CN2155431Y - Roof spacing layer monitoring alarm - Google Patents

Roof spacing layer monitoring alarm Download PDF

Info

Publication number
CN2155431Y
CN2155431Y CN 93217922 CN93217922U CN2155431Y CN 2155431 Y CN2155431 Y CN 2155431Y CN 93217922 CN93217922 CN 93217922 CN 93217922 U CN93217922 U CN 93217922U CN 2155431 Y CN2155431 Y CN 2155431Y
Authority
CN
China
Prior art keywords
displacement
lining rope
frame
rope
directive wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93217922
Other languages
Chinese (zh)
Inventor
刘玉堂
王留义
石文波
丁辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING EXPLOITATION INST OF COAL SCIENTIFIC RESEARCH GENERAL INST
Original Assignee
BEIJING EXPLOITATION INST OF COAL SCIENTIFIC RESEARCH GENERAL INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING EXPLOITATION INST OF COAL SCIENTIFIC RESEARCH GENERAL INST filed Critical BEIJING EXPLOITATION INST OF COAL SCIENTIFIC RESEARCH GENERAL INST
Priority to CN 93217922 priority Critical patent/CN2155431Y/en
Application granted granted Critical
Publication of CN2155431Y publication Critical patent/CN2155431Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a roof spacing layer monitoring alarm, which is suitable for monitoring the spacing layer displacement of the top plate rock layer of a coal mine tunnel. The utility model is composed of anchor heads (1, 2, 29, 31), machine frames (5, 24), measuring ropes (7, 12, 27), a displacement display, a plurality of guide wheels (8, 11, 13, 25, 26, 27), a tension device and alarm devices (6, 23). The measuring ropes winding a plurality of guide wheels are connected among the anchor heads, the displacement display and the tension device. The utility model changes the direction of the displacement along with the axial direction of a drilling hole, reduces the occupied tunnel space, increases the measuring alarm and measures multiple displacements in drilling holes.

Description

Roof spacing layer monitoring alarm
The utility model relates to a kind of roof delamination monitoring alarm.Be used to monitor the absciss layer situation and the deflection of coal mine roadway roof strata.Also can be used for other mine or tunnel.
The roof delamination monitoring alarm is installed in the boring in tunnel.Its effect is by the measurement of the separating location of coal mine roadway roof strata and deflection being determined the degree of stability of top board, for supporting design provides parameter and strengthens roof control.When the top board unstability, give the alarm when reaching precarious position, prompting must take to strengthen supporting measure, to guarantee that tunnel safety normally uses.
Soviet Union AKC type bolt support top board displacement signal instrument is a kind of similar roof delamination monitoring alarm.This instrument is made up of anchor head, frame, displacement transmission indication mechanism, warning device.Anchor head is fixed on foot of hole, and frame is fixed on the drilling orifice place.Displacement is transmitted indication mechanism mainly by forming with anchor head mobile jib that is connected as a single entity and the copper pipe that is fixed on the frame.Copper pipe is marked with scale, casing pipe sleeve is being arranged on the mobile jib outside copper pipe, and the sleeve pipe when anchor head moves on the mobile jib slides along copper pipe, moves distance but change observation bit by scale.Magnet ring is installed on sleeve pipe, and the connection warning device gives the alarm (to reach the limit value of top board displacement) when sleeve pipe slides into certain position.
The deficiencies in the prior art part is: 1. instrument hangs at the drilling orifice place and reveals the big lane space that influences of length, has limited range simultaneously.2. can only measure the absciss layer value at a position in the boring.
The purpose of this utility model is to overcome the deficiencies in the prior art part, provides a kind of outstanding dew length little, the roof delamination monitoring alarm that range is bigger.
The purpose of this utility model also is to make above-mentioned roof delamination monitoring alarm to measure the absciss layer value at a plurality of positions.
The purpose of this utility model can reach by following measure:
The utility model improves the displacement indication mechanism, is made up of anchor head, frame, warning device, lining rope, displacement display unit, several directive wheels and tensioning apparatus.Directive wheel is fixed on the frame, and lining rope is walked around several directive wheels and is connected between anchor head, displacement display unit and the tensioning apparatus.Lining rope passes to the displacement display unit with the displacement of rock stratum between anchor head and the drilling orifice.The displacement display unit demonstrates displacement, and warning circuit is connected.Directive wheel plays a supportive role to lining rope and changes its direction.Tensioning apparatus makes lining rope remain tensioning state, guarantees accurately to transmit displacement.
The purpose of this utility model can also reach by following measure:
Can fix a plurality of anchor heads at the boring diverse location, be equipped with the absciss layer value that corresponding lining rope, displacement display unit, directive wheel and tensioning apparatus can be measured a plurality of positions.
The drawing of accompanying drawing is described as follows:
Fig. 1 is the sketch of embodiment 1 of the present utility model.
Fig. 2 is that the A of Fig. 1 is to view.
Fig. 3 is the sketch of embodiment 2 of the present utility model.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 is that the A of Fig. 3 is to view.
The utility model is described in further detail below in conjunction with embodiment:
Anchor head 1 and anchor head 2 are made up of plastic body 3 and spring leaf 4 fixed thereon among Fig. 1 and Fig. 2.Anchor head 1 and anchor head 2 usefulness spring leafs 4 are fixed on the measuring point of boring different depth.Frame 5 is fixed on the drilling orifice basal plane.The 6th, warning device is installed on the frame 5.The displacement display unit by demonstration with 9 and magnet steel 10 mounted thereto form.Show with on the scale that shows displacement is arranged, the luminescent material that it is marked with scale or scribbles different colours.Tensioning apparatus is made up of spring 16, pulley 15, geometrical clamp 14.Spring one end is fixed on that the other end is connected with pulley on the frame.Geometrical clamp is installed on the frame.Directive wheel 8,11,13 also is installed on the frame.Show and be with 9 two ends to be connected with 12 with lining rope 7 respectively, the other end of lining rope 7 is connected with anchor head 1.Lining rope 7, show be with 9 and lining rope 12 walk around that to walk around pulley 15 again behind the directive wheel 8,11,13 fixing by geometrical clamp 14.Under the effect of spring 16, lining rope keeps tensioning state.The company's wire clips 17 that connects lining rope 7 usefulness is arranged on the lining rope 7 that enters the frame place.Anchor head 2 is furnished with corresponding lining rope, displacement display unit, tensioning apparatus and directive wheel.
The company's of operation wire clips and geometrical clamp make the lining rope tension during use, and make spring that certain pulling force be arranged, and will show that the scale of band transfers to zero-bit, and magnet steel is installed on the desired location.When between the rock stratum at anchor head 1 or 2 places and the hell basal plane absciss layer taking place, anchor head moves up the lining rope in the hole, be can observe the shift value that shows band by the window on the frame.When shift value reached limit value, magnet steel was connected warning circuit, and warning device sends audible and visible alarm.
The displacement display unit of Fig. 3-roof delamination monitoring alarm shown in Figure 5 by driving wheel 20, show that wheel 19 forms with the friction clutch 21 that is connected them.The axle that shows wheel and driving wheel is installed on the frame 24, and showing on the wheel has scale, and magnet steel 22 is installed.The diameter that shows wheel can play amplification to measured displacement greater than driving wheel.Tensioning apparatus is by the rope drum 18 that clockwork spring is housed and prevent that the ratchet mechanism 30 of its reverse from forming.Rope drum is installed on the frame.Walking around driving wheel from the lining rope 28 of anchor head 29 through directive wheel 27,26 is wrapped on the rope drum 18 through directive wheel 25 again.The clockwork spring of rope drum and ratchet mechanism can only unidirectionally be pulled out lining rope, and make lining rope be in tensioning state.Anchor head 31 is furnished with corresponding lining rope, displacement display unit, tensioning apparatus and directive wheel.Earlier friction clutch 21 is thrown off during use, make to show that taking turns scale is transferred to zero-bit, magnet steel 22 is transferred to desired location, friction clutch 21 then closes.When absciss layer took place in the rock stratum, the lining rope at place, aperture moved up, and drove driving wheel and rotated, and drove by friction clutch simultaneously to show the also corresponding rotation of wheel, and lining rope is pulled out by rope drum.Can observe the roof delamination displacement by showing the scale on the wheel.Warning device 23 is installed on the frame 24, and when displacement reached limit value, magnet steel gave the alarm warning device.
The utility model compared with prior art has the following advantages:
1. the improvement of structure makes survey change direction along the displacement of borehole axial, thereby has reduced instrument along the occupied lane space of borehole axial. Simultaneously range can be increased.
2. the roof spacing layer monitoring alarm that a plurality of anchor heads are installed can be monitored boring multi-point displacement situation of change.

Claims (4)

1, roof delamination monitoring alarm, anchor head (1,2,29,31), frame (5,24), warning device (6,23) are arranged, it is characterized in that lining rope is arranged (7,12,28), displacement display unit, directive wheel (8,11,13,25,26,27) and tensioning apparatus; Directive wheel is installed on the frame, and lining rope is walked around directive wheel and is connected between anchor head, displacement display unit and the tensioning apparatus.
2, as the said roof delamination monitoring alarm of claim 1, it is characterized in that the displacement display unit by showing that band (9) and magnet steel (10) mounted thereto form, demonstration with on the scale of demonstration displacement is arranged; Tensioning apparatus is made up of spring (16), pulley (15) and geometrical clamp (14), and spring one end is fixed on the frame (5), and the other end is connected with pulley; Show that band (9) two ends are connected with (12) with lining rope (7) respectively, the other end of lining rope (7) is connected with anchor head (1), lining rope 7, shows that band (9) and lining rope (12) are walked around and walks around pulley (15) again behind the directive wheel (8,11,13) and fixed by geometrical clamp.
3, as the said roof delamination monitoring alarm of claim 1, it is characterized in that the displacement display unit is by driving wheel (20), show that taking turns (19) forms with the friction clutch that is connected them (21), the axle that shows wheel and driving wheel is installed on the frame (24), show on the wheel scale is arranged, and magnet steel (22) tensioning apparatus is installed by the rope drum that clockwork spring is housed (18) with prevent that the ratchet mechanism (30) of its reverse from forming, rope drum is installed on the frame (24), from the lining rope (28) of anchor head (29) through directive wheel (27,26) walking around driving wheel is wrapped on the rope drum (18) through directive wheel (25) again.
4, as claim 1 or 2 or 3 said roof delamination monitoring alarms, it is characterized in that having a plurality of anchor heads and the lining rope that matches, displacement display unit, directive wheel and tensioning apparatus.
CN 93217922 1993-07-10 1993-07-10 Roof spacing layer monitoring alarm Expired - Fee Related CN2155431Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93217922 CN2155431Y (en) 1993-07-10 1993-07-10 Roof spacing layer monitoring alarm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93217922 CN2155431Y (en) 1993-07-10 1993-07-10 Roof spacing layer monitoring alarm

Publications (1)

Publication Number Publication Date
CN2155431Y true CN2155431Y (en) 1994-02-09

Family

ID=33797720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93217922 Expired - Fee Related CN2155431Y (en) 1993-07-10 1993-07-10 Roof spacing layer monitoring alarm

Country Status (1)

Country Link
CN (1) CN2155431Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101737082A (en) * 2008-11-07 2010-06-16 邢念泽 Mining roof plate absciss layer warning instrument and measurement method
CN102435130A (en) * 2011-09-05 2012-05-02 山东中宏路桥建设有限公司 Displacement alarm
CN102980476A (en) * 2012-07-17 2013-03-20 安徽理工大学 Separation layer displacement meter
CN103321681A (en) * 2012-12-31 2013-09-25 尤洛卡矿业安全工程股份有限公司 Monitoring and pre-warning method and system for coal mine roadway roof collapse disaster
CN103485823A (en) * 2013-09-10 2014-01-01 昆山新金福精密电子有限公司 Roof separation layer monitoring device
CN103528530A (en) * 2013-10-25 2014-01-22 中国矿业大学 Monitoring device and monitoring method for mining FBG (fiber bragg grating) roof separation layer
CN103790633A (en) * 2014-01-24 2014-05-14 长安大学 Coal mine tunnel floor heave monitoring device
CN106643413A (en) * 2017-01-23 2017-05-10 陕西煤业化工技术研究院有限责任公司 Roof separation indicator system
CN109612366A (en) * 2018-11-21 2019-04-12 山东里能鲁西矿业有限公司 A kind of novel recyclable roof separation indicator
CN109708566A (en) * 2018-12-29 2019-05-03 重庆工程职业技术学院 Monitoring device for tunnel deformation
CN112983549A (en) * 2021-03-09 2021-06-18 中国矿业大学 Overburden mining abscission layer dynamic development monitoring method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101737082A (en) * 2008-11-07 2010-06-16 邢念泽 Mining roof plate absciss layer warning instrument and measurement method
CN102435130A (en) * 2011-09-05 2012-05-02 山东中宏路桥建设有限公司 Displacement alarm
CN102980476A (en) * 2012-07-17 2013-03-20 安徽理工大学 Separation layer displacement meter
CN102980476B (en) * 2012-07-17 2015-10-21 安徽理工大学 Separation layer displacement meter
CN103321681A (en) * 2012-12-31 2013-09-25 尤洛卡矿业安全工程股份有限公司 Monitoring and pre-warning method and system for coal mine roadway roof collapse disaster
CN103321681B (en) * 2012-12-31 2016-01-20 尤洛卡矿业安全工程股份有限公司 A kind of monitoring and pre-alarming method of coal mine roadway roof collapse disaster and system
CN103485823A (en) * 2013-09-10 2014-01-01 昆山新金福精密电子有限公司 Roof separation layer monitoring device
CN103528530B (en) * 2013-10-25 2015-10-14 中国矿业大学 A kind of mining optical fiber grating roof abscission layer monitoring device and monitoring method
WO2015058488A1 (en) * 2013-10-25 2015-04-30 中国矿业大学 Apparatus and method for monitoring mining fiber grating roof separation layer
CN103528530A (en) * 2013-10-25 2014-01-22 中国矿业大学 Monitoring device and monitoring method for mining FBG (fiber bragg grating) roof separation layer
CN103790633A (en) * 2014-01-24 2014-05-14 长安大学 Coal mine tunnel floor heave monitoring device
CN106643413A (en) * 2017-01-23 2017-05-10 陕西煤业化工技术研究院有限责任公司 Roof separation indicator system
CN106643413B (en) * 2017-01-23 2024-02-27 陕西煤业化工技术研究院有限责任公司 Roof separation layer appearance system
CN109612366A (en) * 2018-11-21 2019-04-12 山东里能鲁西矿业有限公司 A kind of novel recyclable roof separation indicator
CN109708566A (en) * 2018-12-29 2019-05-03 重庆工程职业技术学院 Monitoring device for tunnel deformation
CN112983549A (en) * 2021-03-09 2021-06-18 中国矿业大学 Overburden mining abscission layer dynamic development monitoring method
CN112983549B (en) * 2021-03-09 2021-10-26 中国矿业大学 Overburden mining abscission layer dynamic development monitoring method

Similar Documents

Publication Publication Date Title
CN2155431Y (en) Roof spacing layer monitoring alarm
CN103528530B (en) A kind of mining optical fiber grating roof abscission layer monitoring device and monitoring method
CN202542761U (en) Hydraulic rope winch for deep hole
EP0422706A2 (en) System and method for monitoring drill bit depth
CN110094197B (en) Method for preventing damage of optical cable perforation of horizontal well pipe column
US3001396A (en) Apparatus for maintaining proper depth correlation in well logging apparatus
CN86107168A (en) The method and apparatus that is used for the guiding concrete feed hose during rock bolting grouting
AU2020103412A4 (en) A non-interference automatic monitoring instrument for roadway surface displacement
US20220042412A1 (en) Tape Winch, Drilling Progress Measurement and Hole Depth Measurement
CN2709927Y (en) Multi-point displacement measuring indicating instrument for rock separation layer
US3298226A (en) System for recording work done during rotary drilling operations
CN106643413B (en) Roof separation layer appearance system
CN108507516B (en) Digital display type tunnel roof sinking detector
CN109578078B (en) Multi-base point separation layer instrument suitable for automatic warning of loose and broken coal and rock mass and use method thereof
CN105806275B (en) Device and method for monitoring continuous deformation of different areas of surrounding rock in real time
CN114088775A (en) Plumpness elasticity type detection device and detection method for anchor cable and rod grouting stage
CN212567264U (en) Mining top and bottom plate shift amount monitoring device
CN210031928U (en) Prestressed concrete hollow pile length and pile extension quality detection device
CN216922224U (en) Coal mine separation layer detector
US20100200294A1 (en) Rock drill apparatus
CN207761635U (en) A kind of hinge joining means for logging instrument
CN116537725B (en) Logging exploratory tube well-descending device
CN110566182A (en) drilling measuring device and measuring method
USRE21297E (en) Depth recorder for a well dkul
JPS5933740B2 (en) sand pile creation equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee