CN215595183U - Building engineering construction rail - Google Patents

Building engineering construction rail Download PDF

Info

Publication number
CN215595183U
CN215595183U CN202120663321.5U CN202120663321U CN215595183U CN 215595183 U CN215595183 U CN 215595183U CN 202120663321 U CN202120663321 U CN 202120663321U CN 215595183 U CN215595183 U CN 215595183U
Authority
CN
China
Prior art keywords
water pipe
connecting plate
mounting
piece
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120663321.5U
Other languages
Chinese (zh)
Inventor
王永泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Xingxu Construction Engineering Co ltd
Original Assignee
Tianjin Xingxu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Xingxu Construction Engineering Co ltd filed Critical Tianjin Xingxu Construction Engineering Co ltd
Priority to CN202120663321.5U priority Critical patent/CN215595183U/en
Application granted granted Critical
Publication of CN215595183U publication Critical patent/CN215595183U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a construction fence for constructional engineering, in particular to the technical field of construction safety, and the technical scheme is as follows: the spraying device comprises a handrail, a spraying part, a clamping part, a supporting part and a connecting part, wherein a nozzle of a spraying head is flat, the spraying head is in threaded connection with a rotating part, a first fixing part is sleeved on the outer wall of the upper end of the rotating part, a second fixing part is sleeved on the outer wall of the lower end of the rotating part, and water pipes are arranged on two sides of the rotating part, and the spraying device has the advantages that: the storage space is saved, the design of the whole device is more humanized, the operation is more convenient and rapid, the dust content in the air is reduced, the workers are prevented from working in the dust diffusion environment for a long time, and the influence of dust diffusion on the city appearance is reduced.

Description

Building engineering construction rail
Technical Field
The utility model relates to the technical field of construction safety, in particular to a construction fence for constructional engineering.
Background
The construction guardrail is made of an iron pipe, is manufactured by the layer-by-layer processes of bending, welding, grinding and polishing, high-pressure paint baking, film pasting and the like of the seamless iron pipe, and is generally widely applied to isolation and warning in construction places; isolation: the construction guardrail is generally commonly used for common roads, and highways also comprise crossroads, toll stations, bridges, parking lots, stations, wharfs, dangerous areas and road construction sections of all levels of highways, temporary barriers of meeting places and other places are used as road lane division, area enclosure safety isolation, shunt and guidance or used for order maintenance of some book-drawing celebration activities or sports and entertainment occasions, and can also be used for protecting and protecting equipment and facilities in factories, workshops, warehouses, parking lots, commercial districts, public places and other occasions; warning function: the construction guardrail body is black and is adhered with a remarkable reflective film, so that the construction guardrail has a remarkable warning effect on a driver, can reduce the casualty degree of people and vehicles during accident, and forms a safer effect. The anti-climbing.
The prior art has the following defects: building construction rail is used for the job site mostly, plays to enclose and keeps off the building site and prevents entering construction sites such as idle miscellaneous people, avoids the outsider mistake to break through the building site and meets accident, but the scene that the dust is diffused is many to the job site, and the worker works in the long-term such construction environment, causes bacterial infection easily to the eye, causes a series of eye diseases, causes the consequence of blindness even, and the diffusion of dust can cause great negative effects to the city appearance in a city in addition.
Therefore, the utility model is necessary to develop a construction fence for constructional engineering.
SUMMERY OF THE UTILITY MODEL
Therefore, the utility model provides a construction fence for constructional engineering, which utilizes the interaction of the spraying component, the clamping component, the supporting component and the connecting component to atomize water around a construction site by the spraying component to reduce dust so as to solve the problem of dust diffusion on the construction site.
In order to achieve the above purpose, the utility model provides the following technical scheme: a construction fence for building engineering comprises a railing, a spraying part, a clamping part, a supporting part and a connecting part; preferably, the top end of the handrail is fixedly connected with a second connecting plate, the bottom end of the handrail is fixedly connected with a first connecting plate, a supporting part is arranged below the first connecting plate, a clamping part is arranged above the second connecting plate, a water pipe is clamped on the inner wall of the clamping part, and a spraying part is arranged on the outer wall of the water pipe;
the spray part comprises a spray head, a nozzle of the spray head is flat, the spray head is in threaded connection with a rotating part, a first fixing part is sleeved on the outer wall of the upper end of the rotating part, a second fixing part is sleeved on the outer wall of the lower end of the rotating part, and water pipes are arranged on two sides of the rotating part.
Preferably, the water pipe is a UPVC pipe made of plastic materials, and has the characteristics of light weight, wear resistance and low possibility of breakage.
Preferably, be equipped with first connecting block on the first mounting, first mounting rotates the piece through first rivet connection, be equipped with the second connecting block on the second mounting, the second mounting rotates the piece through second rivet connection.
Preferably, be equipped with the external screw thread on the outer wall of water pipe kneck, be equipped with the internal thread on the first mounting inner wall, be equipped with the internal thread on the second mounting inner wall, it is equipped with the internal thread to rotate top end opening part, it still is equipped with first sheet rubber in recess and the recess to rotate the piece opening part, the second mounting is equipped with the second sheet rubber with second connecting block junction, the second mounting is equipped with the third sheet rubber with rotating the piece junction, third sheet rubber bottom is equipped with the stopper.
Preferably, the spray component is designed symmetrically, the first rubber sheets are arranged into one group, the second rubber sheets are arranged into two groups, the third rubber sheets are arranged into two groups, and the limiting blocks are arranged into two groups.
Preferably, the joint part includes the water pipe, the joint has C type joint spare on the water pipe outer wall, C type joint spare below is equipped with the third connecting plate, C type joint spare passes through the third rivet and connects the third connecting plate.
Preferably, the supporting component comprises a base and a first connecting plate, a base interface is arranged at the bottom end of the first connecting plate, and the base is detachably clamped inside the base interface.
Preferably, the connecting part comprises a hinge and a quick joint, a fourth rivet is arranged on the hinge, one end of the hinge is connected with a second connecting plate, one end, far away from the second connecting plate, of the hinge is connected with a next fence, one end of the quick joint is connected with a water pipe, and one end, far away from the water pipe, of the quick joint is connected with a next water pipe.
Preferably, the quick connector is made of soft plastic and can be bent.
Preferably, the water pipe sets up to five groups, the shower part sets up to four groups, the railing sets up to five groups, the support component sets up to two sets of, the hinge sets up to two sets of.
The utility model has the beneficial effects that:
1. the two fences are effectively assembled and disassembled through the hinges and the quick connectors, so that the operation is simple and the use is convenient in the use process, and the labor and the time are saved;
2. the base interface is arranged below the first connecting plate, so that the base can be quickly butted when in use, the base can be quickly disassembled when in recovery, and the two fences are folded through the hinges, so that the storage space is saved, the design of the whole device is more humanized, and the operation is more convenient and quicker;
3. through spray assembly with water atomization, carry out the dust fall to the job site effectively, reduce dust content in the air, avoid workman's long-time work in the diffuse environment of dust, reduced that the dust is diffused to the influence of city looks, environmental protection, science more of use, the practicality has obtained further promotion, is worth the later stage and uses widely.
Drawings
FIG. 1 is a schematic view of the overall structure provided by the present invention;
FIG. 2 is a front view provided by the present invention;
FIG. 3 is a cross-sectional view of a spray assembly provided by the present invention;
FIG. 4 is a side view provided by the present invention;
FIG. 5 is a schematic structural view of a clip member according to the present invention;
FIG. 6 is an enlarged view of the structure of area A in FIG. 3 according to the present invention;
FIG. 7 is an enlarged view of the structure of area B in FIG. 2 according to the present invention;
fig. 8 is a schematic structural view of a support member provided by the present invention.
In the figure: the base, 2 first connecting plate, 3 railing, 4 second connecting plates, 5 water pipes, 6 hinges, 7 quick-operation joint, 8 first mounting, 9 second mounting, 10 first connecting block, 11 second connecting block, 12 first rivet, 13 second rivet, 14 shower head, 15 first sheet rubber, 16 second sheet rubber, 17 third sheet rubber, 18 stopper, 19C type joint spare, 20 third connecting plate, 21 third rivet, 22 base interface, 23 fourth rivet, 24 rotation piece, 100 spray parts, 200 joint parts, 300 supporting parts, 400 adapting unit.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Referring to fig. 1 to 8, the construction fence for construction engineering provided by the present invention includes a rail 3, a spray part 100, a clamping part 200, a supporting part 300 and a connecting part 400; further, the top end of the handrail 3 is fixedly connected with a second connecting plate 4, the bottom end of the handrail 3 is fixedly connected with a first connecting plate 2, a supporting part 300 is arranged below the first connecting plate 2, a clamping part 200 is arranged above the second connecting plate 4, a water pipe 5 is clamped on the inner wall of the clamping part, and a spraying part 100 is arranged on the outer wall of the water pipe 5;
the spraying part 100 comprises a spraying head 14, a nozzle of the spraying head 14 is flat, the spraying head 14 is in threaded connection with a rotating part 24, a first fixing part 8 is sleeved on the outer wall of the upper end of the rotating part 24, a second fixing part 9 is sleeved on the outer wall of the lower end of the rotating part 24, and water pipes 5 are arranged on two sides of the rotating part 24;
furthermore, the water pipe 5 is a UPVC pipe made of plastic, has the characteristics of light weight, wear resistance and low possibility of breakage, and particularly reduces damage caused by collision in the carrying and using processes;
further, a first connecting block 10 is arranged on the first fixing piece 8, the first fixing piece 8 is connected with the rotating piece 24 through a first rivet 12, a second connecting block 11 is arranged on the second fixing piece 9, the second fixing piece 9 is connected with the rotating piece 24 through a second rivet 13, and specifically, the first fixing piece 8 and the second fixing piece are used for connecting two ends of the rotating piece 24 with an upper water pipe;
furthermore, an external thread is arranged on the outer wall of the joint of the water pipe 5, an internal thread is arranged on the inner wall of the first fixing piece 8, an internal thread is arranged on the inner wall of the second fixing piece 9, an internal thread is arranged at the opening of the top end of the rotating piece 24, a groove is further arranged at the opening of the rotating piece 24, a first rubber sheet 15 is arranged in the groove, a second rubber sheet 16 is arranged at the joint of the second fixing piece 9 and the second connecting block, a third rubber sheet 17 is arranged at the joint of the second fixing piece 9 and the rotating piece 24, a limiting block 18 is arranged at the bottom of the third rubber sheet 17, specifically, the rubber sheets are used for preventing water leakage and increasing resistance during rotation, and also have the function of fixing the position after the rotation is finished;
further, the spraying parts 100 are designed symmetrically, the first rubber sheets 15 are arranged in one group, the second rubber sheets 16 are arranged in two groups, the third rubber sheets 17 are arranged in two groups, the limiting blocks 18 are arranged in two groups, and specifically, the limiting blocks 18 are used for placing the first rubber sheets 15;
further, the clamping component 200 comprises a water pipe 5, a C-shaped clamping piece 19 is clamped on the outer wall of the water pipe 5, a third connecting plate 20 is arranged below the C-shaped clamping piece 19, the C-shaped clamping piece 19 is connected with the third connecting plate 20 through a third rivet 21, and particularly, the C-shaped clamping piece 19 can be used for rapidly disassembling and assembling the water pipe 5;
further, the supporting component 300 includes a base 1 and a first connecting plate 2, a base interface 22 is arranged at the bottom end of the first connecting plate 2, the base 1 is detachably clamped inside the base interface 22, and specifically, the base interface 22 is used for quickly disassembling and assembling the base 1;
further, the connecting part 400 comprises a hinge 6 and a quick connector 7, a fourth rivet 23 is arranged on the hinge 6, one end of the hinge 6 is connected with the second connecting plate 4, one end, far away from the second connecting plate 4, of the hinge 6 is connected with the next fence, one end, far away from the second connecting plate 4, of the quick connector 7 is connected with the water pipe 5, one end, far away from the water pipe 5, of the quick connector 7 is connected with the next water pipe, and particularly, the quick connector 7 is used for connecting the water pipes between the two fences, so that the disassembly and assembly are convenient;
furthermore, the quick connector 7 is made of soft plastic and can be bent, and particularly, the phenomenon that the connector is loosened and leaks water due to the movement of the fence in the use process is avoided;
further, water pipe 5 sets up to five groups, spray set 100 sets up to four groups, railing 3 sets up to five groups, support component 300 sets up to two sets of, hinge 5 sets up to two sets of, and is concrete, and spray set 100 is used for spraying water dust fall, reduces the diffuse phenomenon of dust in the air, reduces to work for a long time in the diffuse environment of dust, to the healthy influence of workman.
The using process of the utility model is as follows: when the dust-settling water pipe is used, the base 1 is placed on the ground, the whole fence is clamped on the base 1, the water pipe 5 is clamped on the inner wall of the C-shaped clamping piece 19, the two fences are connected through the hinge 6, the two water pipes are connected through the quick connector 7, the water pipe 5 is in threaded connection with the installation rotating piece 24, the rotating piece 24 is connected to the water pipe 5 through the first fixing piece 8 and the second fixing piece 9, the spraying head 14 is in threaded connection with the rotating piece 24, the angle is adjusted through the rotating piece 24, water is atomized through the spraying head 14, and dust settling is carried out on surrounding construction sites.
The above description is only a preferred embodiment of the present invention, and any person skilled in the art may modify the present invention or modify it into an equivalent technical solution by using the technical solution described above. Therefore, any simple modifications or equivalent substitutions made in accordance with the technical solution of the present invention are within the scope of the claims of the present invention.

Claims (10)

1. The utility model provides a building engineering construction rail, includes railing (3), spray component (100), joint part (200), support component (300) and adapting unit (400), railing (3) top fixedly connected with second connecting plate (4), railing (3) bottom fixedly connected with first connecting plate (2), its characterized in that: a supporting part (300) is arranged below the first connecting plate (2), a water pipe (5) is arranged above the second connecting plate (4) through a clamping part (200), and a spraying part (100) is arranged on the outer wall of the water pipe (5);
spray component (100) is including shower head (14), the spout of shower head (14) is the platykurtic, shower head (14) threaded connection is on rotating piece (24), rotate and cup jointed first mounting (8) on piece (24) upper end outer wall, rotate and cup jointed second mounting (9) on piece (24) lower extreme outer wall, it is equipped with water pipe (5) to rotate piece (24) both sides.
2. A construction work construction fence according to claim 1, characterized in that: the main body of the water pipe (5) is made of PVC material.
3. A construction work construction fence according to claim 1, characterized in that: be equipped with first connecting block (10) on first mounting (8), first mounting (8) are connected through first rivet (12) and are rotated piece (24), be equipped with second connecting block (11) on second mounting (9), second mounting (9) are connected through second rivet (13) and are rotated piece (24).
4. A construction work construction fence according to claim 3, characterized in that: be equipped with the external screw thread on the outer wall of water pipe (5) kneck, be equipped with the internal thread on first mounting (8) inner wall, be equipped with the internal thread on second mounting (9) inner wall, it is equipped with the internal thread to rotate piece (24) top end opening part, it still is equipped with recess and is equipped with first sheet rubber (15) to rotate piece (24) opening part, second mounting (9) are equipped with second sheet rubber (16) with second connecting block junction, second mounting (9) are equipped with third sheet rubber (17) with rotate piece (24) junction, third sheet rubber (17) bottom is equipped with stopper (18).
5. A construction work construction fence according to claim 4, characterized in that: the spray component (100) is designed symmetrically, the first rubber sheets (15) are arranged into one group, the second rubber sheets (16) are arranged into two groups, the third rubber sheets (17) are arranged into two groups, and the limiting blocks (18) are arranged into two groups.
6. A construction work construction fence according to claim 1, characterized in that: joint part (200) include water pipe (5), the joint has C type joint spare (19) on water pipe (5) outer wall, C type joint spare (19) below is equipped with third connecting plate (20), third connecting plate (20) are connected through third rivet (21) in C type joint spare (19).
7. A construction work construction fence according to claim 1, characterized in that: the supporting component (300) comprises a base (1) and a first connecting plate (2), a base interface (22) is arranged at the bottom end of the first connecting plate (2), and the base (1) is detachably clamped inside the base interface (22).
8. A construction work construction fence according to claim 1, characterized in that: adapting unit (400) includes hinge (6) and quick-operation joint (7), be equipped with fourth rivet (23) on hinge (6), hinge (6) one end is connected with second connecting plate (4), second connecting plate (4) one end connection next rail is kept away from in hinge (6), water pipe (5) are connected to quick-operation joint (7) one end, water pipe (5) one end connection next water pipe (5) are kept away from in quick-operation joint (7).
9. A construction work construction fence according to claim 8, characterized in that: the main body of the quick connector (7) is made of soft plastic materials.
10. A construction work construction fence according to claim 8, characterized in that: the water pipe (5) is set into five groups, the spraying parts (100) are set into four groups, the railing (3) is set into five groups, the supporting parts (300) are set into two groups, and the hinges (6) are set into two groups.
CN202120663321.5U 2021-04-01 2021-04-01 Building engineering construction rail Active CN215595183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120663321.5U CN215595183U (en) 2021-04-01 2021-04-01 Building engineering construction rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120663321.5U CN215595183U (en) 2021-04-01 2021-04-01 Building engineering construction rail

Publications (1)

Publication Number Publication Date
CN215595183U true CN215595183U (en) 2022-01-21

Family

ID=79871385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120663321.5U Active CN215595183U (en) 2021-04-01 2021-04-01 Building engineering construction rail

Country Status (1)

Country Link
CN (1) CN215595183U (en)

Similar Documents

Publication Publication Date Title
CN215595183U (en) Building engineering construction rail
CN210658143U (en) Road guardrail for municipal construction
CN216974387U (en) Rail guard is used in bridge road construction
CN209891816U (en) Protective fence for construction building
CN214740471U (en) Road fence for traffic engineering construction
CN212801336U (en) Protective fence for building construction
CN219826465U (en) On-spot construction safety device of capital construction engineering
CN214143277U (en) Road and bridge rail guard supporting base
CN217760371U (en) Road control is with construction guardrail
CN216008075U (en) Road control is with construction guardrail
CN216341399U (en) Temporary guard railing of municipal works of convenient transportation
CN219864453U (en) Road construction guardrail
CN214576218U (en) Novel a safety protection for construction device
CN219691261U (en) Rail guard of construction usefulness
CN209908085U (en) Construction rail convenient to install and remove
CN212153218U (en) Road greening rail guard with anti-climbing function
CN211949923U (en) Road and bridge construction protection indicating fence
CN218493297U (en) Be applicable to driving school place training and use anticollision barrier
CN213297445U (en) Rail guard is used in road construction
CN215104765U (en) Adjustable safety fence device used in construction of bridge girder erection machine
CN220486320U (en) Rail guard for municipal public works
CN213330398U (en) Protection guardrail for construction
CN220166770U (en) Rail guard for municipal works
CN212867120U (en) Novel construction guardrail of town road construction
CN211115141U (en) Regulation formula construction guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant