CN215417248U - Building engineering planning model device - Google Patents

Building engineering planning model device Download PDF

Info

Publication number
CN215417248U
CN215417248U CN202121702813.7U CN202121702813U CN215417248U CN 215417248 U CN215417248 U CN 215417248U CN 202121702813 U CN202121702813 U CN 202121702813U CN 215417248 U CN215417248 U CN 215417248U
Authority
CN
China
Prior art keywords
building engineering
planning model
guide
box body
model device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121702813.7U
Other languages
Chinese (zh)
Inventor
苗露露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121702813.7U priority Critical patent/CN215417248U/en
Application granted granted Critical
Publication of CN215417248U publication Critical patent/CN215417248U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model belongs to the technical field of building models, and discloses a building engineering planning model device, aiming at the problems in the background art, the utility model provides the following scheme, which comprises a storage box body, wherein guide rails are arranged on the inner walls of two sides of the storage box body, guide blocks are embedded in the inner walls of the guide rails, a threaded rod is screwed in the middle of each guide block, the bottom of each threaded rod is connected with a servo motor, the bottom of each servo motor is arranged on a base, and each guide block is connected with a bearing plate. In order to simulate the effect of the whole drainage system of the building engineering, the spray header is used for continuously spraying water to the model, so that the drainage effect of the engineering can be visually seen, the air inlet fan can be started at the top to simulate the safety performance of the building engineering in severe weather such as rainstorm, storm and the like, the safety of the building engineering can be visually seen, and the air can be heated by the electric heating wire after the simulation is finished, so that the drying treatment of the model is accelerated.

Description

Building engineering planning model device
Technical Field
The utility model relates to the technical field of building models, in particular to a building engineering planning model device.
Background
Teaching aid makes the student can understand all kinds of apparatus that the teaching content used and the apparatus general name that the teacher used when giving lessons directly perceivedly, vividly, teaching aid for short, teaching aid can improve student's interest in learning, riches the perception of sensibility, help forms clear and definite notion, development student's observation ability and thinking ability, teaching instrument is comparatively simple, the teaching instrument of minimum can directly be held and operate in hand, great teaching instrument is called device or equipment.
However, the conventional construction model devices are troublesome to demonstrate during the use process, and most of the demonstration devices can only demonstrate the basic model of the building according to a certain proportion during the demonstration process, but cannot further demonstrate other safety performances of the building, such as the situations of a drainage system and a windproof system.
Therefore, Chinese patent (application number 202020637398.0) discloses "building engineering modeling model teaching display device", through the setting of rolling disc, under the effect of rolling disc, make teaching display platform can multi-angle rotating, reached the effect that can automatic all-round show, be convenient for the student directly perceivedly to see the building engineering modeling model under the arbitrary angle, thereby be favorable to the student to carry out all-round looking over and understanding to the building engineering modeling model of show, and then be favorable to this teaching display device's using widely. However, the device only can visually display the appearance of the device in the display process and cannot simulate other safety performance of the construction project.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a building engineering planning model device.
In order to achieve the purpose, the utility model adopts the following technical scheme:
a building engineering planning model device comprises a containing box body, wherein guide rails are arranged on the inner walls of two sides of the containing box body, guide blocks are embedded in the inner walls of the guide rails, a threaded rod is connected to the middle of each guide block in a threaded mode, the bottom of each threaded rod is connected with a servo motor, the bottom of each servo motor is arranged on a base, each guide block is connected with a bearing plate, drain holes distributed at equal intervals are formed in the top of each bearing plate, drain pipes are arranged in the bearing plates, and the bottoms of the drain pipes are inserted into water collecting tanks;
glass cover is installed at the bearing plate top, and the glass cover top is equipped with the roof, the connecting pipe that the equidistance distributes is installed at the roof top, and is connected with the shower head that the equidistance distributes bottom the connecting pipe, the connecting pipe external connection has the inlet tube, and advances water piping connection and have the suction pump.
Preferably, the four corners of the bottom of the storage box body are provided with universal wheels through bolts, the outer wall of one side of the storage box body is welded with a push handle, and the outer wall of the push handle is bonded with a non-slip mat.
Preferably, electric telescopic handle is all installed in bearing plate bottom four corners, and electric telescopic handle bottom is connected with the magnet board.
Preferably, the top of the bearing plate is provided with a magnet piece, the magnetism of the magnet piece is opposite to that of the magnet plate, and the magnet piece and the magnet plate form a fastening fit.
Preferably, roof top outer wall is opened the rectangle that has the equidistance and distributes and is led to the groove, and the rectangle leads to the groove top and install the set casing, set casing internally mounted has electric heating wire, and the set casing top is fixed with the air inlet fan.
Preferably, servo motor, electric telescopic handle, suction pump, electric heating wire and air inlet fan all are connected with the switch through the wire, and the switch connection has external power source.
Preferably, the size of the inner wall of the guide rail is matched with the size of the guide block, and the guide rail and the guide block form sliding fit.
The utility model has the beneficial effects that:
1. according to the building engineering planning model device, the model device can be unfolded and stored by utilizing the mutual matching of the servo motor, the threaded rod and the guide block, so that the model can be prevented from being damaged in the transferring process, and the mobility of the device can be greatly improved by the universal wheels arranged at the bottom, so that the later-stage transferring is facilitated;
2. this design's building engineering planning model device, in order to simulate building engineering's whole drainage system's effect, utilize the shower head continuously to spray water to the model, can audio-visually see out the drainage effect of engineering how, and can also start the fan of admitting air at the top, the security performance of building engineering under the bad weather such as the simulation storm, thereby audio-visually see out building engineering's security, can also utilize electric heating wire to heat the air after the simulation finishes moreover, accelerate the drying process to the model.
Drawings
Fig. 1 is a schematic overall three-dimensional structure diagram of a building engineering planning model device according to the present invention;
fig. 2 is a schematic view of an overall first perspective structure of a planning model device for construction engineering according to the present invention;
FIG. 3 is a schematic diagram of an internal three-dimensional structure of a planning model device for construction engineering according to the present invention;
fig. 4 is a side view of an internal three-dimensional structure of a planning model device for construction engineering according to the present invention.
In the figure: the automatic cleaning device comprises a storage box body 1, a push-pull handle 2, a guide rail 3, a guide block 4, a threaded rod 5, a servo motor 6, a base 7, a bearing plate 8, an electric telescopic rod 9, a magnet plate 10, a drain pipe 11, a water collecting tank 12, a magnet piece 13, a glass cover 14, a top plate 15, a connecting pipe 16, a spray header 17, a water inlet pipe 18, a water suction pump 19, a rectangular through groove 20, a fixed shell 21, an electric heating wire 22 and an air inlet fan 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, a building engineering planning model device comprises a storage box body 1, guide rails 3 are mounted on the inner walls of two sides of the storage box body 1, universal wheels are mounted on four corners of the bottom of the storage box body 1 through bolts, a push handle 2 is welded on the outer wall of one side of the storage box body 1, anti-skid pads are bonded on the outer wall of the push handle 2, guide blocks 4 are embedded on the inner wall of each guide rail 3, the size of the inner wall of each guide rail 3 is matched with the size of each guide block 4, the guide rails 3 and the guide blocks 4 form sliding fit, and the model device can be unfolded and stored by utilizing the mutual fit of a servo motor 6, a threaded rod 5 and the guide blocks 4, so that a model can be prevented from being damaged in the transferring process, and the universal wheels arranged at the bottom can greatly increase the mobility of the device and facilitate later-stage transfer;
the middle part of the guide block 4 is in threaded connection with a threaded rod 5, the bottom of the threaded rod 5 is connected with a servo motor 6, the bottom of the servo motor 6 is installed on a base 7, the guide block 4 is connected with a bearing plate 8, the top of the bearing plate 8 is provided with drain holes which are distributed equidistantly, a drain pipe 11 is arranged inside the bearing plate 8, four corners of the bottom of the bearing plate 8 are provided with electric telescopic rods 9, the bottom of each electric telescopic rod 9 is connected with a magnet plate 10, and the bottom of each drain pipe 11 is inserted into a water collecting tank 12;
the glass cover 14 is installed at the top of the bearing plate 8, the top of the glass cover 14 is provided with the top plate 15, the top of the bearing plate 8 is provided with the magnet piece 13, the magnetism of the magnet piece 13 is opposite to that of the magnet plate 10, the magnet piece 13 and the magnet plate 10 form a fastening fit, the top of the top plate 15 is provided with the connecting pipe 16 distributed equidistantly, the bottom of the connecting pipe 16 is connected with the spray heads 17 distributed equidistantly, the outer part of the connecting pipe 16 is connected with the water inlet pipe 18, the water inlet pipe 18 is connected with the water suction pump 19, in order to simulate the effect of the whole drainage system of the building engineering, the spray heads 17 continuously spray water to the model, how the drainage effect of the engineering is visually shown, the air inlet fan 23 can be started at the top, the safety performance of the building engineering under severe weather such as rainstorm and storm can be simulated, the safety of the building engineering can be visually shown, and the air can be heated by the electric heating wire 22 after the simulation is finished, accelerating the drying treatment of the model;
15 top outer wall of roof is opened the rectangle that has the equidistance and is led to groove 20, and the rectangle leads to groove 20 top and installs set casing 21, servo motor 6, electric telescopic handle 9, suction pump 19, electric heating wire 22 and air inlet fan 23 all are connected with the switch through the wire, and the switch connection has external power source, set casing 21 internally mounted has electric heating wire 22, and the set casing 21 top is fixed with air inlet fan 23.
The working principle is as follows: when using this building engineering planning model device, at first with the inside appropriate amount cold water that pours into of water catch bowl 12, then connect external power supply with the device, when the device needs the show, at first start servo motor 6 and drive the continuous rotation of threaded rod 5, thereby drive the continuous upward movement of guide block 4, thereby accomplish the rising to bearing plate 8, can demonstrate it after rising to the top, in order to simulate rainstorm stormy weather, can open air inlet fan 23 and blow constantly, and start suction pump 19 and draw water constantly, spray water to the building engineering model, thereby the audio-visual drainage condition who sees drainage system how.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (7)

1. The building engineering planning model device comprises a storage box body (1), and is characterized in that guide rails (3) are mounted on the inner walls of two sides of the storage box body (1), guide blocks (4) are embedded in the inner walls of the guide rails (3), threaded rods (5) are screwed in the middles of the guide blocks (4), servo motors (6) are connected to the bottoms of the threaded rods (5), the bottoms of the servo motors (6) are mounted on a base (7), the guide blocks (4) are connected with bearing plates (8), drain holes distributed equidistantly are formed in the tops of the bearing plates (8), drain pipes (11) are arranged inside the bearing plates (8), and the bottoms of the drain pipes (11) are inserted into water collecting grooves (12);
glass cover (14) are installed at bearing plate (8) top, and glass cover (14) top is equipped with roof (15), connecting pipe (16) that the equidistance distributes are installed at roof (15) top, and connecting pipe (16) bottom is connected with shower head (17) that the equidistance distributes, connecting pipe (16) external connection has inlet tube (18), and inlet tube (18) are connected with suction pump (19).
2. The building engineering planning model device according to claim 1, wherein universal wheels are mounted at four corners of the bottom of the storage box body (1) through bolts, a push handle (2) is welded on the outer wall of one side of the storage box body (1), and anti-skid pads are bonded on the outer wall of the push handle (2).
3. The building engineering planning model device according to claim 1, wherein four corners of the bottom of the bearing plate (8) are provided with electric telescopic rods (9), and the bottom of each electric telescopic rod (9) is connected with a magnet plate (10).
4. A building engineering planning model arrangement according to claim 3, characterized in that the top of the bearing plate (8) is provided with magnet pieces (13), and the magnet pieces (13) are opposite in magnetism to the magnet plate (10), and the magnet pieces (13) form a tight fit with the magnet plate (10).
5. The building engineering planning model device according to claim 1, wherein the top outer wall of the top plate (15) is provided with rectangular through grooves (20) distributed at equal intervals, a fixed shell (21) is installed at the top of the rectangular through grooves (20), an electric heating wire (22) is installed inside the fixed shell (21), and an air inlet fan (23) is fixed at the top of the fixed shell (21).
6. The building engineering planning model device according to claim 5, wherein the servo motor (6), the electric telescopic rod (9), the water pump (19), the electric heating wire (22) and the air inlet fan (23) are all connected with a switch through wires, and the switch is connected with an external power supply.
7. A construction project planning model arrangement according to claim 1, characterized in that the dimensions of the inner wall of the guide rail (3) are adapted to the dimensions of the guide block (4), and the guide rail (3) forms a sliding fit with the guide block (4).
CN202121702813.7U 2021-07-26 2021-07-26 Building engineering planning model device Active CN215417248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121702813.7U CN215417248U (en) 2021-07-26 2021-07-26 Building engineering planning model device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121702813.7U CN215417248U (en) 2021-07-26 2021-07-26 Building engineering planning model device

Publications (1)

Publication Number Publication Date
CN215417248U true CN215417248U (en) 2022-01-04

Family

ID=79652713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121702813.7U Active CN215417248U (en) 2021-07-26 2021-07-26 Building engineering planning model device

Country Status (1)

Country Link
CN (1) CN215417248U (en)

Similar Documents

Publication Publication Date Title
CN215417248U (en) Building engineering planning model device
CN205802002U (en) A kind of stem cell transport case
CN205688880U (en) A kind of cleaning brush containing swimming pool cleaning function
CN208335504U (en) A kind of fire-fighting experience station
CN215282521U (en) Steam health preserving equipment is controlled to precast bridge intelligence
CN211421950U (en) Container cabin
CN211479510U (en) Geography teaching presentation device
CN205992367U (en) For 360 ° of rotary apparatuss of anatomy virtual experimental display
CN203152212U (en) Traditional Chinese medicinal wind-cold dampness syndrome modeling device
CN107607621B (en) Portable building engineering quality detector
CN108868178B (en) Indoor ash shoveling device
CN210223267U (en) Combined urban disaster simulation experiment device
CN206676400U (en) A kind of senior middle school's natural sciences experiment operating desk
CN211406328U (en) Wisdom building site lifting hook visual monitoring device based on building information model
CN214886040U (en) Dust screen for building engineering
CN109577694A (en) A kind of assembled container swimming pool
CN217557901U (en) Movable type vertical rod flag raising device
CN216664320U (en) Pressure-resistant water supply and drainage device for building engineering
CN214695090U (en) Quick concrete condensing device is used in traffic road bridge construction
CN214293078U (en) High-efficient dampproofing processing apparatus for building engineering equipment
CN213956926U (en) Sample gas collection system that atmospheric treatment used
CN219389974U (en) Indoor-mounted ceiling fresh air ventilator
CN210925014U (en) Real integrated device that instructs of electric automatization teaching experiment
CN214312161U (en) Simulation training device
CN218991059U (en) Building structure for training lightning protection practice

Legal Events

Date Code Title Description