CN215595049U - Outer frame connecting and stabilizing tool - Google Patents
Outer frame connecting and stabilizing tool Download PDFInfo
- Publication number
- CN215595049U CN215595049U CN202122062701.6U CN202122062701U CN215595049U CN 215595049 U CN215595049 U CN 215595049U CN 202122062701 U CN202122062701 U CN 202122062701U CN 215595049 U CN215595049 U CN 215595049U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- top plate
- plate
- outrigger
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to an outer frame connection stabilizing tool which comprises a bottom plate and a top plate, wherein connection clamping control mechanisms penetrating through the bottom plate and the top plate are arranged outside the bottom plate and the top plate, an extending mechanism is arranged on the top of the top plate, and a clamping stabilizing pipe is clamped and connected between the bottom plate and the top plate. This firm instrument is connected to outrigger, through the application that firm instrument is connected to centre gripping stabilizator pipe and long steel pipe, the outrigger is whole regular even wall spare, and is pleasing to the eye, it is practical, make the outrigger steadiness reinforcing, it is new-type even wall spare technology contrast material waste reduces by a wide margin with old-fashioned, the requirement that the material turnover was used has been solved, and also can unify on the different positions of outer wall are changed with different drawknot modes, the potential safety hazard problem that even wall spare was drawn the inconsistent and is produced has been solved, because screw rod length is less than nine centimetres on the roof beam that leaks out, equal in insulation board thickness, the later stage need not arrange the workman to cut the processing, the long steel pipe of tearing down can used repeatedly.
Description
Technical Field
The utility model relates to the technical field of external frames, in particular to a tool for connecting and stabilizing an external frame.
Background
In the construction of building engineering, the proportion occupied by falling from a high place and striking by objects in construction production accidents of the high place of the building is large, so that the vertical protection of high-altitude operation is enhanced, people are prevented from being injured by falling objects, the safety management work of a construction site is the most important factor, the existing scaffold is a common vertical protection form of an outer vertical surface of the building engineering, and the existing scaffold mainly comprises two types of dense safety net protection and steel plate net protection.
With the double-strand lead wire be connected with pre-buried reinforcing bar ring, or adopt with the scaffold with the specification steel pipe pre-buried in engineering structure, be connected with steel pipe fastener and scaffold and pre-buried nozzle stub, traditional pre-buried steel pipe sets up, leads to people in the extravagant serious of steel pipe material in actual construction, the later stage still needs to send the manual work cutting moreover, so has proposed the outrigger and has connected firm instrument and solve this problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a stable connecting tool for the outer frame, which has the advantages of simple and effective wall connecting pieces, material use, cost saving in installation and disassembly, repeated use in most residential projects and the like, and solves the problems that steel pipe materials are seriously wasted in construction and manual cutting needs to be carried out in the later period.
(II) technical scheme
In order to realize the simple and effective wall connecting piece, save cost on material use, installation and disassembly and also achieve the purpose of being repeatedly used in most residential projects, the utility model provides the following technical scheme: the outer frame connecting and stabilizing tool comprises a bottom plate and a top plate, wherein connecting and clamping control mechanisms penetrating through the bottom plate and the top plate are arranged outside the bottom plate and the top plate, and an extending mechanism is arranged at the top of the top plate;
the clamping control mechanism comprises a screw and a thread rotating wire, the screw is positioned at the bottom of the bottom plate and penetrates through the bottom plate and the top plate, and the thread rotating wire is connected to the outer thread of the top plate;
the extension mechanism comprises a welding part and a long steel pipe, the top of the top plate is fixedly connected with the welding part, and the top of the welding part is fixedly connected with the long steel pipe.
Furthermore, a clamping and stabilizing pipe is clamped and connected between the bottom plate and the top plate.
Furthermore, the bottom plate is triangular, three stable jacks are formed in the top of the bottom plate, and the thickness of the top plate is thirty-five millimeters.
Furthermore, the number of the screw rods is three, the diameter of each screw rod is twenty millimeters, and the bottom of each screw rod is fixedly connected with an embedded part.
Further, the top plate is triangular plate-shaped, and the top of the top plate is the same as the top of the bottom plate in shape.
Further, the welding part is in a square plate shape, a welding groove is formed in the top of the welding part, and the welding part is connected with the top plate in a welding mode.
Further, the long steel pipe is in a shape of a circular pipe, the length of the long steel pipe is one thousand millimeters, and the long steel pipe is connected with the welding part in a welding mode.
(III) advantageous effects
Compared with the prior art, the utility model provides an outer frame connection stabilizing tool, which has the following beneficial effects:
this firm instrument is connected to outrigger, through the application that firm instrument is connected to centre gripping stabilizator pipe and long steel pipe, the outrigger is whole regular even wall spare, and is pleasing to the eye, it is practical, make the outrigger steadiness reinforcing, it is new-type even wall spare technology contrast material waste reduces by a wide margin with old-fashioned, the requirement that the material turnover was used has been solved, and also can unify on the different positions of outer wall are changed with different drawknot modes, the potential safety hazard problem that even wall spare was drawn the inconsistent and is produced has been solved, because screw rod length is less than nine centimetres on the roof beam that leaks out, equal in insulation board thickness, the later stage need not arrange the workman to cut the processing, the long steel pipe of tearing down can used repeatedly.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the base plate of the present invention.
In the figure: 1 bottom plate, 2 screw rods, 3 top plates, 4 thread rotating wires, 5 clamping stabilizing pipes, 6 welding pieces and 7 long steel pipes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1-2, the steady tool is connected to outrigger, including bottom plate 1 and roof 3, bottom plate 1 and roof 3 outside are provided with the connection centre gripping control mechanism who runs through bottom plate 1 and roof 3, the top of roof 3 is provided with the extension mechanism, centre gripping control mechanism includes screw rod 2 and screw thread rotation silk 4, screw rod 2 is located bottom plate 1 bottom run through with bottom plate 1 and roof 3, the outside threaded connection of roof 3 has screw thread rotation silk 4, the extension mechanism includes welding piece 6 and long steel pipe 7, the top fixedly connected with welding piece 6 of roof 3, the top fixedly connected with long steel pipe 7 of welding piece 6.
In this embodiment, the centre gripping is connected with centre gripping stabilizator pipe 5 between bottom plate 1 and the roof 3, and bottom plate 1 is triangle-shaped, and the top of bottom plate 1 is seted up quantity and is three stable jack, and the thickness of roof 3 is thirty five millimeters.
In this embodiment, the quantity of screw rod 2 is three, and the diameter of screw rod 2 is twenty millimeters, and the bottom fixedly connected with built-in fitting of screw rod 2, roof 3 are triangular plate-like, and the top of roof 3 is the same with the shape at bottom plate 1 top, and through the control of screw rod 2 and screw thread rotation silk 4, the stable centre gripping that can be convenient between control bottom plate 1 and the roof 3 centre gripping stabilizator pipe 5 can be convenient.
In this embodiment, welding 6 is square plate-shaped, and welding groove has been seted up at welding 6's top, and welding 6 is the welding with the connected mode of roof 3, and long steel pipe 7 is the pipe form, and long steel pipe 7's length is a thousand millimeters, and welding 6 is the welding with the connected mode of long steel pipe 7, and through welding 6's stability, can convenient control top long steel pipe 7's stability.
When the wall connecting piece is used, firstly, three screw rods 2 with twenty diameters are selected as pre-embedded connecting pieces, and a four-millimeter top plate 3 is selected as a tool to be connected with the screw rods 2 according to the requirements of the JGJ130-2011 safety technical specification of the fastener type steel pipe scaffold for building construction that the wall connecting pieces need to adopt a structure capable of bearing tension and pressure.
Secondly, designing requirements according to a tool drawing; a one-thousand-millimeter long steel pipe 7 is prepared to be used as a stable part for connecting the outer frame, and a welding worker needs to weld the angle plate at the bottom of the steel pipe to form a T-shaped tool for holding qualified certificates.
Thirdly, manufacturing a top plate 3 according to the design requirements of a tool drawing, drawing the positions of the embedded screws at the beam and wall template parts, and opening the embedded screw grooves.
And fourthly, pouring concrete, fixing the T-shaped wall connecting piece on the embedded screw after the concrete template is removed, and then connecting the T-shaped wall connecting piece with the outer frame to form a complete wall connecting piece. And finishing the installation of upgrading and reforming the outer frame wall connecting piece.
The beneficial effects of the above embodiment are as follows:
this firm instrument is connected to outrigger, connect the application of firm instrument through centre gripping stabilizator 5 and long steel pipe 7, the outrigger is whole regular even wall spare, and is pleasing to the eye, it is practical, make the outrigger steadiness reinforcing, it is new-type even wall spare technology contrast material waste reduces by a wide margin with old-fashioned, the requirement that the material turnover was used has been solved, and also can unify on different positions of outer wall are changed with different drawknot modes, the potential safety hazard problem that even wall spare was drawn the inconsistent and is produced has been solved, because 2 length of screw rod are less than nine centimetres on the roof beam that leaks out, be equal in the insulating board thickness, the later stage need not arrange the workman to cut the processing, long steel pipe 7 of tearing down can used repeatedly.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. Firm instrument is connected to outrigger, including bottom plate (1) and roof (3), its characterized in that: a connecting and clamping control mechanism penetrating through the bottom plate (1) and the top plate (3) is arranged outside the bottom plate (1) and the top plate (3), and an extending mechanism is arranged at the top of the top plate (3);
the clamping control mechanism comprises a screw rod (2) and a thread rotating wire (4), the screw rod (2) is positioned at the bottom of the bottom plate (1) and penetrates through the bottom plate (1) and the top plate (3), and the thread rotating wire (4) is connected to the outer thread of the top plate (3);
the extension mechanism comprises a welding piece (6) and a long steel pipe (7), the top of the top plate (3) is fixedly connected with the welding piece (6), and the top of the welding piece (6) is fixedly connected with the long steel pipe (7).
2. The outrigger connection stabilization tool of claim 1, wherein: and a clamping and stabilizing pipe (5) is clamped and connected between the bottom plate (1) and the top plate (3).
3. The outrigger attachment stabilization tool of claim 2, wherein: the bottom plate (1) is triangular, three stable jacks are formed in the top of the bottom plate (1), and the top plate (3) is thirty-five millimeters thick.
4. The outrigger attachment stabilization tool of claim 3, wherein: the number of the screw rods (2) is three, the diameter of each screw rod (2) is twenty millimeters, and the bottom of each screw rod (2) is fixedly connected with an embedded part.
5. The outrigger attachment stabilization tool of claim 4, wherein: the top plate (3) is triangular plate-shaped, and the top of the top plate (3) is the same as the top of the bottom plate (1).
6. The outrigger attachment stabilization tool of claim 5, wherein: the welding piece (6) is in a square plate shape, a welding groove is formed in the top of the welding piece (6), and the welding piece (6) is connected with the top plate (3) in a welding mode.
7. The outrigger attachment stabilization tool of claim 6, wherein: the long steel pipe (7) is in a circular tube shape, the length of the long steel pipe (7) is one thousand millimeters, and the long steel pipe (7) is connected with the welding piece (6) in a welding mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122062701.6U CN215595049U (en) | 2021-08-30 | 2021-08-30 | Outer frame connecting and stabilizing tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122062701.6U CN215595049U (en) | 2021-08-30 | 2021-08-30 | Outer frame connecting and stabilizing tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215595049U true CN215595049U (en) | 2022-01-21 |
Family
ID=79883423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122062701.6U Active CN215595049U (en) | 2021-08-30 | 2021-08-30 | Outer frame connecting and stabilizing tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215595049U (en) |
-
2021
- 2021-08-30 CN CN202122062701.6U patent/CN215595049U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215595049U (en) | Outer frame connecting and stabilizing tool | |
CN206289981U (en) | A kind of steel pipe truss is encorbelmented floor support plate gusseted and form bracing system | |
CN215631883U (en) | Simple floor slab opening supporting and hanging die structure | |
CN215407447U (en) | Building construction board backplate lever extrusion fixing device | |
CN211286638U (en) | Aluminum alloy template outer wall K board reinforcing apparatus for building | |
CN112523496A (en) | Template for improving utilization rate of aluminum alloy template on non-standard layer | |
CN217000887U (en) | Outer wall I-shaped steel hole plugging device | |
CN215716065U (en) | Connecting structure of precast concrete exterior wall cladding and building steel beam | |
CN213683346U (en) | Temporary supporting device for mounting large-span steel beam | |
CN215516369U (en) | Precast concrete filter plate hoist device | |
CN211597697U (en) | Novel aluminum back edge profile for aluminum alloy template | |
CN214462544U (en) | Novel parapet template reinforcing tool | |
CN216406275U (en) | Tool for supporting steel bar truss floor support plate | |
CN2729221Y (en) | Telescopic support for placing concrete floor | |
CN115126238B (en) | Construction method for aluminum die diagonal bracing fixing device | |
CN211974403U (en) | Adjustable assembled arc brickwork setting tool | |
CN217105988U (en) | Plastering and reserving device for hidden skirting line | |
CN215368695U (en) | Simple and easy mould strutting arrangement that hangs | |
CN210032596U (en) | Round steel pipe column outsourcing clear water concrete steel mould base | |
CN216007323U (en) | Steel structure frame connecting piece | |
CN212743435U (en) | Super high-rise elevator well straightness controller that hangs down | |
CN215594313U (en) | Reusable wellhead closing template supporting tool | |
CN214169630U (en) | Adjustable light steel keel | |
CN221435384U (en) | Portable hanging basket fixing fireproof device for curtain wall welding operation | |
CN213829584U (en) | Concrete pipe pile pouring positioning structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |