CN215520019U - Wire binding hook for building construction - Google Patents

Wire binding hook for building construction Download PDF

Info

Publication number
CN215520019U
CN215520019U CN202121672170.6U CN202121672170U CN215520019U CN 215520019 U CN215520019 U CN 215520019U CN 202121672170 U CN202121672170 U CN 202121672170U CN 215520019 U CN215520019 U CN 215520019U
Authority
CN
China
Prior art keywords
handle
hook
wire binding
building construction
binding hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121672170.6U
Other languages
Chinese (zh)
Inventor
杨启龙
颜钊
钟化明
张立东
桑猛
陈相宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121672170.6U priority Critical patent/CN215520019U/en
Application granted granted Critical
Publication of CN215520019U publication Critical patent/CN215520019U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a wire binding hook for building construction, which comprises a handle, wherein the lower end of the handle is in threaded connection with a handle seat, the upper end of the handle is provided with a handle cover, and the upper end of the handle cover is in threaded connection with an adjusting hook. According to the wire binding hook for building construction, due to the arrangement of the adjusting hook, the second screw rod is utilized to rotate in the second threaded hole, so that the proper using length of the steel bar hook can be conveniently adjusted according to the actual using environment, the flexibility of the wire binding hook is effectively improved, the applicability is high, the anti-skidding effect of the wire binding hook can be effectively enhanced by engraving the plurality of anti-skidding grooves on the outer surface of the handle body, the using effect of the wire binding hook is improved, the use cannot be influenced due to the fact that the hand and the handle body are slippery, if the steel bar hook is difficult to rotate, other accessories can be sleeved in the inner hexagonal hole to rotate, and the wire binding hook is labor-saving to rotate.

Description

Wire binding hook for building construction
Technical Field
The utility model relates to the technical field of building construction, in particular to a wire binding hook for building construction.
Background
The construction is a production activity in the construction implementation stage of engineering, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object at a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the place of construction operation is called a construction site or a construction site, also called a construction site, and on the construction site, when a construction steel beam is manufactured, a fine iron wire is required to fix a reinforcing steel bar, but the following problems exist in the fixation of the iron wire at present: 1. workers generally tie up and fix the steel wires by using special pliers, and the operation is time-consuming and labor-consuming due to the thin and soft iron wires, so that the operation is very inconvenient; 2. at present, most workers can fix the iron wires by using the wire binding hooks, but the iron wires on the current market cannot be adjusted in use length according to actual environment, most of the iron wires are the wire binding hooks with different lengths, and therefore the use cost is increased. Thus, we propose a wire binding hook for use in building construction.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a wire binding hook for building construction, which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides a prick silk hook for construction, includes the handle, handle lower extreme threaded connection has the handle seat, the handle lid is installed to the handle upper end, handle lid upper end interlude is connected with the regulation hook.
Preferably, the handle comprises a handle body, a first threaded hole which penetrates through the handle body from top to bottom is formed in the middle of the upper end of the handle body, a group of anti-skidding grooves are formed in the outer surface of the handle body in a carved mode, and the anti-skidding grooves are provided with a plurality of the anti-skidding grooves.
Preferably, a plurality of the anti-slip grooves are distributed on the outer surface of the handle body in a central annular array of the handle body.
Preferably, the handle seat comprises a handle seat body, a first screw rod is mounted in the middle of the upper end of the handle seat body, and a hexagon socket is formed in the middle of the lower end of the handle seat body.
Preferably, the size of the first screw rod is matched with that of the first threaded hole, and the outer surface of the first screw rod is in threaded connection with the first threaded hole.
Preferably, the adjusting hook comprises an installation rod, a second threaded hole is formed in the middle of the upper end of the installation rod, a second screw rod is connected to the inner wall surface of the second threaded hole in a threaded manner, a reinforcing steel bar hook is connected to the middle of the upper end of the second screw rod in an inserting manner, and the lower end of the installation rod is connected to the upper end of the handle cover in an inserting manner.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the binding wire hook, the adjusting hook is arranged, and the second screw rod is utilized to rotate in the second threaded hole, so that the proper using length of the reinforcing steel bar hook can be conveniently adjusted according to the actual using environment, the flexibility of the binding wire hook is effectively improved, and the applicability is high;
2. be carved with a plurality of antiskid groove through the surface at the handle body, can effectual reinforcing this bundle anti-skidding effect of silk hook to improve this bundle use effect of silk hook, can not influence the use because of more smooth between hand and the handle body.
Drawings
FIG. 1 is a schematic view of the overall construction of a wire binding hook for building construction according to the present invention;
FIG. 2 is a schematic view showing the overall structure of a handle of a wire binding hook for building construction according to the present invention;
FIG. 3 is a schematic view of the overall structure of a handle seat of a wire binding hook for building construction according to the present invention;
fig. 4 is a schematic view showing the overall structure of an adjusting hook of a wire binding hook for building construction according to the present invention.
In the figure: 1. a handle; 2. a handle seat; 3. a handle cover; 4. an adjusting hook; 11. a handle body; 12. a first threaded hole; 13. an anti-slip groove; 21. a handle seat body; 22. a first screw rod; 23. an inner hexagonal hole; 41. mounting a rod; 42. a second threaded hole; 43. a second screw; 44. a steel bar hook.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a wire binding hook for building construction comprises a handle 1, a handle seat 2 is connected to the lower end of the handle 1 through threads, a handle cover 3 is installed on the upper end of the handle 1, and an adjusting hook 4 is inserted and connected to the upper end of the handle cover 3.
The handle 1 comprises a handle body 11, a first threaded hole 12 which penetrates through the handle body 11 from top to bottom is formed in the middle of the upper end of the handle body 11, a group of anti-skidding grooves 13 are formed in the outer surface of the handle body 11, and a plurality of anti-skidding grooves 13 are formed in the group; the anti-slip grooves 13 are distributed on the outer surface of the handle body 11 in a central annular array of the handle body 11; the handle seat 2 comprises a handle seat body 21, a first screw 22 is arranged in the middle of the upper end of the handle seat body 21, and a hexagon socket 23 is arranged in the middle of the lower end of the handle seat body 21; the size of the first screw rod 22 is matched with that of the first threaded hole 12, and the outer surface of the first screw rod 22 is in threaded connection with the first threaded hole 12; the adjusting hook 4 comprises an installation rod 41, a second threaded hole 42 is formed in the middle of the upper end of the installation rod 41, a second screw 43 is in threaded connection with the inner wall surface of the second threaded hole 42, a reinforcing steel bar hook 44 is in penetrating connection with the middle of the upper end of the second screw 43, and the lower end of the installation rod 41 is in penetrating connection with the upper end of the handle cover 3.
It should be noted that, the utility model is a wire binding hook for building construction, when in use, the second screw 43 is used to rotate in the second threaded hole 42, so as to conveniently adjust the appropriate use length of the steel bar hook 44 according to the actual use environment, the flexibility of the wire binding hook is effectively improved, the applicability is higher, a worker holds the handle body 11 with his hand to use, the anti-slip effect of the wire binding hook can be effectively enhanced by engraving the anti-slip grooves 13 on the outer surface of the handle body 11, so as to improve the use effect of the wire binding hook, the use is not affected by the slip between the hand and the handle body 11, if the steel bar hook 44 is hard to rotate, other accessories are sleeved in the inner hexagonal hole 23 to rotate.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. A wire binding hook for building construction, includes handle (1), its characterized in that: the handle is characterized in that the lower end of the handle (1) is in threaded connection with a handle seat (2), a handle cover (3) is installed at the upper end of the handle (1), and an adjusting hook (4) is inserted and connected to the upper end of the handle cover (3).
2. A wire binding hook for use in building construction according to claim 1, wherein: the handle (1) comprises a handle body (11), a first threaded hole (12) which is vertically penetrated is formed in the middle of the upper end of the handle body (11), a group of anti-skidding grooves (13) are carved on the outer surface of the handle body (11), and the anti-skidding grooves (13) are provided with a plurality of.
3. A wire binding hook for use in building construction according to claim 2, wherein: the anti-slip grooves (13) are distributed on the outer surface of the handle body (11) in a central annular array of the handle body (11).
4. A wire binding hook for use in building construction according to claim 1, wherein: handle seat (2) include handle seat body (21), handle seat body (21) upper end mid-mounting has screw rod (22) No. one, handle seat body (21) lower extreme middle part is opened has hexagon socket (23).
5. A wire binding hook for use in building construction according to claim 4, wherein: the size of the first screw rod (22) is matched with that of the first threaded hole (12), and the outer surface of the first screw rod (22) is in threaded connection with the first threaded hole (12).
6. A wire binding hook for use in building construction according to claim 1, wherein: the adjusting hook (4) comprises an installing rod (41), a second threaded hole (42) is formed in the middle of the upper end of the installing rod (41), a second screw rod (43) is connected to the inner wall surface of the second threaded hole (42) in a threaded mode, a reinforcing steel bar hook (44) is connected to the middle of the upper end of the second screw rod (43) in an inserting mode, and the lower end of the installing rod (41) is connected with the upper end of the handle cover (3) in an inserting mode.
CN202121672170.6U 2021-07-25 2021-07-25 Wire binding hook for building construction Expired - Fee Related CN215520019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121672170.6U CN215520019U (en) 2021-07-25 2021-07-25 Wire binding hook for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121672170.6U CN215520019U (en) 2021-07-25 2021-07-25 Wire binding hook for building construction

Publications (1)

Publication Number Publication Date
CN215520019U true CN215520019U (en) 2022-01-14

Family

ID=79814343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121672170.6U Expired - Fee Related CN215520019U (en) 2021-07-25 2021-07-25 Wire binding hook for building construction

Country Status (1)

Country Link
CN (1) CN215520019U (en)

Similar Documents

Publication Publication Date Title
US5394592A (en) Power tool cord strain relief arrangement
KR20120088500A (en) The cable fixing bar provisionally installation equipment for work power distribution line
US9822546B1 (en) Reusable ground anchor, related methods of manuafacture and methods of use
CN215520019U (en) Wire binding hook for building construction
US4810837A (en) Clasp for fixing an electrical wire to an insulator and method of fixation
CN206774996U (en) A kind of self-adaptive conductors on quad bundled line lifter
CN201179118Y (en) Implant for orthodontics
CN210380043U (en) Electric threading device for building construction
CN201372759Y (en) Fishing socket with steel wire ropes
CN212042129U (en) Steel strand bending tool
CN215565671U (en) Rope ladder with position fixing mechanism
CN106351932A (en) Panel connecting screw
CN201174540Y (en) Hanging type insulator string electrification altering apparatus interlocked with a two-connection plate
CN210739037U (en) Automobile body interior trim panel buckle
CN211240964U (en) Fruit tree layering device
CN211480807U (en) 10kV multifunctional insulating support
CN216731564U (en) A kind of spanner
CN112217003A (en) Threaded grounding electrode capable of being installed rapidly
CN213782811U (en) Street code
CN201663418U (en) Embedded vibration-proof hammer
CN201674158U (en) Transmission line aerial earth wire lifter
CN204089123U (en) Skidproof antivibration hammer
CN209963297U (en) Torque locking torsion terminal for electric power
CN220725077U (en) Reinforcing member of large-scale soft rainwater collecting cistern
CN220318101U (en) Auxiliary tool for adjusting line length

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220114