CN215518311U - Steel temporary bridge - Google Patents

Steel temporary bridge Download PDF

Info

Publication number
CN215518311U
CN215518311U CN202121316310.6U CN202121316310U CN215518311U CN 215518311 U CN215518311 U CN 215518311U CN 202121316310 U CN202121316310 U CN 202121316310U CN 215518311 U CN215518311 U CN 215518311U
Authority
CN
China
Prior art keywords
steel
bridge
sides
bearing platform
pontic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121316310.6U
Other languages
Chinese (zh)
Inventor
李钦涛
邱霖
张立军
王俊强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Qingdao Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Qingdao Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN202121316310.6U priority Critical patent/CN215518311U/en
Application granted granted Critical
Publication of CN215518311U publication Critical patent/CN215518311U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a steel suspension bridge, relates to bridge construction technical field, including pontic and two steel-pipe piles, two the steel-pipe pile is squeezed into both sides river along department respectively, the pontic erects two on the steel-pipe pile the both sides of two tip of pontic all are provided with a steel stand the middle part both sides of pontic all are provided with the otic placode, the upper end and the homonymy of steel stand install the cable between the otic placode.

Description

Steel temporary bridge
Technical Field
The utility model relates to the technical field of bridge construction, in particular to a steel temporary bridge.
Background
The steel temporary bridge is a simple bridge temporarily erected by steel. The method is mainly used for main bridge construction or temporary traffic for dredging construction points. When a viaduct bridge is constructed, in order to avoid danger caused by falling objects, traffic below and around the viaduct is temporarily closed or temporarily diverted, a temporary traffic channel needs to be opened around the viaduct, when a small-medium river or a gully is encountered, a steel temporary bridge needs to be erected, a traditional erection method is to uniformly drive steel pipe piles into the river, and then to erect bailey beams, bridge decks and the like.
Disclosure of Invention
In order to solve the problems of the prior art, the utility model provides a steel temporary bridge.
The purpose of the utility model can be realized by the following technical scheme: the utility model provides a steel temporary bridge, includes the pontic and two steel-pipe piles, two both sides river edge department is squeezed into respectively to the steel-pipe pile, the pontic erects two on the steel-pipe pile the both sides of two tip of pontic all are provided with a steel stand the middle part both sides of pontic all are provided with the otic placode, the upper end and the homonymy of steel stand install the cable between the otic placode.
Preferably, concrete poured bearing platforms are arranged on two sides of the river, steps are oppositely arranged on the two bearing platforms, and the bridge body is lapped on the steps to be fixed.
Preferably, the height of the bearing platform is higher than the road surface; and an inclined buffer platform is arranged between the bearing platform and the road surface in the driving direction of the bridge body.
Preferably, the cross section of the slow connecting platform along the longitudinal bridge direction is triangular, and the slow connecting platform is anchored on the end face of the bearing platform by a screw.
Preferably, the lower end of the steel upright post is inserted into the bearing platform and integrally cast.
Preferably, a connecting plate and a reinforcing rib are arranged between the steel upright post and the upper end face of the bearing platform for fixed installation.
Preferably, the bridge body comprises a lower-layer longitudinal and transverse beam supporting frame and an upper-layer bridge deck, the bridge deck extends to the bearing platform, guard rails are arranged on two side edges of the longitudinal and transverse beam supporting frame, and the ear plates are mounted in the middle of the two side edges of the longitudinal and transverse beam supporting frame.
The utility model discloses a construction flow does: (1) constructing bearing platforms and steel columns on two banks of a river, taking a supporting platform surface as a main construction surface, and driving steel pipe piles into the river edge; (2) erecting a longitudinal and transverse beam supporting frame, and installing guard railings and ear plates; (3) and after the bridge deck is laid, a guy cable is arranged between the top of the steel upright post and the lug plate.
The comprehensive effects brought by the utility model comprise: the utility model has simple and reasonable structure, the bearing platform and the steel upright post are firstly constructed on the river bank, then the steel pipe pile on the river edge is used for supporting the two ends of the bridge body, and the steel cable is pulled between the steel upright post and the lug plate on the bridge body to play a role of supporting the middle part of the bridge body, the erection mode is simple and the efficiency is high, and the construction is carried out on the river bank and the bridge body.
Drawings
FIG. 1 is a schematic structural diagram of a steel access bridge according to an embodiment of the present invention.
Wherein like parts are designated by like reference numerals throughout the several views; the figures are not drawn to scale.
Detailed Description
The utility model is further illustrated by the following figures and examples.
Examples
The purpose of the embodiment of the utility model can be realized by the following technical scheme: a steel temporary bridge comprises a bridge body and two steel pipe piles 1, wherein the two steel pipe piles 1 are respectively driven into river edges on two sides, the bridge body is erected on the two steel pipe piles 1, concrete poured bearing platforms 2 are arranged on two sides of a river, namely on the river bank edges on the two sides, steps 3 are oppositely arranged on the two bearing platforms 2, and the end parts of the bridge body are lapped on the steps 3 to be fixed; two sides of the bearing platform 2 are respectively provided with a steel upright post 4, and the lower ends of the steel upright posts 4 are inserted into the bearing platform 2 to be integrally cast and molded; the middle part both sides of pontic all are provided with otic placode 5, the upper end of steel stand 4 and homonymy install cable 6 between the otic placode 5.
Further, in this embodiment, the bridge body includes a lower-layer longitudinal and transverse beam support frame 7 and an upper-layer bridge deck 8, the upper end surface of the bearing platform 2 is flush with the upper end surface of the longitudinal and transverse beam support frame 7, so that the bridge deck 8 can extend onto the bearing platform 2, guard rails 9 are disposed on two side edges of the longitudinal and transverse beam support frame 7, and the ear plates 5 are mounted in the middle of the two side edges of the longitudinal and transverse beam support frame 7.
Further, in the present embodiment, the height of the bearing platform 2 is higher than the road surface 10; an inclined buffer abutment 11 is arranged between the bearing platform 2 and the road surface 10 in the driving direction of the bridge body; the slow connecting table 11 is triangular in cross section along the longitudinal bridge direction, and the slow connecting table 11 is anchored on the end face of the bearing platform 2 by screws.
Further, in the present embodiment, in order to reinforce the connection strength between the steel column 4 and the bearing platform 2, a connecting plate 12 is provided at a position of the steel column 4 on the upper end surface of the bearing platform 2, the connecting plate 12 is anchored on the upper end surface of the bearing platform 2 by bolts, and a reinforcing rib 13 is installed between the connecting plate 12 and the steel column 4.
The utility model discloses construction flow does: 1, constructing bearing platforms 2 and steel columns 4 on both banks of a river, taking a supporting platform surface as a main construction surface, and driving steel pipe piles 1 into the river edge; 2, erecting a longitudinal-transverse beam supporting frame 7, and installing guard rails 9 and ear plates 5; 3, after the bridge deck 8 is laid, a guy cable 6 is arranged between the top of the steel upright post 4 and the ear plate 5.
The comprehensive effects brought by the embodiment of the utility model comprise: the utility model has simple and reasonable structure, the bearing platform 2 and the steel upright post 4 are firstly constructed on the river bank, then the two ends of the bridge body are supported by the steel pipe pile 1 on the river edge, and the steel cable is pulled between the steel upright post 4 and the lug plate 5 on the bridge body to play a role of supporting the middle part of the bridge body, the erection mode is simple and the efficiency is high, and the construction is carried out on the river bank and the bridge body.
The structures, proportions, sizes, and other dimensions shown in the drawings and described in the specification are for understanding and reading the present disclosure, and are not intended to limit the scope of the present disclosure, which is defined in the claims, and are not essential to the art, and any structural modifications, changes in proportions, or adjustments in size, which do not affect the efficacy and attainment of the same are intended to fall within the scope of the present disclosure. In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
The utility model has been described above with reference to preferred embodiments, but the scope of protection of the utility model is not limited thereto, and all technical solutions falling within the scope of the claims are within the scope of protection of the utility model. Various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the utility model. In particular, the technical features mentioned in the embodiments can be combined in any way as long as there is no structural conflict.

Claims (7)

1. The utility model provides a steel temporary bridge, its characterized in that, includes pontic and two steel-pipe pile (1), two both sides river edge department is squeezed into respectively in steel-pipe pile (1), the pontic erects two on steel-pipe pile (1) the both sides of two tip of pontic all are provided with a steel stand (4) the middle part both sides of pontic all are provided with otic placode (5), the upper end and the homonymy of steel stand (4) install cable (6) between otic placode (5).
2. The steel temporary bridge according to claim 1, wherein concrete-poured bearing platforms (2) are arranged on two sides of a river, steps (3) are oppositely arranged on the two bearing platforms (2), and the bridge body is lapped on the steps (3) and fixed.
3. The steel access bridge according to claim 2, characterized in that the bearing platform (2) is higher than the road surface (10); and an inclined buffer platform (11) is arranged between the bearing platform (2) and the road surface (10) in the driving direction of the bridge body.
4. The steel access bridge according to claim 3, characterised in that the buffer abutment (11) is triangular in cross section in the longitudinal direction of the bridge and that the buffer abutment (11) is anchored with screws on the end face of the bearing platform (2).
5. The steel temporary bridge according to claim 2, characterized in that the lower ends of the steel upright posts (4) are inserted into the bearing platform (2) and integrally cast.
6. The steel temporary bridge according to claim 5, characterized in that a connecting plate (12) and a reinforcing rib (13) are fixedly arranged between the steel upright (4) and the upper end face of the bearing platform (2).
7. The steel temporary bridge according to claim 1, wherein the bridge body comprises a lower-layer longitudinal and transverse beam supporting frame (7) and an upper-layer bridge deck (8), the bridge deck (8) extends onto the bearing platform (2), guard rails (9) are arranged on two sides of the longitudinal and transverse beam supporting frame (7), and the ear plates (5) are installed in the middle of two sides of the longitudinal and transverse beam supporting frame (7).
CN202121316310.6U 2021-06-11 2021-06-11 Steel temporary bridge Active CN215518311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121316310.6U CN215518311U (en) 2021-06-11 2021-06-11 Steel temporary bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121316310.6U CN215518311U (en) 2021-06-11 2021-06-11 Steel temporary bridge

Publications (1)

Publication Number Publication Date
CN215518311U true CN215518311U (en) 2022-01-14

Family

ID=79807981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121316310.6U Active CN215518311U (en) 2021-06-11 2021-06-11 Steel temporary bridge

Country Status (1)

Country Link
CN (1) CN215518311U (en)

Similar Documents

Publication Publication Date Title
CN106087777A (en) High pier long cantilever Cast-in-place Bent Cap combined type formwork system and construction method
CN107956202B (en) Safe and stable crescent bridge and mounting process thereof
CN109594581B (en) River-crossing pipeline structure and installation method thereof
CN214613367U (en) Wide construction structures is pieced together to stake board-like road bed
CN215518311U (en) Steel temporary bridge
CN212895944U (en) Cross-line skew cast-in-place construction device based on main beam being Bailey beam
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN217078829U (en) Position structure of bridge pile foundation and subway tunnel
CN210482000U (en) Limiting device for jacking construction of large-span steel pipe concrete tied arch bridge
CN113944103B (en) Assembled support device applied to installation of steel box girder road-crossing bridge and construction method
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method
CN213682477U (en) Upper cover structure system applied to track operation line
CN210658013U (en) Hanging basket structure for construction of wet joints of prefabricated erected small box girder cross-line bridge
CN209353367U (en) On across active service highway door opening bracket upright post basis
CN112095780A (en) Upper cover structure system applied to track operation line and implementation method thereof
CN217517366U (en) Quick construction support system for large cantilever prestressed bent cap
CN105672140A (en) Erecting, constructing and wind preventing method for long-span cable-stayed bridge steel box girder long cantilever in violent typhoon region
CN220486469U (en) A narrow apron structure of no stand for deep basal pit
CN217949823U (en) Protective shed frame device for crossing existing railway on expressway
CN221167506U (en) Road and bridge crack reinforced structure
CN218969784U (en) Cast-in-situ beam bearing support device
CN217419382U (en) Viaduct sound barrier base installation device
CN218952167U (en) Civil engineering pile body reinforcing apparatus
CN217298608U (en) Assembled steel trestle
CN219972971U (en) Hollow slab reinforced structure system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant