CN213829584U CN202022443586.2U CN202022443586U CN213829584U CN 213829584 U CN213829584 U CN 213829584U CN 202022443586 U CN202022443586 U CN 202022443586U CN 213829584 U CN213829584 U CN 213829584U
Authority
CN
China
Prior art keywords
support
branch
pipe pile
concrete pipe
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022443586.2U
Other languages
Chinese (zh)
Inventor
张启海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Aozhong Building Materials Co ltd
Original Assignee
Shanghai Aozhong Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Aozhong Building Materials Co ltd filed Critical Shanghai Aozhong Building Materials Co ltd
Priority to CN202022443586.2U priority Critical patent/CN213829584U/en
Application granted granted Critical
Publication of CN213829584U publication Critical patent/CN213829584U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a concrete pipe pile pours location structure, including first support and second support, the vertical relative setting of first support, and first support is including a section of thick bamboo, extension board, first branch and first cutting ferrule, and the shape of cross section of a section of thick bamboo and extension board is the arc, and the top horizontal welding of a section of thick bamboo has the extension board, and vertical welding has first branch on the top surface of extension board, and on the side end face of first branch vertically be fixed with the first cutting ferrule of arc structure, the vertical top of installing at first branch of second support. The utility model discloses can carry out spacing support to the tubular pile mould to guarantee the stability that the later stage was pour, improve the accurate nature of pouring, prevent to stand up crooked.

Description

Concrete pipe pile pouring positioning structure
Technical Field
The utility model relates to a concrete pipe pile pours technical field, especially relates to a concrete pipe pile pours location structure.
Background
The tubular pile divide into prestressed concrete tubular pile, prestressed concrete thin-walled tubular pile and prestressed high-strength concrete tubular pile according to concrete strength level and wall thickness, need use location structure to carry on spacingly to the external template of tubular pile when current concrete tubular pile is pour to make things convenient for the later stage to carry on spacingly fixed, and then improve the stability that the later stage was pour, prevent that the later stage from taking place crooked, improve the stability of pouring.
Therefore, a concrete pipe pile pouring positioning structure is needed, and a pipe pile die can be supported in a limiting mode, so that the later pouring stability is guaranteed, the pouring accuracy is improved, and the turning-over deflection is prevented.
Disclosure of Invention
An object of the utility model is to provide a location structure is pour to concrete pipe pile aims at improving the outside template that current concrete pipe pile need use location structure to the tubular pile when pouring and carries on spacingly to make things convenient for the later stage to carry on spacingly fixed, and then improve the stability that the later stage was pour, prevent that the later stage from taking place crooked, improve the problem of the stability of pouring.
The utility model discloses a realize like this:
the utility model provides a concrete pipe pile pours location structure, includes first support and second support, the vertical relative setting of first support, and first support is including a section of thick bamboo, extension board, first branch and first cutting ferrule, the shape of cross section of a section of thick bamboo and extension board is the arc, and the top horizontal welding of a section of thick bamboo has the extension board, vertical welding has first branch on the top surface of extension board, and the vertical first cutting ferrule that is fixed with the arc structure on the side end face of first branch, the vertical top at first branch of installing of second support.
Furthermore, the two sides of the top surface of the support plate are vertically welded with screw hole plates, and the adjacent screw hole plates are in threaded through connection through the connecting screw.
And then the equal vertical welding in top surface both sides through the extension board has the spiral shell board, and adjacent spiral shell board passes through connecting screw thread through connection to the relative chucking of being convenient for sets up the both sides at concrete pipe pile's template.
Furthermore, the second support comprises a second support rod with a U-shaped vertical cross section and a second clamping sleeve with an arc-shaped structure, and the second clamping sleeve is vertically fixed on the end face of the inner side of the second support rod.
And then include that the vertical cross sectional shape is the second cutting ferrule of U-shaped second branch and arc structure through the second support, and the vertical fixing of second cutting ferrule is on the medial extremity terminal surface of second branch, is convenient for according to the high needs that support, selects to connect the stability of guaranteeing the support.
Furthermore, both ends of the second supporting rod are penetrated through and provided with screw holes.
And then all run through the both ends through second branch and seted up the screw to equipment connection second branch and first branch satisfy different support height needs.
Furthermore, the vertical screw thread on the top end of the first supporting rod is provided with a connecting screw in a penetrating mode, and the adjacent screw holes of the first supporting rod and the second supporting rod are connected through the connecting screw in a threaded mode.
And then the vertical screw thread through mounting in top through first branch has connecting screw, and the screw that first branch and second branch are adjacent passes through connecting screw threaded connection, and the equipment installation of being convenient for supports.
Furthermore, a positioning hole plate is uniformly and vertically welded at the upper bottom of the outer circumference of the support cylinder, and fixing nails vertically penetrate through the positioning hole plate.
And then through the even perpendicular welding in bottom on the outer circumference of a prop, and vertical run through in the locating hole board and install the staple to spacing fixed prop is on the bottom surface, thereby guarantees the stability of support.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses
When the concrete pipe pile pouring and positioning structure is used for limiting and positioning a concrete pipe pile, the first support is vertically and oppositely arranged and is used for clamping a template of the concrete pipe pile oppositely on two sides, then the cross sections of the support tube and the support plate in the first support are arc-shaped, so that the limiting and positioning are conveniently arranged on two sides of the template of the concrete pipe pile, the support plate is horizontally welded at the top end of the support tube, the first support rod is vertically welded on the top surface of the support plate, the first clamping sleeve with the arc-shaped structure is vertically fixed on one side end surface of the first support rod, the positioning hole plate is uniformly and vertically welded at the upper bottom part of the outer circumference of the support tube, the fixing nail is vertically arranged in the positioning hole plate in a penetrating way, so that the supporting of the limiting and fixing support tube is arranged on the bottom surface, the supporting stability is ensured, the screw hole plates are vertically welded on two sides of the top surface of the support plate, and the adjacent screw hole plates are in a penetrating way through connection through threads of the connecting screw rod, thereby be convenient for relative chucking setting both sides at concrete pipe pile's template, the second support is including erecting the second branch that cross sectional shape is the U-shaped and the second cutting ferrule of arc structure simultaneously, and the vertical fixing of second cutting ferrule is on the medial surface of second branch, be convenient for according to the high needs of support, the stability of selective connection assurance support, and the vertical screw thread in top of first branch is run through and is installed connecting screw, and first branch passes through connecting screw threaded connection with the adjacent screw of second branch, be convenient for assemble and install, support, and then carry out spacing support to the tubular pile mould, thereby guarantee the stability of later stage pouring, improve the accurate nature of pouring, prevent to stand up askew.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the exploded structure of the present invention;
fig. 3 is a schematic structural diagram of a first bracket according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a second bracket according to an embodiment of the present invention.
In the figure: 1. a first bracket; 11. supporting a cylinder; 12. positioning the orifice plate; 13. fixing nails; 14. a support plate; 15. a screw hole plate; 16. connecting a screw rod; 17. a first support bar; 18. a first ferrule; 19. a connecting screw; 2. a second bracket; 21. a second support bar; 22. a screw hole; 23. and a second ferrule.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3 and 4, a concrete pipe pile casting positioning structure includes a first support 1 and a second support 2, the first support 1 is vertically disposed opposite to the second support 1, the first support 1 includes a support tube 11, a support plate 14, a first support rod 17 and a first cutting sleeve 18, the cross-sectional shapes of the support tube 11 and the support plate 14 are arc, the support plate 14 is horizontally welded at the top end of the support tube 11, the first support rod 17 is vertically welded on the top surface of the support plate 14, the first cutting sleeve 18 with an arc structure is vertically fixed on one side end surface of the first support rod 17, and the second support 2 is vertically installed at the top end of the first support rod 17.
When the concrete pipe pile pouring and positioning structure is used for limiting and positioning a concrete pipe pile, the first support 1 is vertically arranged oppositely and is used for clamping a template of the concrete pipe pile oppositely on two sides, then the cross section shapes of the support tube 11 and the support plate 14 in the first support 1 are arc-shaped, so that the limiting and positioning are convenient to be arranged on two sides of the template of the concrete pipe pile, the support plate 14 is horizontally welded on the top end of the support tube 11, the first support rod 17 is vertically welded on the top surface of the support plate 14, the first clamping sleeve 18 with the arc-shaped structure is vertically fixed on one side end surface of the first support rod 17, the positioning pore plate 12 is uniformly and vertically welded on the bottom of the outer circumference of the support tube 11, the fixing nail 13 is vertically arranged in the positioning pore plate 12 in a penetrating mode, so that the support tube 11 is limited and fixed on the bottom surface, the supporting stability is ensured, and the spiral pore plates 15 are vertically welded on two sides of the top surface of the support plate 14, adjacent screw hole board 15 passes through connecting screw 16 screw thread through connection, thereby be convenient for relative chucking setting in the both sides of the template of concrete pipe pile, second support 2 is including erecting the second branch 21 of cross-sectional shape for the U-shaped and second cutting ferrule 23 of arc structure simultaneously, and second cutting ferrule 23 is vertical to be fixed on the medial surface of second branch 21, be convenient for according to the high needs of support, the stability of support is guaranteed in the selective connection, and the vertical screw thread through mounting in top of first branch 17 has connecting screw 19, and first branch 17 passes through connecting screw 19 threaded connection with the screw 22 that second branch 21 is adjacent, be convenient for the equipment installation, support, and then carry out spacing support to the tubular pile mould, thereby guarantee the stability of later stage pouring, improve the accurate nature of pouring, prevent to stand up crooked.
Referring to fig. 3, screw hole plates 15 are vertically welded on both sides of the top surface of the support plate 14, and the adjacent screw hole plates 15 are connected through a connecting screw 16.
And then the equal vertical welding in top surface both sides through extension board 14 has screw plate 15, and adjacent screw plate 15 passes through connecting screw 16 screw thread through connection to be convenient for relative chucking setting in the both sides of concrete pipe pile's template.
Referring to fig. 4, the second bracket 2 includes a second support rod 21 having a U-shaped vertical cross section and a second cutting ferrule 23 having an arc-shaped structure, and the second cutting ferrule 23 is vertically fixed on an inner end surface of the second support rod 21.
And then include that the vertical cross sectional shape is second branch 21 and the second cutting ferrule 23 of arc structure of U-shaped through second support 2, and second cutting ferrule 23 is vertical to be fixed on the medial extremity terminal surface of second branch 21, is convenient for according to the high needs of support, selects to connect the stability of guaranteeing the support.
Referring to fig. 4, both ends of the second supporting rod 21 are provided with screw holes 22.
And then all run through the both ends of second branch pole 21 and seted up screw 22 to assembly connection second branch pole 21 and first branch pole 17 satisfy different support height needs.
Referring to fig. 3, a connecting screw 19 is installed through the vertical thread at the top end of the first support rod 17, and the adjacent screw holes 22 of the first support rod 17 and the second support rod 21 are connected through the connecting screw 19 by screw thread.
And then the vertical screw thread through-mounting in top through first branch 17 has connecting screw 19, and the adjacent screw 22 of first branch 17 and second branch 21 passes through connecting screw 19 threaded connection, and the equipment installation of being convenient for supports.
Referring to fig. 3, a positioning hole plate 12 is uniformly and vertically welded to the upper bottom of the outer circumference of the support tube 11, and a fixing nail 13 is vertically installed in the positioning hole plate 12 in a penetrating manner.
And then through the even perpendicular welding in bottom on the outer circumference of a branch section of thick bamboo 11 location orifice plate 12, and vertically run through in the location orifice plate 12 and install staple 13 to spacing fixed branch section of thick bamboo 11 is on the bottom surface, thereby guarantees the stability of supporting.
The device obtained through the design can basically meet the requirement of limiting and supporting the pipe pile mould, so that the later pouring stability is ensured, the pouring accuracy is improved, and the inclined concrete pipe pile turning-over pouring positioning structure is prevented from being used.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a location structure is pour to concrete pipe pile, includes first support (1) and second support (2), its characterized in that: first support (1) is vertical sets up relatively, and first support (1) is including a section of thick bamboo (11), extension board (14), first branch (17) and first cutting ferrule (18), the shape of cross section of a section of thick bamboo (11) and extension board (14) is the arc, and the top horizontal welding of a section of thick bamboo (11) has extension board (14), vertical welding has first branch (17) on the top surface of extension board (14), and on the side end face of first branch (17) vertically be fixed with first cutting ferrule (18) of arc structure, the vertical top of installing at first branch (17) of second support (2).
2. The concrete pipe pile pouring positioning structure is characterized in that screw hole plates (15) are vertically welded on two sides of the top surface of each support plate (14), and the adjacent screw hole plates (15) are in threaded through connection through connecting screw rods (16).
3. A concrete pipe pile casting positioning structure as claimed in claim 2, wherein the second bracket (2) comprises a second support rod (21) with a U-shaped vertical cross-section and a second clamping sleeve (23) with an arc-shaped structure, and the second clamping sleeve (23) is vertically fixed on the inner side end face of the second support rod (21).
4. The concrete pipe pile pouring positioning structure as claimed in claim 3, wherein both ends of the second supporting rod (21) are provided with screw holes (22) through.
5. A concrete pipe pile pouring positioning structure as claimed in claim 4, wherein the top end of the first support rod (17) is vertically threaded with a connecting screw (19) and the adjacent screw holes (22) of the first support rod (17) and the second support rod (21) are in threaded connection through the connecting screw (19).
6. The concrete pipe pile pouring positioning structure is characterized in that a positioning hole plate (12) is uniformly and vertically welded to the bottom of the outer circumference of the support tube (11), and a fixing nail (13) is vertically installed in the positioning hole plate (12) in a penetrating mode.
CN202022443586.2U 2020-10-28 2020-10-28 Concrete pipe pile pouring positioning structure Expired - Fee Related CN213829584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022443586.2U CN213829584U (en) 2020-10-28 2020-10-28 Concrete pipe pile pouring positioning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022443586.2U CN213829584U (en) 2020-10-28 2020-10-28 Concrete pipe pile pouring positioning structure

Publications (1)

Publication Number Publication Date
CN213829584U true CN213829584U (en) 2021-07-30

Family

ID=77012467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022443586.2U Expired - Fee Related CN213829584U (en) 2020-10-28 2020-10-28 Concrete pipe pile pouring positioning structure

Country Status (1)

Country Link
CN (1) CN213829584U (en)

Similar Documents

Publication Publication Date Title
CN108560716B (en) Steel pipe concrete column beam joint structure and construction method thereof
CN201686972U (en) Variable arc steel moulding plate for arch crown of dam gallery
CN213829584U (en) Concrete pipe pile pouring positioning structure
CN217353535U (en) Template reinforcing apparatus is hung to floor structure board position of falling
CN210152271U (en) Aluminum formwork diagonal bracing device
CN215717158U (en) Building external wall formwork installation reinforcing member
CN213509184U (en) Structure heat preservation integration connecting piece of fixed net piece and ability location support
CN208455656U (en) A kind of anchor ear support device
CN210288685U (en) Fine adjustment connecting structure for assembled building beam
CN114075871A (en) Triangular overhanging support base for slip form
CN209816672U (en) Attached cantilever bracket structure
CN218758742U (en) Torsion-proof device for end constructional column
CN211949750U (en) Aluminum formwork support system
CN220746896U (en) Anti-floating anchor rod fixing device
CN210164265U (en) Positioning device for preformed hole of prefabricated wallboard
CN213015415U (en) Template bearing structure for construction
CN215168042U (en) Concrete structure beam template fixing device
CN218234355U (en) Reinforcing steel bar hanging rack platform for wall formwork installation
CN217151226U (en) Constructional column template fixed clamp without perforation
CN213703937U (en) Concrete pipe pile prefabricated formwork fixing device
CN209760814U (en) Multi-functional building templates link for civil engineering
CN220394504U (en) Auxiliary positioning device for installing bored concrete pile reinforcement cage
CN217174886U (en) Independent foundation cushion cap formwork reinforcing structure
CN210636459U (en) Newly-built template fixing device of using under water
CN212900092U (en) Assembled push pipe back

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210730