CN215519654U - Assembled steel construction wallboard - Google Patents
Assembled steel construction wallboard Download PDFInfo
- Publication number
- CN215519654U CN215519654U CN202121732839.6U CN202121732839U CN215519654U CN 215519654 U CN215519654 U CN 215519654U CN 202121732839 U CN202121732839 U CN 202121732839U CN 215519654 U CN215519654 U CN 215519654U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- assembled steel
- wallboards
- installation
- sand grip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses an assembled steel structure wallboard, which comprises oppositely arranged installation longitudinal beams, wherein a plurality of wallboards which are spliced up and down are arranged between the oppositely arranged installation longitudinal beams, two ends of each wallboard are respectively and fixedly connected with the front ends of the two installation longitudinal beams through screws, convex strips are arranged at the upper ends of the wallboards, clamping grooves matched with the convex strips are arranged at the lower ends of the wallboards, the two adjacent wallboards are clamped and matched into a whole through the corresponding convex strips and the clamping grooves, and concave-shaped sealing strips positioned above the convex strips are arranged between the two adjacent wallboards. Compared with the prior art, the utility model has the advantages that: whole steel construction wallboard simple structure, the on-the-spot fast assembly concatenation of being convenient for, and the connection between the wallboard is comparatively inseparable, the practicality preferred.
Description
Technical Field
The utility model relates to the technical field of steel structures, in particular to an assembled steel structure wallboard.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. Steel construction and traditional structure tank wall have the advantage in the aspect of service function, design, construction and comprehensive economy, are used in fields such as large-scale factory building, venue, superelevation layer widely.
The existing steel structure wallboard is complex in structure, time and labor are wasted in installation, and the existing steel structure wallboard is difficult to splice a plurality of wallboards into a whole in the installation process, so that the connection between the wallboards is not tight enough, and the wallboard is poor in stability after being fixed, and the overall safety performance of the wall body is influenced.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved by the utility model is to overcome the technical defects and provide an assembled steel structure wallboard.
In order to solve the technical problems, the technical scheme provided by the utility model is as follows: the utility model provides an assembled steel construction wallboard, is including the installation longeron of relative setting, sets up relatively be equipped with the wallboard of a plurality of concatenations from top to bottom between the installation longeron, the both ends of wallboard all through the screw respectively with the front end fixed connection of two installation longerons, the upper end of wallboard is equipped with the sand grip, the lower extreme of wallboard be equipped with sand grip looks adaptation clamp the groove, adjacent two through corresponding sand grip between the wallboard and clamp the groove joint cooperation as an organic whole and be equipped with the concave character shape sealing strip that is located the sand grip top between two adjacent wallboards.
As an improvement, the mounting longitudinal beam is I-shaped steel.
As the improvement, the top at wallboard both ends all is equipped with places the mouth, the front end welding of installation longeron has a plurality of L type backup pads, the front end of L type backup pad extends to and places intraorally.
As an improvement, a rock wool heat-insulating layer is arranged inside the wall plate.
Compared with the prior art, the utility model has the advantages that: according to the assembled steel structure wallboard, the raised bars and the clamping grooves are arranged, a plurality of wallboards can be longitudinally spliced into a whole, the installation efficiency is high, the tightness between two adjacent wallboards is improved, meanwhile, the sealing performance between the two adjacent wallboards is further improved by arranging the concave-shaped sealing strips on the raised bars, and the wallboard can be supported to a certain extent by arranging the placing openings and the L-shaped supporting plates, so that the stability of the installed wallboard is improved, the rock wool heat-insulating layer is arranged inside the wallboard to play a role in heat insulation and preservation, and the whole steel structure wallboard is simple in structure, convenient to assemble and splice on site quickly, and good in practicability.
Drawings
Fig. 1 is a schematic structural view of an assembled steel structural wallboard in accordance with the present invention.
Fig. 2 is a schematic structural view of an assembled steel structural wallboard in accordance with the present invention.
Fig. 3 is a side view schematic of an assembled steel structural wallboard in accordance with the present invention.
As shown in the figure: 1. the installation longeron, 2, wallboard, 3, screw, 4, sand grip, 5, clamp the groove, 6, concave character shape sealing strip, 7, place the mouth, 8, L type backup pad, 9, rock wool heat preservation.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The following further describes embodiments of the present invention with reference to the accompanying drawings. In which like parts are designated by like reference numerals.
It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
In order to make the content of the present invention more clearly understood, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
With reference to the attached drawings 1-3, the assembled steel structure wallboard comprises oppositely arranged installation longitudinal beams 1, wherein a plurality of wallboards 2 which are spliced up and down are arranged between the installation longitudinal beams 1, two ends of each wallboard 2 are respectively fixedly connected with the front ends of the two installation longitudinal beams 1 through screws 3, a convex strip 4 is arranged at the upper end of each wallboard 2, a clamping groove 5 matched with the convex strip 4 is arranged at the lower end of each wallboard 2, the adjacent wallboards are connected with each other through the corresponding convex strips 4 and the clamping grooves 5, and concave-shaped sealing strips 6 located above the convex strips 4 are arranged between the two adjacent wallboards 2.
The mounting longitudinal beam 1 is made of I-shaped steel.
The top at 2 both ends of wallboard all is equipped with places mouthful 7, the front end welding of installation longeron 1 has a plurality of L type backup pads 8, the front end of L type backup pad 8 extends to and places in mouthful 7.
And a rock wool heat-insulating layer 9 is arranged in the wallboard 2.
When the wall panel is specifically implemented, the L-shaped support plates are welded on the outer sides of the installation longitudinal beams in advance, the installation longitudinal beams are fixed at the appointed positions of the wall body, the two ends of the wall panel are respectively fixed on the two adjacent installation longitudinal beams through screws, the two adjacent wall panels are mutually spliced into a whole, the raised lines are provided with the concave-shaped sealing strips, the sealing performance between the two adjacent wall panels is further improved, the wall panels can be supported to a certain extent through the arrangement of the placing openings and the L-shaped support plates, the stability of the wall panels after installation is improved, and the rock wool heat-insulating layers are arranged in the wall panels to play a role in heat insulation.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the utility model as defined by the appended claims.
Claims (4)
1. The utility model provides an assembled steel construction wallboard, includes relative installation longeron (1) that sets up, its characterized in that: relatively set up be equipped with wallboard (2) of a plurality of upper and lower concatenations between installation longeron (1), the both ends of wallboard (2) all through screw (3) respectively with the front end fixed connection of two installation longerons (1), the upper end of wallboard (2) is equipped with sand grip (4), the lower extreme of wallboard (2) is equipped with the groove (5) that clamps with sand grip (4) looks adaptation, adjacent two through corresponding sand grip (4) and clamp groove (5) joint cooperation as an organic whole and be equipped with between two adjacent wallboards (2) and be located concave character shape sealing strip (6) of sand grip (4) top between wallboard (2).
2. An assembled steel structural wallboard according to claim 1 and wherein: the mounting longitudinal beam (1) is made of I-shaped steel.
3. An assembled steel structural wallboard according to claim 1 and wherein: wallboard (2) both ends top all is equipped with places mouth (7), the front end welding of installation longeron (1) has a plurality of L type backup pads (8), the front end of L type backup pad (8) extends to and places in the mouth (7).
4. An assembled steel structural wallboard according to claim 1 and wherein: and a rock wool heat-insulating layer (9) is arranged in the wallboard (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121732839.6U CN215519654U (en) | 2021-07-28 | 2021-07-28 | Assembled steel construction wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121732839.6U CN215519654U (en) | 2021-07-28 | 2021-07-28 | Assembled steel construction wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215519654U true CN215519654U (en) | 2022-01-14 |
Family
ID=79787960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121732839.6U Active CN215519654U (en) | 2021-07-28 | 2021-07-28 | Assembled steel construction wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215519654U (en) |
-
2021
- 2021-07-28 CN CN202121732839.6U patent/CN215519654U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209760300U (en) | Steel shell pre-member of double-steel shell concrete immersed tube tunnel | |
CN215519654U (en) | Assembled steel construction wallboard | |
CN203977692U (en) | A kind of steel pipe bundle combined structure system for industrialization residential building | |
CN103850349A (en) | Frame-steel pipe bundle combined structure system for industrial residential building | |
CN212248809U (en) | Prefabricated formula side fascia of assembly type structure | |
CN103850348A (en) | Industrial steel tube bindle composite structure building system | |
CN114439109A (en) | Cross internal support round pipe and taper pipe conversion node and manufacturing method thereof | |
CN203769057U (en) | Industrialized steel tube bundle combined structure construction system | |
CN114059707A (en) | High strength building engineering concrete wallboard | |
CN215802638U (en) | Concatenation formula heat insulating board | |
CN217053767U (en) | Multi-combination rock wool heat insulation house | |
CN205935243U (en) | Concatenation node of dysmorphism post | |
CN212579336U (en) | Corrosion-resistant composite metal heat-insulation color steel plate | |
CN215290755U (en) | Assembled installs infilled wall fast | |
CN214006122U (en) | Assembled internal partition wall | |
CN204804159U (en) | Light energy - saving wall panels of staggered structure | |
CN217557259U (en) | Heat preservation and sound insulation combined strong plate for quickly assembling space truss | |
CN215211797U (en) | Light bearing floor slab frame capable of being assembled and welded quickly | |
CN203769060U (en) | Framework-steel pipe bundle combined structure system for industrial residential buildings | |
CN210530045U (en) | Structure integration heat preservation exempts from to tear open template | |
CN215054502U (en) | Heat-insulating light composite sandwich board capable of being spliced in multiple directions | |
CN214498508U (en) | House capable of being built quickly | |
CN212926611U (en) | Outdoor curtain wall with good heat insulation effect | |
CN210439547U (en) | Heat-insulation building material plate | |
CN202370122U (en) | Anti-drop installing construction member based on light-weight insulating brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |