CN215631972U CN202122301776.5U CN202122301776U CN215631972U CN 215631972 U CN215631972 U CN 215631972U CN 202122301776 U CN202122301776 U CN 202122301776U CN 215631972 U CN215631972 U CN 215631972U
Authority
CN
China
Prior art keywords
cross beam
adjustable
shed
fixed
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122301776.5U
Other languages
Chinese (zh)
Inventor
张永榜
李青林
王素丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dazhi Construction Co ltd
Original Assignee
Henan Dazhi Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dazhi Construction Co ltd filed Critical Henan Dazhi Construction Co ltd
Priority to CN202122301776.5U priority Critical patent/CN215631972U/en
Application granted granted Critical
Publication of CN215631972U publication Critical patent/CN215631972U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a building material protection shed in a building site, which comprises a first protection shed, wherein the first protection shed comprises two first rails arranged on the ground at intervals, a first driving mechanism is arranged on the first rails, first stand columns are arranged on the first driving mechanism, a first shed top is arranged between the tops of the first stand columns on two sides, a plurality of first shelf cross beams are arranged between the first stand column on the left side and the first stand column on the right side, each first shelf cross beam comprises a first fixed cross beam and a first adjustable cross beam, the first fixed cross beam is fixedly arranged on the first stand columns, and a first self-locking oil cylinder is arranged between the first fixed cross beam and the first adjustable cross beam. The utility model not only can axially walk to further change the protection space so as to adapt to the position requirements of different construction period processes, but also is internally provided with the shelf beam, and the height of the shelf beam is adjustable, so that the utility model can be suitable for storing various building materials and can also be suitable for storing special-shaped profiles.

Description

Building material protection canopy in building site
Technical Field
The utility model relates to the technical field of building material protection sheds, in particular to a building material protection shed in a building site.
Background
The building material protective shed is used for storing building materials used in the construction process, particularly for high-rise building construction China, a large number of building materials with different specifications need to be constructed, and the most common building materials are steel bars, section bars and the like. Because the shape, the size difference of reinforcing bar and section bar are very big, reinforcing bar protection canopy and section bar protection canopy set up respectively among the prior art, this kind of embodiment not only can occupy a large amount of job site areas, but also need design different figurative protection canopy according to the specification and the size of section bar and reinforcing bar, and the construction is complicated as engineering material auxiliary device, and the commonality is poor.
Disclosure of Invention
Aiming at the defects in the background art, the utility model provides a building material protection shed in a building site, which solves the technical problem of low universality caused by single function of the existing building material protection shed.
The technical scheme of the utility model is realized as follows: the utility model provides a building material protection canopy in building site, including first protection canopy, first protection canopy includes that the interval sets up two first tracks subaerial, be provided with first actuating mechanism on the first track, be provided with first stand on the first actuating mechanism, set up first shed top between the top of the first stand of both sides, be provided with the first goods shelves crossbeam of a plurality of between the first stand on left first stand and right side, first goods shelves crossbeam includes first fixed cross beam and first adjustable crossbeam, first fixed cross beam is fixed to be set up on first stand, be provided with first auto-lock hydro-cylinder on the first fixed cross beam, first adjustable crossbeam passes through first auto-lock hydro-cylinder and links to each other with first fixed cross beam, the tip of first transfer crossbeam is in the horizontal direction with first stand stopper cooperation.
The first protection shed is provided with a first protection shed periphery, the first protection shed comprises two first rails arranged on the ground at intervals, a first driving mechanism is arranged on the first rails, a first upright column is arranged on the first driving mechanism, a first shed top is arranged between the tops of the first upright columns on two sides, a plurality of first shelf cross beams are arranged between the first upright columns on the left side and the second upright columns on the right side, each second shelf cross beam comprises a first fixed cross beam and a first adjustable cross beam, the first fixed cross beam is fixedly arranged on the first upright columns, a first self-locking oil cylinder is arranged on the first fixed cross beam, the first adjustable cross beam is connected with the first fixed cross beam through the first self-locking oil cylinder, and the end portion of the first adjustable cross beam is in blocking fit with the first upright columns in the horizontal direction.
Further, first track and second track are the I-shaped track, first actuating mechanism and second actuating mechanism all include the gyro wheel that matches with the I-shaped track, and the both ends of gyro wheel are provided with spacing end plate.
Further, first stand and second stand are the channel-section steel, and first adjustable crossbeam second adjustable crossbeam is the I-steel and the tip all is provided with rolling mechanism, and rolling mechanism and channel-section steel roll cooperation.
Further, the rolling mechanism comprises a roller carrier fixed with the I-shaped steel in a welding mode, a fixed shaft is arranged on the roller carrier, and a roller matched with the channel steel in a rolling mode is arranged on the fixed shaft.
Further, the height of the first fixed cross beam is lower than that of the second fixed cross beam, and the height of the second fixed cross beam is larger than 2 m.
The utility model not only can axially walk to further change the protection space so as to adapt to the position requirements of different construction period processes, but also is internally provided with the shelf beam, and the height of the shelf beam is adjustable, so that the utility model can be suitable for storing various building materials and can also be suitable for storing special-shaped profiles. Secondly, the two types of protection sheds are matched with each other, the second protection shed can be sleeved outside the first protection shed according to actual requirements, the first protection shed can also be retracted to the low position inside the protection shed, and part of the space in the second protection shed is free of the second shelf beam, otherwise the two protection sheds cannot be nested. In addition, when processing the building materials in the canopy, can set up adjustable crossbeam to different heights through the auto-lock hydro-cylinder, for example when processing the reinforcing bar, accessible above-mentioned mode sets up the reinforcing bar along its length slope to processing.
Drawings
In order to illustrate the embodiments of the utility model more clearly, the drawings that are needed in the description of the embodiments will be briefly described below, it being apparent that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be derived from those drawings by a person skilled in the art without inventive effort.
FIG. 1 is a front view of the present invention;
FIG. 2 is a transverse cross-sectional view of the engagement of the first adjustable cross member with the first upright;
FIG. 3 is an enlarged view taken at A in FIG. 1;
wherein:
10. the device comprises a first protection shed 1, a first track 2, a first driving mechanism 3 and a first upright post; 4. the system comprises a first shed roof, 5 a first shelf beam, 51 a first fixed beam, 52 a first adjustable beam, 6 a first self-locking oil cylinder;
7. a roller carrier 8, a fixed shaft 9 and a roller;
20. the second protection shed 21, the second track 22, the second driving mechanism 23, the second upright post 24, the second shed roof 25, the second shelf beam 251, the second fixed beam 252, the second adjustable beam 26, the second self-locking oil cylinder 27 and the limit end plate 27.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without inventive effort based on the embodiments of the present invention, are within the scope of the present invention.
A building material protection shed in a building site comprises a first protection shed 10 and a second protection shed 20, wherein the width and the height of the second protection shed 20 are both larger than those of the first protection shed 10, and the first protection shed 10 can be sleeved inside the second protection shed 20. When the first protection shed 10 is positioned outside the second protection shed 20, a large enough building material storage and processing space is provided for a construction site; when first protection canopy 10 is located inside second protection canopy 20, can save the job site area, still be convenient for use the crane to transfer away the work piece in the former coverage area.
Specifically, first protection canopy 10 includes that the interval sets up two first tracks 1 subaerial, is provided with first actuating mechanism 2 on the first track 1, and first actuating mechanism 2 includes driving motor, and driving motor is connected with and first track 1 complex rolling component, and rolling component walks along first track under driving motor's drive. The rolling part of the first track 1 is an I-shaped track, the rolling part is a roller matched with the I-shaped track, and two ends of the roller are provided with limiting end plates 27 which are not shown in the figure. First upright 3 is arranged on first actuating mechanism 2, first shed roof 4 is arranged between the tops of first upright 3 on two sides, and first upright 3 and first shed roof 4 can walk along first track 1 under the driving action of first actuating mechanism 2.
A plurality of first shelf cross beams 5 are arranged between the first upright post 3 on the left side and the first upright post 3 on the right side, and the first shelf cross beams 5 are used for bearing building materials in a layered mode. The first shelf beam 5 comprises a first fixed beam 51 and a first adjustable beam 52, the first fixed beam 51 being fixedly arranged on the first upright 3. The first fixed cross beam 51 is provided with a first self-locking oil cylinder 6, and the first adjustable cross beam 52 is connected with the first fixed cross beam 51 through the first self-locking oil cylinder 6. When the building materials with different specifications and shapes need to be borne, the first self-locking oil cylinder 6 adjusts the distance between the first fixed cross beam 51 and the first adjustable cross beam through lifting.
Further, as shown in fig. 2, in order to sufficiently ensure the stability during adjustment, the end of the first adjusting beam 52 is engaged with the first column 3 in a blocking manner in the horizontal direction. The first upright column 3 is a channel steel, the first adjustable cross beam 52 is an I-steel, the end parts of the first adjustable cross beam are provided with rolling mechanisms, and the rolling mechanisms are matched with the channel steel in a rolling mode. The rolling mechanism comprises a roller carrier 7 fixed with the I-shaped steel in a welding mode, a fixed shaft 8 is arranged on the roller carrier 7, and a roller 9 matched with the channel steel in a rolling mode is arranged on the fixed shaft 8.
Similarly, as shown in fig. 3, the second shelter 20 includes two second rails 21 disposed on the ground at an interval, a second driving mechanism 22 is disposed on the second rails 21, the second driving mechanism 22 includes a driving motor, the driving motor is connected to a rolling component engaged with the second rails 21, and the rolling component travels along the second rails 21 under the driving of the driving motor. The rolling part of the second track 21 is an I-shaped track, the rolling part is a roller matched with the I-shaped track, and two ends of the roller are provided with limiting end plates 27. The second driving mechanism 22 is provided with a second upright column 23, a second shed roof 24 is arranged between the tops of the second upright columns 23 on two sides, and the second upright columns 23 and the second shed roof 24 can walk along the second track 21 under the driving action of the second driving mechanism 22.
A plurality of second shelf cross beams 25 are arranged between the left second upright post 23 and the right second upright post 23, the second shelf cross beams 25 are used for bearing building materials in a layered mode, and can be matched with the first shelf cross beams 5 to bear the building materials together. The second shelf beam 25 comprises a second fixed beam 251 and a second adjustable beam 252, the second fixed beam 251 is fixedly arranged on the second upright column 23, a second self-locking oil cylinder 26 is arranged on the second fixed beam 251, the second adjustable beam 252 is connected with the second fixed beam 251 through the second self-locking oil cylinder 26, and when building materials with different specifications and shapes need to be loaded, the second self-locking oil cylinder 26 adjusts the distance between the second fixed beam 251 and the second adjustable beam 252 through lifting.
Further, similar to fig. 2, in order to ensure the stability during adjustment, the end of the second adjustable beam 252 is engaged with the second upright 23 in a stopping manner in the horizontal direction. The second upright 23 is a channel steel, the second adjustable beam 252 is an i-steel, and the end parts of the second adjustable beam are provided with rolling mechanisms, and the rolling mechanisms are in rolling fit with the channel steel. The rolling mechanism comprises a roller carrier 7 fixed with the I-shaped steel in a welding mode, a fixed shaft 8 is arranged on the roller carrier 7, and a roller 9 matched with the channel steel in a rolling mode is arranged on the fixed shaft 8.
Further, the height of the first fixed beam 51 is lower than that of the second fixed beam 251, and the height of the second fixed beam 251 is greater than 2m, so that the operation of a worker is facilitated.
Nothing in this specification is intended to be exhaustive of all conventional and well known techniques.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (6)

1. The utility model provides a building material protection canopy in building site, includes first protection canopy (10), and first protection canopy (10) are provided with first actuating mechanism (2) including interval setting two first tracks (1) subaerial on first track (1), are provided with first stand (3) on first actuating mechanism (2), set up first shed roof (4) between the top of the first stand of both sides (3), its characterized in that: a plurality of first shelf cross beams (5) are arranged between the first upright (3) on the left side and the first upright (3) on the right side, each first shelf cross beam (5) comprises a first fixed cross beam (51) and a first adjustable cross beam (52), each first fixed cross beam (51) is fixedly arranged on the corresponding first upright (3), each first fixed cross beam (51) is provided with a first self-locking oil cylinder (6), each first adjustable cross beam (52) is connected with the corresponding first fixed cross beam (51) through the corresponding first self-locking oil cylinder (6), and the end part of each first adjustable cross beam (52) is in blocking fit with the corresponding first upright (3) in the horizontal direction.
2. A protective shed of construction material in a construction site according to claim 1, wherein: the periphery of the first protection shed (10) is provided with a second protection shed (20), the second protection shed (20) comprises two second rails (21) which are arranged on the ground at intervals, a second driving mechanism (22) is arranged on the second rails (21), second upright posts (23) are arranged on the second driving mechanism (22), a second shed top (24) is arranged between the tops of the second upright posts (23) on the two sides, a plurality of second shelf cross beams (25) are arranged between the second upright post (23) on the left side and the second upright post (23) on the right side, each second shelf cross beam (25) comprises a second fixed cross beam (251) and a second adjustable cross beam (252), the second fixed cross beams (251) are fixedly arranged on the second upright posts (23), second self-locking oil cylinders (26) are arranged on the second fixed cross beams (251), and the second adjustable cross beams (252) are connected with the second fixed cross beams (251) through the second self-locking oil cylinders (26), the end part of the second adjustable beam (252) is matched with the second upright post (23) in a blocking way in the horizontal direction.
3. A protective shed of construction material in a construction site according to claim 2, wherein: first track (1) and second track (21) are the I-shaped track, first actuating mechanism (2) and second actuating mechanism (22) all include the gyro wheel that matches with the I-shaped track, and the both ends of gyro wheel are provided with spacing end plate (27).
4. A protective shed for construction material in a construction site according to claim 2 or 3, characterized in that: the first upright post (3) and the second upright post (23) are both channel steel, the first adjustable cross beam (52) and the second adjustable cross beam (252) are both I-shaped steel, the end parts of the two adjustable cross beams are both provided with rolling mechanisms, and the rolling mechanisms are in rolling fit with the channel steel.
5. A shelter for construction material in a construction site as claimed in claim 4, wherein: the rolling mechanism comprises a roller carrier (7) welded and fixed with the I-shaped steel, a fixed shaft (8) is arranged on the roller carrier (7), and a roller (9) matched with the channel steel in a rolling mode is arranged on the fixed shaft (8).
6. A shelter for construction material in a construction site as claimed in claim 5, wherein: the position height of the first fixed cross beam (51) is lower than that of the second fixed cross beam (251), and the height of the second fixed cross beam (251) is more than 2 m.
CN202122301776.5U 2021-09-23 2021-09-23 Building material protection canopy in building site Active CN215631972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122301776.5U CN215631972U (en) 2021-09-23 2021-09-23 Building material protection canopy in building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122301776.5U CN215631972U (en) 2021-09-23 2021-09-23 Building material protection canopy in building site

Publications (1)

Publication Number Publication Date
CN215631972U true CN215631972U (en) 2022-01-25

Family

ID=79918756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122301776.5U Active CN215631972U (en) 2021-09-23 2021-09-23 Building material protection canopy in building site

Country Status (1)

Country Link
CN (1) CN215631972U (en)

Similar Documents

Publication Publication Date Title
EP3429947B1 (en) System of a retrieval machine and a transport and handover system for storing and removing or relocating standard container in high-bay warehouses, and storage
EP0309487B1 (en) Storage system, in particular a parking system
EP3243769A1 (en) Method and storage device for storing piece goods with bridgeable shelf rows
EP0029073B1 (en) Warehouse for storing piece-goods
EP1478584A1 (en) Storage retrieval system comprising a load receiving element
CN103046477A (en) Traveling-rail-free type triangular hanging basket traveling construction method
CN215631972U (en) Building material protection canopy in building site
DE3205765C2 (en) Device for the storage and retrieval of self-supporting pallets for cantilever rack storage
DE102007060730B4 (en) Einfahrregalsystem
AT507334B1 (en) STACKER UNIT
DE4325446A1 (en) Storage and retrieval unit with counterweight arrangement
DE3435690C2 (en)
DE3545254C2 (en)
CN214783330U (en) Lifting construction platform for deck bridge
CN217946489U (en) Novel belt conveyor belt storage bin is with carrying belted vehicle
CN203764685U (en) Truck correction platform
CN216863438U (en) Rigid truss type stacking machine
DE102004043575B4 (en) Plant for charging the batteries of forklifts
CN220393129U (en) Portal crane with adjustable span
CN214168787U (en) Special box girder stretch-draw protection canopy of frame-type
CN212865606U (en) Aerial working safety platform for box girder construction
CN218318997U (en) Translation dolly of aluminum alloy coiled material transfer apparatus
CN217105569U (en) Overhead traveling crane track support
CN216864681U (en) Iron-making bin cloth track
CN211496233U (en) Steel coil feeding trolley