CN215528498U - Fixing device of construction cable - Google Patents
Fixing device of construction cable Download PDFInfo
- Publication number
- CN215528498U CN215528498U CN202121566916.5U CN202121566916U CN215528498U CN 215528498 U CN215528498 U CN 215528498U CN 202121566916 U CN202121566916 U CN 202121566916U CN 215528498 U CN215528498 U CN 215528498U
- Authority
- CN
- China
- Prior art keywords
- construction
- buckle
- rod
- connecting plate
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
A fixing device for a construction cable belongs to the technical field of frame steel structure installation construction. Comprises a buckle, a screw, a connecting plate, a cantilever rod, a bolt, a horizontal supporting rod and a sleeve which are used in combination; the buckle is connected with two ends of the connecting plate through screws, the screws are arranged on two sides of the buckle, the cantilever rod is vertically welded and fixed with the middle of the connecting plate, and a bolt hole is arranged on each 200mm of the cantilever rod. The horizontal support rod is fixedly connected with the cantilever rod through a bolt in the middle, and a vertical sleeve is welded on each 300mm of two sides of the horizontal support rod. The construction cable has the advantages that the assembly is simple, the operation is convenient, the construction cable cannot be interwoven and wound, the construction cable is prevented from touching objects around, the service life of the construction cable is prolonged, and the construction cost is reduced.
Description
Technical Field
The utility model belongs to the technical field of installation and construction of a frame steel structure, and particularly provides a fixing device for a construction cable.
Background
When the frame steel structure is installed and constructed, construction cables used on a frame generally hang down freely, and the method has the defects that firstly, when the number of the construction cables is large, the randomly drooped cables are easy to wind together, so that constructors are difficult to drag; secondly, the flagging cable rocks easily and touches sharp-pointed object damage on every side, influences cable life, increases construction cost.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a fixing device for a construction cable, which solves the problems of low service life of the cable, high construction cost and the like.
According to the utility model, two buckles are fixed with flange plates on two sides of an H-shaped steel column of a frame through screws, a group of fixing devices is arranged every 5m from top to bottom, and then a plurality of construction cables respectively penetrate through sleeves on the fixing devices. Make the construction cable more regular, can not twine interweave together, it is more convenient that constructor drags the construction cable, and the construction cable also can not touch hard thing damage on every side.
The utility model comprises a buckle 1, a screw 2, a connecting plate 3, an overhanging rod 4, a bolt 5, a horizontal supporting rod 6 and a sleeve 7 which are used in combination; connect buckle 1 through screw 2 and 3 both ends of connecting plate, screw 2 is all established to 1 both sides of buckle, and the pole 4 of encorbelmenting is fixed with the perpendicular welded connection in 3 middle parts of connecting plate, and every 200mm establishes a bolt hole above the pole 4 of encorbelmenting. The horizontal support rod 6 is fixedly connected with the cantilever rod 4 through a bolt 5 in the middle, and a vertical sleeve 7 is welded on each 300mm of two sides of the horizontal support rod 6.
The fastener 1 is formed by processing a 10mm steel plate, the size is 100 x 60mm (length, width and height), and the clamping groove of the fastener 1 is 60mm deep and 40mm wide; the diameter of the screw 2 is 10mm, and the length is 30 mm; the connecting plate 3 is machined from a 16mm thick steel plate and has the size (length and width) of 300 x 50 mm; the cantilever rod 4 is formed by a cross section size (length and width) of 50mm and a length of 600 mm; the diameter of the bolt 5 is 10mm, and the length of the bolt is 100 mm; the horizontal support bar 6 is made of a cross section with the size (length and width) of 40mm by 40mm and the length of 800 mm; the sleeve 7 is formed by machining a steel pipe with the diameter of 40mm and the length of 60mm (shown in figures 1 and 2).
During the use, it is fixed with the both sides flange board of frame H shape steel column 8 through screw 2 with two buckle 1 of fixing device, set up a set of fixing device per 5m from top to bottom, then pass sleeve pipe 7 on the fixing device respectively with a plurality of construction cables 9. Fixing device makes the construction cable more regular, can not twine interweave together, and it is more convenient that constructor drags construction cable 9, and construction cable 9 also can not touch hard thing damage (fig. 3, fig. 4) on every side.
The fixing device is simple to assemble and convenient to operate, the construction cable cannot be interwoven and wound, the construction cable is prevented from touching objects around, the service life of the construction cable is prolonged, construction is facilitated, construction cost is reduced, and good economic benefits are obtained for companies.
Drawings
Fig. 1 is a top view of a fixture.
Fig. 2 is a front view of the fixture.
Fig. 3 is a top view of the fixture in use.
Fig. 4 is a front view of the fixture in use.
In the figure, a buckle 1, a screw 2, a connecting plate 3, an overhanging rod 4, a bolt 5, a horizontal support rod 6, a sleeve 7, an H-shaped steel column 8 and a construction cable 9.
Detailed Description
Fig. 1-4 illustrate an embodiment of the present invention. The utility model is further described below with reference to the accompanying drawings.
The fixing device comprises a buckle 1, screws 2, a connecting plate 3, an overhanging rod 4, bolts 5, a horizontal supporting rod 6 and a sleeve 7, and is used in a combined mode, wherein the buckle 1 is connected with two ends of the connecting plate 3 through the screws 2, the screws 2 are arranged on two sides of the buckle 1, the overhanging rod 4 is vertically welded and fixed with the middle of the connecting plate 3, and each 200mm bolt hole is formed in the upper surface of the overhanging rod 4. The horizontal support rod 6 is fixedly connected with the cantilever rod 4 through a bolt 5 in the middle, and a vertical sleeve 7 is welded on each 300mm of two sides of the horizontal support rod 6. The fastener 1 is formed by processing a 10mm steel plate, the size is 100 x 60mm (length, width and height), and the clamping groove of the fastener 1 is 60mm deep and 40mm wide; the diameter of the screw 2 is 10mm, and the length is 30 mm; the connecting plate 3 is machined from a 16mm thick steel plate and has the size (length and width) of 300 x 50 mm; the cantilever rod 4 is formed by a cross section size (length and width) of 50mm and a length of 600 mm; the diameter of the bolt 5 is 10mm, and the length of the bolt is 100 mm; the horizontal support bar 6 is made of a cross section with the size (length and width) of 40mm by 40mm and the length of 800 mm; the sleeve 7 is formed by processing a steel pipe with the diameter of 40mm and the length of 60 mm.
During the use, it is fixed with the both sides flange board of frame H shape steel column 8 through screw 2 with two buckle 1 of fixing device, set up a set of fixing device per 5m from top to bottom, then pass sleeve pipe 7 on the fixing device respectively with a plurality of construction cables 9. Fixing device makes the construction cable more regular, can not twine interweave together, and it is more convenient that constructor drags construction cable 9, and construction cable 9 also can not touch hard thing damage on every side.
When the installation and construction of the frame steel structure of the electric power plant are carried out, a fixing device for construction cables is adopted for a large number of construction cables of the frame, and a good effect is obtained. This fixing device includes buckle, screw, connecting plate, cantilever pole, bolt, horizontal support pole, 7 parts of sleeve pipe, uses in combination, passes through the screw with the buckle and is connected with the connecting plate both ends, and the screw is all established to the buckle both sides, and the pole of encorbelmenting establishes a bolt hole with the perpendicular welded fastening in connecting plate middle part above the pole of encorbelmenting every 200 mm. The horizontal support rod is fixedly connected with the cantilever rod through a bolt in the middle, and a vertical sleeve is welded on each 300mm of two sides of the horizontal support rod. During the use, pass through two buckles of fixing device and the both sides flange board of frame H shaped steel post fixed through the screw, every 5m sets up a set of fixing device from top to bottom, then passes the sleeve pipe on the fixing device respectively with a plurality of construction cables. Make the construction cable more regular, can not twine interweave together, it is more convenient that constructor drags the construction cable, and the construction cable also can not touch hard thing damage on every side. This fixing device equipment is simple, and convenient operation makes the construction cable can not interweave the winding, has also avoided the construction cable with the touching of object on every side, has increased the life of construction cable, has made things convenient for the construction, has reduced construction cost, has accumulated valuable experience for similar construction in the future.
Claims (2)
1. A fixing device for a construction cable is characterized by comprising a buckle (1), a screw (2), a connecting plate (3), a cantilever rod (4), a bolt (5), a horizontal supporting rod (6) and a sleeve (7); the buckle (1) is connected with two ends of the connecting plate (3) through screws (2), the screws (2) are arranged on two sides of the buckle (1), the cantilever rod (4) is vertically welded and fixed with the middle part of the connecting plate (3), and a bolt hole is arranged on each 200mm of the upper surface of the cantilever rod (4); the horizontal support rod (6) is fixedly connected with the cantilever rod (4) through a bolt (5) in the middle position, and a vertical sleeve (7) is welded on each 300mm of the two sides of the horizontal support rod (6).
2. The fixing device of the construction cable according to claim 1, wherein the buckle (1) is formed by processing 10mm steel plates, the length and the width of the buckle are 100 and 60mm, and the groove of the buckle (1) is 60mm deep and 40mm wide; the diameter of the screw (2) is 10mm, and the length is 30 mm; the connecting plate (3) is processed by a 16mm thick steel plate, and the length and the width of the connecting plate are 300 and 50 mm; the cross section of the cantilever rod (4) is 50mm by 50mm and 600mm long; the diameter of the bolt (5) is 10mm, and the length of the bolt is 100 mm; the cross section of the horizontal support rod (6) is 40 x 40mm, and the length is 800 mm; the sleeve (7) is formed by processing a steel pipe with the diameter of 40mm and the length of 60 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121566916.5U CN215528498U (en) | 2021-07-10 | 2021-07-10 | Fixing device of construction cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121566916.5U CN215528498U (en) | 2021-07-10 | 2021-07-10 | Fixing device of construction cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215528498U true CN215528498U (en) | 2022-01-14 |
Family
ID=79812917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121566916.5U Active CN215528498U (en) | 2021-07-10 | 2021-07-10 | Fixing device of construction cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215528498U (en) |
-
2021
- 2021-07-10 CN CN202121566916.5U patent/CN215528498U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207847228U (en) | A kind of overturning-preventing concrete wire pole | |
CN215528498U (en) | Fixing device of construction cable | |
CN101707336A (en) | Improved roller device specially used for cable laying of bridge frame | |
CN208078602U (en) | A kind of high-tension cable upper boom bottom protection pipe | |
CN210468155U (en) | Measurable lightning protection grounding system suitable for complementary photovoltaic power plant of farming light | |
CN201219186Y (en) | Special clamp apparatus for live replacement of 220kV tension-resistant rod stay wire | |
CN216548935U (en) | Shipyard cable wiring device | |
CN201562917U (en) | Special roller device for bridge cable laying | |
CN204333854U (en) | Steel tower T connects cable fixture | |
CN216598736U (en) | Cable suspension hanger under frame beam | |
CN203361179U (en) | Column pile and high-voltage power line tower base comprising column piles | |
CN217431951U (en) | Wet electrode special for flue gas of flame cleaning machine | |
CN204809803U (en) | Can hang novel strain insulator pole of overhead ground wire | |
CN211981139U (en) | Lightning arrester for electric power iron tower | |
CN217030719U (en) | Fixing device for fixing electric meter box and service wire | |
CN211918429U (en) | Hang contact net mounting structure under structure tuber pipe | |
CN218900625U (en) | Safety belt hanging device on upper part of switch cabinet | |
CN205491501U (en) | Device convenient to regulator cubicle removes | |
CN215528480U (en) | Cable bracket on steel beam | |
CN210490341U (en) | Cable suspension bracket | |
CN219684334U (en) | Bracket for dragging welding handle line on frame steel beam | |
CN211376308U (en) | Stain-resistant suspension insulator | |
CN216312562U (en) | Construction cable bracket under crane beam | |
CN218629993U (en) | Lightning protection device monitor and lightning protection testing platform | |
CN217639241U (en) | Electric meter box mounting structure in narrow-size electric well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |