CN215594449U - Passive building insulation construction - Google Patents

Passive building insulation construction Download PDF

Info

Publication number
CN215594449U
CN215594449U CN202122046052.0U CN202122046052U CN215594449U CN 215594449 U CN215594449 U CN 215594449U CN 202122046052 U CN202122046052 U CN 202122046052U CN 215594449 U CN215594449 U CN 215594449U
Authority
CN
China
Prior art keywords
wall body
wall
groove
clamping
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122046052.0U
Other languages
Chinese (zh)
Inventor
张雷
李迪
朱航
翟午琛
李军伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Construction Engineering Quality Inspection And Testing Center Co ltd
Shandong Provincial Academy of Building Research
Original Assignee
Shandong Construction Engineering Quality Inspection And Testing Center Co ltd
Shandong Provincial Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Construction Engineering Quality Inspection And Testing Center Co ltd, Shandong Provincial Academy of Building Research filed Critical Shandong Construction Engineering Quality Inspection And Testing Center Co ltd
Priority to CN202122046052.0U priority Critical patent/CN215594449U/en
Application granted granted Critical
Publication of CN215594449U publication Critical patent/CN215594449U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a passive building heat-insulation structure, which relates to the technical field of heat-insulation building structures and comprises two walls, wherein the two walls are arranged in parallel, connecting plates are inserted at the bottoms and the tops of the two walls, jacks corresponding to the walls are formed in the side walls of the connecting plates, limiting plates are fixedly connected to the surfaces of the connecting plates, the two limiting plates are positioned at the two sides of the jacks, the connecting plates are positioned at the two sides of the limiting plates, and fixing mechanisms for fixing the connecting plates and the walls are arranged between the limiting plates and the connecting plates, so that the passive building heat-insulation structure has the beneficial effects that: through the fixed establishment who sets up, under the cooperation of slide cartridge, card ball, screw thread post, second spring and card post, make things convenient for heat preservation wall's installation, can show improvement work efficiency.

Description

Passive building insulation construction
Technical Field
The utility model relates to the technical field of building heat insulation structures, in particular to a passive building heat insulation structure.
Background
Building heat preservation is a measure for reducing the indoor heat of a building to be dissipated outdoors, and plays an important role in creating a suitable indoor heat environment and saving energy. The building heat preservation mainly takes measures from the external protective structure of the building, simultaneously reduces the measure of the indoor heat of the building to be emitted to the outdoor, and plays an important role in creating a proper indoor heat environment and saving energy. The building heat preservation mainly takes measures from the external enclosure structure of the building, and simultaneously, comprehensive consideration is also needed from the aspects of room orientation, the plane and body type design of single buildings, the overall arrangement of building groups and the like.
When the existing heat-insulating wall structure is used, the installation and the disassembly between the walls are more troublesome, the construction efficiency is influenced, in addition, the stability between the walls is poorer, and the walls are easy to collapse when being subjected to larger vibration.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a passive building heat-insulation structure, which solves the problems in the background technology.
In order to achieve the purpose, the utility model is realized by the following technical scheme: the utility model provides a passive form building insulation construction, includes the wall body, the quantity of wall body is two, and two wall body parallel arrangement, two the bottom and the top of wall body are all pegged graft and are had the connecting plate, set up the jack that corresponds with the wall body on the lateral wall of connecting plate, the fixed surface of connecting plate is connected with the limiting plate, the quantity of limiting plate is two and is located the both sides of jack, the connecting plate is located the both sides of limiting plate, be provided with the fixed establishment who is used for fixed connection board and wall body between limiting plate and the connecting plate.
Through adopting above-mentioned technical scheme, the jack that sets up on the connecting plate lateral wall is used for connecting the wall body, and the limiting plate that sets up is used for restricting the position of connecting plate, makes connecting plate and wall connection's more firm.
Preferably, fixed establishment includes slide cartridge, card ball, screw thread post, second spring and card post, set up the draw-in groove that corresponds with the slide cartridge between limiting plate and the connecting plate, slide cartridge sliding connection is in the draw-in groove, screw thread post threaded connection is in the slide cartridge, and the one end of screw thread post extends to the outside of slide cartridge, card post sliding connection is in the inside of slide cartridge, and the second spring is located between card post and the screw thread post, the both ends of second spring respectively with screw thread post and card post connection, set up a plurality of round holes that are the circumference and arrange on the inner wall of slide cartridge, the card ball is located the round hole, and card ball and card post contact, the card ball extends to the outside of slide cartridge and in the inner wall contact of draw-in groove.
Through adopting above-mentioned technical scheme, the fixed establishment of setting, at the slide cartridge, the card ball, the screw thread post, under the cooperation of second spring and card post, make things convenient for thermal insulation wall's installation, can show improvement work efficiency, when installing, peg graft into the connecting plate with the wall body earlier, then in with the slide cartridge grafting draw-in groove, then rotate the screw thread post, second spring extrusion card post this moment, the outer wall of card post is the toper, the outer wall extrusion card ball of card post this moment, the inner wall joint of card ball and wall body, accomplish the installation of wall body and connecting plate.
Preferably, two fixedly connected with dead lever between the wall body, the equal fixedly connected with in both ends of dead lever rotates the seat, it is connected with the dwang to rotate the seat internal rotation, two the dwang is kept away from the one end of rotating the seat and is rotated the connection, fixedly connected with hydraulic stem between dwang and the wall body.
Through adopting above-mentioned technical scheme, the dead lever that sets up, the cooperation of rotating seat, dwang and hydraulic stem, wherein the dwang forms the triangle-shaped structure with the dead lever, has stability, the deformation that produces when can avoiding the wall body to receive the impact, and the hydraulic stem can provide horizontal support, and the hydraulic stem can change length along with the production of deformation.
Preferably, it is connected with the bracing piece, two to rotate on the outer wall of dwang fixedly connected with slide bar between the wall body, sliding connection has the slide on the outer lane of slide bar, the one end that the dwang was kept away from to the bracing piece rotates with the slide to be connected, be provided with first spring between slide and the wall body, first spring cup joints the outer lane at the slide bar.
Through adopting above-mentioned technical scheme, the cooperation of bracing piece, slide bar, slide and the first spring that sets up can effectively cushion the impact that the wall body received.
Preferably, equal fixedly connected with mounting panel on the inner wall of wall body, square groove has been seted up on the surface of mounting panel, two be provided with the heated board between the mounting panel, the heated board is installed in square inslot.
Through adopting above-mentioned technical scheme, the mounting panel that sets up to and the square groove of seting up on the mounting panel for the installation heated board.
Preferably, the slot has been seted up at the top of mounting panel, the slot extends to the inside of heated board, it has the inserted bar to peg graft in the slot, the top fixedly connected with handle of inserted bar, first bar groove and second bar groove have been seted up respectively at the top of mounting panel, first bar groove and second bar groove all correspond with the handle.
By adopting the technical scheme, the installation and the disassembly of the heat-insulation board can be facilitated due to the matching of the arranged insertion rod, the lifting handle, the first strip-shaped groove and the second strip-shaped groove, specifically, when the heat-insulation board is installed, the insertion rod is inserted into the insertion groove, then the lifting handle is placed into the first strip-shaped groove, and at the moment, the end part of the insertion rod is positioned at the bottom of the insertion groove, so that the installation board and the heat-insulation board are fixed; when dismantling, take out the handle from first bar inslot, let the back rotate the inserted bar, put into the second bar inslot with the handle, the inserted bar is not pegged graft with the heated board this moment, can dismantle the heated board.
Preferably, the depth of the first strip-shaped groove is smaller than that of the second strip-shaped groove, and the height difference between the first strip-shaped groove and the second strip-shaped groove is larger than the part of the slot, which is located on the heat preservation plate.
Through adopting above-mentioned technical scheme, the difference in height of first bar groove and second bar groove is greater than the part that the slot is located the heated board, and the aim at inserted bar that this set up can make things convenient for fixed mounting and dismantlement mounting panel and heated board.
The utility model provides a passive building heat insulation structure, which has the following beneficial effects:
1. this passive form building insulation construction, through the fixed establishment who sets up, at the slide cartridge, the card ball, the screw thread post, under the cooperation of second spring and card post, make things convenient for thermal insulation wall's installation, can show and improve work efficiency, when installing, in advance the wall body grafting advances the connecting plate, then with the slide cartridge in the grafting advances the draw-in groove, then rotate the screw thread post, second spring extrusion card post this moment, the outer wall of card post is the toper, the outer wall extrusion card ball of card post this moment, the inner wall joint of card ball and wall body, accomplish the installation of wall body and connecting plate.
2. According to the passive building insulation structure, the insulation board can be conveniently mounted and dismounted through the matching of the arranged insertion rod, the lifting handle, the first strip-shaped groove and the second strip-shaped groove, and the insulation board is convenient to maintain and replace at a later stage; when dismantling, take out the handle from first bar inslot, let the back rotate the inserted bar, put into the second bar inslot with the handle, the inserted bar is not pegged graft with the heated board this moment, can dismantle the heated board.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front cross-sectional view of the present invention;
FIG. 3 is an enlarged view taken at A of FIG. 2 according to the present invention;
FIG. 4 is a partial cross-sectional view of the present invention;
FIG. 5 is an enlarged view of the structure at B of the present invention;
fig. 6 is a partial cross-sectional view of the present invention.
In the figure: 1. a wall body; 2. a connecting plate; 3. a first spring; 4. a slide bar; 5. a support bar; 6. a slide base; 7. rotating the rod; 8. a rotating seat; 9. fixing the rod; 10. a slide cylinder; 11. blocking the ball; 12. a threaded post; 13. a second spring; 14. clamping the column; 15. a limiting plate; 16. a thermal insulation board; 17. mounting a plate; 18. a first bar-shaped groove; 19. a second strip groove; 20. a slot; 21. a handle; 22. inserting a rod; 23. a hydraulic rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1 to 6, the present invention provides a technical solution: the utility model provides a passive form building insulation construction, including wall body 1, the quantity of wall body 1 is two, and 1 parallel arrangement of two wall bodies, connecting plate 2 has all been pegged graft at the bottom and the top of two wall bodies 1, set up the jack that corresponds with wall body 1 on the lateral wall of connecting plate 2, the fixed surface of connecting plate 2 is connected with limiting plate 15, limiting plate 15's quantity is two and is located the both sides of jack, connecting plate 2 is located limiting plate 15's both sides, be provided with the fixed establishment who is used for fixed connection board 2 and wall body 1 between limiting plate 15 and the connecting plate 2, the limiting plate 15 of setting is used for limiting connection board 2's position, make connecting plate 2 be connected with wall body 1 more firm, the jack that sets up on the connecting plate 2 lateral wall is used for connecting wall body 1.
The fixing mechanism comprises a sliding barrel 10, a clamping ball 11, a threaded column 12, a second spring 13 and a clamping column 14, a clamping groove corresponding to the sliding barrel 10 is formed between a limiting plate 15 and a connecting plate 2, the sliding barrel 10 is connected in the clamping groove in a sliding mode, the threaded column 12 is connected in the sliding barrel 10 in a threaded mode, one end of the threaded column 12 extends to the outside of the sliding barrel 10, the clamping column 14 is connected in the sliding barrel 10 in a sliding mode, the second spring 13 is located between the clamping column 14 and the threaded column 12, two ends of the second spring 13 are respectively connected with the threaded column 12 and the clamping column 14, a plurality of circular holes which are arranged in a circumferential mode are formed in the inner wall of the sliding barrel 10, the clamping ball 11 is located in the circular hole and contacts with the clamping column 14, the clamping ball 11 extends to the outside of the sliding barrel 10 and contacts with the inner wall of the clamping groove, the clamping column 14 is of a conical structure, the purpose of the arrangement is that rigid extrusion with the clamping ball 11 can be conveniently achieved, and the bottom of the sliding barrel 10 is provided with a positioning hole, card post 14 extends to in the locating hole, the fixed establishment of setting, at slide cartridge 10, card ball 11, screw thread post 12, under second spring 13 and the cooperation of card post 14, make things convenient for heat preservation wall body 1's installation, can show and improve work efficiency, when installing, peg graft into connecting plate 2 with wall body 1 earlier, then in pegging graft into the draw-in groove with slide cartridge 10, then rotate screw thread post 12, second spring 13 extrusion card post 14 this moment, the outer wall of card post 14 is the toper, the outer wall extrusion card ball 11 of card post 14 this moment, card ball 11 and wall body 1's inner wall joint, accomplish the installation of wall body 1 and connecting plate 2.
Fixedly connected with dead lever 9 between two wall bodies 1, the equal fixedly connected with in both ends of dead lever 9 rotates seat 8, it is connected with dwang 7 to rotate 8 internal rotations in seat, the one end that rotates seat 8 is kept away from to two dwang 7 is rotated and is connected, fixedly connected with hydraulic stem 23 between dwang 7 and the wall body 1, the dead lever 9 of setting, rotate seat 8, the cooperation of dwang 7 and hydraulic stem 23, wherein dwang 7 and dead lever 9 form the triangle-shaped structure, stability has, the deformation that produces when can avoiding wall body 1 to receive the impact, hydraulic stem 23 can provide horizontal support, and hydraulic stem 23 can be along with the production of deformation and change length.
Rotate on the outer wall of dwang 7 and be connected with bracing piece 5, fixedly connected with slide bar 4 between two wall bodies 1, sliding connection has slide 6 on slide bar 4's the outer lane, the one end that dwang 7 was kept away from to bracing piece 5 rotates with slide 6 to be connected, be provided with first spring 3 between slide 6 and the wall body 1, first spring 3 cup joints the outer lane at slide bar 4, bracing piece 5 of setting, slide bar 4, slide 6 and first spring 3's cooperation, can effectively cushion the impact that wall body 1 received.
Equal fixedly connected with mounting panel 17 on the inner wall of wall body 1, square groove has been seted up on mounting panel 17's surface, is provided with heated board 16 between two mounting panels 17, and heated board 16 installs at square inslot, the mounting panel 17 of setting to and the square groove of seting up on the mounting panel 17 for installation heated board 16.
The top of the mounting plate 17 is provided with a slot 20, the slot 20 extends into the heat insulation plate 16, an insertion rod 22 is inserted in the slot 20, the top of the insertion rod 22 is fixedly connected with a handle 21, the top of the mounting plate 17 is respectively provided with a first strip-shaped slot 18 and a second strip-shaped slot 19, the first strip-shaped slot 18 and the second strip-shaped slot 19 both correspond to the handle 21, and the insertion rod 22, the handle 21, the first strip-shaped slot 18 and the second strip-shaped slot 19 are matched to facilitate the mounting and dismounting of the heat insulation plate 16; when the heat insulation board 16 is disassembled, the handle 21 is taken out from the first strip-shaped groove 18, the inserted bar 22 is rotated after the handle 21 is put into the second strip-shaped groove 19, and the inserted bar 22 is not inserted into the heat insulation board 16 at the moment, so that the heat insulation board 16 can be disassembled.
To sum up, when the passive building insulation structure is used, the wall body 1 is firstly inserted into the connecting plate 2, then the sliding cylinder 10 is inserted into the clamping groove, then the threaded column 12 is rotated, the second spring 13 extrudes the clamping column 14 at the moment, the outer wall of the clamping column 14 is conical, the outer wall of the clamping column 14 extrudes the clamping ball 11 at the moment, and the clamping ball 11 is clamped with the inner wall of the wall body 1, so that the installation of the wall body 1 and the connecting plate 2 is completed; the fixed rod 9, the rotating seat 8, the rotating rod 7 and the hydraulic rod 23 are matched, wherein the rotating rod 7 and the fixed rod 9 form a triangular structure, the stability is achieved, deformation generated when the wall body 1 is impacted can be avoided, the hydraulic rod 23 can provide transverse support, and the length of the hydraulic rod 23 can be changed along with the deformation; the supporting rod 5, the sliding rod 4, the sliding seat 6 and the first spring 3 are matched, so that impact on the wall body 1 can be effectively buffered; the installation and the disassembly of the heat insulation board 16 can be facilitated through the matching of the arranged insertion rod 22, the lifting handle 21, the first strip-shaped groove 18 and the second strip-shaped groove 19, specifically, when the installation is carried out, the insertion rod 22 is inserted into the insertion groove 20, then the lifting handle 21 is placed into the first strip-shaped groove 18, and at the moment, the end part of the insertion rod 22 is located at the bottom of the insertion groove 20, so that the installation board 17 and the heat insulation board 16 are fixed; when the heat insulation board 16 is disassembled, the handle 21 is taken out from the first strip-shaped groove 18, the inserted bar 22 is rotated after the handle 21 is put into the second strip-shaped groove 19, and the inserted bar 22 is not inserted into the heat insulation board 16 at the moment, so that the heat insulation board 16 can be disassembled.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a passive form building insulation construction, includes wall body (1), its characterized in that: the quantity of wall body (1) is two, and two wall body (1) parallel arrangement, two the bottom and the top of wall body (1) are all pegged graft and are had connecting plate (2), set up the jack that corresponds with wall body (1) on the lateral wall of connecting plate (2), the fixed surface of connecting plate (2) is connected with limiting plate (15), the quantity of limiting plate (15) is two and is located the both sides of jack, connecting plate (2) are located the both sides of limiting plate (15), be provided with the fixed establishment who is used for fixed connection board (2) and wall body (1) between limiting plate (15) and connecting plate (2).
2. A passive building insulation structure according to claim 1, wherein: the fixing mechanism comprises a sliding barrel (10), a clamping ball (11), a threaded column (12), a second spring (13) and a clamping column (14), a clamping groove corresponding to the sliding barrel (10) is formed between a limiting plate (15) and a connecting plate (2), the sliding barrel (10) is slidably connected in the clamping groove, the threaded column (12) is in threaded connection with the sliding barrel (10), one end of the threaded column (12) extends to the outside of the sliding barrel (10), the clamping column (14) is slidably connected with the inside of the sliding barrel (10), the second spring (13) is located between the clamping column (14) and the threaded column (12), two ends of the second spring (13) are respectively connected with the threaded column (12) and the clamping column (14), a plurality of circular holes which are arranged in a circumferential direction are formed in the inner wall of the sliding barrel (10), the clamping ball (11) is located in the circular hole, and the clamping ball (11) is in contact with the clamping column (14), the clamping ball (11) extends to the outside of the sliding barrel (10) and is contacted with the inner wall of the clamping groove.
3. A passive building insulation structure according to claim 1, wherein: two fixedly connected with dead lever (9) between wall body (1), the equal fixedly connected with in both ends of dead lever (9) rotates seat (8), it is connected with dwang (7), two to rotate seat (8) internal rotation dwang (7) are kept away from the one end rotation connection that rotates seat (8), fixedly connected with hydraulic stem (23) between dwang (7) and wall body (1).
4. A passive building insulation structure according to claim 3, wherein: rotate on the outer wall of dwang (7) and be connected with bracing piece (5), two fixedly connected with slide bar (4) between wall body (1), sliding connection has slide (6) on the outer lane of slide bar (4), the one end of dwang (7) is kept away from in bracing piece (5) rotates with slide (6) and is connected, be provided with first spring (3) between slide (6) and wall body (1), first spring (3) cup joint the outer lane at slide bar (4).
5. A passive building insulation structure according to claim 1, wherein: equal fixedly connected with mounting panel (17) on the inner wall of wall body (1), square groove has been seted up on the surface of mounting panel (17), two be provided with heated board (16) between mounting panel (17), heated board (16) are installed in square inslot.
6. A passive building insulation structure according to claim 5, wherein: slot (20) have been seted up at the top of mounting panel (17), slot (20) extend to the inside of heated board (16), it has inserted bar (22) to peg graft in slot (20), top fixedly connected with handle (21) of inserted bar (22), first bar groove (18) and second bar groove (19) have been seted up respectively at the top of mounting panel (17), first bar groove (18) and second bar groove (19) all correspond with handle (21).
7. The passive building insulation structure of claim 6, wherein: the depth of the first strip-shaped groove (18) is smaller than that of the second strip-shaped groove (19), and the height difference between the first strip-shaped groove (18) and the second strip-shaped groove (19) is larger than the part, located inside the heat insulation board (16), of the slot (20).
CN202122046052.0U 2021-08-27 2021-08-27 Passive building insulation construction Active CN215594449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122046052.0U CN215594449U (en) 2021-08-27 2021-08-27 Passive building insulation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122046052.0U CN215594449U (en) 2021-08-27 2021-08-27 Passive building insulation construction

Publications (1)

Publication Number Publication Date
CN215594449U true CN215594449U (en) 2022-01-21

Family

ID=79883602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122046052.0U Active CN215594449U (en) 2021-08-27 2021-08-27 Passive building insulation construction

Country Status (1)

Country Link
CN (1) CN215594449U (en)

Similar Documents

Publication Publication Date Title
CN209941986U (en) Curtain wall construction convenient to installation
CN215594449U (en) Passive building insulation construction
CN211447375U (en) Fixing support for mounting building curtain wall
CN110425607B (en) Modularized integrated kitchen base and installation method thereof
CN111827470A (en) Assembled steel structure frame high-stability supporting system and mounting method thereof
CN214329893U (en) Supporting structure of building construction template
CN112127482B (en) Detachable movable wooden house
CN210256591U (en) Fixing device easy for assembling enclosing plates
CN114215830A (en) Assembled large-scale LED display screen
CN216713838U (en) Beam bottom supporting and jacking device capable of being rapidly installed and disassembled
CN216379971U (en) Steel structural framework of simple house
CN219425273U (en) Water tank cooling assembly calibration device
CN215519408U (en) Curtain wall beam connecting spring pin and connecting structure with same
CN219548105U (en) Connection structure of ceramic plate curtain wall
CN219152859U (en) Fast-assembling formula panel beating frame
CN220247318U (en) Hyperbolic curtain wall aluminum veneer
CN219509026U (en) Multi-curved-surface structure assembly modeling structure
CN219735486U (en) Building heating ventilation air conditioner convenient to fix
CN220888972U (en) Civil space capsule
CN215548567U (en) Rack is used in assembled architectural equipment lease
CN111677254B (en) High-rise external frame structure and construction method thereof
CN217949469U (en) Energy-conserving curtain of architectural decoration
CN220623547U (en) Assembled steel structure support
CN216713328U (en) Assembled wall body and floor fixed knot construct
CN220747514U (en) Wallboard combination pendant convenient to quick construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant