CN215593976U - Novel bored concrete pile operation platform - Google Patents

Novel bored concrete pile operation platform Download PDF

Info

Publication number
CN215593976U
CN215593976U CN202120425948.7U CN202120425948U CN215593976U CN 215593976 U CN215593976 U CN 215593976U CN 202120425948 U CN202120425948 U CN 202120425948U CN 215593976 U CN215593976 U CN 215593976U
Authority
CN
China
Prior art keywords
base
hydraulic push
fixedly arranged
rods
safety plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120425948.7U
Other languages
Chinese (zh)
Inventor
邵金安
邵振华
刘玉霞
于凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Aosen Construction Engineering Co ltd
Original Assignee
Zhengzhou Jintaili Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Jintaili Engineering Technology Co ltd filed Critical Zhengzhou Jintaili Engineering Technology Co ltd
Priority to CN202120425948.7U priority Critical patent/CN215593976U/en
Application granted granted Critical
Publication of CN215593976U publication Critical patent/CN215593976U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a novel cast-in-place pile operation platform, which comprises a base and four adjusting components, wherein the top end of the base is provided with a workbench, a pile hole is formed in the middle of the workbench, guard plates are fixedly arranged at four corners of the top end of the workbench, the four adjusting components comprise fixed cylinders, supporting rods and hydraulic push rods, the hydraulic push rods are fixedly arranged at the bottom ends of the inner parts of the four fixed cylinders, and the telescopic ends of the four hydraulic push rods are fixedly connected with the bottom ends of the four supporting rods, and the novel cast-in-place pile operation platform has the beneficial effects that: under the action of the four hydraulic push rods, the four support rods move upwards, so that the height of the base is adjusted; make the safety plate remove under electric putter's effect and the cooperation of slide rail to separate the fender to the stake hole, avoid taking place the accident, and the wire net through setting up on the top of safety plate and bottom, can enough alleviate the weight of safety plate, can make things convenient for the staff again to survey drilling.

Description

Novel bored concrete pile operation platform
Technical Field
The utility model relates to a cast-in-place pile operation platform, in particular to a novel cast-in-place pile operation platform, and belongs to the technical field of building construction.
Background
Bored concrete pile is the most common one in the pile foundation construction, because the safety protection is less when the bored concrete pile foundation, constructor make a round trip to walk about on the workstation etc. reason, because of the protection does not in place makes personnel fall into the drilling and takes place dangerously easily. And the existing cast-in-place pile operation platform is troublesome to install, and the height of the existing cast-in-place pile operation platform is inconvenient to adjust once the existing cast-in-place pile operation platform is installed, so that the height adjustment required by construction becomes extremely troublesome.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a novel cast-in-place pile operation platform to solve the problems of poor safety protection and inconvenience in height adjustment in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a novel bored concrete pile operation platform, includes base and four adjusting part and sets up the connecting seat in the base bottom, the top of base sets up to the workstation, the stake hole has been seted up at the middle part of workstation, the four corners on workstation top is all fixed and is equipped with the backplate, the fixed two dead levers that are equipped with in one side on base inner wall top, the both sides in stake hole are all fixed and are equipped with the slide rail, the both sides in stake hole all seted up with two slide rail matched with spout, one of them the inside slip of slide rail is equipped with the safety plate, the safety plate is hollow structure, one side of safety plate bottom is fixed and is equipped with the connecting rod, one of them the bottom of slide rail seted up with connecting rod matched with slide, four adjusting part is fixed the setting respectively in the four corners of base bottom, four adjusting part includes a fixed section of thick bamboo, four adjusting part, Branch and hydraulic pressure push rod, four the inside bottom of solid fixed cylinder is all fixed and is equipped with hydraulic pressure push rod, four hydraulic pressure push rod's flexible end all with four the bottom fixed connection of branch, four branch is fixed the setting respectively is in the four corners of base bottom, one of them the fixed flush mounting plate that is equipped with in one side of backplate, flush mounting plate's surface is fixed being equipped with down switch and electric putter switch respectively, four hydraulic pressure push rod all passes through down switch and power electric connection.
According to a preferable technical scheme, limiting plates are fixedly arranged at the bottom ends of the four supporting rods, and the bottom ends of the four limiting plates are respectively fixedly connected with the telescopic ends of the four hydraulic push rods.
As a preferred technical scheme, the bottom ends of the four connecting seats are respectively provided with a screw hole, and the top ends of the four supporting rods are respectively in threaded connection with the four screw holes.
As a preferable technical scheme of the utility model, the middle part of one guard plate is provided with an inlet.
As a preferred technical scheme of the present invention, an electric push rod is fixedly arranged at the top of one side of the inner wall of the base, a telescopic end of the electric push rod is fixedly connected with the bottom of one side of the connecting rod, the top end of the electric push rod is fixedly connected with the bottom ends of the two fixing rods, respectively, and the electric push rod is electrically connected with a power supply through an electric push rod switch.
As a preferable technical scheme of the utility model, the top end and the bottom end of the safety plate are both fixedly provided with steel wire meshes.
Compared with the prior art, the utility model has the beneficial effects that: according to the novel cast-in-place pile operation platform, under the action of the four hydraulic push rods and the cooperation of the four fixed cylinders, the four support rods move upwards, so that the height of the base is adjusted; the limiting plates arranged at the bottom ends of the four support rods can limit the telescopic end of the hydraulic push rod and prevent the telescopic end of the hydraulic push rod from extending out of the fixed cylinder; make the safety plate remove under electric putter's effect and the cooperation of slide rail to separate the fender to the stake hole, avoid taking place the accident, and the wire net through setting up on the top of safety plate and bottom, can enough alleviate the weight of safety plate, can make things convenient for the staff again to survey drilling.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
fig. 3 is a schematic structural view of the security pane of the present invention.
In the figure: 1. a base; 2. pile holes; 3. a guard plate; 4. an adjustment assembly; 41. a fixed cylinder; 42. a strut; 43. a limiting plate; 44. a hydraulic push rod; 5. a connecting seat; 6. an inlet; 7. a slide rail; 8. fixing the rod; 9. an electric push rod; 10. a security pane; 11. a connecting rod; 12. a switch panel; 13. steel wire mesh; 14. a work bench.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a novel bored concrete pile operation platform, which comprises a base 1, four adjusting assemblies 4 and a connecting seat 5 disposed at the bottom end of the base 1, wherein the top end of the base 1 is provided with a workbench 14, the middle portion of the workbench 14 is provided with a pile hole 2, four corners of the top end of the workbench 14 are all fixedly provided with guard plates 3, one side of the top end of the inner wall of the base 1 is fixedly provided with two fixing rods 8, two sides of the pile hole 2 are both fixedly provided with slide rails 7, two sides of the pile hole 2 are both provided with slide grooves matched with the two slide rails 7, one of the slide rails 7 is internally provided with a safety plate 10 in a sliding manner, the safety plate 10 is of a hollow structure, one side of the bottom end of the safety plate 10 is fixedly provided with a connecting rod 11, the bottom end of one of the slide rail 7 is provided with a slide rail matched with the connecting rod 11, the four adjusting assemblies 4 are respectively fixedly disposed at four corners of the bottom end of the base 1, four adjusting part 4 are including solid fixed cylinder 41, branch 42 and hydraulic rod 44, the inside bottom of four solid fixed cylinders 41 is all fixed and is equipped with hydraulic rod 44, four hydraulic rod 44's flexible end all with four branch 42's bottom fixed connection, four branch 42 are the fixed four corners that set up in base 1 bottom respectively, the fixed flush mounting plate 12 that is equipped with in one side of one of them backplate 3, flush mounting plate 12's surface is fixed respectively and is equipped with lifting switch and electric putter switch, four hydraulic rod 44 are all through lifting switch and power electric connection.
Preferably, the bottom ends of the four support rods 42 are all fixedly provided with a limiting plate 43, the bottom ends of the four limiting plates 43 are respectively fixedly connected with the telescopic ends of the four hydraulic push rods 44, and the limiting plates 43 arranged at the bottom ends of the four support rods 42 can limit the telescopic ends of the hydraulic push rods 44 and prevent the telescopic ends from extending out of the fixed cylinder 41; the bottom ends of the four connecting seats 5 are respectively provided with a screw hole, the top ends of the four supporting rods 42 are respectively in threaded connection with the four screw holes, and the four supporting rods 42 are respectively in threaded connection with the four connecting seats 5 without being fixedly connected with screws, so that the operation platform can be conveniently mounted and dismounted; the middle part of one of the guard plates 3 is provided with an inlet 6, and the inlet 6 arranged in the middle part of one of the guard plates 3 can facilitate the coming in and going out of a worker, so that the trouble of going up and down is avoided; an electric push rod 9 is fixedly arranged at the top of one side of the inner wall of the base 1, the telescopic end of the electric push rod 9 is fixedly connected with the bottom of one side of the connecting rod 11, the top end of the electric push rod 9 is fixedly connected with the bottom ends of the two fixing rods 8 respectively, the electric push rod 9 is electrically connected with a power supply through an electric push rod switch, the electric push rod 9 arranged at one side of the inner wall of the base 1 can be controlled through the switch, and the safety plate 10 is moved under the cooperation of the sliding rail 7, so that the pile hole 2 is blocked, and the condition that a constructor falls into a drilled hole is avoided; the top and the bottom of safety plate 10 all fix and are equipped with wire net 13, through the wire net 13 that sets up on the top of safety plate 10 and bottom, can enough alleviate safety plate 10's weight, can make things convenient for the staff to observe drilling again.
When the novel cast-in-place pile operation platform is used, firstly, the base 1 is lifted, the four support rods 42 are respectively in threaded connection with the four screw holes and then are placed at a construction position, when construction operation is required, the inlet 6 can enter the upper surface of the workbench 14, the cast-in-place pile is operated through the pile holes 2, then, the four hydraulic push rods 44 are controlled through the lifting switch on the switch panel 12, the four support rods 42 are upwards moved under the action of the four hydraulic push rods 44 and the cooperation of the four fixed cylinders 41, so that the height of the base 5 is adjusted, the telescopic end of each hydraulic push rod 44 can be limited through the limiting plate 43 arranged at the bottom end of each support rod 42, the telescopic end of each hydraulic push rod 44 is prevented from extending out of the corresponding fixed cylinder 41, then, after construction is completed, the electric push rod 9 is controlled through the electric push rod switch on the switch panel 12, make safety plate 10 remove under electric putter 9's effect and the cooperation of slide rail 7 to separate the fender to stake hole 2, avoid meeting accident, and through the wire net 13 of the top and the bottom setting at safety plate 10, can enough alleviate safety plate 10's weight, can make things convenient for the staff to observe drilling again.
In the description of the present invention, it is to be understood that the indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings and are only for convenience in describing the present invention and simplifying the description, but are not intended to indicate or imply that the indicated devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly attached, detachably attached, or integrated; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A novel cast-in-place pile operation platform comprises a base (1), four adjusting components (4) and a connecting seat (5) arranged at the bottom end of the base (1), and is characterized in that the top end of the base (1) is provided with a workbench (14), a pile hole (2) is formed in the middle of the workbench (14), guard plates (3) are fixedly arranged at four corners of the top end of the workbench (14), two fixing rods (8) are fixedly arranged at one side of the top end of the inner wall of the base (1), slide rails (7) are fixedly arranged at two sides of the pile hole (2), slide grooves matched with the two slide rails (7) are formed in two sides of the pile hole (2), a safety plate (10) is arranged inside one of the slide rails (7) in a sliding mode, the safety plate (10) is of a hollow structure, a connecting rod (11) is fixedly arranged at one side of the bottom end of the safety plate (10), the bottom end of one of the sliding rails (7) is provided with a slideway matched with the connecting rod (11), four adjusting assemblies (4) are respectively and fixedly arranged at four corners of the bottom end of the base (1), the four adjusting assemblies (4) comprise fixed cylinders (41), supporting rods (42) and hydraulic push rods (44), the hydraulic push rods (44) are fixedly arranged at the bottom ends of the inner parts of the four fixed cylinders (41), the telescopic ends of the four hydraulic push rods (44) are respectively and fixedly connected with the bottom ends of the four supporting rods (42), the four supporting rods (42) are respectively and fixedly arranged at the four corners of the bottom end of the base (1), one side of one of the guard plates (3) is fixedly provided with a switch panel (12), the surface of the switch panel (12) is respectively and fixedly provided with a lifting switch and an electric push rod switch, and the four hydraulic push rods (44) are electrically connected with a power supply through the lifting switches.
2. The novel bored concrete pile work platform of claim 1, wherein: four the bottom of branch (42) all is fixed and is equipped with limiting plate (43), four the bottom of limiting plate (43) respectively with four the flexible end fixed connection of hydraulic push rod (44).
3. The novel bored concrete pile work platform of claim 1, wherein: screw holes are formed in the bottom ends of the four connecting seats (5), and the top ends of the four supporting rods (42) are respectively in threaded connection with the four screw holes.
4. The novel bored concrete pile work platform of claim 1, wherein: the middle part of one of the guard plates (3) is provided with an inlet (6).
5. The novel bored concrete pile work platform of claim 1, wherein: the top of base (1) inner wall one side is fixed and is equipped with electric putter (9), the flexible end of electric putter (9) with the bottom fixed connection of connecting rod (11) one side, the top of electric putter (9) respectively with two the bottom fixed connection of dead lever (8), electric putter (9) are through electric putter switch and power electric connection.
6. The novel bored concrete pile work platform of claim 1, wherein: the top and the bottom of safety plate (10) all are fixed and are equipped with wire net (13).
CN202120425948.7U 2021-02-26 2021-02-26 Novel bored concrete pile operation platform Active CN215593976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120425948.7U CN215593976U (en) 2021-02-26 2021-02-26 Novel bored concrete pile operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120425948.7U CN215593976U (en) 2021-02-26 2021-02-26 Novel bored concrete pile operation platform

Publications (1)

Publication Number Publication Date
CN215593976U true CN215593976U (en) 2022-01-21

Family

ID=79869384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120425948.7U Active CN215593976U (en) 2021-02-26 2021-02-26 Novel bored concrete pile operation platform

Country Status (1)

Country Link
CN (1) CN215593976U (en)

Similar Documents

Publication Publication Date Title
CN215593976U (en) Novel bored concrete pile operation platform
CN210152203U (en) Installation operation platform for housing construction
CN210316535U (en) Construction hydraulic pressure template climbing device
CN210500860U (en) Secondary structure constructional column top bar planting assistor
CN217129048U (en) Adjusting device is consolidated to vertical building prefab
CN217972496U (en) Height-adjustable's elevating gear is used in iron tower maintenance
CN214384047U (en) Hydraulic system for high-rise building climbing pouring
CN215055122U (en) Simple mounting platform for large formwork
CN211172973U (en) Improved heightening device based on scaffold for building construction
CN221420501U (en) Tower crane climbing mechanism
CN213141333U (en) Lifting platform for installing variable-frequency series resonance device
CN219906932U (en) Manhole cover opening tool
CN219603215U (en) Auxiliary device for assembling security door
CN220301589U (en) Novel curved curtain wall
CN220450895U (en) Civil engineering foundation connection structure for electric power construction
CN219677867U (en) Adjusting mechanism capable of adjusting height of distribution box
CN113685037B (en) Detachable mounting bracket and mounting construction method of prefabricated balcony
CN219491766U (en) Adjustable U-shaped support for overhead installation of suspension type linear steel structure
CN215208182U (en) Attachment frame mounting and supporting device
CN220599693U (en) Supporting mechanism for operation and maintenance of high place of photovoltaic power station
CN221502610U (en) Good scaffold frame for construction of stability
CN221722224U (en) Safety frame
CN216921499U (en) Top bracing device for controlling crack of super-long reinforced concrete structure
CN219298831U (en) Positioning device convenient to adjust and used for installing inclined column steel structure
CN219794722U (en) Steel beam connection auxiliary frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240322

Address after: 110500 Office Building of Liushu Village Cultural Station, Liushu Township, Kangping County, Shenyang City, Liaoning Province

Patentee after: Liaoning Aosen Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 450000 west house, 1st floor, unit 1, East Building, Huiyuan community, Xincheng Road, Tianhe Road, Huiji District, Zhengzhou City, Henan Province

Patentee before: Zhengzhou jintaili Engineering Technology Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right