CN215520162U - Novel steel construction building escape way - Google Patents

Novel steel construction building escape way Download PDF

Info

Publication number
CN215520162U
CN215520162U CN202120834997.6U CN202120834997U CN215520162U CN 215520162 U CN215520162 U CN 215520162U CN 202120834997 U CN202120834997 U CN 202120834997U CN 215520162 U CN215520162 U CN 215520162U
Authority
CN
China
Prior art keywords
standpipe
vertical pipe
plate
novel steel
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120834997.6U
Other languages
Chinese (zh)
Inventor
马敏钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120834997.6U priority Critical patent/CN215520162U/en
Application granted granted Critical
Publication of CN215520162U publication Critical patent/CN215520162U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a novel steel structure building safety passage which comprises a first vertical pipe, a second vertical pipe, a sleeve, an inserted rod, a threaded handle, a connecting rod, a connecting plate and a telescopic mechanism. This novel steel construction building escape way, during the use, at first stimulate first standpipe and second standpipe, make sleeve pipe and inserted bar produce relative slip, thereby adjust the interval of first standpipe and second standpipe through telescopic machanism, then rotate the screw thread handle, make sleeve pipe and inserted bar relatively fixed, accomplish the regulation work of first standpipe and second standpipe, then will adjust first standpipe and the second standpipe of accomplishing the interval through the fixed plate and fix subaerial, then take once more and adjust first standpipe and second standpipe, and fix on the bottom surface of position is built to the passageway with its equidistance through the fixed plate, then the connecting rod of taking, it fixes with adjacent first standpipe and adjacent second standpipe respectively to pass through the connecting plate with the connecting rod.

Description

Novel steel construction building escape way
Technical Field
The utility model relates to the field of buildings, in particular to a novel steel structure building safety channel.
Background
The steel structure building is a novel building system, breaks through the industrial boundary lines among the house area industry, the building industry and the metallurgical industry, and is integrated into a new industrial system, namely the steel structure building system which is generally seen by people in the industry. Compared with the traditional concrete building, the steel plate or the section steel replaces reinforced concrete, so that the steel structure building has higher strength and better shock resistance. And because the components can be manufactured in factories and installed on site, the construction period is greatly reduced. Because the steel can be repeatedly used, the construction waste can be greatly reduced, and the steel is more environment-friendly, so the steel is widely adopted by all countries in the world and is applied to industrial buildings and civil buildings. At present, the application of steel structure buildings on high-rise and super high-rise buildings is mature day by day, and the steel structure buildings gradually become mainstream building processes, and are the development direction of buildings in the future.
The safety channel is usually constructed at a position which is easy to be in a dangerous situation below a construction area in the building construction process, but the width of the safety channel cannot be adjusted in the existing construction process of the safety channel, so that the safety channel is not beneficial to the construction of the channels in areas with different widths.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a novel steel structure building safety channel to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
a novel steel structure building safety passage comprises a first vertical pipe and a second vertical pipe, wherein a plurality of first vertical pipes and a plurality of second vertical pipes are arranged at equal distances, the first vertical pipes and the second vertical pipes are symmetrical to each other, a telescopic mechanism is arranged between the first vertical pipes and the second vertical pipes, the bottom ends of the first vertical pipes and the second vertical pipes are fixedly connected with a fixing plate, through holes for fixing with ground bolts are formed in the fixing plate, connecting rods are arranged between the adjacent first vertical pipes and the adjacent second vertical pipes, the connecting rods are arranged at the top parts of the first vertical pipes and the second vertical pipes, connecting plates are fixedly arranged at two ends of the connecting rods, through holes for fixing with the first vertical pipes and the second vertical pipes are formed in the connecting plates, supporting rods are symmetrically and fixedly connected with the top surfaces of the connecting rods, hinge seats are hinged to the top ends of the supporting rods, shielding plates are symmetrically arranged above the hinge seats, and are hinged to each other between the shielding plates, the bottom surface symmetry fixedly connected with backing plate of shield plate, backing plate and articulated seat correspond and the adaptation, offer on the articulated seat be used for with backing plate bolt fastening's perforation, the impartial distance in the outside of first standpipe and second standpipe is equipped with a plurality of curb plates, be equipped with first coupling mechanism and second coupling mechanism between curb plate and first standpipe and the second standpipe respectively, the bottom side fixedly connected with slot of shield plate.
As a further scheme of the utility model: the telescopic mechanism comprises a sleeve, an inserted link and a threaded handle.
As a still further scheme of the utility model: the telescopic one end and the top lateral wall fixed connection of first standpipe, the one end of inserted bar and the top lateral wall fixed connection of second standpipe, the sleeve pipe slip cap is established in the outside of inserted bar, screw thread handle threaded connection is at the sheathed tube tip, the one end of screw thread handle passes the sleeve pipe and touches with the outer wall of inserted bar.
As a still further scheme of the utility model: the first connecting mechanism comprises an inserting hole and a hook piece, and the second connecting mechanism is the same as the first connecting mechanism in structure.
As a still further scheme of the utility model: the jacks are symmetrically arranged on the outer wall of one side of the first vertical pipe at equal intervals, the hook members are symmetrically and fixedly connected to one side of the side plate at equal intervals, and the hook members correspond to the jacks and are matched with the jacks.
As a still further scheme of the utility model: the upper portion of curb plate has seted up through the window, curb plate lower part outer wall fixedly connected with warning board.
Compared with the prior art, the utility model has the beneficial effects that:
1. the utility model uses the matching use among the first vertical pipe, the second vertical pipe, the telescopic mechanism, the fixed plate, the connecting rod, the connecting plate, the supporting rod, the hinge seat, the shielding plate, the backing plate, the side plate, the first connecting mechanism, the second connecting mechanism, the groove, the sleeve, the inserted rod, the threaded handle, the inserting hole and the hook piece to make the whole assembly structure, the assembly structure can be disassembled when not in use, the transportation and the storage are convenient, meanwhile, the distance between the first vertical pipe and the second vertical pipe can be adjusted by the matching use among the sleeve, the inserted rod and the threaded handle, the first vertical pipe and the second vertical pipe can be conveniently extended by the use of the connecting rod and the connecting plate to form a channel with longer distance, the shielding plate can be adjusted along with the distance between the first vertical pipe and the second vertical pipe by the matching use among the supporting rod, the hinge seat, the shielding plate and the backing plate, form all the time at the top and shield the protection to make this novel steel construction building escape way be the assembled structure, the split equipment is convenient, simultaneously convenient widen and the extension to its piece at the in-process of equipment, make the suitability more extensive.
2. According to the utility model, through the matching and use between the shielding plate and the side plate, the inner side of the channel can be conveniently protected, and objects falling on the shielding plate are received through the arrangement of the groove, so that the safety of the periphery of the channel is improved, through the arrangement of the through window, the light transmittance of the channel is increased, and the pedestrian can conveniently pass through the channel.
Drawings
Fig. 1 is a schematic structural diagram of a novel steel structure building safety channel.
Fig. 2 is a perspective view of a novel steel structure building safety channel.
Fig. 3 is a sectional view of a novel steel structure building safety channel.
In the figure: 1 first standpipe, 2 second standpipes, 3 telescopic machanisms, 4 fixed plates, 5 connecting rods, 6 connecting plates, 7 bracing pieces, 8 articulated seats, 9 shielding plates, 10 backing plates, 11 side plates, 12 first connecting mechanisms, 13 second connecting mechanisms, 14 grooves, 15 sleeves, 16 inserted bars, 17 threaded handles, 18 jacks, 19 hook members, 20 through windows and 21 warning plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment of the present invention, a novel steel structure building safety passageway comprises a first vertical pipe 1 and a second vertical pipe 2, wherein a plurality of first vertical pipes 1 and a plurality of second vertical pipes 2 are equally spaced, the first vertical pipe 1 and the second vertical pipe 2 are symmetrical to each other, a telescopic mechanism 3 is arranged between the first vertical pipe 1 and the second vertical pipe 2, a fixing plate 4 is fixedly connected to the bottom ends of the first vertical pipe 1 and the second vertical pipe 2, a through hole for fixing with a ground bolt is formed on the fixing plate 4, a connecting rod 5 is arranged between the adjacent first vertical pipe 1 and the adjacent second vertical pipe 2, the connecting rod 5 is arranged at the top of the first vertical pipe 1 and the second vertical pipe 2, connecting plates 6 are fixedly mounted at both ends of the connecting rod 5, a through hole for fixing with a first vertical pipe 1 and a second vertical pipe 2 bolt is formed on the connecting plate 6, supporting rods 7 are symmetrically and fixedly connected to the top surface of the connecting rod 5, the top of bracing piece 7 articulates there is articulated seat 8, the top symmetry of articulated seat 8 is equipped with shield plate 9, it is articulated each other between shield plate 9, the bottom surface symmetry fixedly connected with backing plate 10 of shield plate 9, backing plate 10 corresponds and the adaptation with articulated seat 8, set up on the articulated seat 8 and be used for the perforation with backing plate 10 bolt fastening, the impartial distance in the outside of first standpipe 1 and second standpipe 2 is equipped with a plurality of curb plates 11, be equipped with first coupling mechanism 12 and second coupling mechanism 13 between curb plate 11 and first standpipe 1 and the second standpipe 2 respectively, the bottom side fixedly connected with slot 14 of shield plate 9, slot 14 is used for accepting the article of landing on the shield plate 9.
The telescoping mechanism 3 comprises a sleeve 15, a plunger 16 and a threaded shank 17.
One end of the sleeve 15 is fixedly connected with the top side wall of the first vertical pipe 1, one end of the inserted link 16 is fixedly connected with the top side wall of the second vertical pipe 2, the sleeve 15 is sleeved on the outer side of the inserted link 16 in a sliding manner, the threaded handle 17 is connected to the end portion of the sleeve 15 in a threaded manner, and one end of the threaded handle 17 penetrates through the sleeve 15 and is in contact with the outer wall of the inserted link 16.
The first connecting mechanism 12 comprises an inserting hole 18 and a hook piece 19, and the second connecting mechanism 13 is identical to the first connecting mechanism 12 in structure.
The jacks 18 are symmetrically arranged on the outer wall of one side of the first vertical pipe 1 at equal intervals, the hook members 19 are symmetrically and fixedly connected to one side of the side plate 11 at equal intervals, and the hook members 19 correspond to and are matched with the jacks 18.
The upper portion of curb plate 11 has been seted up and has been passed through window 20, and pass through window 20 and be used for the light to drop into, for providing light in the passageway, 11 lower part outer walls fixedly connected with of curb plate 21 warn the board, warn board 21 and be used for the warning, avoid pedestrian and vehicle to hit the passageway.
The working principle of the utility model is as follows:
when the device is used, the first vertical pipe 1 and the second vertical pipe 2 are pulled firstly, so that the sleeve 15 and the inserted rod 16 slide relatively, the distance between the first vertical pipe 1 and the second vertical pipe 2 is adjusted through the telescopic mechanism 3, then the threaded handle 17 is rotated, so that the sleeve 15 and the inserted rod 16 are relatively fixed, the adjustment work of the first vertical pipe 1 and the second vertical pipe 2 is completed, then the first vertical pipe 1 and the second vertical pipe 2 with the adjusted distance are fixed on the ground through the fixing plate 4, then the first vertical pipe 1 and the second vertical pipe 2 are taken again, and are fixed on the bottom surface of the channel building position at equal intervals through the fixing plate 4, then the connecting rod 5 is taken, the connecting rod 5 is respectively fixed with the adjacent first vertical pipe 1 and the adjacent second vertical pipe 2 through the connecting plate 6, so that the first vertical pipe 1 and the second vertical pipe 2 form a channel main body through the telescopic mechanism and the connecting rod 5, then the angles of the shielding plates 9 are adjusted, so that the backing plates 10 connected with the bottom surfaces of the two shielding plates 9 correspond to the hinged seats 8 at the tops of the supporting rods 7, the shielding plate 9 is then placed over the first riser pipe 1 and the second riser pipe 2, while the shim plate 10 is brought into correspondence with the hinge seat 8, then the angle of the hinge base 8 relative to the support rod 7 is adjusted, so that the hinge base 8 is jointed with the backing plate 10, then the shielding plate 9 is fixedly connected on the hinged seat 8 through the backing plate 10, the installation work of the shielding plate 9 is completed, then taking the side plate 11, inserting the hook piece 19 at one side of the side plate 11 into the insertion hole 18, and simultaneously dropping the side plate 11 under the action of gravity, so that the hook piece 19 is clamped into the jack 18, and the operation is sequentially performed, and the side plate 11 is sequentially fixed on the outer sides of the adjacent first vertical pipe 1 and the adjacent second vertical pipe 2 through the first connecting mechanism 12 and the second connecting mechanism 13, so as to complete the channel building work.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a novel steel construction building escape way, includes first standpipe (1) and second standpipe (2), its characterized in that: the equal distance between the first vertical pipe (1) and the second vertical pipe (2) is provided with a plurality of vertical pipes, the first vertical pipe (1) and the second vertical pipe (2) are symmetrical to each other, a telescopic mechanism (3) is arranged between the first vertical pipe (1) and the second vertical pipe (2) relatively, the bottom ends of the first vertical pipe (1) and the second vertical pipe (2) are fixedly connected with a fixing plate (4), a through hole for fixing with a ground bolt is formed in the fixing plate (4), a connecting rod (5) is arranged between the adjacent first vertical pipe (1) and the adjacent second vertical pipe (2), the connecting rod (5) is arranged at the tops of the first vertical pipe (1) and the second vertical pipe (2), connecting plates (6) are fixedly arranged at the two ends of the connecting rod (5), through holes for fixing with the first vertical pipe (1) and the second vertical pipe (2) through bolts are formed in the connecting plate (6), supporting rods (7) are symmetrically and fixedly connected with the top surface of the connecting rod (5), the top of bracing piece (7) articulates there is articulated seat (8), the top symmetry of articulated seat (8) is equipped with shield plate (9), it is articulated each other between shield plate (9), the bottom surface symmetry fixedly connected with backing plate (10) of shield plate (9), backing plate (10) correspond and the adaptation with articulated seat (8), set up on articulated seat (8) and be used for the perforation with backing plate (10) bolt fastening, the impartial distance in the outside of first standpipe (1) and second standpipe (2) is equipped with a plurality of curb plates (11), be equipped with first coupling mechanism (12) and second coupling mechanism (13) between curb plate (11) and first standpipe (1) and second standpipe (2) respectively, the bottom side fixedly connected with slot (14) of shield plate (9).
2. The novel steel structure building safe channel of claim 1, characterized in that: the telescopic mechanism (3) comprises a sleeve (15), an inserted bar (16) and a threaded handle (17).
3. The novel steel structure building safe passage of claim 2, characterized in that: the one end of sleeve pipe (15) and the top lateral wall fixed connection of first standpipe (1), the one end of inserted bar (16) and the top lateral wall fixed connection of second standpipe (2), sleeve pipe (15) slip cover is established in the outside of inserted bar (16), screw thread handle (17) threaded connection is at the tip of sleeve pipe (15), and the one end of screw thread handle (17) is passed sleeve pipe (15) and is touched with the outer wall of inserted bar (16).
4. The novel steel structure building safe channel of claim 1, characterized in that: the first connecting mechanism (12) comprises an inserting hole (18) and a hook piece (19), and the second connecting mechanism (13) is the same as the first connecting mechanism (12) in structure.
5. The novel steel structure building safe channel of claim 4, characterized in that: the jacks (18) are symmetrically arranged on the outer wall of one side of the first vertical pipe (1) at equal intervals, the hook members (19) are symmetrically and fixedly connected to one side of the side plate (11) at equal intervals, and the hook members (19) correspond to the jacks (18) and are matched with the jacks.
6. The novel steel structure building safe channel of claim 1, characterized in that: the upper portion of curb plate (11) is seted up and is passed through window (20), and curb plate (11) lower part outer wall fixedly connected with warning board (21).
CN202120834997.6U 2021-04-22 2021-04-22 Novel steel construction building escape way Expired - Fee Related CN215520162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120834997.6U CN215520162U (en) 2021-04-22 2021-04-22 Novel steel construction building escape way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120834997.6U CN215520162U (en) 2021-04-22 2021-04-22 Novel steel construction building escape way

Publications (1)

Publication Number Publication Date
CN215520162U true CN215520162U (en) 2022-01-14

Family

ID=79802519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120834997.6U Expired - Fee Related CN215520162U (en) 2021-04-22 2021-04-22 Novel steel construction building escape way

Country Status (1)

Country Link
CN (1) CN215520162U (en)

Similar Documents

Publication Publication Date Title
CN201254830Y (en) Convenient wall joint
CN205654069U (en) Saddle formula is climbed platform and is attached wall device
CN208056596U (en) A kind of Novel engineering exterior wall scaffold
CN215520162U (en) Novel steel construction building escape way
CN204752026U (en) Tower crane escape way
CN112065013A (en) Outer wall scaffold reinforcing mechanism for construction
CN205531248U (en) Construction scaffolding component
CN208518307U (en) A kind of fast pylon easy to install of adjustable platform width
CN206205407U (en) It is a kind of can flexible combination multi-functional scaffold
CN206784977U (en) Construction stair are easily assembled temporary guard rail
CN215055580U (en) Construction is with safe type high altitude protector
CN212927043U (en) Concrete form strutting arrangement for building engineering
CN109779223B (en) Assembly type building external hanging platform
CN208056519U (en) A kind of detachable edge protection column
CN209637189U (en) Detachable kiln tail frame structure
CN114086752A (en) Movable cantilever platform device for roof structure
CN207063560U (en) Protection drop in leaf in a kind of steel climbing frame combination tool formula
CN216239681U (en) Steel construction mesa that barrier propterty is good for construction
CN221073402U (en) Building construction scaffold with safety protection function
CN219489440U (en) Telescopic tower crane stay bar
CN211500500U (en) A collapsible steel cat ladder of locking for not having people's roofing
CN205259558U (en) Novel scaffold for fitment
CN220036212U (en) Safety protection platform for elevator shaft
CN218205553U (en) Scaffold with multifunctional protective fence
CN215331309U (en) Firm type scaffold frame for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220114

CF01 Termination of patent right due to non-payment of annual fee