CN215666730U - Quick construction trolley for large-size prefabricated blocks - Google Patents

Quick construction trolley for large-size prefabricated blocks Download PDF

Info

Publication number
CN215666730U
CN215666730U CN202122192799.7U CN202122192799U CN215666730U CN 215666730 U CN215666730 U CN 215666730U CN 202122192799 U CN202122192799 U CN 202122192799U CN 215666730 U CN215666730 U CN 215666730U
Authority
CN
China
Prior art keywords
top beam
back timber
gantry
precast block
construction trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122192799.7U
Other languages
Chinese (zh)
Inventor
郭强
李永巍
张士朵
杨云
司剑
谷俊
孟鑫
史晓波
王江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Third Engineering Group Third Engineering Co ltd
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway Third Engineering Group Third Engineering Co ltd
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Third Engineering Group Third Engineering Co ltd, China Railway No 3 Engineering Group Co Ltd filed Critical China Railway Third Engineering Group Third Engineering Co ltd
Priority to CN202122192799.7U priority Critical patent/CN215666730U/en
Application granted granted Critical
Publication of CN215666730U publication Critical patent/CN215666730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the field of large-volume precast block demoulding lifting appliances, and particularly relates to a large-volume precast block rapid construction trolley; the gantry crane comprises a gantry and a winch, wherein four corners of the bottom of the gantry are respectively provided with a traveling wheel, and the winch is arranged on the gantry; the hoisting machine is arranged on the top beam of the portal frame and can move along the length direction of the top beam to change the hoisting position, a cable of the hoisting machine hangs down from one side of the top beam and bypasses a movable pulley below the top beam, the cable is protruded from the other side of the top beam and is tied on a rack of the hoisting machine, and a lifting hook is arranged on the movable pulley. The large-size precast block rapid construction trolley provided by the utility model is simple in overall structure, high in strength and convenient to move, and can solve the problems of low construction speed, easiness in damage, large mechanical investment and the like of large-size precast blocks.

Description

Quick construction trolley for large-size prefabricated blocks
Technical Field
The utility model belongs to the field of large-size precast block demoulding lifting appliances, and particularly relates to a large-size precast block rapid construction trolley.
Background
At present, traffic development at home and abroad is rapid, highway and railway engineering is rapidly developed, and large-volume concrete prefabrication and installation construction is often encountered in the on-line off-engineering construction process. Traditional construction often adopts the design steel mould to carry out concrete placement, treats that concrete strength satisfies the back, and manual cooperation crane or fork truck demold, and there is the construction slow, the template turnover rate is low, easily damaged, mechanical input big scheduling problem, and these problems need to be improved and are solved urgently.
SUMMERY OF THE UTILITY MODEL
An object of the present invention is to solve at least the above problems and to provide at least the advantages described later.
In order to achieve the purpose, the utility model provides a large-size precast block rapid construction trolley which comprises a portal frame and a winch, wherein four corners of the bottom of the portal frame are respectively provided with a traveling wheel, and the winch is arranged on the portal frame; the hoisting machine is arranged on the top beam of the portal frame and can move along the length direction of the top beam to change the hoisting position, a cable of the hoisting machine hangs down from one side of the top beam and bypasses a movable pulley below the top beam, the cable is protruded from the other side of the top beam and is tied on a rack of the hoisting machine, and a lifting hook is arranged on the movable pulley.
Further, the main part of portal is by I-steel assembly welding shaping, and the back timber is by several I-steels welding shaping side by side, and the flange board meets between the I-steel, has welded the pole setting in the middle of back timber beam-ends, and the welding has the stull under the pole setting, and the stull is perpendicular with the back timber, and the mid point at the stull is connected to the pole setting, and the walking wheel is installed under the end of stull.
Furthermore, an inclined strut steel pipe is welded between the two sides of the vertical rod and the cross strut, and an inclined strut rib plate is welded between the top beam and the vertical rod.
Further, the frame of hoist engine is including the cardboard that is located the both sides abdominal cavity of back timber, the bedplate that is located the back timber top surface, and the one side of cardboard has the stay tube with the last pterygoid lamina laminating of back timber, the web laminating of one side and the top beam, the welding between the cardboard of front and back.
Furthermore, four the walking wheel includes two universal wheels and two directional wheels, and two universal wheels are located the span both sides of portal, are connected with the direction control pole that upwarps on the wheel carrier of universal wheel.
Compared with the prior art, the utility model has the advantages that:
the large-size precast block rapid construction trolley provided by the utility model is simple in overall structure, high in strength and convenient to move, and can solve the problems of low construction speed, easiness in damage, large mechanical investment and the like of large-size precast blocks.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the mating of the frame and the top beam.
In the figure: 1-a winch; 2-top beam; 3-erecting a rod; 4-horizontal bracing; 5-a directional wheel; 6-universal wheel; 7-a directional control lever; 8-diagonal bracing steel pipes; 9-a frame; 9.1-cardboard; 9.2-seat board; 9.3-supporting the tube; 10-a movable pulley; 11-a hook; 12-diagonal bracing rib plate.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
As shown in fig. 1 and 2; a large-size precast block rapid construction trolley comprises a portal frame and a winch 1, wherein four corners of the bottom of the portal frame are respectively provided with a traveling wheel, and the winch 1 is arranged on the portal frame; hoist engine 1 sets up on the back timber 2 of portal and can follow 2 long to the removal transform hoisting position of back timber, hoist engine 1's hawser hangs down from one side of back timber 2 and winds the movable pulley 10 under the roof beam, it ties on hoist engine 1's frame 9 to emerge from the opposite side of back timber 2, install lifting hook 11 on the movable pulley 10, through setting up a movable pulley 10 transition, both can balance the pulling force of prefabricated section to back timber 2 both sides, prevent that the portal from toppling over to one side, can reduce hoist engine 1 half again and lift by crane power.
The main part of portal 9 is formed by the I-steel assembly welding, and back timber 2 is formed by several I-steels welding side by side, and the flange board meets between the I-steel, has welded pole setting 3 in the middle of 2 roof beams ends of back timber, and the welding has stull 4 under the pole setting 3, and stull 4 is perpendicular with back timber 2, and the mid point at stull 4 is connected to pole setting 3, and the walking wheel is installed under the end of stull 4.
Diagonal bracing steel pipes 8 are welded between the two sides of the vertical rods 3 and the transverse bracing 4, and diagonal bracing rib plates 12 are welded between the top beam 2 and the vertical rods 3 to form a triangular stable structure.
Frame 9 of hoist engine 1 is including the cardboard 9.1 that is located the both sides abdominal cavity of back timber 2, the bedplate 9.2 that is located back timber 2 top surface, cardboard 9.1 one side with the last pterygoid lamina laminating of back timber 2, one side with the web laminating of back timber 2, the welding has stay tube 9.3 between the cardboard 9.1 of front and back.
The four travelling wheels comprise two universal wheels 6 and two directional wheels 5, the two universal wheels 6 are positioned at two sides of the span of the portal frame, the directional wheels 5 are arranged at the front part of the advancing direction, the universal wheels 6 are arranged at the rear part, and the wheel carrier of the universal wheels 6 is connected with an upturned directional control rod 7; the direction control rod 7 is made of a steel bar with the length of 1.2m and the diameter of 14, the end of which is bent into a handle, and is welded on a wheel frame of the universal wheel 3 to be used as a direction control device.
The method comprises the following specific operation steps:
1. in a prefabricated field hardened in advance, longitudinally arranging the shaping molds at intervals of 3 meters;
2. prefabricating a large-size precast block, and embedding lifting rings in the precast block according to requirements;
3. after the strength of the concrete meets the requirement, a direction control rod is manually operated to move the trolley along the arrangement direction of the shaping mold, the gantry stretches across the shaping mold to be demoulded, and the large-volume precast block is manually connected with a lifting hook under a winch through a pre-buried lifting ring;
4. starting a winch, lifting the precast block by 15cm, and manually matching for demoulding;
5. after demolding is finished, pushing the trolley to place the precast block beside for stacking, manually matching to brush oil on the shaping mold, assembling, and waiting for next pouring;
6. and repeating the work to complete the demoulding and stacking work of all the large-volume precast blocks.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (5)

1. A large-size precast block rapid construction trolley comprises a gantry and a winch (1), wherein four corners of the bottom of the gantry are respectively provided with a traveling wheel, and the winch (1) is arranged on the gantry; the method is characterized in that: the hoisting machine (1) is arranged on a top beam (2) of the gantry and can move along the length direction of the top beam (2) to change the hoisting position, a cable of the hoisting machine (1) hangs down from one side of the top beam (2) to bypass a movable pulley (10) below the top beam, protrudes from the other side of the top beam (2) to be fastened on a rack (9) of the hoisting machine (1), and a lifting hook (11) is arranged on the movable pulley (10).
2. The large-volume precast block rapid construction trolley according to claim 1, wherein: the main part of frame (9) is by I-steel assembly welding shaping, and back timber (2) are by several I-steels weld forming side by side, and the flange board meets between the I-steel, and pole setting (3) have been welded to the centre of back timber (2) beam-ends, and the welding has stull (4) under pole setting (3), and stull (4) are perpendicular with back timber (2), and the mid point in stull (4) is connected in pole setting (3), and the walking wheel is installed under the end of stull (4).
3. The large-volume precast block rapid construction trolley according to claim 2, wherein: diagonal bracing steel pipes (8) are welded between the two sides of the vertical rods (3) and the cross braces (4), and diagonal bracing rib plates (12) are welded between the top beams (2) and the vertical rods (3).
4. The large-volume precast block rapid construction trolley according to claim 2 or 3, wherein: frame (9) of hoist engine (1) are including cardboard (9.1) that are located the both sides abdominal cavity of back timber (2), bedplate (9.2) that are located back timber (2) top surface, and the one side of cardboard (9.1) is laminated with the last pterygoid lamina of back timber (2), the web laminating of back timber (2) on one side, and the welding has stay tube (9.3) between preceding back cardboard (9.1).
5. The large-volume precast block rapid construction trolley according to claim 4, wherein: four the walking wheel includes two universal wheels (6) and two directional wheels (5), and two universal wheels (6) are located the span both sides of portal, are connected with upturned direction control pole (7) on the wheel carrier of universal wheel (6).
CN202122192799.7U 2021-09-10 2021-09-10 Quick construction trolley for large-size prefabricated blocks Active CN215666730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122192799.7U CN215666730U (en) 2021-09-10 2021-09-10 Quick construction trolley for large-size prefabricated blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122192799.7U CN215666730U (en) 2021-09-10 2021-09-10 Quick construction trolley for large-size prefabricated blocks

Publications (1)

Publication Number Publication Date
CN215666730U true CN215666730U (en) 2022-01-28

Family

ID=79962314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122192799.7U Active CN215666730U (en) 2021-09-10 2021-09-10 Quick construction trolley for large-size prefabricated blocks

Country Status (1)

Country Link
CN (1) CN215666730U (en)

Similar Documents

Publication Publication Date Title
CN201908664U (en) Movable trestle bridge invert form board trolley
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN215252400U (en) Self-supporting synchronous hanger system for corrugated steel web construction
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN109267490B (en) Long guide beam type movable formwork and construction method thereof
CN212774321U (en) Disconnect-type concrete form platform truck
CN107829408B (en) Rectangular aqueduct construction steel mould trolley
CN215666730U (en) Quick construction trolley for large-size prefabricated blocks
CN205638491U (en) Multi -functional platform truck
CN210031563U (en) Quick construction equipment of mobilizable modularization box culvert
CN214883863U (en) Template system is pour to utility tunnel
CN113152309A (en) Self-supporting synchronous hanging bracket system for corrugated steel web construction and construction method
CN215589475U (en) Movable bottom die system for prefabricated box girder
CN211735125U (en) Culvert template trolley device
CN110714785A (en) Pipe gallery top plate construction trolley, trolley set and construction method
CN208473293U (en) Narrow deformation joint easy-dismount template system
CN209799360U (en) combined movable steel formwork
CN207244659U (en) A kind of Urban Underground pipe gallery scene rapidform machine
CN214993215U (en) Culvert wall body support and whole sideslip device of template
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN216640114U (en) Can have enough to meet need prefabricated high performance concrete pavement slab of regularization
CN210049907U (en) Integrally-walking type tunnel internal vertical wall template
CN210529501U (en) Movable shuttling truss for mounting transverse wet joint reinforcing steel bars on parallel double-width bridge deck
CN218255830U (en) Box girder pedestal capable of automatically walking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant