CN215442358U - Set up quick industrial pipeline support - Google Patents

Set up quick industrial pipeline support Download PDF

Info

Publication number
CN215442358U
CN215442358U CN202120357771.1U CN202120357771U CN215442358U CN 215442358 U CN215442358 U CN 215442358U CN 202120357771 U CN202120357771 U CN 202120357771U CN 215442358 U CN215442358 U CN 215442358U
Authority
CN
China
Prior art keywords
layer frame
frame
bolt
layer
upright post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120357771.1U
Other languages
Chinese (zh)
Inventor
朱斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pec Building Materials China Co ltd
Original Assignee
Peck Construction Accessories Zhangjiagang Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Peck Construction Accessories Zhangjiagang Co ltd filed Critical Peck Construction Accessories Zhangjiagang Co ltd
Priority to CN202120357771.1U priority Critical patent/CN215442358U/en
Application granted granted Critical
Publication of CN215442358U publication Critical patent/CN215442358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an industrial pipeline bracket capable of being quickly erected, which comprises a foundation bearing platform frame with a reinforced concrete structure, a single-layer frame and a connecting beam; wherein the foundation bearing platform frame is cast in situ integrally, and the upper surface of the foundation bearing platform frame is provided with a protruding bolt; the single-layer frame is a crossbeam and two piece at least stand whole pouring door-shaped structure that form, the bottom surface of its stand lower extreme and the four corners of the terminal surface at tie-beam two all are provided with the connecting piece, the single-layer frame divide into middle level and top layer two kinds, at least one side of the single-layer frame of top layer is provided with outstanding bolt, upper surface and at least one side of the stand upper end of middle level single-layer frame all are provided with outstanding bolt, the bolt is unanimous with the connecting piece quantity that corresponds, through nut single-layer frame and basic cushion cap frame, single-layer frame and single-layer frame, single-layer frame is connected with the tie-beam. Most components of the utility model are prefabricated parts, and all components are connected by bolts, so that the whole support is quick to erect and convenient to construct, and the construction period is shortened.

Description

Set up quick industrial pipeline support
Technical Field
The utility model belongs to the technical field of building concrete prefabricated parts, and relates to an industrial pipeline support capable of being erected quickly.
Background
With the development of modern industrial technology, in order to accelerate the construction time and simplify the construction process, the prefabricated building is becoming the mainstream, so that the house can be manufactured in a set like the machine production in batches, and the production cost is low, and the prefabricated building is rapidly popularized and developed all over the world.
However, the existing assembly type construction is mainly used in the construction of common buildings, the industrial buildings or structures are still erected by using the traditional cast-in-place reinforced concrete or steel structures, the cast-in-place concrete has the problems of long maintenance time, inconvenient repair after part of the positions are damaged and the like, and the requirement of quick erection is difficult to meet.
Therefore, it is necessary to develop a reinforced concrete industrial pipe support which can be quickly erected and is corrosion-resistant.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a reinforced concrete industrial pipeline support which can be quickly erected and accelerate the construction progress of an industrial pipeline.
In order to achieve the purpose, the technical scheme of the utility model is as follows:
an industrial pipeline bracket capable of being quickly erected comprises a foundation bearing platform frame of a reinforced concrete structure, a single-layer frame and a connecting beam; wherein the foundation bearing platform frame is cast in situ integrally, and the upper surface of the foundation bearing platform frame is provided with a protruding bolt; the single-layer frame is a crossbeam and two piece at least stand whole pouring door-shaped structure that form, the bottom surface of its stand lower extreme and the four corners of the terminal surface at tie-beam two all are provided with the connecting piece, the single-layer frame divide into middle level and top layer two kinds, at least one side of the single-layer frame of top layer is provided with outstanding bolt, upper surface and at least one side of the stand upper end of middle level single-layer frame all are provided with outstanding bolt, the bolt is unanimous with the connecting piece quantity that corresponds, through nut single-layer frame and basic cushion cap frame, single-layer frame and single-layer frame, single-layer frame is connected with the tie-beam.
Further, the bolts arranged on the upper surface of the foundation bearing platform frame and the top surface of the upper end of the upright post of the single-layer frame are first type bolts formed after threads are machined on one end of the protruding surface of the steel bar embedded in the bolts; the bolt arranged on the side face of the upper end of the stand column of the single-layer frame is a second bolt which is formed by transversely connecting two ends of a steel bar in the stand column with the sleeve or transversely bending one end of the steel bar in the stand column by 90 degrees to the side face, exposing the other end of the sleeve to the adjacent surface and then forming the bolt with detachable bolts with threads at two ends, and the problem that the inconvenient installation is caused by the exposed bolt with fixed side face is avoided.
Furthermore, more than four connecting pieces in pairs are arranged on the bottom surface of the lower end of the stand column of the single-layer frame and the four sides of the end surfaces of the two ends of the connecting beam.
Furthermore, the connecting piece is a component formed by overlapping two or more metal plates at least on three sides or formed by overlapping one metal plate bent into two sides with one metal plate as the bottom surface, the metal plate forming the bottom surface is provided with a hole for penetrating through a bolt, at least one reinforcing steel bar is welded on the inner side of each metal plate forming the side surface, and a reinforcing steel bar is welded on the external corner formed by the two metal plates on the two side surfaces for strengthening the connection with the concrete component after being embedded.
Furthermore, the connecting piece arranged on the bottom surface of the lower end of the single-layer frame upright post is fixed with the first type of bolt arranged on the top surface of the upper end of the other single-layer frame upright post, so that one single-layer frame is erected on the other single-layer frame.
Furthermore, the two single-layer frames are fixed with the connecting pieces arranged at two ends of the connecting beam through second bolts arranged on opposite side surfaces of the upper ends of the stand columns respectively, so that the two single-layer frames are connected with each other, the second bolts are arranged on the front side surface and the rear side surface of the upper portion of the stand column of the middle single-layer frame, and only one side surface of the upper portion of the single-layer frame at two ends is provided with the second bolt.
Furthermore, brackets are arranged below the second type of bolts arranged on the side face of the upper end of the upright post of the single-layer frame and correspond to the connecting beam, and non-shrinkable grouting materials are poured at the connecting positions of the upright post, the connecting beam and the brackets to package the upright post, the connecting beam and the brackets into a complete stressed whole.
Has the advantages that:
(1) most components of the utility model are prefabricated parts, and all components are connected by bolts, so that the whole support is quick to erect and convenient to construct, and the construction period is shortened.
Drawings
FIG. 1 is a schematic structural diagram of the present invention
FIG. 2 is an enlarged view of node A;
FIG. 3 is a schematic view of a single-layered frame incorporating cast-in-place concrete;
FIG. 4 is a schematic structural view of a connector;
FIG. 5 is a schematic view of the embedded steel bars in the column being connected to the first type of bolts at the top surface;
FIG. 6 is a schematic view of a second type of bolt formed by connecting vertical embedded steel bars in a column with detachable bolts on the side surface;
FIG. 7 is a schematic view of a second type of bolt formed by connecting a transverse embedded steel bar in a column with a detachable bolt on the side surface;
wherein, 1 is basic cushion cap frame, 2 is the individual layer frame, 3 is the tie-beam, 4 is the bolt, 5 is the connecting piece, 6 is the bracket.
Detailed Description
The following further describes the embodiments of the present invention with reference to the attached drawings.
As shown in fig. 1 and 2, the quick-erection industrial pipeline bracket comprises a foundation cap frame 1 of a reinforced concrete structure, a single-layer frame 2 and a connecting beam 3; wherein the foundation bearing platform frame 1 is cast in situ integrally, and the upper surface of the foundation bearing platform frame is provided with a protruding bolt 4; the single-layer frame 2 is a door-shaped structure formed by integrally pouring a cross beam and at least two stand columns, the bottom surfaces of the stand columns at the lower ends of the stand columns and the four corners of the end surfaces of two ends of the connecting beam are respectively provided with a connecting piece 5, the single-layer frame 2 is divided into a middle layer and a top layer, at least one side surface of the single-layer frame at the top layer is provided with a protruding bolt 4, the upper surface and at least one side surface of the stand columns at the middle layer are respectively provided with a protruding bolt 4, the bolts 4 are consistent with the corresponding connecting pieces 5 in quantity, the single-layer frame 2 and the basic bearing platform frame 1 are arranged through nuts, the single-layer frame 2 and the single-layer frame 2 are connected with the connecting beam 3.
As shown in fig. 5 to 7, the bolts 4 provided on the upper surface of the foundation cap frame 1 and the top surface of the upper end of the upright of the single-layer frame 2 are first type bolts formed by processing threads on one end of the protruding surface of the steel bar embedded inside; the bolt arranged on the side face of the upper end of the upright post of the single-layer frame 2 is a second type bolt which is formed by connecting two ends of a steel bar transversely arranged in the upright post with the sleeve or connecting one end of a steel bar vertically arranged in the upright post, which is transversely bent by 90 degrees towards the side face, with the sleeve, and exposing the adjacent surface of the other end of the sleeve and then forming a detachable bolt with threads at two ends.
The bottom surface of the lower end of the upright post of the single-layer frame 2 and the four sides of the end surfaces of the two ends of the connecting beam are provided with more than four connecting pieces 5 in pairs.
As shown in fig. 4, the connecting member 5 is a member formed by overlapping two or more metal plates on three sides or by overlapping one metal plate bent into two sides and one metal plate serving as a bottom surface, the metal plate constituting the bottom surface is provided with a hole, at least one reinforcing steel bar is welded on each of the inner sides of the metal plates constituting the side surfaces, and a reinforcing steel bar is welded on the external corner formed by the two metal plates on the side surfaces.
The connecting piece 5 arranged on the bottom surface of the lower end of the upright post of the single-layer frame 2 is fixed with the first type of bolt arranged on the top surface of the upper end of the upright post of the other single-layer frame 2, so that one single-layer frame 2 stands on the other single-layer frame 2.
The two single-layer frames 2 are fixed with the connecting pieces 5 arranged at the two ends of the connecting beam through second bolts arranged on the opposite side surfaces of the upper ends of the respective stand columns, so that the two single-layer frames 2 are connected with each other.
A bracket 6 is arranged below a second type bolt 4 arranged on the side surface of the upper end of the upright post of the single-layer frame 2 and corresponding to the connecting beam, and the upright post, the connecting beam 3 and the bracket 6 are packaged into a complete stressed whole by pouring non-shrinkable grouting material.
Although specific embodiments of the present invention have been described above, it will be appreciated by those skilled in the art that these embodiments are merely illustrative and various changes or modifications may be made without departing from the principles and spirit of the utility model.

Claims (7)

1. A set up quick industrial pipeline support which characterized in that: comprises a foundation cushion cap frame (1) with a reinforced concrete structure, a single-layer frame (2) and a connecting beam (3); wherein the foundation bearing platform frame (1) is cast in situ integrally, and the upper surface of the foundation bearing platform frame is provided with a protruding bolt (4); single-layer frame (2) are the door-shaped structure that a crossbeam and two piece at least stand monolithic pouring formed, the bottom surface of its stand lower extreme and the four corners of the terminal surface at tie-beam both ends all are provided with connecting piece (5), single-layer frame (2) divide into middle level and top layer two kinds, at least one side of the single-layer frame of top layer is provided with outstanding bolt (4), upper surface and at least one side of the stand upper end of middle level single-layer frame all are provided with outstanding bolt (4), bolt (4) are unanimous with connecting piece (5) quantity that corresponds, through the nut with single-layer frame (2) and basic cushion cap frame (1), single-layer frame (2) and single-layer frame (2), single-layer frame (2) are connected with tie-beam (3).
2. A quick-set industrial pipe support according to claim 1, wherein: the bolts (4) arranged on the upper surface of the foundation bearing platform frame (1) and the top surface of the upper end of the upright post of the single-layer frame (2) are first-class bolts formed by processing threads on one end of the protruding surface of the steel bar pre-embedded in the foundation bearing platform frame; the bolt arranged on the side face of the upper end of the upright post of the single-layer frame (2) is a second type bolt which is formed by connecting two ends of a steel bar transversely arranged in the upright post with the sleeve or vertically bending one end of the steel bar transversely arranged in the upright post by 90 degrees to the side face and then connecting the other end of the steel bar with the sleeve, and exposing the adjacent surface of the other end of the sleeve and then forming a detachable bolt with threads at two ends.
3. A quick-set industrial pipe support according to claim 1, wherein: the bottom surfaces of the lower ends of the stand columns of the single-layer frame (2) and four sides of the end surfaces of two ends of the connecting beam are provided with more than four connecting pieces (5) in pairs.
4. A quick-set industrial pipe support according to claim 1, wherein: the connecting piece (5) is a component formed by overlapping at least two metal plates on three sides or formed by overlapping one metal plate bent into two metal plates on two sides and one metal plate taken as the bottom surface, a hole is formed in the metal plate forming the bottom surface, at least one reinforcing steel bar is welded on the inner side of each metal plate forming the side surface, and one reinforcing steel bar is welded at the external corner formed by the two metal plates on the side surfaces.
5. A quick-set industrial pipe support according to claim 1, wherein: the connecting piece (5) arranged on the bottom surface of the lower end of the upright post of the single-layer frame (2) is fixed with the first type of bolt arranged on the top surface of the upper end of the upright post of the other single-layer frame (2), so that one single-layer frame (2) is erected on the other single-layer frame (2).
6. A quick-set industrial pipe support according to claim 1, wherein: the two single-layer frames (2) are fixed with the connecting pieces (5) arranged at the two ends of the connecting beam through second bolts arranged on the opposite side surfaces of the upper ends of the respective stand columns, so that the two single-layer frames (2) are connected with each other.
7. A quick-set industrial pipe support according to claim 6, wherein: a bracket (6) is arranged below the second type of bolt corresponding to the connecting beam and arranged on the side surface of the upper end of the upright post of the single-layer frame (2), and the upright post, the connecting beam (3) and the bracket (6) are packaged into a complete stressed whole by pouring non-shrinkable grouting material at the joint of the upright post, the connecting beam and the bracket.
CN202120357771.1U 2021-02-08 2021-02-08 Set up quick industrial pipeline support Active CN215442358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120357771.1U CN215442358U (en) 2021-02-08 2021-02-08 Set up quick industrial pipeline support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120357771.1U CN215442358U (en) 2021-02-08 2021-02-08 Set up quick industrial pipeline support

Publications (1)

Publication Number Publication Date
CN215442358U true CN215442358U (en) 2022-01-07

Family

ID=79701776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120357771.1U Active CN215442358U (en) 2021-02-08 2021-02-08 Set up quick industrial pipeline support

Country Status (1)

Country Link
CN (1) CN215442358U (en)

Similar Documents

Publication Publication Date Title
CN203049832U (en) Assembling type shear wall structure
CN103114648B (en) Multi-high-layer assembly type steel structure frame-center supporting system
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN101858055A (en) Setting steel pipe bracket support system of cover beam and construction method thereof
CN105821769A (en) Large-angle inclined leg pier pouring construction method
CN214194152U (en) Assembled bracket supporting structure of upper beam construction template of cable-stayed bridge cable tower
CN107299679A (en) A kind of many high-rise assembled modularization Self-resetting steel construction special-shaped column frame systems
CN201953070U (en) Repeatedly usable assembly type processing shed on building construction sites
CN112323985A (en) Prefabricated reinforced concrete column and composite board node and construction process
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN103452350A (en) Fabricated electronic workshop and construction method thereof
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN215442358U (en) Set up quick industrial pipeline support
CN212897482U (en) Construction platform for high-rise building overhanging structural layer
CN215442357U (en) Modular lapped industrial pipeline support
CN111335137A (en) Deck type arch bridge structure and construction method thereof
CN116771182A (en) Building structure of electronic factory building and construction method thereof
CN111424948A (en) Construction method and construction platform for cantilever structure layer of high-rise building
CN216920677U (en) First-layer supporting structure of large rockery outer package
CN216892017U (en) Tie beam integral casting template in template connecting piece and lower stand
CN109138161A (en) A kind of Steel Structure skeleton formwork assembled integral RC frame structure and construction method
CN210482048U (en) Bent cap construction bracket
CN112878508A (en) Repairable assembly type reinforced concrete column-steel beam column joint and construction method thereof
CN217352174U (en) Pier edge side span cast-in-place support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 215699 No.9 Fuxin Road, North District, Zhangjiagang Economic and Technological Development Zone (yangshe town), Suzhou City, Jiangsu Province

Patentee after: PEC building materials (China) Co.,Ltd.

Address before: 215699 No.9 Fuxin Road, North District, Zhangjiagang Economic and Technological Development Zone (yangshe town), Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: Peck construction accessories (Zhangjiagang) Co.,Ltd.