CN215630638U - Interior decoration high strength fossil fragments connection structure - Google Patents

Interior decoration high strength fossil fragments connection structure Download PDF

Info

Publication number
CN215630638U
CN215630638U CN202121460293.3U CN202121460293U CN215630638U CN 215630638 U CN215630638 U CN 215630638U CN 202121460293 U CN202121460293 U CN 202121460293U CN 215630638 U CN215630638 U CN 215630638U
Authority
CN
China
Prior art keywords
keel
connection structure
high strength
fixed
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121460293.3U
Other languages
Chinese (zh)
Inventor
朱高峰
施浙锋
施国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Gaoxin Construction Co ltd
Original Assignee
Zhejiang Gaoxin Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Gaoxin Construction Co ltd filed Critical Zhejiang Gaoxin Construction Co ltd
Priority to CN202121460293.3U priority Critical patent/CN215630638U/en
Application granted granted Critical
Publication of CN215630638U publication Critical patent/CN215630638U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports Or Holders For Household Use (AREA)

Abstract

The utility model belongs to the technical field of interior decoration, and particularly relates to a high-strength keel connecting structure for interior decoration. The light steel keel support device can install and fix light steel keels with various types and specifications by arranging the fixing holes, so that the support hook can be suitable for various installation occasions, is more convenient to use, can prevent the main keel from being clamped when the main keel is arranged on the first movable hook by arranging the connecting groove and reserving a space on the connecting groove, and ensures that the first support plate can be installed smoothly in the installation process.

Description

Interior decoration high strength fossil fragments connection structure
Technical Field
The utility model relates to the technical field of interior decoration, in particular to an interior decoration high-strength keel connecting structure.
Background
The keel is a building material for supporting modeling and fixing structures, is widely applied to hotels and waiting buildings, passenger stations, theaters, markets, factories, office buildings, old building transformation, indoor decoration setting, ceilings and other places, is a decorated framework and a base material, is very common in use, can be divided into wooden keels, light steel keels, aluminum alloy keels, steel keels and the like according to different manufacturing materials, is divided into ceiling keels, vertical wall keels (partition keels), floor keels, suspension keels and the like according to the use positions, and can be widely applied to the hotels and waiting buildings. According to different decoration construction processes, bearing keels and non-bearing keels (namely the accessible keels and the inaccessible keels) are arranged.
There are the following problems:
1. current fossil fragments connection structure is installing fossil fragments, and the support couple has certain limitation, when facing the fossil fragments of different model specifications, can not install fossil fragments, and it is convenient inadequately to use.
2. The main joist blocks the condition that can appear when installing main joist on first removal couple in the installation of current fossil fragments connection structure, influences going on smoothly of installation.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides an indoor decoration high-strength keel connecting structure, which solves the problem that keels with different specifications cannot be installed and can be clamped when main keels are installed.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an interior decoration high strength fossil fragments connection structure, includes light gauge steel, light gauge steel's surface fixed mounting has the support couple, the medial surface that supports the couple is provided with the fixed orifices, the medial surface of fixed orifices is provided with fixing bolt, fixing nut is installed to fixing bolt's surface screw thread, light gauge steel's up end movable mounting has first removal couple, the medial surface of first removal couple is provided with connecting groove, the lower terminal surface of first removal couple is provided with first support end, the up end fixed mounting who supports the couple has fixed jib.
As a preferable aspect of the present invention, a third nut is threadedly mounted on an outer surface of the fixed boom, and a fourth nut is disposed below the third nut.
As a preferred technical scheme of the utility model, the lower end face of the light steel keel is fixedly provided with a main keel, and the inner side face of the connecting groove is fixedly provided with a first supporting plate edge.
As a preferable technical scheme of the present invention, a second movable hook is fixedly installed on an outer surface of the main keel, and a fixing groove is formed on an outer surface of the second movable hook.
As a preferable technical scheme of the present invention, a second support end is provided on a lower end surface of the second movable hook, an auxiliary keel is fixedly installed on a lower end surface of the main keel, and an installation groove is provided on a lower end surface of the auxiliary keel.
As a preferable technical scheme of the utility model, the upper end face of the second support end is provided with a second support plate edge, and the light steel keel, the main keel and the auxiliary keel are all made of aluminum alloy.
As a preferred technical scheme, the fixing bolt is made of low-carbon alloy steel, and the first movable hook and the second movable hook are made of galvanized carbon steel.
Compared with the prior art, the utility model provides an indoor decoration high-strength keel connecting structure, which has the following beneficial effects:
1. this interior decoration high strength fossil fragments connection structure through setting up the fixed orifices, can install the light gauge steel of multiple model specification fixed, makes the support couple can be applicable to multiple installation occasion, and is more convenient during the use.
2. This interior decoration high strength fossil fragments connection structure through setting up connecting grooves, through the space of reserving on the connecting grooves, can make the main joist adorn can not block when first removal couple, ensures that first backup pad limit can install smoothly in the installation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of a first moveable hanger of the present invention;
fig. 3 is a structural view of a second movable hook according to the present invention.
In the figure: 1. a light steel keel; 2. a support hook; 3. a fixing hole; 4. fixing the bolt; 5. fixing a nut; 6. a first movable hook; 7. a connecting groove; 8. a first support end; 9. a third nut; 10. fixing the suspender; 11. a fourth nut; 12. a main keel; 13. a first support panel edge; 14. a second movable hook; 15. fixing grooves; 16. a second support end; 17. a second support panel edge; 18. a false keel; 19. and (4) mounting the groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides an interior decoration high strength fossil fragments connection structure, including light gauge steel 1, the fixed surface of light gauge steel 1 installs support couple 2, the medial surface of support couple 2 is provided with fixed orifices 3, the medial surface of fixed orifices 3 is provided with fixing bolt 4, fixing nut 5 is installed to fixing bolt 4's surface screw thread, light gauge steel 1's up end movable mounting has first removal couple 6, the medial surface of first removal couple 6 is provided with connecting groove 7, the lower terminal surface of first removal couple 6 is provided with first support end 8, the up end fixed mounting who supports couple 2 has fixed jib 10.
In this embodiment, support couple 2 and can fix light gauge steel 1, fixed orifices 3 provide the mounted position for fixing bolt 4, fixing bolt 4 can prevent that light gauge steel 1 from appearing sliding, fixation nut 5 is used for making fixing bolt 4 keep the stationary state, first removal couple 6 links together light gauge steel 1 and main joist 12, connecting groove 7 is convenient for install first backup pad limit 13, first supporting end 8 supports first backup pad limit 13, fixed jib 10 can fix fossil fragments on the roof.
Specifically, a third nut 9 is threadedly mounted on the outer surface of the fixed boom 10, and a fourth nut 11 is disposed below the third nut 9.
In this embodiment, the third nut 9 and the fourth nut 11 are used in cooperation, so that the fixed hanger 10 can be firmly fixed to the support hook 2.
Specifically, the lower end face of the light steel keel 1 is fixedly provided with a main keel 12, and the inner side face of the connecting groove 7 is fixedly provided with a first supporting plate edge 13.
In this embodiment, the main keel 12 provides a mounting position for the second movable hook 14, and the first supporting plate edge 13 facilitates free clamping and fixing of the fixing groove 15.
Specifically, a second movable hook 14 is fixedly installed on the outer surface of the main keel 12, and a fixing groove 15 is formed on the outer surface of the second movable hook 14.
In this embodiment, the secondary removal hook 14 connects the main runner 12 to the cross runner 18, and the secondary support end 16 facilitates securing the secondary removal hook 14 to the main runner 12.
Specifically, a second support end 16 is arranged on the lower end surface of the second movable hook 14, an auxiliary keel 18 is fixedly arranged on the lower end surface of the main keel 12, and an installation groove 19 is arranged on the lower end surface of the auxiliary keel 18.
In this embodiment, the second supporting end 16 supports the second supporting plate edge 17, the cross runners 18 support the decorative plate, and the mounting grooves 19 facilitate mounting of the decorative plate.
Specifically, the upper end face of the second support end 16 is provided with a second support plate edge 17, and the light steel keel 1, the main keel 12 and the auxiliary keel 18 are all made of aluminum alloy.
In this embodiment, the second supporting plate edge 17 provides a supporting position for the second supporting end 16, and the light gauge steel 1, the main runner 12 and the cross runner 18 made of aluminum alloy have high strength and light weight.
Specifically, the fixing bolt 4 is made of low-carbon alloy steel, and the first moving hook 6 and the second moving hook 14 are made of galvanized carbon steel.
In this embodiment, the fixing bolt 4 made of low carbon alloy steel is not easily damaged, and the first moving hook 6 and the second moving hook 14 made of galvanized carbon steel can bear large pulling force.
The working principle and the using process of the utility model are as follows: when the keel is installed, a fixed suspender 10 is fixed on the roof, then a supporting hook 2 is installed on a light steel keel 1 in the same quantity according to the quantity of the fixed suspender 10, a first movable hook 6 is installed according to a preset interval, a third nut 9 is installed on the fixed suspender 10 after the installation is finished, then the supporting hook 2 is installed on the fixed suspender 10, the height of the supporting hook 2 is determined, a fourth nut 11 is installed on the fixed suspender 10 after the height is determined and is matched with the third nut 9 to fix the supporting hook 2, a fixing bolt 4 is installed on the supporting hook 2 after the supporting hook 2 is fixed, so that the light steel keel 1 can be tightly fixed in the supporting hook 2, when the light steel keel is fixed, the light steel keels 1 with various types and specifications can be installed and fixed through a reserved fixing hole 3, so that the supporting hook 2 can be suitable for various installation occasions, more convenient during the use, install the main joist 12 that has second removal couple 14 after light gauge steel 1 is fixed, carry out the in-process of installing main joist 12, through the space of reserving on connecting groove 7, can make main joist 12 adorn can not block when first removal couple 6, ensure that first backup pad limit 13 can install smoothly in the installation, after main joist 12 has installed, install false keel 18, make second removal couple 14 fix false keel 18, accomplish the installation work to fossil fragments.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides an interior decoration high strength fossil fragments connection structure, includes light gauge steel (1), its characterized in that: the utility model discloses a light steel keel's (1) support hook (2) is installed to fixed surface, the medial surface that supports hook (2) is provided with fixed orifices (3), the medial surface of fixed orifices (3) is provided with fixing bolt (4), fixation nut (5) are installed to the surface screw thread of fixing bolt (4), the up end movable mounting of light steel keel (1) has first removal couple (6), the medial surface of first removal couple (6) is provided with connecting groove (7), the lower terminal surface of first removal couple (6) is provided with first support end (8), the up end fixed mounting who supports hook (2) has fixed jib (10).
2. The interior trim high strength keel connection structure according to claim 1, wherein: and a third nut (9) is installed on the outer surface of the fixed suspender (10) in a threaded manner, and a fourth nut (11) is arranged below the third nut (9).
3. The interior trim high strength keel connection structure according to claim 1, wherein: the lower end face of the light steel keel (1) is fixedly provided with a main keel (12), and the inner side face of the connecting groove (7) is fixedly provided with a first supporting plate edge (13).
4. An interior trim high strength keel connection structure according to claim 3, wherein: the outer fixed surface of main joist (12) installs second removal couple (14), the surface of second removal couple (14) is provided with fixed slot (15).
5. The interior trim high strength keel connection structure according to claim 4, wherein: the lower terminal surface of second removal couple (14) is provided with second support end (16), the lower terminal surface fixed mounting of main joist (12) has false keel (18), the lower terminal surface of false keel (18) is provided with mounting groove (19).
6. An interior trim high strength keel connection structure according to claim 5, wherein: and a second supporting plate edge (17) is arranged on the upper end face of the second supporting end (16), and the light steel keel (1), the main keel (12) and the auxiliary keel (18) are all made of aluminum alloy.
7. The interior trim high strength keel connection structure according to claim 1, wherein: the fixing bolt (4) is made of low-carbon alloy steel, and the first movable hook (6) and the second movable hook (14) are made of galvanized carbon steel.
CN202121460293.3U 2021-06-30 2021-06-30 Interior decoration high strength fossil fragments connection structure Active CN215630638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121460293.3U CN215630638U (en) 2021-06-30 2021-06-30 Interior decoration high strength fossil fragments connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121460293.3U CN215630638U (en) 2021-06-30 2021-06-30 Interior decoration high strength fossil fragments connection structure

Publications (1)

Publication Number Publication Date
CN215630638U true CN215630638U (en) 2022-01-25

Family

ID=79946854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121460293.3U Active CN215630638U (en) 2021-06-30 2021-06-30 Interior decoration high strength fossil fragments connection structure

Country Status (1)

Country Link
CN (1) CN215630638U (en)

Similar Documents

Publication Publication Date Title
CN215630638U (en) Interior decoration high strength fossil fragments connection structure
CN201292595Y (en) Support framework for architectural decoration
CN216713553U (en) Fireproof environment-friendly curtain box
CN214833929U (en) Safe and space-saving ceiling structure
CN205890889U (en) A decorate mounting structure in automobile body for track engineering vehicle
CN212358798U (en) Assembled ceiling with triangular three-dimensional modeling design
CN209053322U (en) A kind of light gauge steel structure being easily installed
CN210049468U (en) Fast-assembling wall body smallpox binding off component and furred ceiling structure
CN220080476U (en) Light galvanized keel bracket
CN212773082U (en) Ceiling access hole repairing structure
CN212897122U (en) Keel piece for building
CN216042022U (en) Assembled curtain connection structure of decorating
CN216766461U (en) Suspended ceiling structure convenient to installation
CN217711331U (en) Combined clamping type keel for concealed frame
CN213979531U (en) Indoor floor end node structure
CN214785225U (en) Aluminum alloy suspended ceiling assembly convenient to overhaul
CN215442640U (en) Combined light steel keel building material
CN214833940U (en) Green environmental protection light gauge steel building frame
CN216641052U (en) Keel structure with adjustable
CN221118919U (en) Belt Kong Kashi bearing keel
CN212104967U (en) Unilateral self-balancing keel universal support
CN220266976U (en) Suspended ceiling partition structure with air outlet
CN216109502U (en) Iron keel convenient to install
CN218149192U (en) Connection structure of light gauge steel and wall body
CN216380213U (en) Clamping type suspended ceiling structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant