CN215564587U - Quick school clamp is used in wallboard installation flattening - Google Patents
Quick school clamp is used in wallboard installation flattening Download PDFInfo
- Publication number
- CN215564587U CN215564587U CN202120266629.6U CN202120266629U CN215564587U CN 215564587 U CN215564587 U CN 215564587U CN 202120266629 U CN202120266629 U CN 202120266629U CN 215564587 U CN215564587 U CN 215564587U
- Authority
- CN
- China
- Prior art keywords
- clamp
- leveling
- quick
- pushing
- wallboard installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a quick correcting clamp for wallboard installation and leveling, wherein a connecting beam penetrates through a gap between leveled wallboards in the wallboard installation process, a clamping hook and a pushing clamp respectively clamp and hang metal pipes arranged on the front and back surfaces of the wallboard, and the pushing device is driven to finish the leveling correction of a building partition board. The device comprises a connecting beam, a clamping hook, a pushing and clamping clamp and a pushing device, wherein the clamping hook and the pushing device are connected with the connecting beam, the pushing and clamping clamp is connected to the front end of a pushing rod of the pushing device, and the pushing rod drives the pushing and clamping clamp to move back and forth along the direction of the connecting beam. The clamping hook and/or the pushing device is fixedly connected or detachably connected with the connecting beam. This real novel a wallboard installation flattening is with its profitable effect of quick school clamp is, the school clamps uses ejector means drive tubular metal resonator to carry out the flattening correction to the wallboard, and school clamps easy operation, but the drive pressure of correction free control.
Description
Technical Field
The utility model provides a wallboard installation flattening is with quick school tight clamp, relates to a building wall body portion article installation correcting tool, concretely relates to building partition plate installation flattening is with quick fastening school tight anchor clamps.
Background
In recent years, with the gradual improvement of the environmental protection concepts of the country and the people, the environment-friendly and energy-saving fabricated building is gradually favored by the authorities and the public. The light building partition board is one of important members of a fabricated building, and is widely applied to the sealing of an outer wall and the partition of an inner wall of the building. In the site installation and construction of the specific partition boards, most of the leveling and correction of the board surface between the two partition boards adopt a double-pipe butt-clamp leveling mode or a leveling bar leveling mode.
Wherein double-barrelled double-layered flattening adopts two tubular metals to attach on the face around two blocks of adjacent wallboards, and the wire winding that the rethread penetrated in the joint line between two blocks of wallboards comes the completion to two blocks of adjacent wallboard flattening corrections.
Wherein install level and smooth thick stick flattening additional and adopt two tubular metals to attach on the face around two blocks of adjacent wallboards, the middle part of two tubular metals is provided with the through-hole, and the metal screw rod passes the joint line between two blocks of wallboards and connects two tubular metals through the through-hole on the tubular metal and fasten together and accomplish to two blocks of adjacent wallboard flattening corrections.
The two wallboard installation leveling correction modes have the following defects in specific construction.
One, double-barrelled double-layered flattening mode, 1) its two tubular metals pass through the fastening of winding wire, and the initial condition can't be resumeed to the wire after the winding, thereby can not used repeatedly many times and cause the wallboard installation cost higher. 2) If the waste metal wires wound on the ground of the installation site cannot be cleaned in time, hidden dangers can be brought to construction safety, and the cleaned waste metal wires need to be transported out of the construction site in time, so that time and labor are wasted. 3) The fastening force between two metal pipes which are fastened by winding metal wires cannot be effectively controlled, judgment can only be carried out through experience of constructors, the judgment of different constructors cannot be unified, and the quality and the effect of the wallboard after installation and construction are different.
And secondly, a leveling bar leveling mode is additionally arranged, and although the leveling bar leveling fastening mode is additionally arranged to overcome the defects of a double-pipe butt-clamping leveling mode, the following defects still occur in the installation and construction of specific wallboards. 1) The through-hole that is used for wearing hanging the bolt that levels two tubular metal resonator middle parts of thick stick set up warp under the long-time extrusion of bolt body and nut, and the bolt can't penetrate smoothly and take out at the through-hole often appears in the through-hole after the deformation, brings inconvenience for the wallboard installation. 2) Because the through hole is arranged in the middle of the metal pipe, the metal pipe can be bent along the through hole under the action of the pressure of the bolt, and the metal pipe must be repaired to be flat when the bolt is used for the second time. The strength of the metal pipe after being trimmed for many times is reduced under the action of metal fatigue, and the metal pipe is frequently replaced, so that the installation cost of the wallboard is increased.
Disclosure of Invention
In order to solve the problems, the utility model provides a quick correcting clamp for wallboard installation and leveling, wherein a connecting beam penetrates through a gap between leveled wallboards in the installation process of the wallboards, a clamping hook and a pushing clamp respectively clamp and hang metal pipes arranged on the front and back surfaces of the wallboards, and the leveling and the correction of building partition boards are completed under the driving of a pushing device.
The utility model relates to a quick fastening clamp for wallboard installation and leveling, which comprises a connecting beam, a clamping hook, a pushing clamp and a pushing device, wherein the clamping hook and the pushing device are connected with the connecting beam, the pushing clamp is connected to the front end of a pushing rod of the pushing device, and the pushing rod drives the pushing clamp to move back and forth along the direction of the connecting beam.
Specifically, the clamping hook and/or the pushing device is fixedly connected with the connecting beam.
Specifically, the clamping hook and/or the ejector device are detachably connected with the connecting beam, and the clamping hook and/or the ejector device are fixedly positioned on the connecting beam through the clamping mechanism.
Further specifically, the clamping hook and/or the ejection device is detachably connected to the connecting beam in a sleeved and hung mode through a sleeve sliding body, a hollow cavity is formed in the sleeve sliding body, and the shape of the hollow cavity is matched with the cross section shape of the connecting beam.
More specifically, the clamping hook and/or the pushing device is detachably sleeved and hung on the connecting beam through a groove sliding and rotating pull ring, and the groove sliding and rotating pull ring is composed of a groove sliding body and a rotating pull ring rotatably connected to the groove sliding body.
Specifically, the ejection device comprises an internal thread sleeve and an ejection rod, the ejection rod is rotatably connected with the internal thread sleeve through an external thread formed on the outer surface of the ejection rod, the internal thread sleeve is fixedly connected with the connecting beam or the sleeve sliding body or the groove sliding pull ring, and the rotating ejection rod can drive the push clamp to move back and forth.
Specifically, the ejection device comprises an eccentric wheel, a wheel connecting frame, a sliding sleeve and an ejection rod, the ejection rod is arranged in a sliding hole of the sliding sleeve in a sliding mode, and the eccentric wheel is rotatably arranged in the wheel connecting frame. The wheel connecting frame and the sliding sleeve are fixedly connected with the connecting beam or the sleeve sliding body or the slot sliding rotary pull ring, and the rotary eccentric wheel can drive the ejector rod and the push clamp to move back and forth.
Specifically, the clamping mechanism is a pin hole I arranged on the connecting beam, a pin hole II arranged on the sleeve sliding body and a pin.
Specifically, the clamping mechanism is a tooth clamping groove arranged on the upper end face of the connecting beam and a circular clamping column arranged on the upper end face of the sleeve sliding body.
Specifically, the clamping mechanism is a tooth clamping groove arranged on the upper end face of the connecting beam and a ring top connecting column of the rotary pull ring.
Specifically, the shape of the clip hook and the push top surface of the push clip card is arranged in a right angle or an arc.
The quick correcting clamp for wallboard installation and leveling has the beneficial effects that 1) the correcting clamp drives the metal pipe to level and correct the wallboard by using the pushing device, the correcting clamp is simple to operate, and the correcting driving pressure can be freely controlled. 2) The clamping device can be repeatedly used for a long time, and is suitable for metal pipes in various shapes such as metal square pipes and metal round pipes in the installation and construction of partition boards. 3) The clamping hook and the ejector device can be movably arranged on the connecting beam, the distance between the clamping hook and the ejector device can be adjusted, and the correcting clamp can be suitable for installation, leveling and correction of partition boards with various thicknesses.
Drawings
FIG. 1 is a three-dimensional schematic view of the rapid fastening clamp for wallboard installation and leveling according to the present invention
FIG. 2 is a three-dimensional schematic view (I) of a rapid-fastening clamp for wallboard installation and leveling according to the present invention
FIG. 3 is a three-dimensional schematic view (II) of a rapid-fastening clamp for wallboard installation and leveling according to the present invention
FIG. 4 is a three-dimensional schematic view (III) of a quick-acting clamp for wallboard installation and leveling according to the present invention
FIG. 5 is a three-dimensional schematic view (IV) of the quick tightening clamp for wallboard installation and leveling of the present invention
FIG. 6 is a three-dimensional schematic view (V) of a rapid-tightening clamp for wallboard installation and leveling according to the present invention
FIG. 7 is a three-dimensional schematic View (VI) of a quick tightening clamp for wallboard installation and leveling according to the present invention
Detailed Description
The concrete structure and the working principle of the quick correcting clamp for wallboard installation and leveling of the utility model are further explained with reference to the attached drawings.
The utility model relates to a quick correcting clamp for wallboard installation and leveling, which is shown in figure 2, wherein the correcting clamp 1 comprises a connecting beam 11, a clamping hook 12, a pushing clamp 13 and a pushing device 14, the clamping hook 12 and the pushing device 14 are connected with the connecting beam 11, the pushing clamp 13 is connected to the front end of a pushing rod 14a of the pushing device 14, and the pushing rod 14a drives the pushing clamp 13 to move back and forth along the direction of the connecting beam 11.
Referring to fig. 1 and fig. 2, the coupling beam 11 of the fastening clip 1 passes through the gap between two partition boards a, the clip hook 12 is added with a metal tube B1 hung on the rear end face of the partition board, the push clip 13 clips a metal tube B2 hung on the front end face of the partition board, after the push rod 14a arranged on the ejector 14 is rotated, the push rod 14a drives the push clip 13 to drive the metal tube B1 to move towards the metal tube B2, so as to complete the leveling and the fastening between two adjacent partition boards.
The utility model relates to a quick fastening clamp for wallboard installation and leveling, wherein a clamp hook 12, a pushing device 14 and a connecting beam 11 are connected in a fixed connection mode or a detachable connection mode.
As shown in fig. 2 and 7 in particular, the clamping hook 12 and/or the ejector 14 is fixedly connected with the connecting beam 11.
As shown in fig. 3-6 and 7, the clip hook 12 and/or the ejector 14 are detachably connected to the connecting beam 11, and the clip hook and the ejector are fixed on the connecting beam 11 by the fastening mechanism 15.
As further shown in fig. 3 and 5, the clamping hook 12 and/or the ejector 14 are detachably connected to the coupling beam 11 by a sleeve slider 16, and the sleeve slider 16 is provided with a hollow cavity 16a, wherein the shape of the hollow cavity 16a matches with the cross-sectional shape of the coupling beam 11.
As further shown in fig. 6, the hook 12 and/or the ejector 14 are detachably engaged with the coupling beam 11 by a slot slide-and-turn tab 17, and the slot slide-and-turn tab 17 is composed of a slot slide body 17a and a turn tab 17b rotatably connected to the slot slide body 17 a.
The pushing device 14 of the quick fastening clamp for wallboard installation and leveling has the following two structures.
Specifically, as shown in fig. 2, fig. 3, fig. 6 and fig. 7, the ejector 14 includes an internally threaded sleeve 14b and an ejector rod 14a, the ejector rod 14a is rotatably connected to the internally threaded sleeve 14b through an external thread formed on an outer surface thereof, and the rotating ejector rod 14a can drive the pinch clamp 13 to move back and forth. As shown in fig. 2 and 7, the internal thread sleeve 14b is fixedly connected with the connecting beam 11. As shown in fig. 3, the internally threaded sleeve 14b is fixedly connected to the sleeve slider 16. As shown in fig. 6, the female threaded sleeve 14b is fixedly connected with the slot sliding and rotating ring 17.
Specifically, as shown in fig. 4 and 5, the ejection device 14 includes an eccentric wheel 14c, a wheel connecting frame 14d, a sliding sleeve 14e, and an ejection rod 14a, the ejection rod 14a is slidably disposed in a sliding hole of the sliding sleeve 14e, the eccentric wheel 14c is rotatably disposed in the wheel connecting frame 14d, and the rotating eccentric wheel 14c can drive the ejection rod 14a and the ejection clamp 13 to move back and forth. As shown in fig. 4, the wheel connecting frame 14d and the sliding sleeve 14e are respectively fixedly connected with the connecting beam 11. As shown in fig. 5, the wheel-connecting frame 14d and the sliding sleeve 14e are fixedly connected to the sleeve sliding body 16. Referring to fig. 5 and 6, the wheel-link frame 14d and the slide bushing 14e are fixedly connected to the slot-slide-spinning ring 17, respectively.
The quick fastening clamp clamping mechanism 15 for wallboard installation and leveling has the following three structures.
Specifically, as shown in fig. 3, the locking mechanism 15 is a pin hole I11a provided on the coupling beam 11, a pin hole II16b provided on the sleeve slider 16, and a pin 15 a.
Specifically, as shown in fig. 5, the fastening mechanism 15 is a tooth clamping groove 11b disposed on the upper end surface of the coupling beam 11 and a circular clamping column 16c disposed on the upper end surface of the sliding sleeve 16.
Specifically, as shown in fig. 6, the fastening mechanism 15 is a tooth clamping groove 11b provided on the upper end surface of the coupling beam 11 and a loop top coupling post (17b1) of the rotary-pull loop (17 b).
As shown in figure 2, the shape of the push top surface 123 of the clamp hook 12 and the push clamp 13 of the quick fastening clamp for wallboard installation and leveling is right-angled. The 123 right-angled clamping hooks 12 on the pushing top surface are used for clamping the metal square tubes.
As shown in figure 7, the shape of the push top surface 123 of the clamp hook 12 and the push clamp 13 of the quick fastening clamp for wallboard installation and leveling is arc-shaped. The 123 of the pushing top surface is provided with a clamping hook 12 which is arranged at a right angle and is used for clamping a metal round pipe.
The above is a detailed description of the technical scheme of the rapid fastening clamp for wallboard installation and leveling provided by the embodiment of the present invention, and for a person skilled in the art, there are variations in the specific implementation and application scope according to the idea of the embodiment of the present invention. In summary, the content of the present specification should not be construed as limiting the present invention, and any modification made according to the design concept of the present invention is within the scope of the present invention.
Claims (11)
1. A quick correcting clamp for wallboard installation and leveling is characterized in that the correcting clamp (1) comprises a connecting beam (11), a clamping hook (12), a pushing clamp (13) and a pushing device (14);
the clamping hook (12) and the pushing device (14) are connected with the connecting beam (11);
the push clamp (13) is connected to the front end of a push rod (14a) of the push device (14);
the ejector rod (14a) drives the push clamp (13) to move back and forth along the direction of the connecting beam (11).
2. A quick-acting clip for wallboard installation and levelling as claimed in claim 1, wherein the clip hook (12) and or the ejector (14) is fixedly connected to the coupling beam (11).
3. The quick-acting fastening clip for wallboard installation and leveling as claimed in claim 1, wherein the clip hook (12) and or the ejector (14) is detachably connected with the connecting beam (11), and the clip hook and the ejector are fixedly positioned on the connecting beam (11) through the clamping mechanism (15).
4. A quick-acting fastening clip for wallboard installation and levelling as claimed in claim 3, wherein the clip hook (12) and or the ejector (14) is detachably hitched on the coupling beam (11) through a slip body (16); the sleeve sliding body (16) is provided with a hollow cavity (16a), wherein the shape of the hollow cavity (16a) is matched with the cross section shape of the connecting beam (11).
5. A quick-acting fastening clip for wallboard installation and levelling as claimed in claim 3, wherein the clip hook (12) and or the ejector (14) is detachably hitched on the coupling beam (11) by a slot sliding and rotating pull ring (17);
the slot sliding rotary pull ring (17) is composed of a slot sliding body (17a) and a rotary pull ring (17b) rotatably connected on the slot sliding body (17 a).
6. A rapid-tightening clamp for wallboard installation and leveling according to any one of claims 2, 4 and 5, wherein the ejector (14) comprises an internally threaded sleeve (14b) and an ejector rod (14 a);
the ejector rod (14a) is rotationally connected with the internal thread sleeve (14b) through an external thread formed on the outer surface of the ejector rod;
the internal thread sleeve (14b) is fixedly connected with the connecting beam (11) or the sleeve sliding body (16) or the groove sliding rotary pull ring (17), and the rotary ejector rod (14a) can drive the push clamp (13) to move back and forth.
7. The quick correcting clamp for wallboard installation and leveling of claims 2, 4 and 5, wherein the pushing device (14) comprises an eccentric wheel (14c), a wheel connecting frame (14d), a sliding sleeve (14e) and a pushing rod (14 a);
the ejector rod (14a) is arranged in a sliding hole of the sliding sleeve (14e) in a sliding way, and the eccentric wheel (14c) is rotationally arranged in the wheel connecting frame (14 d);
the wheel connecting frame (14d) and the sliding sleeve (14e) are fixedly connected with the connecting beam (11) or the sleeve sliding body (16) or the groove sliding rotary pull ring (17);
the rotating eccentric wheel (14c) can drive the push rod (14a) and the push clamp (13) to move back and forth.
8. The quick fastening clip for wallboard installation and leveling as claimed in claim 3, wherein the fastening mechanism (15) is a pin hole I (11a) provided on the coupling beam (11), a pin hole II (16b) provided on the sleeve slider (16) and a pin (15 a).
9. The quick fastening clip for wallboard installation and leveling as claimed in claim 3, wherein the fastening mechanism (15) is a tooth slot (11b) arranged on the upper end surface of the coupling beam (11) and a round fastening column (16c) arranged on the upper end surface of the slip body (16).
10. The quick fastening clip for wallboard installation and leveling as claimed in claim 3, wherein the fastening mechanism (15) is a tooth slot (11b) arranged on the upper end face of the coupling beam (11) and a top coupling column (17b1) of the rotary ring (17 b).
11. The quick-acting fastening clip for wallboard installation and leveling as claimed in claim 1, wherein the shape of the push top surface (123) of the clip hook (12) and the push clip (13) is a right angle arrangement or a circular arc arrangement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120266629.6U CN215564587U (en) | 2021-01-25 | 2021-01-25 | Quick school clamp is used in wallboard installation flattening |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120266629.6U CN215564587U (en) | 2021-01-25 | 2021-01-25 | Quick school clamp is used in wallboard installation flattening |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215564587U true CN215564587U (en) | 2022-01-18 |
Family
ID=79837799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120266629.6U Active CN215564587U (en) | 2021-01-25 | 2021-01-25 | Quick school clamp is used in wallboard installation flattening |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215564587U (en) |
-
2021
- 2021-01-25 CN CN202120266629.6U patent/CN215564587U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205100547U (en) | A stupefied device of aluminum alloy template back of body for shear force wall | |
CN206053324U (en) | A kind of curved adjustable securing member of building template list | |
CN215564587U (en) | Quick school clamp is used in wallboard installation flattening | |
CN206376527U (en) | A kind of aluminum alloy pattern plate back cord component | |
CN112832540A (en) | Quick school clamp is used in wallboard installation flattening | |
CN219158404U (en) | Concrete upturning beam template fixing device | |
CN210857607U (en) | Frame structure of building wall | |
CN209907935U (en) | Supporting device for assembled external wall panel and aluminum template cast-in-place concrete beam system | |
CN205189402U (en) | Back edge connecting device of steel and wood structure of template | |
CN207032844U (en) | U-shaped fastener | |
CN201169923Y (en) | Grouting and joint pointing dual-purpose tools | |
CN213868950U (en) | Adjustable split bolt device for building | |
CN201521103U (en) | Scaffold connecting tube device for curtain wall construction | |
CN205063338U (en) | Be used for stupefied device of reinforced (rfd) adjustable back of body of post template | |
CN203050029U (en) | Fixing part for outer wall stone slabs | |
CN107939037B (en) | Remote steel pipe scaffold wall connecting device | |
CN201128959Y (en) | Novel building top structure | |
CN218814387U (en) | Detachable pre-buried anchoring device | |
CN217711678U (en) | Angle counter-pulling device for building aluminum template | |
CN2567294Y (en) | One-way fastening, support for steel reinforced concrete | |
CN216475799U (en) | Sail curtain wall connection structure | |
CN220487102U (en) | Corner constructional column reinforcing device | |
CN216840540U (en) | Scaffold is wall device even | |
CN214499691U (en) | Combined eccentric plastic expansion nut | |
CN219773630U (en) | Back edge adaptable to screw fastening position |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |