-proof toughened glass 15 is completed, sun-proof protection is conducted on workers, when the workers need to leave the guardrail 10, the rotating frame 14 and the sun-proof toughened glass 15 are enabled to return to the original positions through the starting speed reduction motor 11 through the first gear 12 and the second gear 13, and the channels of the workers are opened.
Example 2:
referring to fig. 6, the climbing formwork construction device for columnar building construction provided by the utility model comprises, specifically, damping airbags 28 are arranged on the inner walls of two sliding stabilizers 27, the damping airbags 28 are fixedly connected with the top of a sliding plate 24, the damping airbags 28 are uniformly installed on the top of the sliding plate 24, the number of the damping airbags 28 is three, the damping airbags are always attached to the outer surface of the columnar building through stabilizing rollers 21 on the two sliding stabilizers 27 to play a role in stabilizing the climbing formwork construction device body 1, the sliding rods 23 and the sliding plate 24 are in sliding connection with the two sliding stabilizers 27, and at this time, the elastic force of the three damping airbags 28 provides a damping effect for the sliding stabilizers 27.
The using process of the utility model is as follows: when starting two 5 electronic slide rails and upwards extending and contracting climbing device 7 and guardrail 10, the stabilizer roll 21 through two sets of stabilizers of sliding on 27 is laminated on the outer surface of the columnar building always, play the stabilizing effect of creeping formwork construction device body 1, slide bar 23 and sliding plate 24 and two sets of stabilizers of sliding 27 sliding connection, the elasticity of three groups of shock attenuation gasbags 28 of this moment provides the shock attenuation effect for sliding two 27 stabilizers, when creeping formwork construction device body 1 is not at the creeping formwork, two sets of stabilizers of sliding 27 are also laminated on the outer surface of the columnar building always, play anti and shake stabilizing effect.
The above description is only a preferred embodiment of the present invention, and any person skilled in the art may modify the present invention or modify it into an equivalent technical solution by using the technical solution described above. Therefore, any simple modifications or equivalent substitutions made in accordance with the technical solution of the present invention are within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a column is creeping formwork construction equipment for building construction, includes creeping formwork construction equipment body (1), linkage (4), climbing device (7), slides stabilizer one (9) and slides stabilizer two (27), its characterized in that: the formwork climbing construction device comprises a formwork climbing construction device body (1), a formwork (2) is installed at the top of the formwork climbing construction device body (1), a first electric slide rail (3) is fixedly connected to the bottom of the formwork (2), a hanging device (4) is installed at the bottom of the first electric slide rail (3), a first hydraulic cylinder (6) is fixedly connected to the inner wall of one side of the hanging device (4), a second electric slide rail (5) is installed on one side of the hanging device (4), a climbing device (7) is fixedly connected to one side of the second electric slide rail (5), a second hydraulic cylinder (8) is installed on the inner wall of the climbing device (7), a first sliding stabilizer (9) is fixedly connected to the inner wall of the climbing device (7), a sliding plate (24) is arranged on the inner wall of the first sliding stabilizer (9), a triangular fixing plate (17) is fixedly connected to one side of the sliding stabilizer (9), a groove (26) is formed in one side of the triangular fixing plate (17), and a rotating rod (19) is arranged on the inner wall of the triangular fixing plate (17), the outer surface of the rotating rod (19) is sleeved with a rotating roller (18), the bottom of the sliding plate (24) is fixedly connected with a sliding rod (23), a rotating shaft (20) is arranged on the inner wall of one side, a stabilizing roller (21) is sleeved on the outer surface of the rotating shaft (20), the outer surface of the stabilizing roller (21) is sleeved with a rubber pad (22), the top of the sliding plate (24) is fixedly connected with a damping spring (25), a guardrail (10) is arranged on one side of the suspension device (4), a speed reducing motor (11) is fixedly connected with the inner wall of one side of the guardrail (10), the output end of the speed reducing motor (11) is fixedly connected with a first gear (12), one side of the first gear (12) is meshed with a second gear (13), a rotating frame (14) is installed at the top of the second gear (13), the inner wall of the rotating frame (14) is fixedly connected with sun-proof toughened glass (15), and a limit stop (16) is installed on the inner wall of the top of the guardrail (10).
2. The creeping formwork construction apparatus for columnar building construction as claimed in claim 1, wherein: the template (2) is connected with the suspension device (4) in a sliding mode through the electric sliding rail I (3).
3. The creeping formwork construction apparatus for columnar building construction as claimed in claim 1, wherein: the first hydraulic cylinders (6) are uniformly arranged on the inner wall of the suspension device (4), and the first hydraulic cylinders (6) are arranged into two groups.
4. The creeping formwork construction apparatus for columnar building construction as claimed in claim 1, wherein: climbing device (7) and linkage (4) sliding connection, slide stabilizer (9) uniform mount and climb device (7) inner wall, the quantity that slides stabilizer (9) sets up to two sets of, live-rollers (18) are rotated through dwang (19) and triangle fixed plate (17) and are connected, steady roller (21) rotate with slide stabilizer (9) through axis of rotation (20) and are connected, damping spring (25) uniform mount is at sliding plate (24) top, the quantity of damping spring (25) sets up to three groups, pneumatic cylinder two (8), the uniform mount is at climbing device (7) one side inner wall, the quantity of pneumatic cylinder two (8) sets up to two sets of.
5. The creeping formwork construction apparatus for columnar building construction as claimed in claim 1, wherein: the rotating frame (14) is rotationally connected with the sliding stabilizer I (9) through a gear I (12) and a gear II (13).
6. The creeping formwork construction apparatus for columnar building construction as claimed in claim 1, wherein: and the inner wall of the second sliding stabilizer (27) is provided with a damping air bag (28), the damping air bag (28) is fixedly connected with the top of the sliding plate (24), the damping air bags (28) are uniformly arranged on the top of the sliding plate (24), and the number of the damping air bags (28) is three.
CN202022891827.XU 2020-12-03 2020-12-03 Creeping formwork construction device for columnar building construction Expired - Fee Related CN215671047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022891827.XU CN215671047U (en) 2020-12-03 2020-12-03 Creeping formwork construction device for columnar building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022891827.XU CN215671047U (en) 2020-12-03 2020-12-03 Creeping formwork construction device for columnar building construction

Publications (1)

Publication Number Publication Date
CN215671047U true CN215671047U (en) 2022-01-28

Family

ID=79949375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022891827.XU Expired - Fee Related CN215671047U (en) 2020-12-03 2020-12-03 Creeping formwork construction device for columnar building construction

Country Status (1)

Country Link
CN (1) CN215671047U (en)

Similar Documents

Publication Publication Date Title
CN206319625U (en) Equipment is installed in a kind of building inner partition plate transhipment
CN110331849B (en) Exterior wall operation device for building construction and operation method thereof
CN209855196U (en) Double-mast type combined lifting climbing frame
CN215671047U (en) Creeping formwork construction device for columnar building construction
CN206737382U (en) It is easy to the scaffold of regulation
CN210177691U (en) Steel house convenient to remove fixedly
CN207228592U (en) One kind is used for construction frame
CN215367313U (en) Building foundation pit supporting assembly
CN212984562U (en) Mobilizable safe civil engineering scaffold
CN203382337U (en) Electric hanging basket for drainage vertical well of large-scale ship lock
CN104545680A (en) Electric basket for vertical shafts
CN213297070U (en) Large-span ultrahigh-degree steel structure net rack construction work platform
CN212052563U (en) Scaffold for water conservancy construction
CN211341824U (en) Assembled steel structure sliding frame
CN104249963A (en) Electric lifting basket for large-size lock drainage shaft
CN203555689U (en) Electric hanging basket for vertical shaft
CN210369828U (en) High temporary support of security for construction
CN209179478U (en) Jumping formwork truss
CN219548361U (en) Intelligent climbing anti-falling system
CN221399791U (en) Portable operation panel of frame activity climbs
CN221000630U (en) Effectual platform is used in bridge construction of antidetonation
CN221220338U (en) Wheel disc type engineering safety cat ladder
CN211681991U (en) Maintenance auxiliary device of three-dimensional soil equipment
CN218234271U (en) Bearing frame for building construction
CN216194072U (en) Bridge pier shaft hydraulic creeping formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220128