CN215669041U - Novel assembled pier stud reinforcing bar construction and support for concrete maintenance - Google Patents
Novel assembled pier stud reinforcing bar construction and support for concrete maintenance Download PDFInfo
- Publication number
- CN215669041U CN215669041U CN202121589650.6U CN202121589650U CN215669041U CN 215669041 U CN215669041 U CN 215669041U CN 202121589650 U CN202121589650 U CN 202121589650U CN 215669041 U CN215669041 U CN 215669041U
- Authority
- CN
- China
- Prior art keywords
- support
- trusses
- pier stud
- bar construction
- concrete maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a novel assembled pier stud reinforcing steel bar construction and concrete maintenance support which comprises a support main body, wherein the support main body is composed of support single bodies which are annularly arranged, each support single body is composed of connecting trusses which are arranged in a layered mode and are mutually vertically fixed, pedals are fixedly arranged among the horizontally arranged connecting trusses, connecting rods for connecting the horizontally connected trusses are arranged at corners of the support single bodies, and intelligent water storage tanks are arranged among the connecting trusses at the bottommost layer of each support single body at intervals; the bottom of the intelligent water storage tank is provided with a spray head. The utility model aims to provide a construction support which is suitable for the pier stud steel bar construction process, is convenient for concrete maintenance, has lighter weight and is easy to build.
Description
Technical Field
The utility model belongs to the technical field of bridge pier column rollover construction, and particularly relates to a novel support for assembly type pier column steel bar construction and concrete maintenance.
Background
The bridge pier column construction selects a turnover construction process and a floor type double-row scaffold as an operation platform, and has the main defects that: must carry out large tracts of land ground hardening before construction scaffold sets up, will use a large amount of cement concrete materials, build the console mode scaffold and will use a large amount of scaffold steel pipes, the material consumptive material is big, every promotes a section template, all needs to rise scaffold frame support, lays the bamboo slat again and forms operation platform, the construction cycle is long, sets up at every turn and all needs artifical high altitude construction, and the safety risk is big, and the danger coefficient is high. Therefore, a construction support which is suitable for the pier stud reinforcing steel bar construction process, is convenient for concrete curing, has light weight and is easy to build is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects in the prior art and provides a construction support which is suitable for the pier stud steel bar construction process, is convenient for concrete maintenance, has light weight and is easy to build.
In order to achieve the purpose, the utility model is realized by the following technical scheme:
a novel support for assembly type pier stud reinforcement construction and concrete maintenance comprises a support main body, wherein the support main body is composed of support single bodies which are annularly arranged, each support single body is composed of connecting trusses which are arranged in a layered mode and are mutually perpendicular and fixed, pedals are fixedly arranged among the horizontally arranged connecting trusses, connecting rods for connecting the horizontally arranged connecting trusses are arranged at corners of the support single bodies, and intelligent water storage tanks are arranged among the connecting trusses at the bottommost layer of each support single body at intervals; the bottom of the intelligent water storage tank is provided with a spray head.
Furthermore, a horizontal connecting disc is arranged at the vertical connecting position of the connecting truss, and the horizontal connecting truss and the vertical connecting truss are fixedly connected with the connecting disc through connecting pieces.
Furthermore, the connecting truss and the connecting rod are both composed of angle steel.
Compared with the prior art, the utility model has the following beneficial effects:
the intelligent concrete curing device is light in structure, intelligent concrete curing can be realized by arranging the intelligent water storage tank at the bottom of the support main body in the reinforcing steel bar construction process, and a certain number of support monomers are selected according to the size of a pier to surround the pier to form the support main body. The assembled construction mode is applicable to the construction of each medium-sized pier stud reinforcing bar, and the quality is light, and the potential safety hazard is little, and convenient construction, construction period is short, and material reuse rate is high, material saving.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a stent unit according to the present invention.
Reference numerals:
1-bracket single body, 2-intelligent water storage tank, 3-connecting disc, 4-pedal, 5-nozzle, 6-connecting truss and 7-connecting rod.
Detailed Description
The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
As shown in fig. 1 and 2, a novel assembly type support for pier stud reinforcement construction and concrete maintenance comprises a support main body, wherein the support main body is composed of support single bodies 1 which are annularly arranged, the support single bodies 1 are composed of connecting trusses 6 which are arranged in a layered manner and are mutually perpendicular and fixed, pedals 4 are fixedly arranged between the horizontally arranged connecting trusses 6, connecting rods 7 for connecting the horizontally arranged connecting trusses 6 are arranged at corners of the support single bodies 1, and intelligent water storage tanks 2 are arranged between the connecting trusses 6 at the bottommost layer of the support single bodies 1 at intervals; the bottom of the intelligent water storage tank 2 is provided with a spray head 5; a horizontal connecting disc 3 is arranged at the vertical connecting position of the connecting truss 6, and the horizontal connecting truss 6 and the vertical connecting truss 6 are fixedly connected with the connecting disc 3 through connecting pieces; the connecting truss 6 and the connecting rod 7 are both composed of angle steel.
According to the utility model, the support main body is assembled in advance at the open place, the support is integrally lifted by using lifting equipment after the assembly is finished, the reinforcement binding construction can be carried out by protecting the support on the back edge of the turnover formwork construction wood plate, meanwhile, the spray nozzle 5 is opened to carry out spraying maintenance on the poured concrete, the support main body is lifted to the open place by using the lifting equipment after the reinforcement plate is bundled, the turnover formwork is installed, the concrete is poured, and the steps are repeated until the pier construction is finished. In order to facilitate maintenance work, the intelligent water storage tank 2 arranged between the connection trusses 6 at the bottommost layer of the bracket single body 1 can be controlled by connecting an intelligent maintenance system, so that the spraying work of the spray head 5 is accurately controlled.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.
Claims (3)
1. The utility model provides a novel assembled pier stud steel bar construction and support for concrete maintenance, includes the support main part, its characterized in that: the support main body is composed of support single bodies which are annularly arranged, each support single body is composed of connecting trusses which are arranged in a layered mode and are mutually perpendicular and fixed, pedals are fixedly arranged among the horizontally arranged connecting trusses, connecting rods for connecting the horizontally connected trusses are arranged at corners of the support single bodies, and intelligent water storage tanks are arranged among the connecting trusses at the bottommost layer of the support single bodies at intervals; the bottom of the intelligent water storage tank is provided with a spray head.
2. The novel assembled pier stud steel bar construction and concrete maintenance support of claim 1, which is characterized in that: the vertical connection part of the connecting truss is provided with a horizontal connecting disc, and the horizontal connecting truss and the vertical connecting truss are fixedly connected with the connecting disc through connecting pieces.
3. The novel assembled pier stud steel bar construction and concrete maintenance support of claim 2, characterized in that: the connecting truss and the connecting rod are both composed of angle steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121589650.6U CN215669041U (en) | 2021-07-13 | 2021-07-13 | Novel assembled pier stud reinforcing bar construction and support for concrete maintenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121589650.6U CN215669041U (en) | 2021-07-13 | 2021-07-13 | Novel assembled pier stud reinforcing bar construction and support for concrete maintenance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215669041U true CN215669041U (en) | 2022-01-28 |
Family
ID=79979598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121589650.6U Active CN215669041U (en) | 2021-07-13 | 2021-07-13 | Novel assembled pier stud reinforcing bar construction and support for concrete maintenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215669041U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115058979A (en) * | 2022-07-05 | 2022-09-16 | 中建八局第一建设有限公司 | High and large pier stud concrete one-time pouring framework and one-time pouring method thereof |
CN115058979B (en) * | 2022-07-05 | 2024-05-17 | 中建八局第一建设有限公司 | High and large pier column concrete one-time pouring framework and one-time pouring method thereof |
-
2021
- 2021-07-13 CN CN202121589650.6U patent/CN215669041U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115058979A (en) * | 2022-07-05 | 2022-09-16 | 中建八局第一建设有限公司 | High and large pier stud concrete one-time pouring framework and one-time pouring method thereof |
CN115058979B (en) * | 2022-07-05 | 2024-05-17 | 中建八局第一建设有限公司 | High and large pier column concrete one-time pouring framework and one-time pouring method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110331668B (en) | Construction method of bidirectional inclined V-shaped bridge tower of cable-stayed bridge without back cables | |
CN111270852A (en) | Construction method of novel formwork support system for reinforced concrete silo dome | |
CN202017346U (en) | Late poured band hanging formwork structure | |
CN107989447A (en) | A kind of large-scale earthing concrete tank dome steel support structure and installation method | |
CN105908902A (en) | Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN101255714B (en) | Construction method for concrete macrotype xenotype shell construction body | |
CN202731104U (en) | Novel reinforcing mesh sheet support structure | |
CN113293694B (en) | Turnover formwork frame structure for efficient pier body construction and construction process | |
CN215669041U (en) | Novel assembled pier stud reinforcing bar construction and support for concrete maintenance | |
CN201648978U (en) | Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam | |
CN203475310U (en) | Formwork for concrete slabs of composite steel-concrete box girders | |
CN205617664U (en) | Prefabricated pier stud locating rack for steel reinforcement cage | |
CN103669566B (en) | The construction method of the steel reinforced concrete pedestal on large span grid roof | |
CN201339320Y (en) | High-altitude overhanging hanging reinforced concrete hanging bracket | |
CN207228652U (en) | Stent spray system for beam spray maintenance | |
CN202611112U (en) | Reinforcing steel bar frame body for controlling thicknesses of protective layers of plate negative reinforcements | |
CN201778392U (en) | Steel conical shell for coal silo | |
CN216664732U (en) | Bucket-shaped molding column | |
CN219326998U (en) | Foam concrete construction platform | |
CN203284737U (en) | Steel bar supporting formwork of thin-wall hollow high pier | |
CN205134192U (en) | Cast -in -place roof beam support frame of internal force balanced type is fallen to ground to non - | |
CN215671159U (en) | Concrete floor elevation control device | |
CN204343174U (en) | A kind of prestress concrete cantilever continuous beam No. zero block construction support | |
CN218091633U (en) | Support frame suitable for super thick bulky concrete raft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |