CN215564237U - Decorate engineering ceramic tile installation auxiliary structure - Google Patents

Decorate engineering ceramic tile installation auxiliary structure Download PDF

Info

Publication number
CN215564237U
CN215564237U CN202120029149.8U CN202120029149U CN215564237U CN 215564237 U CN215564237 U CN 215564237U CN 202120029149 U CN202120029149 U CN 202120029149U CN 215564237 U CN215564237 U CN 215564237U
Authority
CN
China
Prior art keywords
ceramic tile
clamping
sliding block
ceramic
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120029149.8U
Other languages
Chinese (zh)
Inventor
刘会旭
李永林
刘喜平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Jinjida Decoration Engineering Co ltd
Original Assignee
Foshan Jinjida Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Jinjida Decoration Engineering Co ltd filed Critical Foshan Jinjida Decoration Engineering Co ltd
Priority to CN202120029149.8U priority Critical patent/CN215564237U/en
Application granted granted Critical
Publication of CN215564237U publication Critical patent/CN215564237U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to an auxiliary structure for installing a decorative engineering ceramic tile, which comprises an installation plate and a ceramic tile clamping assembly arranged on the installation plate, wherein the ceramic tile clamping assembly comprises a sliding groove arranged on one side of the installation plate, a sliding block arranged in the sliding groove, a telescopic rod connected with the sliding block and a sucker arranged at the end part of the telescopic rod, a clamping driving piece connected with the sliding block is arranged in the sliding groove, and the clamping driving piece is a micro cylinder. When this structure uses, laminate two sucking discs respectively in the outside of wall both sides ceramic tile, relative tensile telescopic link makes the sucking disc be located the central point of ceramic tile and puts, and the clamping-force that guarantees that the ceramic tile and receive is even, and sucking disc rigidity back, through two sucking disc clamp tight fixed ceramic tiles of miniature cylinder control, the ceramic tile of guaranteeing the wall new laying is by the clamping and stabilizing, prevents effectively that the ceramic tile at wall edge from dropping, and the concrete of ceramic tile bottom solidifies the back, demolish auxiliary structure can. The structure is suitable for clamping and fixing the newly laid ceramic tiles on the edge of any wall surface, and is convenient to operate.

Description

Decorate engineering ceramic tile installation auxiliary structure
Technical Field
The utility model relates to the field of decoration engineering, in particular to an auxiliary structure for installing a ceramic tile in the decoration engineering.
Background
In decorating the engineering field, can relate to ceramic tile installation process, the ceramic tile installation is laid and the wall ceramic tile is laid including ground ceramic tile, when the wall ceramic tile is laid, especially need carry out artifical supplementary clamping to wall border position's ceramic tile, because the ceramic tile quantity that wall border position's ceramic tile links up is not many, concrete drag force between the adjacent ceramic tile is less, the problem of perk and droing appears very easily in wall border position's ceramic tile, for this reason, need assist the clamping with the help of the manual work, at present, decorating the engineering field, the supplementary clamping of ceramic tile has not been accomplished to better frock yet, this patent is based on the defect that the supplementary clamping of current ceramic tile exists, design a decoration engineering ceramic tile installation auxiliary structure.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects in the prior art and provides an auxiliary structure for mounting a decorative engineering ceramic tile.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a decorate engineering ceramic tile installation auxiliary structure, includes the mounting panel and sets up the ceramic tile centre gripping subassembly on the mounting panel, ceramic tile centre gripping subassembly is including setting up the sliding tray of mounting panel one side sets up two sliding blocks in the sliding tray, with sliding block fixed connection's telescopic link, sets up the sucking disc at the telescopic link tip, be equipped with in the sliding tray with the centre gripping driving piece that the sliding block is connected, behind the ceramic tile was laid to the wall, two sucking discs laminating in the outside of ceramic tile and the fixed ceramic tile of centre gripping.
Furthermore, the clamping driving piece is a micro cylinder, a cylinder rod of the micro cylinder is fixedly connected with the sliding block, and a cylinder body of the micro cylinder is fixedly connected with the end part of the sliding groove.
Furthermore, the sucking disc is made of rubber.
Further, the top of the mounting plate is provided with a handle.
Further, the slide groove extends in the longitudinal direction of the mounting plate.
Further, the telescopic rod is perpendicular relative to the mounting plate.
The utility model has the beneficial effects that: when this structure uses, laminate two sucking discs respectively in the outside of wall both sides ceramic tile, relative tensile telescopic link makes the sucking disc be located the central point of ceramic tile and puts, and the clamping-force that guarantees that the ceramic tile and receive is even, and sucking disc rigidity back, through two sucking disc clamp tight fixed ceramic tiles of miniature cylinder control, the ceramic tile of guaranteeing the wall new laying is by the clamping and stabilizing, prevents effectively that the ceramic tile at wall edge from dropping, and the concrete of ceramic tile bottom solidifies the back, demolish auxiliary structure can. The structure is suitable for clamping and fixing the newly laid ceramic tiles on the edge of any wall surface, and is convenient to operate.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a diagram illustrating the effect of the present invention.
Detailed Description
As shown in fig. 1 and fig. 2, a decorate engineering ceramic tile installation auxiliary structure, including mounting panel 1 and the ceramic tile centre gripping subassembly of setting on mounting panel 1, ceramic tile centre gripping subassembly is including setting up the sliding tray 2 in mounting panel 1 one side, set up two sliding blocks 3 in sliding tray 2, with 3 fixed connection's of sliding block telescopic link 4, set up the sucking disc 5 at 4 tip of telescopic link, be equipped with the centre gripping driving piece 6 of being connected with sliding block 3 in the sliding tray 2, behind the ceramic tile 8 was laid to wall 7, two sucking discs 5 laminated in the outside of ceramic tile 8 and centre gripping fixed ceramic tile 8.
Wherein, centre gripping driving piece 6 is miniature cylinder, and miniature cylinder's cylinder pole and sliding block 3 fixed connection, miniature cylinder's cylinder body and the end fixed connection of sliding tray 2.
Furthermore, the sucking disc 5 is made of rubber, and the top of the mounting plate 1 is provided with a handle 9. The slide groove 2 extends in the longitudinal direction of the mounting plate 1. The telescopic rod 4 is perpendicular relative to the mounting plate 1.
When this structure uses, laminate two sucking discs 5 respectively in the outside of 7 both sides ceramic tiles 8 of wall, relative tensile telescopic link 4 makes sucking disc 5 be located ceramic tile 8's central point and puts, it is even to guarantee the clamping-force that ceramic tile 8 received, sucking disc 5 rigidity back, press from both sides tight fixed ceramic tile 8 through two sucking discs 5 of miniature cylinder control, it is stable to guarantee that the ceramic tile 8 that the wall was newly laid is by the clamping, effectively prevent that the ceramic tile 8 at 7 edges of wall from dropping, the concrete on ceramic tile bottom layer solidifies the back, it can to demolish auxiliary structure. The structure is suitable for clamping and fixing the newly laid ceramic tiles on the edge of any wall surface, and is convenient to operate.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the utility model, but that various changes and modifications may be made without departing from the spirit and scope of the utility model, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a decorate engineering ceramic tile installation auxiliary structure, includes the mounting panel and sets up the ceramic tile centre gripping subassembly on the mounting panel, its characterized in that, ceramic tile centre gripping subassembly is including setting up the sliding tray of mounting panel one side sets up two sliding blocks in the sliding tray, with sliding block fixed connection's telescopic link, sets up the sucking disc at the telescopic link tip, be equipped with in the sliding tray with the centre gripping driving piece that the sliding block is connected, behind the ceramic tile was laid to the wall, two sucking discs laminating in the outside of ceramic tile and the fixed ceramic tile of centre gripping.
2. The auxiliary structure for installing decorative engineering ceramic tiles as claimed in claim 1, wherein the clamping driving member is a micro cylinder, a cylinder rod of the micro cylinder is fixedly connected with the sliding block, and a cylinder body of the micro cylinder is fixedly connected with the end of the sliding groove.
3. A decorative engineered tile installation aid according to claim 1 or 2, wherein said suction cup is made of rubber.
4. A decorative engineered tile installation aid according to claim 3, wherein said mounting plate has a handle at the top thereof.
5. A decorative engineered tile installation assistance structure as claimed in claim 3, wherein said sliding groove extends in a length direction of the mounting plate.
6. A decorative engineered tile installation aid according to claim 3, wherein said telescoping rod is perpendicular relative to said mounting plate.
CN202120029149.8U 2021-01-06 2021-01-06 Decorate engineering ceramic tile installation auxiliary structure Active CN215564237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120029149.8U CN215564237U (en) 2021-01-06 2021-01-06 Decorate engineering ceramic tile installation auxiliary structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120029149.8U CN215564237U (en) 2021-01-06 2021-01-06 Decorate engineering ceramic tile installation auxiliary structure

Publications (1)

Publication Number Publication Date
CN215564237U true CN215564237U (en) 2022-01-18

Family

ID=79816173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120029149.8U Active CN215564237U (en) 2021-01-06 2021-01-06 Decorate engineering ceramic tile installation auxiliary structure

Country Status (1)

Country Link
CN (1) CN215564237U (en)

Similar Documents

Publication Publication Date Title
CN110145106A (en) A kind of construction wall construction tile laying mechanical device
CN215564237U (en) Decorate engineering ceramic tile installation auxiliary structure
CN211572460U (en) Building wall tile pasting device
CN204662949U (en) For concrete wall and masonry wall intersection aluminum alloy mould plate groove pressing device
CN203640132U (en) Stereoscopic hanging system
CN103266707B (en) A kind of ceiling decoration insert structure
CN211369445U (en) Compound ceramic tile spreads fast and pastes structure
CN213979675U (en) Assembled concatenation binding off structure of decorative board
CN110067355A (en) A kind of novel composite floor
CN210177918U (en) Auxiliary tool for paving floor tiles
CN201843295U (en) Double-sided base supporting section for color steel wallboard
CN205314466U (en) Take dampproofing ground plate brick of self -adhesive layer
CN207092439U (en) A kind of joggle wallboard quick assembling coupling
CN215803003U (en) Ceramic plate paving flatness control device
CN206752979U (en) The automatic mortar trowelling machine of ash on a kind of ceramic tile binding face
CN201800424U (en) Supporting sheet for surface mount or application of mosaics
CN203160592U (en) Anti-seepage external wall tile
CN207776459U (en) Mortar joint control structure of archaizing brick
CN210918138U (en) Special ceramic tile of intelligence decoration construction equipment is spread and is pasted anchor clamps
CN208686000U (en) Floor
CN217580984U (en) Ceramic tile with back surface being grooved and firmly connected with wall
CN217054211U (en) Ceramic tile paving structure capable of controlling position
CN209145032U (en) Anti- metope cracking device
CN113605622B (en) Reentrant corner structure
CN209780169U (en) Efficient mosaic picture arrangement paving device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant