CN215442980U - A prevent device that ftractures for terrazzo - Google Patents

A prevent device that ftractures for terrazzo Download PDF

Info

Publication number
CN215442980U
CN215442980U CN202121828826.9U CN202121828826U CN215442980U CN 215442980 U CN215442980 U CN 215442980U CN 202121828826 U CN202121828826 U CN 202121828826U CN 215442980 U CN215442980 U CN 215442980U
Authority
CN
China
Prior art keywords
terrazzo
rectangular frame
pole
frame
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121828826.9U
Other languages
Chinese (zh)
Inventor
杨晓平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Yangjia Flooring Co ltd
Original Assignee
Fuzhou Yangjia Flooring Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Yangjia Flooring Co ltd filed Critical Fuzhou Yangjia Flooring Co ltd
Priority to CN202121828826.9U priority Critical patent/CN215442980U/en
Application granted granted Critical
Publication of CN215442980U publication Critical patent/CN215442980U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides an anti-cracking device for terrazzo, which comprises a rectangular frame, wherein a concrete layer and a soil layer are sequentially arranged below the rectangular frame, terrazzo plates are arranged in the rectangular frame, a diamond-shaped protective frame is arranged at the bottom of the rectangular frame, four vertexes of the diamond-shaped protective frame are respectively positioned at the middle points of four side edges of the bottom of the rectangular frame, the diamond-shaped protective frame consists of four connecting plates, the bottom of each connecting plate is provided with a main rod, a plurality of branch rods are arranged on the main rods, and a plurality of bifurcated rods are arranged on the branch rods; adopt above-mentioned technical scheme, before concrete layer pours, bury trunk pole and branch dry pole through the dirt bed, make trunk pole and branch dry pole bury in the dirt bed, pour terrazzo board in rectangular frame, utilize the forked pole to improve the power of grabbing of terrazzo board, prevent breaking away from at will of terrazzo board and concrete layer binding face, stabilized the connected state of terrazzo board and concrete, prevent the fracture of terrazzo and concrete adhesive face.

Description

A prevent device that ftractures for terrazzo
Technical Field
The utility model relates to the field of anti-cracking devices for terrazzo, in particular to an anti-cracking device for terrazzo.
Background
The terrazzo is made up by mixing aggregate of broken stone, glass and quartz stone with cement binder, and grinding and polishing its surface. The terrazzo made of cement adhesive is called inorganic terrazzo, and the terrazzo made of epoxy adhesive is called epoxy terrazzo or organic terrazzo, and the terrazzo is cast in situ with terrazzo and prefabricated slab terrazzo ground according to construction and manufacturing process.
The epoxy terrazzo for the ground is suitable for the ground, has strong wear resistance and durability, has rich colors, forms a unique and glaring ground, and is popular with people. However, in the installation of the traditional terrazzo, the terrazzo is generally directly attached to the surface of the concrete, but when the connection state of the terrazzo and the concrete is poor, the terrazzo is likely to loosen, and the bonding surface of the terrazzo and the concrete is cracked, so that the problem that the crack prevention device for the terrazzo is urgently needed to solve is solved.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to solve the above problems of the prior art, the present invention provides a crack prevention device for a terrazzo. .
(II) technical scheme
In order to achieve the purpose, the utility model adopts the main technical scheme that:
the utility model provides a prevent device that ftractures for terrazzo, includes rectangular frame, rectangular frame's below is equipped with concrete layer and dirt layer in proper order, install terrazzo board in the rectangular frame, rectangular frame's bottom is provided with diamond-shaped protection frame, four summits of diamond-shaped protection frame are located respectively the mid point department of four sides in rectangular frame bottom, diamond-shaped protection frame comprises four connecting plates, every the bottom of connecting plate all is provided with the trunk pole, be provided with a plurality of branches and do the pole on the trunk pole, be provided with a plurality of forked poles on the branch and do the pole.
Preferably, the bottom of the main rod is fixedly connected with a conical seat.
Preferably, the rhombus protective frame is buried in the concrete layer, and the trunk rod penetrates through the concrete layer and extends into the soil layer.
Preferably, an elastic material is filled between the rectangular frame and the terrazzo board, and the elastic material is glass cement or rock wool.
Preferably, the two opposite side walls of the rectangular frame are provided with T-shaped connecting blocks, and the other two side walls of the rectangular frame are provided with T-shaped connecting grooves matched with the T-shaped connecting blocks.
(III) advantageous effects
The utility model has the beneficial effects that: adopt above-mentioned technical scheme, before concrete layer pours, bury trunk pole and branch dry pole through the dirt bed, make trunk pole and branch dry pole bury in the dirt bed, pour terrazzo board in rectangular frame, utilize the forked pole to improve the power of grabbing of terrazzo board, prevent breaking away from at will of terrazzo board and concrete layer binding face, stabilized the connected state of terrazzo board and concrete, prevent the fracture of terrazzo and concrete adhesive face.
Drawings
FIG. 1 is a schematic view showing a structure of a crack preventing means for a terrazzo;
FIG. 2 is a first perspective view of a rectangular frame;
FIG. 3 is a schematic perspective view of a rectangular frame;
fig. 4 is a schematic structural diagram of a second embodiment of the present invention.
[ description of reference ]
1-a rectangular frame; 2-diamond protective frame; 3-a concrete layer; 4-a mud layer; 5-trunk pole; 6-bifurcated stems; 7-a conical seat; 8-branch stem; 9-T-shaped connecting blocks; 10-T type connecting groove.
Detailed Description
For the purpose of better explaining the present invention and to facilitate understanding, the present invention will be described in detail by way of specific embodiments with reference to the accompanying drawings.
Referring to fig. 1 to 3, a first embodiment of the present invention: a cracking prevention device for terrazzo comprises a rectangular frame 1, a concrete layer 3 and a soil layer 4 are sequentially arranged below the rectangular frame 1, terrazzo plates are mounted in the rectangular frame 1, a rhombic protection frame 2 is arranged at the bottom of the rectangular frame 1, four vertexes of the rhombic protection frame 2 are respectively located at the middle points of four side edges of the bottom of the rectangular frame 1, the rhombic protection frame 2 is composed of four connecting plates, a main rod 5 is arranged at the bottom of each connecting plate, a plurality of branch rods 8 are arranged on the main rod 5, and a plurality of bifurcated rods 6 are arranged on the branch rods 8; during the use, before concrete layer 3 pours, bury trunk pole 5 and prop up futilely pole 8 through soil layer 4, make trunk pole 5 and prop up futilely pole 8 and bury in soil layer 4, pour the terrazzo board in rectangular frame 1, utilize bifurcated rod 6 to improve the power of grabbing of terrazzo board, prevent breaking away from at will of terrazzo board and concrete layer 3 binding face, the connection status of terrazzo board and concrete has been stabilized, prevent the fracture of terrazzo and concrete adhesive face.
In this embodiment, the bottom of the main rod 5 is fixedly connected with a conical seat 7, and the conical seat 7 is beneficial to the main rod 5 to be inserted into the soil layer 4.
In this embodiment, the diamond-shaped protective frame 2 is embedded in the concrete layer 3, and the main rod 5 penetrates through the concrete layer 3 and extends into the soil layer 4.
In this embodiment, rectangular frame 1 and terrazzo inter-plate are filled with elastic material, and elastic material glues or rock wool for glass, and the elastic material of filling can play the effect of buffering to the terrazzo board, makes the live time extension of terrazzo board, has just also prolonged the normal life of terrazzo board.
Referring to fig. 4, in the second embodiment of the present invention, T-shaped connection blocks 9 are disposed on two opposite side walls of the rectangular frame 1, T-shaped connection grooves 10 adapted to the T-shaped connection blocks 9 are disposed on two other side walls of the rectangular frame 1, and the T-shaped connection blocks 9 are matched with the T-shaped connection grooves 10, so that a plurality of rectangular frames 1 can be spliced side by side quickly, which is beneficial to quick construction.
The working principle of the utility model is as follows: before concrete layer 3 pours, bury trunk pole 5 and prop up futilely pole 8 through soil layer 4, make trunk pole 5 bury in soil layer 4 with propping up futilely pole 8, pour terrazzo board in rectangular frame 1, utilize bifurcated rod 6 to improve the grab power of terrazzo board, prevent breaking away from at will of terrazzo board and concrete layer 3 binding face, the connection status of terrazzo board and concrete has been stabilized, prevent the fracture of terrazzo and concrete binding face.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent modifications made by the contents of the present specification and the drawings, or applied to the related technical fields directly or indirectly, are included in the scope of the present invention.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides a prevent device that ftractures for terrazzo, includes rectangular frame, its characterized in that, rectangular frame's below is equipped with concrete layer and dirt layer in proper order, install terrazzo board in the rectangular frame, rectangular frame's bottom is provided with the rhombus protective frame, four summits of rhombus protective frame are located respectively the mid point department of four sides in rectangular frame bottom, the rhombus protective frame comprises four connecting plates, every the bottom of connecting plate all is provided with the trunk pole, be provided with a plurality of branches and do the pole on the trunk pole, be provided with a plurality of forked poles on the branch and do the pole.
2. The crack preventing device for terrazzo according to claim 1, characterized in that a conical seat is fixedly connected to the bottom of the main rod.
3. The crack preventing device for terrazzo according to claim 1, characterized in that the diamond-shaped protective frame is embedded in a concrete layer, and the trunk rod penetrates through the concrete layer and extends into the soil layer.
4. The crack prevention device for a terrazzo according to claim 1, characterized in that an elastic material is filled between the rectangular frame and the terrazzo, the elastic material being glass cement or rock wool.
5. The crack preventing device for terrazzo according to claim 1, characterized in that T-shaped connecting blocks are arranged on two opposite side walls of the rectangular frame, and T-shaped connecting grooves adapted to the T-shaped connecting blocks are arranged on the other two side walls of the rectangular frame.
CN202121828826.9U 2021-08-06 2021-08-06 A prevent device that ftractures for terrazzo Active CN215442980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121828826.9U CN215442980U (en) 2021-08-06 2021-08-06 A prevent device that ftractures for terrazzo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121828826.9U CN215442980U (en) 2021-08-06 2021-08-06 A prevent device that ftractures for terrazzo

Publications (1)

Publication Number Publication Date
CN215442980U true CN215442980U (en) 2022-01-07

Family

ID=79692001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121828826.9U Active CN215442980U (en) 2021-08-06 2021-08-06 A prevent device that ftractures for terrazzo

Country Status (1)

Country Link
CN (1) CN215442980U (en)

Similar Documents

Publication Publication Date Title
CN207003252U (en) Permanent seal cooling Bridge Surface Paving by Cement structure
CN108517733A (en) The pavement structure and urban road of urban road
CN110700121B (en) Road and bridge crack repairing and fixing structure
CN215442980U (en) A prevent device that ftractures for terrazzo
CN110593445A (en) Environmental protection brick convenient to lay closely and water permeability is good
CN212896942U (en) Wall body for archaized building
CN211772505U (en) Town road paves road surface structure that permeates water
CN210797161U (en) Municipal administration pavement ceramic tile
EP2154293A2 (en) Road surface construction
CN216237943U (en) Rural highway cement concrete pavement assembled structure of small traffic
KR101190767B1 (en) Stone Block And Construction Method There Of For Side Walk Packing
CN211621043U (en) Ceramic thick plate permeable paving system
CN211849269U (en) Hydraulic engineering side slope protective structure
CN107740323A (en) Semi-rigid and semi-flexible highway extension splicing structure and construction method
CN107288007A (en) A kind of asphalt paving structure with safeguard measure
CN207193694U (en) A kind of asphalt paving structure with safeguard measure
CN206768507U (en) Spacing slot type water-permeable brick on four sides
CN206457692U (en) A kind of road side stone mounting structure
CN208586484U (en) A kind of vertical road dental structure
CN106544940B (en) A kind of garden road pile foundation type spit of fland step structure and construction technology
CN211285114U (en) Grass embedding structure between bricks of pavement bricks
CN217231338U (en) Environment-friendly water permeable brick pavement structure
CN201053095Y (en) Stone for laying
CN212294216U (en) Anti-crack concrete layer structure
CN202577095U (en) Sidewalk brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant