CN215549636U - Rapid demoulding's building engineering room is built and is used prefabricated wall body mould - Google Patents
Rapid demoulding's building engineering room is built and is used prefabricated wall body mould Download PDFInfo
- Publication number
- CN215549636U CN215549636U CN202121244831.5U CN202121244831U CN215549636U CN 215549636 U CN215549636 U CN 215549636U CN 202121244831 U CN202121244831 U CN 202121244831U CN 215549636 U CN215549636 U CN 215549636U
- Authority
- CN
- China
- Prior art keywords
- threaded rod
- wall body
- rapid
- prefabricated wall
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a prefabricated wall mold for building construction of building engineering, which belongs to the technical field of assembly type building molds and comprises a bottom plate, wherein a prefabricated bottom plate is arranged on the upper end surface of the bottom plate, rectangular groove plates are respectively arranged on the front side and the rear side of the upper end surface of the prefabricated bottom plate, the openings of the rectangular groove plates face the front side and the rear side respectively, side plates are respectively arranged on the left side and the right side between the two groups of rectangular groove plates, the front end surface and the rear end surface of each side plate are oppositely attached to the rectangular groove plates, a first threaded rod and a second threaded rod are respectively arranged on the left side and the right side of the opposite surfaces of the side plates, and the tail ends of the first threaded rod and the second threaded rod are respectively movably connected with a sleeve rod.
Description
Technical Field
The utility model relates to the technical field of assembled building molds, in particular to a rapid demolding prefabricated wall mold for building construction of building engineering.
Background
The existing prefabricated wall body mold is designed in a way that the molds used for producing the existing industrialized parts and components are designed in a one-part mode or a one-component mode, and can be specially designed due to the fact that the parts and the components are different in size and different in reinforcement arrangement and even different in embedded parts, the existing prefabricated wall body mold is difficult to disassemble due to ribs on two sides of a prefabricated wall body, the quality of components is greatly influenced, the mold is easy to deform, the turnover frequency of the mold is reduced, the production efficiency is seriously influenced, the improvement of the industrialized production efficiency is limited, and the prefabricated wall body mold for building the construction engineering house capable of achieving rapid demolding is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a rapid demoulding prefabricated wall body mould for building construction of building engineering, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a building engineering room of quick drawing of patterns is built and is used prefabricated wall body mould, comprises a base plate, the bottom plate up end is equipped with prefabricated bottom plate, both sides all are equipped with rectangular frid around the prefabricated bottom plate up end, the opening of rectangular frid is towards both sides around respectively, and is two sets of the left and right sides all is equipped with the curb plate between the rectangular frid, both ends face and rectangular frid are laminated mutually face to face around the curb plate, the curb plate opposite face left and right sides is equipped with first threaded rod and second threaded rod respectively, the terminal equal swing joint of a threaded rod and second threaded rod has the loop bar.
Preferably, the upper portions of the left end face and the right end face of the rectangular groove plate are respectively provided with a connecting block, the upper end face of the rectangular groove plate is respectively provided with a sliding groove, an inner cavity of each sliding groove is respectively provided with a sliding block, and the sliding blocks are arranged on the lower end faces of the connecting blocks.
Preferably, the rectangular groove plate inner cavity is longitudinally and uniformly provided with reinforcing plates, and the reinforcing plates are arranged in the rectangular groove plate inner cavity in a linear array mode.
Preferably, the middle of the outer wall of the loop bar is provided with a handle, the outer part of the handle is sleeved with a rubber sleeve, and the loop bar is hollow.
Preferably, the threads of the outer walls of the first threaded rod and the second threaded rod are opposite, and the left side and the right side of the inner cavity of the loop bar are respectively provided with an internal thread matched with the first threaded rod and the second threaded rod.
Preferably, the upper end surface and the lower end surface of the rectangular groove plate and the end surface of the prefabricated bottom plate are provided with threaded holes, and the threaded holes of the upper end surface and the lower end surface of the rectangular groove plate correspond to the threaded holes of the end surface of the prefabricated bottom plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. through spout, slider, connecting block, curb plate, first threaded rod, second threaded rod, rectangle frid, loop bar and handle, spout and slider cooperation guarantee that curb plate and prefabricated bottom plate can be perpendicular, and have the guidance quality, guarantee that the curb plate can the left and right sides translation, during the drawing of patterns, twist grip, handle drive loop bar are rotatory, drive first threaded rod and second threaded rod and remove to both sides, fast demoulding.
2. Through prefabricated bottom plate, rectangle frid, screw hole and reinforcing plate, the reinforcing plate guarantees that rectangle frid has stability, avoids rectangle frid to warp, and through screw hole and bolt cooperation, with rectangle frid and prefabricated bottom plate stable connection, guarantees prefabricated wallboard stable in structure.
Drawings
FIG. 1 is a schematic structural view of a prefabricated wall mold for building construction of a building engineering according to the present invention;
FIG. 2 is a left side view structural diagram of the prefabricated wall mold for building construction of the building engineering of the present invention;
fig. 3 is a schematic top view of the prefabricated wall mold for building construction of the building engineering of the present invention.
In the figure: 1. a base plate; 2. prefabricating a bottom plate; 3. a rectangular channel plate; 4. a second threaded rod; 5. a reinforcing plate; 6. a handle; 7. a loop bar; 8. a side plate; 9. a first threaded rod; 10. connecting blocks; 11. a slider; 12. A threaded hole; 13. a chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1, the present invention provides a technical solution: the utility model provides a building engineering room of quick drawing of patterns is built and is used prefabricated wall body mould, includes bottom plate 1, and 1 up end of bottom plate is equipped with prefabricated bottom plate 2, and both sides all are equipped with rectangular frid 3 around 2 up end of prefabricated bottom plate, and both sides around the opening of rectangular frid 3 is towards respectively, and prefabricated bottom plate 2 is the support frame form, and the opening of prefabricated bottom plate is towards bottom plate 1, and prefabricated bottom plate 2 and 1 an organic whole of bottom plate form, guarantee prefabricated bottom plate 2's stability.
In this embodiment, please refer to fig. 1, the left and right sides all is equipped with curb plate 8 between two sets of rectangular frid 3, both ends face and the 3 opposite faces of rectangular frid are laminated mutually around curb plate 8, the 8 opposite faces left and right sides of curb plate are equipped with first threaded rod 9 and second threaded rod 4 respectively, the equal swing joint in end of threaded rod 9 and second threaded rod 4 has loop bar 7, both ends face and the 3 opposite faces junction of rectangular frid all are equipped with the rubber pad around curb plate 8, avoid concrete mud to spill, avoid prefabricated wallboard hardness poor, first threaded rod 9 and second threaded rod 4 all with loop bar 7 phase-match.
In this embodiment, please refer to fig. 2, the upper portions of the left and right end faces of the side plate 8 are respectively provided with a connecting block 10, the upper end face of the rectangular groove plate 3 is respectively provided with a sliding groove 13, an inner cavity of the sliding groove 13 is respectively provided with a sliding block 11, the sliding block 11 is arranged on the lower end face of the connecting block 10, the sliding groove 13 is matched with the sliding block 11, so that when the side plate 8 is moved left and right, the side plate cannot be shifted, the guide effect is achieved, the sliding block 11 and the connecting block 10 are integrally formed, the connecting block 10 and the side plate 8 are integrally formed, and the stable structure of the side plate 8 is ensured.
In this embodiment, please refer to fig. 1, the middle of the outer wall of the loop bar 7 is provided with the handle 6, the outer part of the handle 6 is sleeved with the rubber sleeve, the loop bar 7 is hollow, the handle 6 is arranged on the front side and the rear side of the outer wall of the loop bar 7, the rotation is convenient when the use is performed, and the rubber sleeve ensures that the hand is not damaged.
In this embodiment, please refer to fig. 1 and fig. 3, the first threaded rod 9 and the second threaded rod 4 have opposite outer wall threads, and the left and right sides of the inner cavity of the loop bar 7 are respectively provided with internal threads matched with the first threaded rod 9 and the second threaded rod 4, so as to ensure that the loop bar 7 is rotated to drive the first threaded rod 9 and the second threaded rod 4 to contract and extend, thereby facilitating the demolding.
In this embodiment, please refer to fig. 1, the upper and lower end surfaces of the rectangular groove plate 3 and the end surface of the prefabricated bottom plate 1 are respectively provided with a threaded hole 12, the threaded holes 12 of the upper and lower end surfaces of the rectangular groove plate 3 and the end surface of the prefabricated bottom plate 1 are respectively provided with a threaded hole 12 corresponding to each other, the threaded holes 12 facilitate locking bolts to lock, and the rectangular groove plate 3 and the prefabricated bottom plate 2 are stably connected, so as to control the area of the prefabricated wall panel.
Example 2
Referring to fig. b, the embodiment is different from the first embodiment in that: 3 inner chambers of rectangular groove board vertically evenly are equipped with reinforcing plate 5, and reinforcing plate 5 all is the linear array setting at 3 inner chambers of rectangular groove board, and reinforcing plate 5 and 3 inner chambers welded connection of rectangular groove board guarantee rectangular groove board 3's stability, cause the deformation when avoiding the drawing of patterns, reduce mould turnover number of times.
The working principle is as follows: during the use, utilize the locking bolt to revolve wrong entering screw hole 12 inner chamber, guarantee rectangular frid 3 and prefabricated bottom plate 2 stable connection, place the curb plate 8 that has first threaded rod 9 and second threaded rod 4 in the welding again between two sets of rectangular frids 3, and guarantee that slider 11 sets up in spout 13 inner chamber, through rotatory handle 6, it is rotatory to drive loop bar 7, guarantee first threaded rod 9 and the contraction of second threaded rod 4 and extension, according to the specification of prefabricated wallboard, adjust the distance between two sets of curb plates 8, pour again. During the drawing of patterns, twist grip 6 guarantees that two sets of curb plates 8 are kept away from, and locking bolt is dismantled to the rethread, accomplishes the drawing of patterns of prefabricated wallboard.
Claims (6)
1. The utility model provides a building engineering room of quick drawing of patterns is built and is used prefabricated wall body mould, includes bottom plate (1), its characterized in that: bottom plate (1) up end is equipped with prefabricated bottom plate (2), both sides all are equipped with rectangle frid (3) around prefabricated bottom plate (2) up end, the opening of rectangle frid (3) is towards both sides around respectively, and is two sets of the left and right sides all is equipped with curb plate (8) between rectangle frid (3), both ends face is laminated with rectangle frid (3) opposite face around curb plate (8), curb plate (8) opposite face left and right sides is equipped with first threaded rod (9) and second threaded rod (4) respectively, the equal swing joint in end of threaded rod (9) and second threaded rod (4) has loop bar (7).
2. The rapid-demolding prefabricated wall body mold for building construction of building engineering according to claim 1, wherein the rapid-demolding prefabricated wall body mold comprises: both ends face upper portion all is equipped with connecting block (10) about rectangle frid (3), rectangle frid (3) up end all is equipped with spout (13), spout (13) inner chamber all is equipped with slider (11), slider (11) set up terminal surface under connecting block (10).
3. The rapid-demolding prefabricated wall body mold for building construction of building engineering according to claim 1, wherein the rapid-demolding prefabricated wall body mold comprises: reinforcing plates (5) are longitudinally and uniformly arranged in the inner cavity of the rectangular groove plate (3), and the reinforcing plates (5) are arranged in the inner cavity of the rectangular groove plate (3) in a linear array mode.
4. The rapid-demolding prefabricated wall body mold for building construction of building engineering according to claim 1, wherein the rapid-demolding prefabricated wall body mold comprises: handle (6) all are equipped with in loop bar (7) outer wall middle part, and handle (6) outside has all cup jointed the rubber sleeve, loop bar (7) are the cavity form.
5. The rapid-demolding prefabricated wall body mold for building construction of building engineering according to claim 4, wherein the rapid-demolding prefabricated wall body mold comprises: the first threaded rod (9) is opposite to the outer wall of the second threaded rod (4) in threads, and the left side and the right side of the inner cavity of the loop bar (7) are respectively provided with internal threads matched with the first threaded rod (9) and the second threaded rod (4).
6. The rapid-demolding prefabricated wall body mold for building construction of building engineering according to claim 1, wherein the rapid-demolding prefabricated wall body mold comprises: the upper end face and the lower end face of the rectangular groove plate (3) and the end face of the prefabricated bottom plate (1) are respectively provided with a threaded hole (12), and the threaded holes (12) of the upper end face and the lower end face of the rectangular groove plate (3) correspond to the threaded holes (12) formed in the end face of the prefabricated bottom plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121244831.5U CN215549636U (en) | 2021-06-04 | 2021-06-04 | Rapid demoulding's building engineering room is built and is used prefabricated wall body mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121244831.5U CN215549636U (en) | 2021-06-04 | 2021-06-04 | Rapid demoulding's building engineering room is built and is used prefabricated wall body mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215549636U true CN215549636U (en) | 2022-01-18 |
Family
ID=79866231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121244831.5U Active CN215549636U (en) | 2021-06-04 | 2021-06-04 | Rapid demoulding's building engineering room is built and is used prefabricated wall body mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215549636U (en) |
-
2021
- 2021-06-04 CN CN202121244831.5U patent/CN215549636U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215549636U (en) | Rapid demoulding's building engineering room is built and is used prefabricated wall body mould | |
CN207130962U (en) | A kind of assembled architecture panel structure | |
CN108560574B (en) | Assembled brick moulding bed | |
CN217028106U (en) | Concrete placement template connection structure | |
CN212554387U (en) | Concrete tubular pile cast molding auxiliary device | |
CN207905169U (en) | A kind of double heat insulation cavity walls and its build module by laying bricks or stones | |
CN114575520A (en) | Split type connecting bridge and cavity module applying same | |
CN210999254U (en) | Easy demoulding concrete standard test block mould | |
CN209999441U (en) | Prefabricated formwork member of prefabricated concrete fighters | |
CN112895087A (en) | Integral tunnel inverted arch block die | |
CN220882782U (en) | Mould for four-way refractory brick | |
CN206418629U (en) | A kind of shear wall | |
CN207003720U (en) | A kind of assembled integral concrete shear force wall attachment structure | |
CN217268289U (en) | Split type connecting bridge and cavity module applying same | |
CN210880155U (en) | Reinforced assembly type building forming die | |
CN220972780U (en) | Movable pedestal of concrete prefabricated part | |
CN211775025U (en) | Wall brick of support column formwork erection is exempted from | |
CN215830005U (en) | A prefabricated formula aluminum mould board for radian wall | |
CN211898347U (en) | Prefabricated part and cast-in-place integral concrete frame structure of building assembly | |
CN220482050U (en) | Ballastless track plate die middle hole forming die | |
CN215319415U (en) | Prefabricated component wallboard flange mould | |
CN217128957U (en) | Elliptical concrete column construction mould | |
CN218375223U (en) | Combined pouring template | |
CN219276159U (en) | Electric four-way well die | |
CN215212415U (en) | Stretch-draw molding structure and former of prefabricated enclosure component of preparation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |