CN207244659U - On-site rapid prototyping machine for urban underground comprehensive pipe gallery - Google Patents

On-site rapid prototyping machine for urban underground comprehensive pipe gallery Download PDF

Info

Publication number
CN207244659U
CN207244659U CN201720995704.6U CN201720995704U CN207244659U CN 207244659 U CN207244659 U CN 207244659U CN 201720995704 U CN201720995704 U CN 201720995704U CN 207244659 U CN207244659 U CN 207244659U
Authority
CN
China
Prior art keywords
formwork
support
end template
template
rear end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720995704.6U
Other languages
Chinese (zh)
Inventor
尚进
姚永坚
于文洪
吕艳波
李爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Mingwan Engineering Technology Co ltd
Original Assignee
Mingda Underground Space Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mingda Underground Space Technology Development Co ltd filed Critical Mingda Underground Space Technology Development Co ltd
Priority to CN201720995704.6U priority Critical patent/CN207244659U/en
Application granted granted Critical
Publication of CN207244659U publication Critical patent/CN207244659U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides an on-spot rapid prototyping machine of city utility tunnel which belongs to the technical field of the underground space of road bridge roof beam. The movable type self-propelled walking trolley comprises an outer template, a front end template, a rear end template and an inner model, wherein the outer template, the front end template and the rear end template are carried on a walking trolley, the inner model is carried on a bearing beam, and a foldable front support, a middle support and a rear support are arranged below the bearing beam. The positions of the front end template and the rear end template on the walking trolley are adjustable up and down for sealing with the foundation. The bearing beam can penetrate through the front end template and the rear end template, so that the carried internal mold is arranged between the external molds. And after the module assembly is finished, pouring in place and preserving health. The die is assembled and installed into a whole by using a special connecting piece, and can be repeatedly used. Because the transportation weight and the transportation size are not required to be considered, the production construction of large concrete members can be carried out, and the construction period and the manufacturing cost can be greatly saved because the mounting and demoulding speed is high.

Description

一种城市地下综合管廊现场快速成型机On-site rapid prototyping machine for urban underground comprehensive pipe gallery

技术领域technical field

本实用新型涉及一种城市地下综合管廊现场快速成型机,其属于道路桥梁的地下空间的技术领域。The utility model relates to an on-site rapid prototyping machine for an urban underground comprehensive pipe gallery, which belongs to the technical field of underground spaces of roads and bridges.

背景技术Background technique

为转变城市发展方式、推进城市管理向现代化方向发展,各地正在进行大规模的城市地下综合管廊建设和地下空间的建设,城市综合管廊的主体结构施工技术主要有传统的现浇方式和预制拼装方式。传统的现浇施工工艺施工受季节及气候影响大、施工效率低、工期长、对环境污染大、质量难以控制。预制拼装施工工艺施工受季节及气候影响小、施工效率高、工期短、质量容易控制;但存在预制构件的运输重量,运输尺寸的限制,并且运输和吊装费用高。In order to change the mode of urban development and promote the development of urban management in the direction of modernization, large-scale construction of urban underground comprehensive pipe corridors and underground space is being carried out in various places. The main structure construction technologies of urban comprehensive pipe corridors mainly include traditional cast-in-place methods and prefabricated Assembly method. The traditional cast-in-place construction technology is greatly affected by seasons and climate, low construction efficiency, long construction period, large environmental pollution, and difficult quality control. The construction of prefabricated assembly construction technology is less affected by seasons and climate, high construction efficiency, short construction period, and easy quality control; but there are restrictions on the transportation weight and transportation size of prefabricated components, and the transportation and hoisting costs are high.

发明内容Contents of the invention

为解决现有技术中存在的问题,本发明提供一种城市地下综合管廊现场快速成型机及其工作方法,其主体结构,外模,端板,内模,梁采用钢结构,工厂制作精度高。组模脱模等采用液压系统实现自动化操作,成型机通过电器或液压控制系统实现自动行走自动化程度高。In order to solve the problems existing in the prior art, the present invention provides an on-site rapid prototyping machine for urban underground comprehensive pipe gallery and its working method. high. The hydraulic system is used to realize automatic operation such as mold set and demoulding, and the forming machine realizes automatic walking through electrical appliances or hydraulic control system with a high degree of automation.

本发明采用的技术方案为:一种城市地下综合管廊现场快速成型机,它包括带有行走轮的行走台车,所述行走台车的两侧设置外模板,行走台车的前端设置前端头模板,行走台车的后端设置后端头模板;外模板之间设置四壁型的内模板,内模板搭载在承重的横梁上,横梁下方设置折叠式的前支撑和中间支撑,前支撑和中间支撑的下方都设置有支撑滚轮;承重的横梁后端固定在主梁上。该成型机它包括主体结构、内外模具、端板模具、行走系统、液压控制系统、电器控制系统等组成。所述主体结构由主梁和支撑内模的横梁、两側架在地梁轨道上的支腿和其他连接件组成;通过液压马达或减速机驱动实现成型机在两側轨道上的行走。所述外模、内模和端模通过液压油缸与主体结构的框架及横梁连接,通过液压系统的油缸伸缩来进行内外模,端模的组模和脱模操作。支撑内模的横梁前端下方设置可折叠的前支撑和中间支撑。The technical solution adopted in the present invention is: a site rapid prototyping machine for urban underground comprehensive pipe gallery, which includes a traveling trolley with traveling wheels, the two sides of the traveling trolley are provided with external templates, and the front end of the traveling trolley is provided with a front end Head formwork, the rear end of the walking trolley is provided with a rear end formwork; a four-walled inner formwork is set between the outer formworks, the inner formwork is mounted on a load-bearing beam, and a foldable front support and an intermediate support are set under the beam. Supporting rollers are arranged under the middle support and the middle support; the rear end of the load-bearing beam is fixed on the main beam. The molding machine consists of main structure, inner and outer molds, end plate molds, walking system, hydraulic control system, electrical control system and so on. The main structure is composed of the main beam, the cross beam supporting the inner mold, the outriggers on both sides on the ground beam track and other connecting parts; the forming machine is driven on both sides of the track by a hydraulic motor or a reducer. The outer mold, inner mold and end mold are connected with the frame and crossbeam of the main structure through a hydraulic cylinder, and the inner and outer molds and the end mold are formed and demoulded through the expansion and contraction of the oil cylinder of the hydraulic system. A foldable front support and a middle support are arranged below the front end of the crossbeam supporting the inner mold.

一种城市地下综合管廊现场快速成型机的工作方法,包括以下步骤:A working method of an on-site rapid prototyping machine for an urban underground comprehensive pipe gallery, comprising the following steps:

(1)折叠收起承重横梁的前支撑,通过行走台车成型机向前行走,横梁前端穿过钢筋笼,到达另一端后将前支撑打开支起;(1) Fold and store the front support of the load-bearing beam, walk forward through the walking trolley forming machine, the front end of the beam passes through the steel cage, and open the front support after reaching the other end;

(2)折叠收起承重横梁的中间支撑,继续行走成型机,直至内模置于钢筋笼下,架起中间支撑;(2) Fold and put away the middle support of the load-bearing beam, and continue to walk the molding machine until the inner mold is placed under the steel cage, and the middle support is erected;

(3)外模板、前端头模板和后端头模板在行走台车上上下调整高度,使外模板、前端头模板和后端头模板与地基之间进行密封处理;(3) Adjust the height of the outer formwork, front end formwork and rear end formwork on the walking trolley up and down, so that the outer formwork, front end formwork, rear end formwork and the foundation are sealed;

(4)通过液压系统的油缸伸缩来进行内模的合模安装,并通过内外模间的辅佐连接件将内外模连成一体,完成组模作业后浇筑混凝土、养生;(4) Clamp and install the inner mold through the expansion and contraction of the oil cylinder of the hydraulic system, and connect the inner and outer molds into one body through the auxiliary connector between the inner and outer molds, and pour concrete and maintain the health after completing the formwork;

(5)浇筑的混凝土通过蒸汽快速养生达到脱模强度后,将内模收紧与混凝土结构整体分离,同样将外模和端模通过液压油缸将其拉开。(5) After the poured concrete reaches the demoulding strength through rapid steam curing, the inner mold is tightened and separated from the concrete structure as a whole, and the outer mold and end mold are also pulled apart by the hydraulic cylinder.

(6)通过行走台车将管廊成型机整体向后行走,直至离开刚刚成型的混凝土结构物,进而脱模。(6) Walk the pipe gallery forming machine as a whole backwards through the walking trolley until it leaves the newly formed concrete structure, and then demould.

该工法的包括钢制(或铝合金)外模,钢制(或铝合金)前后端板,钢制(或铝合金)内模,主体结构的主梁,承重的内模支撑横梁,行走台车,预制钢筋笼。预制钢筋笼先放置指定位置,成型机向指定的位置行走,使支撑内模的横梁插入预制钢筋笼内,通过液压系统和辅佐连接件进行组模安装使之成为一体。然后浇筑混凝土,进行适当养生达到脱模强度后脱模。The construction method includes steel (or aluminum alloy) outer mold, steel (or aluminum alloy) front and rear end plates, steel (or aluminum alloy) inner mold, main beam of the main structure, load-bearing inner mold supporting beam, walking platform car, prefabricated steel cage. The prefabricated steel cage is first placed at the designated position, and the forming machine walks to the designated position, so that the beam supporting the inner mold is inserted into the prefabricated steel cage, and the mold is assembled and installed through the hydraulic system and auxiliary connectors to make it integrated. Then pour the concrete and carry out proper curing to achieve the demoulding strength before demoulding.

先脱内模,然后脱外模和端头模板,模板离开混凝土结构后通过行走系统将成型机向后移动到指定位置。再次安装预制钢筋笼,成型机向指定的位置行走,使支撑内模的横梁插入预制钢筋笼内,通过液压系统和辅佐连接件进行组模安装使之成为一体。然后浇筑混凝土,进行适当养生达到脱模强度后脱模。重复此流程进行混凝土管廊的生产施工。该成型机还可以制作多仓,多层的构造体。The inner mold is removed first, and then the outer mold and end formwork are removed. After the formwork leaves the concrete structure, the forming machine is moved backward to the designated position through the walking system. Install the prefabricated reinforcement cage again, and the forming machine walks to the designated position, so that the crossbeam supporting the inner mold is inserted into the prefabricated reinforcement cage, and the mold is assembled and installed through the hydraulic system and auxiliary connectors to make it integrated. Then pour the concrete and carry out proper curing to achieve the demoulding strength before demoulding. Repeat this process for the production and construction of the concrete pipe gallery. The molding machine can also make multi-compartment, multi-layer structures.

本实用新型的有益效果:该成型机它包括主体结构、内外模具、端板模具、行走系统、液压控制系统、电器控制系统等组成。主体结构由主梁和支撑内模的横梁、两側架在地梁轨道上的支腿和其他连接件组成;通过液压马达或减速机驱动实现成型机在两側轨道上的行走。外模、内模和端模通过液压油缸与主体结构的框架及横梁连接,通过液压系统的油缸伸缩来进行内外模,端模的组模和脱模操作。组模完成后,进行现场浇筑、养生。该成型机采用液压系统和电器控制系统进行操作,实现自动化操作,能够确保施工质量和成型的精度;该成型机可在开挖的基坑内实现连续的混凝土浇注成型作业,因无需考虑运输重量,运输尺寸的限制,所以可以进行各种规格断面的城市地下综合管廊和地下空间设施的施工、又因其安装脱模速度快,可以大大节省工期和造价。Beneficial effects of the utility model: the forming machine includes a main structure, inner and outer molds, end plate molds, a walking system, a hydraulic control system, an electrical control system and the like. The main structure is composed of the main beam, the cross beam supporting the inner mold, the outriggers on both sides on the ground beam track and other connecting parts; the forming machine is driven on both sides of the track by hydraulic motor or reducer. The outer mold, inner mold and end mold are connected with the frame and beam of the main structure through the hydraulic cylinder, and the inner and outer molds and the end mold are formed and demoulded through the expansion and contraction of the oil cylinder of the hydraulic system. After the formwork is completed, on-site pouring and health preservation are carried out. The forming machine adopts hydraulic system and electrical control system to realize automatic operation, which can ensure the construction quality and forming accuracy; the forming machine can realize continuous concrete pouring and forming operations in the excavated foundation pit, because there is no need to consider the transportation weight, Due to the limitation of transportation size, it is possible to carry out the construction of urban underground comprehensive pipe corridors and underground space facilities of various specifications and sections, and because of the fast installation and demoulding speed, it can greatly save the construction period and cost.

将预制好的钢筋笼放在指定位置,然后通过行走台车的行走系统将成型机整体向前移动,支撑内模的横梁前端穿过钢筋笼,在另一侧架起前支点,收起中间支点,将与其搭载的内模移动到指定位置进行组合安装。因其在现场采用可行走的成型机实现自动组模脱模作业,连续成型。既有现浇工艺的连续性,又有预制拼装工艺的质量合效率;且此工法无需新建厂房,无需运输,因此不受重量和尺寸大小的限制,操作灵活,运用范围广,性价比高,从而满足多种需求。Place the prefabricated reinforcement cage at the designated position, and then move the molding machine forward as a whole through the walking system of the trolley. The fulcrum moves the internal mold equipped with it to the designated position for combined installation. Because it adopts a walkable forming machine on site to realize automatic forming and demoulding operations, and continuous forming. It not only has the continuity of the cast-in-place process, but also has the quality and efficiency of the prefabricated assembly process; and this construction method does not require a new factory building or transportation, so it is not limited by weight and size, flexible operation, wide application range, and high cost performance. Meet a variety of needs.

附图说明Description of drawings

图1 是一种城市地下综合管廊现场快速成型机的正视图。Figure 1 is a front view of an on-site rapid prototyping machine for an urban underground utility tunnel.

图2是一种城市地下综合管廊现场快速成型机的侧面图。Fig. 2 is a side view of an on-site rapid prototyping machine for an urban underground utility tunnel.

图3是一种城市地下综合管廊现场快速成型机的俯视图。Fig. 3 is a top view of an on-site rapid prototyping machine for an urban underground utility tunnel.

图4是一种城市地下综合管廊现场快速成型机(多仓)的结构图。Figure 4 is a structural diagram of an on-site rapid prototyping machine (multiple warehouses) for urban underground comprehensive pipe corridors.

图中:1、外模板,2、前端头模板,3、后端头模板,4、内模板, 5、中间支撑,6、前支撑,7、行走台车,7a、行走轮,8、承重横梁, 9、主梁,10、支撑滚轮。In the figure: 1. Outer formwork, 2. Front end formwork, 3. Rear end formwork, 4. Inner formwork, 5. Middle support, 6. Front support, 7. Walking trolley, 7a, Traveling wheels, 8. Load bearing Crossbeam, 9, main beam, 10, support roller.

具体实施方式Detailed ways

实施例1Example 1

一种城市地下综合管廊现场快速成型机,它包括带有行走轮7a的行走台车7,其特征在于:所述行走7的两侧设置外模板1,行走台车7的前端设置前端头模板2,行走台车7的后端设置后端头模板3;外模板1之间设置四壁型的内模板4,内模板4搭载在承重的横梁8上,横梁8下方设置折叠式的前支撑6和中间支撑5,前支撑6和中间支撑5的下方都设置有支撑滚轮10。承重的横梁后端固定在主梁9上。An on-site rapid prototyping machine for urban underground comprehensive pipe gallery, which includes a traveling trolley 7 with traveling wheels 7a, characterized in that: the two sides of the walking trolley 7 are provided with outer formwork 1, and the front end of the traveling trolley 7 is provided with a front end Template 2, the rear end of the walking trolley 7 is provided with a rear end template 3; a four-walled inner template 4 is arranged between the outer templates 1, and the inner template 4 is mounted on a load-bearing beam 8, and a foldable front panel is arranged under the beam 8. Support 6 and middle support 5, the bottom of front support 6 and middle support 5 are all provided with support roller 10. The load-bearing beam rear end is fixed on the main beam 9.

采用上述技术方案工作时,包括以下步骤:When adopting above-mentioned technical scheme to work, comprise the following steps:

(1)折叠收起承重横梁8的前支撑6,通过行走台车成型机向前行走,横梁前端穿过钢筋笼,到达另一端后将前支撑6打开支起;(1) Fold and store the front support 6 of the load-bearing beam 8, and walk forward through the walking trolley forming machine. The front end of the beam passes through the steel cage, and when it reaches the other end, the front support 6 is opened and supported;

(2)折叠收起承重横梁8的中间支撑5,继续行走成型机,直至内模板4置于钢筋笼下,架起中间支撑5;(2) Fold and put away the middle support 5 of the load-bearing beam 8, continue to walk the forming machine until the inner template 4 is placed under the steel cage, and set up the middle support 5;

(3)外模板1、前端头模板2和后端头模板3在行走台车7上下调整高度,使外模板1、前端头模板2和后端头模板3与地基之间进行密封处理;(3) Adjust the height of the outer formwork 1, the front end formwork 2 and the rear end formwork 3 up and down on the trolley 7, so that the outer formwork 1, the front end formwork 2, the rear end formwork 3 and the foundation are sealed;

(4)通过液压系统的油缸伸缩来进行内模板4的合模安装,并通过内模板间的辅佐连接件将内外模连成一体,完成组模作业后浇筑混凝土、养生;(4) Clamp and install the inner formwork 4 through the expansion and contraction of the oil cylinder of the hydraulic system, and connect the inner and outer molds into one through the auxiliary connectors between the inner formworks, and pour concrete and maintain health after completing the formwork operation;

(5)浇筑的混凝土通过蒸汽快速养生达到脱模强度后,将内模板4收紧与混凝土结构整体分离,同样将外模板1和端模板2、3通过液压油缸将其拉开。(5) After the poured concrete reaches the demoulding strength through rapid steam curing, the inner formwork 4 is tightened and separated from the concrete structure as a whole, and the outer formwork 1 and end formworks 2 and 3 are also pulled apart by hydraulic cylinders.

(6)通过行走台车7将管廊成型机整体向后行走,直至离开刚刚成型的混凝土结构物,进而脱模。(6) Walk the pipe gallery forming machine as a whole backwards through the walking trolley 7 until it leaves the newly formed concrete structure, and then demould.

该成型机包括两侧由行走台车7搭载的可滑动的外模板1、前端头模板2、后端头模板3和承重横梁8搭载的内模板4。成型机安装,先将预制好的钢筋笼放在指定位置,带有外模板1、端头模板2、主梁9、承重横梁8及与其搭载的内模板4的成型机在收起前支撑6后向钢筋笼方向移动,横梁前端穿过钢筋笼到达另一端后,架起前支撑6,同时收起中间支撑5,继续移动成型机达到预定位置后,架起中间支撑5用以承载内模重量,通过液压系统撑起内模和外模等进行组模安装。然后进行混凝土浇筑。浇筑的混凝土达到脱模强度后该成型机能够快速的将内模板4收紧与整体分离,在拉开外模和端模后成型机向后移动从而达到脱模的目的。外模板1前端头模板2、悬挂在行走台车7上,使它们能够上下调整高度,从而可以使外模板1、前端头模板2、与地基之间进行密封处理达到组模密封要求。外模板1与前端头模板2悬挂在安装车7上,使之可以前后移动达到脱模和从新组模的目的。The forming machine includes a slidable outer formwork 1 carried by a walking trolley 7 on both sides, a front end formwork 2, a rear end formwork 3 and an inner formwork 4 carried by a load-bearing crossbeam 8 . For the installation of the forming machine, first place the prefabricated steel cage at the designated position, and the forming machine with the outer formwork 1, the end formwork 2, the main beam 9, the load-bearing beam 8 and the inner formwork 4 equipped with it are supported 6 before being folded. Move back to the direction of the reinforcement cage, after the front end of the beam passes through the reinforcement cage to reach the other end, set up the front support 6, and at the same time put away the middle support 5, continue to move the molding machine to reach the predetermined position, set up the middle support 5 to carry the inner mold Weight, through the hydraulic system to prop up the inner mold and outer mold, etc. for grouping and installation. Then the concrete is poured. After the poured concrete reaches the demoulding strength, the molding machine can quickly tighten the inner formwork 4 and separate it from the whole, and after the outer mold and end mold are pulled apart, the molding machine moves backward so as to achieve the purpose of demoulding. Outer formwork 1 front end formwork 2, is suspended on the walking trolley 7, makes them can adjust height up and down, thereby can make outer formwork 1, front end head formwork 2, carry out sealing treatment between foundation and meet the mold sealing requirement. The outer formwork 1 and the front end formwork 2 are suspended on the installation vehicle 7, so that they can move back and forth to achieve the purpose of demoulding and regrouping.

实施例2Example 2

1)首先按照要求打好基础,铺好垫层。1) First lay the foundation and lay the cushion according to the requirements.

2)同时进行钢筋笼的加工,为便于运输每一单元可为2.5米,一段可为10米共4单元。2) At the same time, the steel cage is processed. For the convenience of transportation, each unit can be 2.5 meters, and a section can be 10 meters, a total of 4 units.

3)在铺好的垫层上标出钢筋笼放置位置并设置好钢筋笼保护层冶具,钢筋各单元之间按设计要求进行连接。3) Mark the location of the steel cage on the paved cushion and set up the steel cage protective layer jig, and connect the steel bar units according to the design requirements.

4)现场快速成型机由主体结构,主梁9、第一承重横梁8a、第二承重横梁8b、第三承重横梁8c;内外模具,外模板1、内模板4(第一内模板、第二内模板、第三内模板)、前端头模板2;行走机构,行走台车7、前支撑6(第一前支撑、第二前支撑、第三前支撑)、支撑滚轮10(第一支撑滚轮、第二支撑滚轮、第三支撑滚轮),中间支撑5(第一中间支撑、第二中间支撑、第三中间支撑)中间支撑轮等组成。4) On-site rapid prototyping machine consists of main structure, main beam 9, first load-bearing beam 8a, second load-bearing beam 8b, third load-bearing beam 8c; inner and outer molds, outer formwork 1, inner formwork 4 (first inner formwork, second Inner formwork, third inner formwork), front end head formwork 2; traveling mechanism, walking trolley 7, front support 6 (first front support, second front support, third front support), support roller 10 (first support roller , the second support roller, the third support roller), the intermediate support 5 (the first intermediate support, the second intermediate support, the third intermediate support) the intermediate support wheel and so on.

5)采用现场快速成型机工作时,包括以下步骤:5) When working with on-site rapid prototyping machines, the following steps are included:

(1)折叠收起承重横梁8(第一承重横梁、第二承重横梁、第三承重横梁)的前支撑6(第一前支撑、第二前支撑、第三前支撑),通过中间支撑5(第一中间支撑、第二中间支撑、第三中间支撑)行走台车成型机向前行走,横梁前端穿过钢筋笼,到达另一端后将前支撑6(第一前支撑、第二前支撑、第三前支撑)打开支起;(1) Fold the front support 6 (the first front support, the second front support, the third front support) of the load-bearing beam 8 (the first load-bearing beam, the second load-bearing beam, and the third load-bearing beam), and pass the middle support 5 (the first intermediate support, the second intermediate support, the third intermediate support) the walking trolley forming machine moves forward, the front end of the beam passes through the steel cage, and when it reaches the other end, the front support 6 (the first front support, the second front support , the third front support) to open the support;

(2)折叠收起承重横梁8(第一承重横梁、第二承重横梁、第三承重横梁)的中间支撑5(第一中间支撑、第二中间支撑、第三中间支撑),继续行走成型机,直至内模板4(第一内模板、第二内模板、第三内模板)置于钢筋笼内,架起中间支撑5(第一中间支撑、第二中间支撑、第三中间支撑);(2) Fold and put away the intermediate support 5 (the first intermediate support, the second intermediate support, the third intermediate support) of the load-bearing beam 8 (the first load-bearing beam, the second load-bearing beam, and the third load-bearing beam), and continue to walk the molding machine , until the inner formwork 4 (the first inner formwork, the second inner formwork, and the third inner formwork) is placed in the reinforcement cage, and the intermediate support 5 (the first intermediate support, the second intermediate support, and the third intermediate support) is erected;

(3)外模板1、前端头模板2和后端头模板3在行走台车7上下调整高度,使外模板1、前端头模板2和后端头模板3与地基之间进行密封处理;(3) Adjust the height of the outer formwork 1, the front end formwork 2 and the rear end formwork 3 up and down on the trolley 7, so that the outer formwork 1, the front end formwork 2, the rear end formwork 3 and the foundation are sealed;

(4)通过液压系统的油缸伸缩来进行内模板4(第一内模板、第二内模板、第三内模板)的合模安装,并通过内模板间的辅佐连接件将内外模连成一体,完成组模作业后浇筑混凝土、混凝土浇筑可采用每10m一段分次浇筑,每段混凝土浇筑时,在距离管廊底板顶面以上一定高度的墙壁上留设施工缝,等混凝土初凝后再浇筑剩余部分。浇筑完混凝土进行蒸汽养生;(4) Clamp and install the inner formwork 4 (the first inner formwork, the second inner formwork, and the third inner formwork) through the expansion and contraction of the oil cylinder of the hydraulic system, and connect the inner and outer molds into one body through the auxiliary connectors between the inner formworks After completing the formwork, pouring concrete, concrete pouring can be poured in stages every 10m. When pouring each section of concrete, leave a construction joint on the wall at a certain height above the top surface of the bottom plate of the pipe gallery, and wait for the concrete to set. Pouring the remainder. Steam curing after pouring concrete;

(5)浇筑的混凝土通过蒸汽快速养生达到脱模强度后,将内模板4(第一内模板、第二内模板、第三内模板)收紧与混凝土结构整体分离,同样将外模板1和端模板2、3通过液压油缸将其拉开。(5) After the poured concrete reaches the demoulding strength through rapid steam curing, the inner formwork 4 (the first inner formwork, the second inner formwork, and the third inner formwork) is tightened and separated from the concrete structure as a whole, and the outer formwork 1 and The end templates 2 and 3 are pulled apart by hydraulic cylinders.

(6)通过行走台车7将管廊成型机整体向后行走,直至离开刚刚成型的混凝土结构物,进而脱模。(6) Walk the pipe gallery forming machine as a whole backwards through the walking trolley 7 until it leaves the newly formed concrete structure, and then demould.

该成型机包括两侧由行走台车7搭载的可滑动的外模板1、前端头模板2、后端头模板3和承重横梁8(第一承重横梁、第二承重横梁、第三承重横梁)搭载的内模板4(第一内模板、第二内模板、第三内模板)。成型机安装,先将预制好的钢筋笼放在指定位置,带有外模板1、端头模板2、主梁9、承重横梁8(第一承重横梁、第二承重横梁、第三承重横梁)及与其搭载的内模板4(第一内模板、第二内模板、第三内模板)的成型机在收起前支撑6(第一前支撑、第二前支撑、第三前支撑)后向钢筋笼方向移动,横梁前端穿过钢筋笼到达另一端后,架起前支撑6(第一前支撑、第二前支撑、第三前支撑),同时收起第一中间支撑5(第一中间支撑、第二中间支撑、第三中间支撑),继续移动成型机达到预定位置后,架起中间支撑5(第一中间支撑、第二中间支撑、第三中间支撑)用以承载内模重量,通过液压系统撑起内模和外模等进行组模安装。然后进行混凝土浇筑。浇筑的混凝土达到脱模强度后该成型机能够快速的将内模板4(第一内模板、第二内模板、第三内模板)收紧与整体分离,在拉开外模和端模后成型机向后移动从而达到脱模的目的。外模板1前端头模板2、悬挂在行走台车7上,使它们能够上下调整高度,从而可以使外模板1、前端头模板2、与地基之间进行密封处理达到组模密封要求。外模板1与前端头模板2悬挂在行走台车7上,使之可以前后移动达到脱模和从新组模的目的。The molding machine includes a slidable outer formwork 1, a front end formwork 2, a rear end formwork 3 and load-bearing beams 8 (first load-bearing beam, second load-bearing beam, third load-bearing beam) carried by a walking trolley 7 on both sides. The carried inner formwork 4 (the first inner formwork, the second inner formwork, and the third inner formwork). For the installation of the forming machine, first place the prefabricated steel cage at the designated position, with outer formwork 1, end formwork 2, main beam 9, and load-bearing beam 8 (the first load-bearing beam, the second load-bearing beam, and the third load-bearing beam) And the forming machine of the inner formwork 4 (the first inner formwork, the second inner formwork, and the third inner formwork) equipped with it is facing backward when the front support 6 (the first front support, the second front support, and the third front support) is folded up. Move in the direction of the reinforcement cage, after the front end of the beam passes through the reinforcement cage to reach the other end, set up the front support 6 (the first front support, the second front support, the third front support), and at the same time put away the first middle support 5 (the first middle Support, the second intermediate support, the third intermediate support), after continuing to move the molding machine to reach the predetermined position, set up the intermediate support 5 (the first intermediate support, the second intermediate support, the third intermediate support) to bear the weight of the inner mold, The inner mold and outer mold are propped up by the hydraulic system for mold installation. Then the concrete is poured. After the poured concrete reaches the demoulding strength, the molding machine can quickly tighten the inner formwork 4 (the first inner formwork, the second inner formwork, and the third inner formwork) and separate them from the whole, and form them after pulling apart the outer formwork and end formwork The machine moves backward to achieve the purpose of demoulding. Outer formwork 1 front end formwork 2, is suspended on the walking trolley 7, makes them can adjust height up and down, thereby can make outer formwork 1, front end head formwork 2, and carry out sealing treatment between foundation and meet the mold sealing requirement. The outer template 1 and the front end template 2 are suspended on the walking trolley 7, so that they can move back and forth to achieve the purpose of demoulding and regrouping.

Claims (1)

1. a kind of Urban Underground pipe gallery scene rapidform machine, it includes carrying traveling wheel(7a)Walking carriage(7), its It is characterized in that:The walking carriage(7)Both sides set exterior sheathing(1), walking carriage(7)Front end set front end template (2), walking carriage(7)Rear end set follower head template(3);Exterior sheathing(1)Between the inner templates of four wall-shaped is set(4), it is interior Template(4)It is mounted in the crossbeam of load-bearing(8)On, crossbeam(8)Lower section sets folding front support(6)And intermediate supports(5), it is preceding Support(6)And intermediate supports(5)Lower section be both provided with back-up roller wheel(10);The crossbeam rear end of load-bearing is fixed on girder(9)On.
CN201720995704.6U 2017-08-10 2017-08-10 On-site rapid prototyping machine for urban underground comprehensive pipe gallery Active CN207244659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720995704.6U CN207244659U (en) 2017-08-10 2017-08-10 On-site rapid prototyping machine for urban underground comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720995704.6U CN207244659U (en) 2017-08-10 2017-08-10 On-site rapid prototyping machine for urban underground comprehensive pipe gallery

Publications (1)

Publication Number Publication Date
CN207244659U true CN207244659U (en) 2018-04-17

Family

ID=61879989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720995704.6U Active CN207244659U (en) 2017-08-10 2017-08-10 On-site rapid prototyping machine for urban underground comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN207244659U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326930A (en) * 2017-08-10 2017-11-07 明达地下空间科技发展有限公司 On-site rapid prototyping machine for urban underground comprehensive pipe gallery and its working method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326930A (en) * 2017-08-10 2017-11-07 明达地下空间科技发展有限公司 On-site rapid prototyping machine for urban underground comprehensive pipe gallery and its working method

Similar Documents

Publication Publication Date Title
CN201982108U (en) Single-track railway tunnel integral type full-hydraulic lining trolley
CN107326930A (en) On-site rapid prototyping machine for urban underground comprehensive pipe gallery and its working method
CN111941637B (en) Sectional prefabricating method for immersed tube joint
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN104097253B (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN107639719A (en) Movable prefabricated box girder formwork system and box beam preparation method
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN107882064A (en) A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN203768814U (en) High-pier minor-radius curve cast-in-situ box girder novel moving die carrier
CN105952482A (en) Self-propelled tunnel invert lining trolley
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN111424570A (en) Assembly type trolley for box culvert construction and construction method thereof
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN207567810U (en) A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN205223976U (en) Irrigation gallery concrete slipform device
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN204109135U (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN202658533U (en) Movable formwork of curved bridge with variable width
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN111139868B (en) Complete construction method for comprehensive pipe gallery
CN205936645U (en) A full liquid die plate system for culvert is pour
CN109355983B (en) Trackless construction method for urban rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210301

Address after: 1801, China Railway South headquarters building, 3333 Central Road, Yulan Coast Community, Yuehai street, Nanshan District, Shenzhen, Guangdong 518000

Patentee after: Shenzhen Mingda Underground Space Technology Development Co.,Ltd.

Address before: 116023 9, 2, 3 units of Mitutoyo building, 6A, Yiyang Road, Dalian high tech Industrial Park, Liaoning

Patentee before: MINGDA UNDERGROUND SPACE TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240423

Address after: 116000, Units 2 and 3, 9th Floor, Sanfeng Building, No. 6A Yiyang Road, High tech Industrial Park, Dalian City, Liaoning Province

Patentee after: MINGDA UNDERGROUND SPACE TECHNOLOGY DEVELOPMENT CO.,LTD.

Country or region after: China

Address before: 1801, China Railway South headquarters building, 3333 Central Road, Yulan Coast Community, Yuehai street, Nanshan District, Shenzhen, Guangdong 518000

Patentee before: Shenzhen Mingda Underground Space Technology Development Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240530

Address after: 1801, China Railway South headquarters building, 3333 Central Road, Yulan Coast Community, Yuehai street, Nanshan District, Shenzhen, Guangdong 518000

Patentee after: Shenzhen Mingda Underground Space Technology Development Co.,Ltd.

Country or region after: China

Address before: 116000, Units 2 and 3, 9th Floor, Sanfeng Building, No. 6A Yiyang Road, High tech Industrial Park, Dalian City, Liaoning Province

Patentee before: MINGDA UNDERGROUND SPACE TECHNOLOGY DEVELOPMENT CO.,LTD.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240705

Address after: 4A16, Building W2-A, Gaoxin Industrial Village, No. 025 Gaoxin South Fourth Road, Gaoxin Community, Yuehai Street, Nanshan District, Shenzhen City, Guangdong Province 518000

Patentee after: Shenzhen Mingwan Engineering Technology Co.,Ltd.

Country or region after: China

Address before: 1801, China Railway South headquarters building, 3333 Central Road, Yulan Coast Community, Yuehai street, Nanshan District, Shenzhen, Guangdong 518000

Patentee before: Shenzhen Mingda Underground Space Technology Development Co.,Ltd.

Country or region before: China