CN215631788U - Pipeline fixing structure - Google Patents

Pipeline fixing structure Download PDF

Info

Publication number
CN215631788U
CN215631788U CN202121252711.XU CN202121252711U CN215631788U CN 215631788 U CN215631788 U CN 215631788U CN 202121252711 U CN202121252711 U CN 202121252711U CN 215631788 U CN215631788 U CN 215631788U
Authority
CN
China
Prior art keywords
pressure reducing
floor
fixing structure
node sleeve
floor body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121252711.XU
Other languages
Chinese (zh)
Inventor
龙永焯
田景杨
黎智坚
黄峻峰
凌文定
何娟娟
翁文彪
陈伯科
李晓君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Building Development & Construction Co ltd
Original Assignee
Guangzhou Building Development & Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Building Development & Construction Co ltd filed Critical Guangzhou Building Development & Construction Co ltd
Priority to CN202121252711.XU priority Critical patent/CN215631788U/en
Application granted granted Critical
Publication of CN215631788U publication Critical patent/CN215631788U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A pipeline fixing structure comprises a pre-buried line box, a floor body, a prefabricated shear wall and a node sleeve body; the prefabricated shear wall is connected with the floor body; the embedded wire box is arranged on the floor body; the node sleeve bodies are respectively arranged on the prefabricated shear wall and the floor body, and the outlet ends of the node sleeve bodies of the prefabricated shear wall and the outlet ends of the node sleeve bodies of the floor body are oppositely arranged; the outlet end of the node sleeve body positioned on the floor body extends out of the embedded wire box; and a fixed support connected with the node sleeve body is arranged in the embedded wire box. The deviation condition of the pipeline can be prevented from being easily caused in the pouring process of the pipeline arranged on the floor body, so that the outlet end of the node sleeve body arranged on the prefabricated shear wall is opposite to the outlet end of the node sleeve body arranged on the floor body, and subsequent pipeline installation is not influenced.

Description

Pipeline fixing structure
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a pipeline fixing structure.
Background
At present, in the middle of the wall body is built, in order to enable the wall surface to look more attractive and tidy, the lines of wires and the like are generally embedded in the wall body, namely, the pipelines are laid in the wall body in advance, the pipelines are used for electrifying the wires, the wires are reduced to be exposed outside the wall body, and a plurality of embedded wire boxes can be reserved in places needing sockets or switches.
In the pipeline embedded structure of the traditional assembly type structure on the market at present, the pipeline arranged on the floor body is only simply fixed on the horizontal plane of the floor body, and the deviation condition of the pipeline is easily caused in the pouring process, so that the subsequent pipeline installation is influenced.
Disclosure of Invention
In order to overcome the above disadvantages of the prior art, the present invention provides a pipeline fixing structure, which aims to solve the problems of the prior art.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows:
a pipeline fixing structure comprising:
pre-burying a wire box, a floor body, a prefabricated shear wall and a node sleeve body;
the prefabricated shear wall is connected with the floor body;
the embedded wire box is arranged on the floor body;
the node sleeve bodies are respectively arranged on the prefabricated shear wall and the floor body, and the outlet ends of the node sleeve bodies of the prefabricated shear wall and the outlet ends of the node sleeve bodies of the floor body are oppositely arranged;
the outlet end of the node sleeve body positioned on the floor body extends out of the embedded wire box;
and a fixed support connected with the node sleeve body is arranged in the embedded wire box.
Preferably, floor slab reinforcing steel bars are arranged in the floor body, and the fixed support is connected with the floor slab reinforcing steel bars.
Preferably, the fixed bolster includes the fixed steel bar, the fixed steel bar set up in around the node cover body be equipped with the framework reinforcing bar on the fixed steel bar, the fixed steel bar with the junction of framework reinforcing bar is equipped with the iron wire spare.
Preferably, the fixed steel bars are connected with the frame steel bars to form a fixed clamping part, and the node sleeve body of the floor body is matched with the fixed clamping part.
Preferably, the pre-buried line box comprises a line box body, a line box sealing device and a supporting device, wherein the line box sealing device is connected with the opening of the line box body, and the supporting device is connected with the line box body.
Preferably, the thread box sealing device comprises a cover body assembly and a decompression cotton body assembly, the cover body assembly is arranged at the opening of the thread box body, the decompression cotton body assembly is accommodated in the cover body assembly, and two ends of the decompression cotton body assembly are respectively connected with the inner side wall of the cover body assembly.
Preferably, the junction box body is provided with a wiring port for the node sleeve body to pass through.
Preferably, the decompression cotton body assembly comprises a decompression sponge body and a decompression pearl cotton body, and the decompression sponge body is connected with the decompression pearl cotton body.
Preferably, the decompression sponge body and the decompression pearl cotton body both have cuboid structures, and the thicknesses of the decompression sponge body and the decompression pearl cotton body are 10-15 mm.
Preferably, the supporting device comprises a base supporting component and a pressure reducing spring, the base supporting component is arranged on the outer side wall of the pre-buried wire box, the base supporting component is located on the pre-buried wire box and is far away from the opening end of the wire box body, and the pressure reducing spring is arranged at one end, away from the pre-buried wire box, of the base supporting component.
Compared with the prior art, the utility model has the beneficial effects that:
the pipeline fixing structure provided by the utility model can prevent the pipeline arranged on the floor body from easily causing deviation in the pouring process, so that the outlet end of the node sleeve body arranged on the prefabricated shear wall is arranged opposite to the outlet end of the node sleeve body arranged on the floor body, and subsequent pipeline installation is not influenced.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of the connection between the fixing bracket and the joint housing according to the present invention;
FIG. 3 is a structural view of a buried wire box of the present invention;
description of reference numerals:
1-embedded wire box, 2-floor body, 3-prefabricated shear wall, 4-node sleeve body, 5-floor slab steel bar, 6-fixed steel bar, 7-frame body steel bar, 8-wire box body, 9-cover body component, 10-pressure reduction cotton body component, 11-wiring port, 12-base support component and 13-pressure reduction spring.
Detailed Description
In order to make the technical problems solved, technical solutions adopted, and technical effects achieved by the present invention clearer, the technical solutions of the embodiments of the present invention are described in further detail below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "connected," "connected," and "fixed" are to be construed broadly, e.g., as meaning permanently connected, removably connected, or integral to one another; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present invention, unless otherwise expressly stated or limited, "above" or "below" a first feature means that the first and second features are in direct contact, or that the first and second features are not in direct contact but are in contact with each other via another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
Referring to fig. 1 to 3, an embodiment of the present invention provides a pipeline fixing structure, including:
pre-burying a wire box 1, a floor body 2, a prefabricated shear wall 3 and a node sleeve body 4;
the prefabricated shear wall 3 is connected with the floor body 2;
the embedded wire box 1 is arranged on the floor body 2;
the node sleeve bodies 4 are respectively arranged on the prefabricated shear wall 3 and the floor body 2, and the outlet ends of the node sleeve bodies 4 of the prefabricated shear wall 3 are opposite to the outlet ends of the node sleeve bodies 4 of the floor body 2;
the outlet end of the node sleeve body 4 positioned on the floor body 2 extends out of the embedded wire box 1;
and a fixed support connected with the node sleeve body 4 is arranged in the embedded wire box 1.
According to the pipeline fixing structure provided by the utility model, the pre-buried wire box 1 and the fixing support are arranged, so that the deviation condition of the pipeline easily caused in the pouring process of the pipeline arranged on the floor body 2 can be prevented, the outlet end of the node sleeve body 4 arranged on the prefabricated shear wall 3 is opposite to the outlet end of the node sleeve body 4 arranged on the floor body 2, and the subsequent pipeline installation is not influenced.
The specific operation method is as follows: firstly, making a pre-buried wire box 1, making a through hole for the node sleeve body 4 to pass through on the pre-buried wire box 1, installing the node sleeve body 4, installing a fixed support to enable the fixed support to be connected with the node sleeve body 4, covering the fixed support and the node sleeve body 4 with the pre-buried wire box 1, and dismantling the pre-buried wire box 1 and the fixed support after concrete pouring.
Specifically, the floor body 2 is internally provided with floor slab steel bars 5, and the fixed support is connected with the floor slab steel bars 5.
Specifically, the fixed bolster includes fixed reinforcement 6, fixed reinforcement 6 set up in around the node cover body 4 be equipped with framework reinforcing bar 7 on the fixed reinforcement 6, fixed reinforcement 6 with the junction of framework reinforcing bar 7 is equipped with the iron wire spare.
Specifically, the fixed steel bars 6 are connected with the frame steel bars 7 to form a fixed clamping portion, and the node sleeve body 4 of the floor body 2 is matched with the fixed clamping portion.
Specifically, pre-buried line box 1 includes line box body 8, line box closing device and strutting arrangement, line box closing device with line box body 8's opening is connected, strutting arrangement with line box body 8 is connected.
Specifically, the thread box sealing device comprises a cover body assembly 9 and a decompression cotton body assembly 10, wherein the cover body assembly 9 is arranged at the opening of the thread box body 8, the decompression cotton body assembly 10 is accommodated in the cover body assembly 9, and two ends of the decompression cotton body assembly 10 are respectively connected with the inner side wall of the cover body assembly 9.
By adopting the structure, the structure of the decompression cotton body assembly 10 is adopted, when the building shaping template is dismantled, the cover body assembly 9 can rebound to expose the blank wall body under the elastic action of the decompression cotton body assembly 10, so that the procedure of positioning and chiseling the opening of the wire box body 8 of the embedded wire box 1 is omitted.
Specifically, the junction box body 8 is provided with a wiring port 11 through which the junction box body 4 passes.
Specifically, the pressure reducing cotton assembly 10 comprises a pressure reducing sponge body and a pressure reducing pearl cotton body, wherein the pressure reducing sponge body is connected with the pressure reducing pearl cotton body.
Specifically, the decompression sponge body and the decompression pearl cotton body both have cuboid structures, and the thicknesses of the decompression sponge body and the decompression pearl cotton body are 10-15 mm.
Specifically, strutting arrangement includes base supporting component 12 and relief spring 13, base supporting component 12 set up in on the lateral wall of pre-buried line box 1, just base supporting component 12 is located on the pre-buried line box 1 and keep away from the opening one end of line box body 8, relief spring 13 set up in base supporting component 12 keeps away from the one end of pre-buried line box 1.
By adopting the structure, when the pressure reducing spring 13 is helpful for dismantling the building shaping template, the cover body assembly 9 is exposed, the secondary decoration of the blank wall body is not needed, the opening of the wire box body 8 is plugged and prevented from being blocked, and the positioning and chiseling are not needed, so that the wall body is prevented from being damaged when the positioning and chiseling are carried out, the implementation process can be shortened, the working efficiency is improved, and the labor cost and the material cost are reduced.
In the description herein, it is to be understood that the terms "upper," "lower," "left," "right," and the like are used in an orientation or positional relationship merely for convenience in description and simplicity of operation, and do not indicate or imply that the referenced device or element must have a particular orientation, configuration, and operation in a particular orientation, and therefore should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used merely for descriptive purposes and are not intended to have any special meaning.
In the description herein, references to the description of "an embodiment," "an example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be appropriately combined to form other embodiments as will be appreciated by those skilled in the art.
The technical principle of the present invention is described above in connection with specific embodiments. The description is made for the purpose of illustrating the principles of the utility model and should not be construed in any way as limiting the scope of the utility model. Based on the explanations herein, those skilled in the art will be able to conceive of other embodiments of the present invention without inventive effort, which would fall within the scope of the present invention.

Claims (10)

1. A pipeline fixing structure, comprising:
pre-burying a wire box, a floor body, a prefabricated shear wall and a node sleeve body;
the prefabricated shear wall is connected with the floor body;
the embedded wire box is arranged on the floor body;
the node sleeve bodies are respectively arranged on the prefabricated shear wall and the floor body, and the outlet ends of the node sleeve bodies of the prefabricated shear wall and the outlet ends of the node sleeve bodies of the floor body are oppositely arranged;
the outlet end of the node sleeve body positioned on the floor body extends out of the embedded wire box;
and a fixed support connected with the node sleeve body is arranged in the embedded wire box.
2. The pipeline fixing structure according to claim 1, wherein floor slab reinforcing bars are provided in the floor body, and the fixing bracket is connected with the floor slab reinforcing bars.
3. The pipeline fixing structure according to claim 1, wherein the fixing bracket comprises a fixing steel bar, the fixing steel bar is disposed around the joint sleeve body, a frame steel bar is disposed on the fixing steel bar, and a wire member is disposed at a joint of the fixing steel bar and the frame steel bar.
4. The pipeline fixing structure of claim 3, wherein the fixing steel bars are connected with the frame steel bars to form a fixing clamping portion, and the node sleeves of the floor body are matched with the fixing clamping portion.
5. The line fixing structure according to claim 1, wherein the pre-buried cassette comprises a cassette body, a cassette closure device connected to an opening of the cassette body, and a support device connected to the cassette body.
6. The pipeline fixing structure according to claim 5, wherein the thread cassette sealing device comprises a cover assembly and a pressure reducing cotton assembly, the cover assembly is disposed at the opening of the thread cassette body, the pressure reducing cotton assembly is accommodated in the cover assembly, and two ends of the pressure reducing cotton assembly are respectively connected to the inner side wall of the cover assembly.
7. The pipeline fixing structure according to claim 6, wherein the junction box body is provided with a wire connection port through which the junction box body passes.
8. The pipeline fixing structure according to claim 6, wherein the pressure reducing cotton assembly comprises a pressure reducing sponge and a pressure reducing pearl cotton body, and the pressure reducing sponge is connected with the pressure reducing pearl cotton body.
9. The pipeline fixing structure according to claim 8, wherein the pressure reducing sponge and the pressure reducing pearl wool each have a rectangular parallelepiped structure, and the thickness of each of the pressure reducing sponge and the pressure reducing pearl wool is 10mm to 15 mm.
10. The pipeline fixing structure according to claim 5, wherein the supporting device comprises a base supporting component and a pressure reducing spring, the base supporting component is arranged on the outer side wall of the embedded junction box and is located on the embedded junction box and far away from one end of the opening of the junction box body, and the pressure reducing spring is arranged at one end of the base supporting component far away from the embedded junction box.
CN202121252711.XU 2021-06-04 2021-06-04 Pipeline fixing structure Expired - Fee Related CN215631788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121252711.XU CN215631788U (en) 2021-06-04 2021-06-04 Pipeline fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121252711.XU CN215631788U (en) 2021-06-04 2021-06-04 Pipeline fixing structure

Publications (1)

Publication Number Publication Date
CN215631788U true CN215631788U (en) 2022-01-25

Family

ID=79941588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121252711.XU Expired - Fee Related CN215631788U (en) 2021-06-04 2021-06-04 Pipeline fixing structure

Country Status (1)

Country Link
CN (1) CN215631788U (en)

Similar Documents

Publication Publication Date Title
CN215631788U (en) Pipeline fixing structure
CN211315328U (en) Multidimensional connecting piece for comprehensive pipeline supporting system
CN212294761U (en) A prefabricated apron for shutoff post-cast strip
CN213656305U (en) Hydrogenation panel of mobile container hydrogenation pry
CN210067006U (en) Assembled wall component with built-in electric pipeline and assembled wallboard installation system
CN209425742U (en) A kind of prefabricated panel window opening mold of the pre-buried window frame of band
JP2838511B2 (en) Buried concrete
KR200242769Y1 (en) structure of a terminal box
CN215671288U (en) Local equipotential downlead mounting structure of prefabricated building bathroom
KR200344283Y1 (en) Protective Device for Lay a pipe of Electric Wire
KR20210123982A (en) Non removing form assembly with insulation and method for constructing beam structure using the same
JP3019742U (en) BOX type tension vertical joint groove
CN218843805U (en) A protection device for indoor piping erection
JP3908331B2 (en) Concrete box and support system
CN210372564U (en) Main base structure of low-power reciprocating compressor unit
JP3585361B2 (en) End cover member of piping duct
CN215771587U (en) Grounding device is consolidated to regulator cubicle
JP3011881U (en) Boiler with pipe outlets on the left and right
CN215009537U (en) Cable fire-proof plate integral type support
CN209907934U (en) Boundary beam template clamp and boundary beam fixing device
CN218511075U (en) Openable wall decoration air port
CN214884668U (en) Stone curtain wall fixing structure
KR200423796Y1 (en) A duct for bus bar
CN214204664U (en) Cable construction box
CN110158711B (en) Precast concrete caisson for toilet and construction method based on caisson

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220125