CN215439335U - Lifting beam portal frame - Google Patents

Lifting beam portal frame Download PDF

Info

Publication number
CN215439335U
CN215439335U CN202121640319.2U CN202121640319U CN215439335U CN 215439335 U CN215439335 U CN 215439335U CN 202121640319 U CN202121640319 U CN 202121640319U CN 215439335 U CN215439335 U CN 215439335U
Authority
CN
China
Prior art keywords
steel pipe
pipe stand
fixing device
upright post
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121640319.2U
Other languages
Chinese (zh)
Inventor
金星
袁会波
康华
姚冠华
王保辉
何佩军
晏竞
李好辉
汪健
刁元森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN202121640319.2U priority Critical patent/CN215439335U/en
Application granted granted Critical
Publication of CN215439335U publication Critical patent/CN215439335U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a girder gantry which comprises steel pipe stand columns, wherein transverse connection systems are arranged among the steel pipe stand columns, the steel stand columns and the transverse connection systems form a left steel pipe stand column device and a right steel pipe stand column device, a left fixing device is arranged on the side surface of the left steel pipe stand column device, a right fixing device is arranged on the right steel pipe stand column device, a concrete main beam is arranged on the right fixing device, a plurality of supporting stand columns are arranged on the concrete main beam, cross beams are arranged on the supporting stand columns, and a girder transporting trolley is arranged in the transverse direction. By adopting the structure, the construction safety risk can be effectively reduced, the construction efficiency is improved, and the economic feasibility is realized. Due to the fact that the installation conditions and the structure are simple, corresponding adjustment can be conducted according to site construction conditions, and the application range is wider. The structure of the supporting upright post, the concrete girder and the steel pipe upright post is more stable in arrangement and supporting.

Description

Lifting beam portal frame
Technical Field
The utility model relates to the field of bridge construction, in particular to a lifting beam portal frame.
Background
In actual engineering, the steel box girder is put on the bridge, the forward movement is transported, and the construction process of transferring to the transport beam dolly is transferred, and traditional technical scheme uses gantry crane and crane. However, due to the limitation of construction sites and the consideration of safety factors, the requirements on construction precision and the like and the disadvantages of the traditional technical scheme are very obvious. In response to these problems, the development of "GGB-200 type lifting beam door frame" is of great significance.
The use of traditional gantry crane in the work progress is very convenient, but its requirement to the place is stricter, and its installation and the process of transporting the case roof beam need consume quite a long time, also consumes a large amount of manpower and materials. The gantry crane requires a professional installer for installation and operation since it is a special equipment itself, and also requires acceptance by a quality inspection department, which is a considerably long period from a plan to a construction implementation. Aiming at the current tense construction period of each item, the gantry crane is not cost-effective to use.
Therefore, the development of the lifting beam portal frame becomes a problem to be solved urgently in the whole society.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problems that the gantry crane in the prior art needs professional installation personnel to install and operate due to the fact that the gantry crane is special equipment, and needs to pass the acceptance of a quality inspection department, so that the period from a scheme to construction implementation is quite long, and the like.
In order to solve the technical problems, the technical scheme provided by the utility model is as follows: a lifting beam portal frame comprises steel pipe columns, transverse connection systems are arranged among the steel pipe columns, a left steel pipe column device and a right steel pipe column device are formed by the steel pipe building main and the transverse connection systems, a left fixing device is arranged on the side face of the left steel pipe column device, a right fixing device is arranged on the right steel pipe column device, a concrete main beam is arranged on the right fixing device, a plurality of supporting columns are arranged on the concrete main beam, cross beams are arranged on the supporting columns, and a beam transporting trolley is arranged on the cross beams.
Furthermore, the top of the steel tube upright post is provided with a longitudinal and transverse distribution beam.
Furthermore, the left side fixing device comprises a first bearing platform and an attached wall, and the steel pipe upright is fixed on the first bearing platform.
Further, the right fixing device comprises a second bearing platform.
Furthermore, one end of the concrete main beam is fixed in the second bearing platform.
Furthermore, a fixed connecting piece is arranged on the supporting upright post.
Compared with the prior art, the method has the advantages that: by adopting the structure, the construction safety risk can be effectively reduced, the construction efficiency is improved, and the economic feasibility is realized. Due to the fact that the installation conditions and the structure are simple, corresponding adjustment can be conducted according to site construction conditions, the application range is wider, construction risks are reduced, and construction efficiency is improved. The structure setting of support post, concrete girder and steel pipe stand supports more firmly.
Drawings
Fig. 1 is a schematic structural view of a lifting beam portal of the present invention.
As shown in the figure: 1. the concrete beam transportation system comprises steel pipe columns, 2, transverse connection systems, 3, concrete main beams, 4, supporting columns, 5, cross beams, 6, a beam transportation trolley, 7, longitudinal and transverse distribution beams, 8, first bearing platforms, 9, attached walls, 10, second bearing platforms, 11 and fixed connecting pieces.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The present invention will be described in detail with reference to the accompanying drawings.
The utility model provides a lifting beam portal frame which comprises steel pipe upright posts 1, wherein transverse connection systems 2 are arranged between the steel pipe upright posts 1, a left steel pipe upright post device and a right steel pipe upright post device are formed by a steel pipe main 1 and the transverse connection systems 2, a left fixing device is arranged on the side surface of the left steel pipe upright post device, a right fixing device is arranged on the right steel pipe upright post device, a concrete main beam 3 is arranged on the right fixing device, a plurality of supporting upright posts 4 are arranged on the concrete main beam 3, cross beams 5 are arranged on the supporting upright posts 4, and beam transporting trolleys 6 are arranged on the cross beams 5.
As a further illustration of the utility model, the top of the steel tube upright post 1 is provided with a longitudinal and transverse distribution beam 7.
As a further illustration of the utility model, the left fixing device comprises a bearing platform I8 and an attached wall 9, and the steel pipe upright 1 is fixed on the bearing platform I8.
As a further elaboration of the present invention, the right fixing device comprises a second bearing platform 10.
As a further illustration of the present invention, one end of the concrete girder 3 is fixed in the second bearing platform 10. Plays a role of stable support.
As a further elaboration of the utility model, the support upright 4 is provided with a fixed connection 11. The connection is firm, the structure is simple, and the supporting upright posts 4 are conveniently and fixedly connected.
The specific embodiment of the utility model is as follows: when the lifting beam gantry is used, the first bearing platform 8, the second bearing platform 10, the attached wall 9, the attached wall 10 and the steel pipe upright posts 1 are sequentially arranged from bottom to top, the concrete girder 3 is arranged above the attached wall 10, the top of the device is provided with the crossbeam 5 and the beam transporting trolley 6, the steel pipe upright posts 1 are fixedly connected by adopting a transverse connection system, and the mounting structure is simple and practical. Effectively reduces the construction safety risk, improves the construction efficiency and achieves economic feasibility.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (6)

1. The utility model provides a handle portal which characterized in that: including steel pipe stand (1), be provided with transverse connection system (2) between steel pipe stand (1), left side steel pipe stand device and right side steel pipe stand device are constituteed to steel pipe stand (1) and transverse connection system (2), the side of left side steel pipe stand device is provided with left side fixing device, be provided with right side fixing device on the right side steel pipe stand device, be provided with concrete girder (3) on the fixing device of right side, be provided with a plurality of support posts (4) on concrete girder (3), be provided with crossbeam (5) on support post (4), be provided with fortune roof beam platform truck (6) on crossbeam (5).
2. A boom mast according to claim 1, characterized in that: the top of the steel tube upright post (1) is provided with a longitudinal and transverse distribution beam (7).
3. A boom mast according to claim 1, characterized in that: the left fixing device comprises a bearing platform I (8) and an attached wall (9), and the steel pipe upright post (1) is fixed on the bearing platform I (8).
4. A boom mast according to claim 1, characterized in that: the right fixing device comprises a second bearing platform (10).
5. A boom mast according to claim 1, characterized in that: one end of the concrete main beam (3) is fixed in the second bearing platform (10).
6. A boom mast according to claim 1, characterized in that: and the supporting upright post (4) is provided with a fixed connecting piece (11).
CN202121640319.2U 2021-07-19 2021-07-19 Lifting beam portal frame Active CN215439335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121640319.2U CN215439335U (en) 2021-07-19 2021-07-19 Lifting beam portal frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121640319.2U CN215439335U (en) 2021-07-19 2021-07-19 Lifting beam portal frame

Publications (1)

Publication Number Publication Date
CN215439335U true CN215439335U (en) 2022-01-07

Family

ID=79683185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121640319.2U Active CN215439335U (en) 2021-07-19 2021-07-19 Lifting beam portal frame

Country Status (1)

Country Link
CN (1) CN215439335U (en)

Similar Documents

Publication Publication Date Title
CN208995937U (en) Mounting bracket is slid suitable for the S type steel box girder of cable stayed bridge above subway station
CN201458583U (en) Liftable and detachable lifting platform
CN103523665B (en) A kind of transport device and method of high pedestal jib crane
CN215439335U (en) Lifting beam portal frame
CN209889693U (en) Combined steel pipe transportation tool
CN205257792U (en) Bridge crane with triangular support girder
CN113620167A (en) Lifting beam portal frame
CN216512520U (en) Lifting system suitable for small space
CN204876630U (en) Interim supporting platform of super high -rise building equipment
CN209942078U (en) Large-span even strides factory building roof boarding installation dolly
CN103498559A (en) Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
US20220144598A1 (en) Construction System
CN203923923U (en) High pier steel truss girder sets up gate-type lifting station
CN220484459U (en) Material transfer loading device
CN218815281U (en) Dragging and beam falling construction structure for installing single steel structure main truss
CN217266885U (en) Steel construction assembled landing stage convenient to integral hoisting
CN219637703U (en) Movable tensioning trolley
CN209740549U (en) Self-unloading type plate unit conveying device
CN218708741U (en) Prestressed workshop roof panel dismouting system
CN219637717U (en) Cable-stayed bridge cable guide pipe installation device
CN218371462U (en) Pipeline horizontal transportation device in restricted space
CN218840756U (en) Simple carrying device after scaffold is dismantled
CN203903792U (en) Gantry frame for placing equipment
CN216188593U (en) Support bridge frame mounting trolley