CN215414224U - Engineering is managed with building outer wall infiltration testing arrangement - Google Patents

Engineering is managed with building outer wall infiltration testing arrangement Download PDF

Info

Publication number
CN215414224U
CN215414224U CN202121690569.7U CN202121690569U CN215414224U CN 215414224 U CN215414224 U CN 215414224U CN 202121690569 U CN202121690569 U CN 202121690569U CN 215414224 U CN215414224 U CN 215414224U
Authority
CN
China
Prior art keywords
water
wall
fixedly installed
drain pipe
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121690569.7U
Other languages
Chinese (zh)
Inventor
王晨辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121690569.7U priority Critical patent/CN215414224U/en
Application granted granted Critical
Publication of CN215414224U publication Critical patent/CN215414224U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses a building outer wall water seepage testing device for engineering supervision, which comprises a base, wherein four self-locking universal wheels which are symmetrically arranged in pairs are fixedly installed at the bottom of the base, two electric push rods are fixedly installed at the top of the base, telescopic columns are fixedly installed at output shaft ends of the two electric push rods, and the same connecting seat is fixedly installed at the top ends of the two telescopic columns. The water seepage testing device is reasonable in design, good in practicability, convenient for adjusting the height positions of the two cylindrical water retaining covers, convenient for adjusting the distance between the two cylindrical water retaining covers, convenient for water seepage testing work on different positions of the outer wall of a building, convenient to operate, time-saving and labor-saving, more accurate in water seepage testing result of the outer wall of the building, and capable of recycling water resources after being recovered, filtered and purified in the water seepage testing work process, so that the waste of the water resources is reduced, and the water conservation effect is achieved.

Description

Engineering is managed with building outer wall infiltration testing arrangement
Technical Field
The utility model relates to the technical field of water seepage detection equipment, in particular to a building outer wall water seepage testing device for engineering supervision.
Background
After the construction of the building is completed, the building needs to be checked and accepted by an engineering supervision, and a plurality of performance tests of the building need to be developed in the checking and accepting process, wherein the water seepage test of the outer wall of the building is an important detection item so as to judge whether the waterproof performance of the outer wall of the building is qualified.
However, in the prior art, when testing the water seepage of the external wall of a building, usually, the spray pipe is held by a worker, the clean water is sprayed on the external wall of the building for detection, the worker is required to lift the spray pipe for a long time, the operation process is complicated, time and labor are wasted, and the water resource recycling function is not realized.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides a building outer wall water seepage testing device for engineering supervision, which solves the problems that when the building outer wall water seepage is tested, workers usually hold a spray pipe to spray clear water on the building outer wall for detection, the operation process is complicated, time and labor are wasted, the function of recycling and reusing water resources is not realized, the waste of the water resources is serious, and the effect of saving the water resources is not realized.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: a building outer wall water seepage testing device for engineering supervision comprises a base, wherein four self-locking universal wheels are fixedly installed at the bottom of the base in a pairwise symmetrical mode, two electric push rods are fixedly installed at the top of the base, telescopic columns are fixedly installed at output shaft ends of the two electric push rods, the top ends of the two telescopic columns are fixedly installed with a connecting seat, a sliding groove is formed in the top of the connecting seat, two sliding seats are slidably installed in the sliding groove, the tops of the two sliding seats extend out of the sliding groove, stand columns are fixedly installed at the tops of the two sliding seats, water cavities are formed in the two stand columns, water spray pipes are fixedly installed on one sides of the two stand columns, the two water spray pipes are respectively communicated with the corresponding water cavities, cylindrical water retaining covers are fixedly sleeved on the two water spray pipes, one sides of the two cylindrical water retaining covers, far away from the corresponding stand columns, are both of open structures, and one ends of the two water spray pipes, far away from the corresponding stand columns, are both fixedly installed with spray heads, two shower nozzles are located corresponding tube-shape manger plate cover respectively, and the equal fixed mounting in one side that corresponding stand was kept away from to two tube-shape manger plate covers has the sealing washer, and the sealing washer is made for soft rubber materials, is provided with adjusting part on the connecting seat, and the top fixed mounting of base has the water tank, and fixed mounting has the filter screen in the water tank, is provided with water delivery subassembly on the base.
Preferably, the adjusting assembly comprises two lead screws and a motor, the two lead screws are all rotatably installed in the sliding grooves, the thread turning directions of the two lead screws are opposite, the two lead screws are fixedly connected with one ends close to each other, the two sliding seats are respectively sleeved on the corresponding lead screws in a threaded manner, the motor is fixedly installed on the outer wall of one side of the connecting seat, and one end of one lead screw of the two lead screws is fixedly connected with the output shaft end of the motor.
Preferably, the water delivery assembly comprises a water pump, a suction pipe and a transverse drain pipe, longitudinal drain pipe, two water delivery hoses and two inlet tubes, water pump fixed mounting is at the top of base, the one end that absorbs water the pipe and the suction end fixed connection of water pump, the one end that absorbs water the pipe and keeps away from the water pump extends to in the water tank, the one end of horizontal drain pipe and the discharge end fixed connection of water pump, the one end fixed connection that the water pump was kept away from to one side of longitudinal drain pipe and horizontal drain pipe, longitudinal drain pipe is linked together with horizontal drain pipe, two inlet tubes fixed mounting respectively are on corresponding stand, the one end of two water delivery hoses respectively with the one end fixed connection of corresponding inlet tube, the one end that corresponding water delivery hose was kept away from to two inlet tubes extends to corresponding water intracavity respectively, the one end that corresponding inlet tube was kept away from to two water delivery hoses respectively with the both ends fixed connection of longitudinal drain pipe.
Preferably, the bottom of horizontal drain pipe and vertical drain pipe is equal fixed mounting has two bracing pieces, the bottom of four bracing pieces all with the top fixed connection of base.
Preferably, the top of the water tank is provided with a water filling hole, the bottoms of the two cylindrical water retaining covers are fixedly provided with return water hoses respectively, the two return water hoses are communicated with the interiors of the corresponding cylindrical water retaining covers respectively, and one ends, far away from the corresponding cylindrical water retaining covers, of the two return water hoses penetrate through the water filling hole.
Preferably, the guide grooves are formed in the inner walls of the two sides of the sliding groove, guide rods are fixedly mounted on the two sides of the two sliding seats, and the guide rods are slidably mounted in the corresponding guide grooves.
Preferably, the top of the base is fixedly provided with a storage battery pack and a multi-control switch.
(III) advantageous effects
The utility model provides a building outer wall water seepage testing device for project supervision. The method has the following beneficial effects:
(1) this building outer wall infiltration testing arrangement for engineering supervision is through pushing away this equipment to the other suitable position of building outer wall that needs detected for two sealing washers all with building outer wall in close contact with, through the work of start-up water pump, two shower nozzles spouts are followed to the clear water in the steerable water tank, sprays on building outer wall from two shower nozzles spun clear water, can carry out infiltration test work to two positions of building outer wall.
(2) This building outer wall infiltration testing arrangement is used in engineering supervision, can collect spun water through utilizing two tube-shape manger plate covers, utilize the sealing washer, play and carry out sealed effect to tube-shape manger plate cover and building outer wall, avoid the clear water to flow out the tube-shape manger plate cover outward, make spun water flow back to the water tank in through two return water hoses again, utilize the filter screen can be to the grit of the aquatic of backward flow to the water tank, impurity such as dust filters, thereby can retrieve reuse after the filtration purification to the water resource, the waste of water resource has been reduced, the effect of economizing on water has.
(3) This building outer wall infiltration testing arrangement for engineering supervision, through controlling two electric putter work, be convenient for adjust the high position of tube-shape manger plate cover, through starter motor corotation or reversal, be convenient for adjust the interval between two tube-shape manger plate covers, thereby adjust through the high position to two tube-shape manger plate covers, and adjust through the interval to between two tube-shape manger plate covers, the convenience carries out infiltration test work to the different positions of building outer wall, and the operation is convenient, time saving and labor saving, it is more accurate to the infiltration test result of building outer wall.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic sectional view of the present invention;
fig. 3 is a schematic sectional view of the connecting seat from above.
In the figure: 1. a base; 2. a self-locking universal wheel; 3. an electric push rod; 4. a telescopic column; 5. a connecting seat; 6. a chute; 7. a screw rod; 8. a slide base; 9. a column; 10. a water chamber; 11. a water spray pipe; 12. a cylindrical water retaining cover; 13. a spray head; 14. a seal ring; 15. a water tank; 16. a water filling hole; 17. filtering with a screen; 18. a water return hose; 19. a water pump; 20. a suction pipe; 21. a transverse drain pipe; 22. a longitudinal drain pipe; 23. a water delivery hose; 24. a water inlet pipe; 25. a battery pack; 26. a multi-control switch; 27. a motor; 28. a support rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1-3, the present invention provides a technical solution: a building outer wall water seepage testing device for engineering supervision comprises a base 1, four self-locking universal wheels 2 which are symmetrically arranged in pairs are fixedly installed at the bottom of the base 1, the four self-locking universal wheels 2 are arranged to facilitate pushing of the whole device to move and to firmly fix the whole device on the ground, two electric push rods 3 are fixedly installed at the top of the base 1, telescopic columns 4 are fixedly installed at output shaft ends of the two electric push rods 3, the top ends of the two telescopic columns 4 are fixedly provided with a same connecting seat 5, a sliding groove 6 is formed in the top of the connecting seat 5, two sliding seats 8 are slidably installed in the sliding groove 6, the top parts of the two sliding seats 8 extend out of the sliding groove 6, stand columns 9 are fixedly installed at the top parts of the two sliding seats 8, water cavities 10 are formed in the two stand columns 9, and a water spray pipe 11 is fixedly installed on one side of the two stand columns 9, two water spraying pipes 11 are respectively communicated with corresponding water cavities 10, cylindrical water retaining covers 12 are fixedly sleeved on the two water spraying pipes 11, one sides of the two cylindrical water retaining covers 12 far away from corresponding upright posts 9 are both of an open structure, one ends of the two water spraying pipes 11 far away from the corresponding upright posts 9 are both fixedly provided with spray heads 13, the two spray heads 13 are respectively positioned in the corresponding cylindrical water retaining covers 12, one sides of the two cylindrical water retaining covers 12 far away from the corresponding upright posts 9 are both fixedly provided with sealing rings 14, the height position of the connecting seat 5 can be adjusted by utilizing the two electric push rods 3, so that the height position of the cylindrical water retaining covers 12 can be adjusted, the water seepage test work of different height positions of a building wall can be conveniently carried out, the water receiving effect is achieved by utilizing the cylindrical water retaining covers 12, and the sealing effect of the cylindrical water retaining covers 12 and the building outer wall is achieved by utilizing the sealing rings 14, the clean water is prevented from flowing out of the cylindrical water retaining covers 12, the adjusting assembly is arranged on the connecting seat 5, the distance between the two cylindrical water retaining covers 12 can be adjusted conveniently by arranging the adjusting assembly, the water seepage test can be conveniently carried out on different positions of the building outer wall, the water tank 15 is fixedly arranged at the top of the base 1, the clean water can be stored conveniently by utilizing the water tank 15, the filter screen 17 is fixedly arranged in the water tank 15, and by arranging the filter screen 17, can filter impurities such as sand, dust and the like in the water flowing back to the water tank 15, avoid the impurities such as sand, dust and the like from entering the spray head 13 to cause the spray hole blockage phenomenon, can filter and purify water resources and then recycle the water resources, the base 1 is provided with a water delivery component, the clean water in the water tank 15 can be controlled to be sprayed out of the two spray heads 13 to the wall, and then the water seepage test work can be carried out on the outer wall of the building.
In this embodiment, the adjusting part includes two lead screws 7 and motor 27, two lead screws 7 all rotate to be installed in spout 6, the screw thread of two lead screws 7 revolves to opposite setting, and the one end fixed connection that two lead screws 7 are close to each other, two slide 8 respectively the thread bush is established on corresponding lead screw 7, motor 27 fixed mounting is on one side outer wall of connecting seat 5, the one end of a lead screw 7 in two lead screws 7 and the output shaft fixed connection of motor 27, revolve to the lead screw 7 that sets up on the contrary through utilizing two screw threads of motor 27 drive, steerable two slide 8 slide to the orientation of keeping away from each other or being close to each other, thereby can adjust the interval between two slide 8.
In this embodiment, the water delivery assembly includes a water pump 19, a water suction pipe 20, a transverse drainage pipe 21, a longitudinal drainage pipe 22, two water delivery hoses 23 and two water inlet pipes 24, the water pump 19 is fixedly installed at the top of the base 1, one end of the water suction pipe 20 is fixedly connected with the suction end of the water pump 19, one end of the water suction pipe 20 far away from the water pump 19 extends into the water tank 15, one end of the transverse drainage pipe 21 is fixedly connected with the discharge end of the water pump 19, one side of the longitudinal drainage pipe 22 is fixedly connected with one end of the transverse drainage pipe 21 far away from the water pump 19, the longitudinal drainage pipe 22 is communicated with the transverse drainage pipe 21, the two water inlet pipes 24 are respectively and fixedly installed on the corresponding upright posts 9, one ends of the two water delivery hoses 23 are respectively and fixedly connected with one ends of the corresponding water inlet pipes 24, one ends of the two water inlet pipes 24 far away from the corresponding water delivery hoses 23 extend into the corresponding water cavities 10, one ends of the two water delivery hoses 23 far away from the corresponding water inlet pipes 24 are respectively and fixed with two ends of the longitudinal drainage pipes 22 The clean water in the water tank 15 can be conveyed into the two water cavities 10 by utilizing the conveying action of the water pump 19, so that the clean water entering the water cavities 10 is sprayed out from the two spray heads 13.
In this embodiment, the equal fixed mounting in bottom of horizontal drain pipe 21 and vertical drain pipe 22 has two bracing pieces 28, and the bottom of four bracing pieces 28 all with base 1's top fixed connection, through setting up four bracing pieces 28, play the effect that supports horizontal drain pipe 21 and vertical drain pipe 22 respectively for horizontal drain pipe 21 and vertical drain pipe 22 are installed more firmly on base 1.
In this embodiment, the water filling hole 16 has been seted up at the top of water tank 15, the equal fixed mounting in bottom of two tube-shape water-retaining cover 12 has return water hose 18, two return water hoses 18 are linked together with the inside of corresponding tube-shape water-retaining cover 12 respectively, the one end that corresponding tube-shape water-retaining cover 12 was kept away from to two return water hoses 18 all runs through water filling hole 16, through setting up return water hose 18, can carry the water that flows into in tube-shape water-retaining cover 12 in meeting water tank 15, through setting up water filling hole 16, be convenient for to the clear water of adding in the water tank 15.
In this embodiment, all seted up the guide way on the both sides inner wall of spout 6, the equal fixed mounting in both sides of two slides 8 has the guide bar, and guide bar slidable mounting plays the effect of leading to the slip direction of slide 8 in corresponding guide way through setting up the sliding connection cooperation of guide bar in the guide way for two slides 8 can steadily slide in spout 6.
In this embodiment, the top fixed mounting of base 1 has storage battery 25 and many accuse switch 26, two electric putter 3, water pump 19, motor 27, storage battery 25 and many accuse switch 26 loop through wire electric connection and constitute return circuit motor 27 and be the motor that can just reverse, utilize storage battery 25 can provide the electric energy to two electric putter 3 respectively, water pump 19, motor 27, the start-stop and the reset work of two electric putter 3 of many accuse switch 26 are steerable, the start-stop work of steerable water pump 19, the start-stop and the just reverse work of motor 27 still can be controlled.
When the device is used, the device is pushed to a proper position beside the building outer wall to be detected, so that the two sealing rings 14 are in close contact with the building outer wall, then the water pump 19 is started to work, clean water in the water tank 15 sequentially passes through the water suction pipe 20, the water pump 19, the transverse drain pipe 21, the longitudinal drain pipe 22, the two water delivery hoses 23 and the two water inlet pipes 24, so that the clean water flows into the two water cavities 10, the clean water entering the two water cavities 10 sequentially passes through the two water spray pipes 11, finally the clean water is sprayed out from the two spray nozzles 13, the clean water sprayed out from the two spray nozzles 13 is sprayed on the building outer wall, water seepage test work can be carried out on two positions of the building outer wall, after the clean water is continuously sprayed on the building outer wall for a certain time, a worker can observe whether water seepage condition occurs from the other side of the wall, if the water seepage phenomenon occurs, the waterproof performance of the building outer wall is poor, if the water seepage phenomenon does not exist, the waterproof performance of the building outer wall is good, in the process of water seepage test work, the two cylindrical water retaining covers 12 are utilized to collect the sprayed water, the sealing rings 14 are utilized to play a role in sealing the cylindrical water retaining covers 12 and the building outer wall, clear water is prevented from flowing out of the cylindrical water retaining covers 12, the sprayed water is enabled to flow back to the water tank 15 through the two water return hoses 18, impurities such as gravel and dust in the water flowing back to the water tank 15 can be filtered through the filter screen 17, the phenomenon that the gravel and dust enter the spray nozzle 13 to cause the blockage of the spray nozzle is avoided, the water resource can be recycled and reused after being recovered, the waste of the water resource is reduced, the water-saving effect is achieved, and the two telescopic columns 4 push the connecting seat 5 to work by starting the two electric push rods 3 to enable the water pump 19 to work continuously, The two upright posts 9 and the two cylindrical water retaining covers 12 are lifted, the two electric push rods 3 are started to reset, so that the two telescopic posts 4 drive the connecting seats 5, the two upright posts 9 and the two cylindrical water retaining covers 12 to descend, the height positions of the cylindrical water retaining covers 12 are convenient to adjust, the motor 27 drives the two lead screws 7 to rotate through the positive rotation of the starting motor 27, the two lead screws 7 are respectively in threaded connection and matching with the corresponding sliding seats 8, the two sliding seats 8 slide towards the mutually close directions due to the opposite rotation of the threads of the two lead screws 7, the two sliding seats 8 drive the corresponding upright posts 9 and the cylindrical water retaining covers 12 to move, the distance between the two cylindrical water retaining covers 12 is gradually reduced, and similarly, the motor 27 drives the two lead screws 7 to rotate in the opposite directions through the reverse rotation of the starting motor 27, so that the two sliding seats 8 slide towards the mutually far directions, two slides 8 drive corresponding stand 9 and tube-shape manger plate cover 12 and remove, make the interval between two tube-shape manger plate covers 12 crescent, thereby be convenient for adjust the interval between two tube-shape manger plate covers 12, through adjusting the high position to two tube-shape manger plate covers 12, and through adjusting the interval between two tube-shape manger plate covers 12, the convenience is to the different positions of building outer wall infiltration test work, the simple operation, time saving and labor saving, it is more accurate to the infiltration test result of building outer wall, simultaneously the content of not making detailed description in this description all belongs to the prior art that technical personnel are known in the field.
To sum up can, this project is managed and is used building outer wall infiltration testing arrangement, be convenient for adjust the high position of two tube-shape manger plate covers 12, and be convenient for adjust the interval between two tube-shape manger plate covers 12, the convenience carries out infiltration test work to the different positions of building outer wall, the simple operation, time saving and labor saving, it is more accurate to the infiltration test result of building outer wall, and in carrying out the infiltration test work in-process, can retrieve the water resource and filter and purify the back recycle, the waste of water resource has been reduced, the water conservation effect has.

Claims (7)

1. The utility model provides an engineering is managed with building outer wall infiltration testing arrangement, includes base (1), its characterized in that: four self-locking universal wheels (2) which are symmetrically arranged in pairs are fixedly installed at the bottom of the base (1), two electric push rods (3) are fixedly installed at the top of the base (1), telescopic columns (4) are fixedly installed at output shaft ends of the two electric push rods (3), the top ends of the two telescopic columns (4) are fixedly installed with the same connecting seat (5), a sliding groove (6) is formed in the top of the connecting seat (5), two sliding seats (8) are slidably installed in the sliding groove (6), the top parts of the two sliding seats (8) extend out of the sliding groove (6), stand columns (9) are fixedly installed at the top parts of the two sliding seats (8), water cavities (10) are formed in the two stand columns (9), water spray pipes (11) are fixedly installed at one side of the two stand columns (9), and the two water spray pipes (11) are respectively communicated with the corresponding water cavities (10), two equal fixed cover is equipped with tube-shape manger plate cover (12), two on spray pipe (11) one side that corresponding stand (9) were kept away from in tube-shape manger plate cover (12) is the opening structure, two the equal fixed mounting in one end that corresponding stand (9) were kept away from in spray pipe (11) has shower nozzle (13), two shower nozzle (13) are located correspondingly respectively in tube-shape manger plate cover (12), two the equal fixed mounting in one side that corresponding stand (9) were kept away from in tube-shape manger plate cover (12) has sealing washer (14), be provided with adjusting part on connecting seat (5), the top fixed mounting of base (1) has water tank (15), water tank (15) internal fixation installs filter screen (17), be provided with water delivery subassembly on base (1).
2. The building outer wall water seepage testing device for project supervision according to claim 1, characterized in that: the adjusting part comprises two screw rods (7) and a motor (27), two the screw rods (7) are all rotatably installed in the sliding grooves (6), two the threads of the screw rods (7) are oppositely arranged and two one end fixed connection and two ends of the screw rods (7) are close to each other are respectively sleeved on the sliding seats (8) in a corresponding mode through threads on the screw rods (7), the motor (27) is fixedly installed on the outer wall of one side of the connecting seat (5), and the other end of one screw rod (7) in the screw rods (7) is fixedly connected with the output shaft end of the motor (27).
3. The building outer wall water seepage testing device for project supervision according to claim 1, characterized in that: the water delivery assembly comprises a water pump (19), a water suction pipe (20), a transverse drain pipe (21), a longitudinal drain pipe (22), two water delivery hoses (23) and two water inlet pipes (24), the water pump (19) is fixedly installed at the top of the base (1), one end of the water suction pipe (20) is fixedly connected with the suction end of the water pump (19), one end, far away from the water pump (19), of the water suction pipe (20) extends into the water tank (15), one end of the transverse drain pipe (21) is fixedly connected with the discharge end of the water pump (19), one side of the longitudinal drain pipe (22) is fixedly connected with one end, far away from the water pump (19), of the transverse drain pipe (21), the longitudinal drain pipe (22) is communicated with the transverse drain pipe (21), and the two water inlet pipes (24) are respectively and fixedly installed on the corresponding upright posts (9), one end of each of the two water delivery hoses (23) is fixedly connected with one end of the corresponding water inlet pipe (24), one end, far away from the corresponding water delivery hose (23), of each of the two water inlet pipes (24) extends into the corresponding water cavity (10), and one end, far away from the corresponding water inlet pipe (24), of each of the two water delivery hoses (23) is fixedly connected with two ends of the longitudinal drain pipe (22).
4. The building outer wall water seepage testing device for project supervision according to claim 3, characterized in that: the bottom of horizontal drain pipe (21) with vertical drain pipe (22) all fixed mounting have two bracing pieces (28), four the bottom of bracing piece (28) all with the top fixed connection of base (1).
5. The building outer wall water seepage testing device for project supervision according to claim 1, characterized in that: the water filling device is characterized in that a water filling hole (16) is formed in the top of the water tank (15), two water return hoses (18) are fixedly mounted at the bottoms of the cylindrical water retaining covers (12), the two water return hoses (18) are communicated with the corresponding interiors of the cylindrical water retaining covers (12), and one ends, far away from the corresponding cylindrical water retaining covers (12), of the two water return hoses (18) penetrate through the water filling hole (16).
6. The building outer wall water seepage testing device for project supervision according to claim 1, characterized in that: the guide grooves are formed in the inner walls of the two sides of the sliding groove (6), guide rods are fixedly mounted on the two sides of the sliding seat (8), and the guide rods are slidably mounted in the corresponding guide grooves.
7. The building outer wall water seepage testing device for project supervision according to claim 1, characterized in that: and the top of the base (1) is fixedly provided with a storage battery pack (25) and a multi-control switch (26).
CN202121690569.7U 2021-07-23 2021-07-23 Engineering is managed with building outer wall infiltration testing arrangement Active CN215414224U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121690569.7U CN215414224U (en) 2021-07-23 2021-07-23 Engineering is managed with building outer wall infiltration testing arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121690569.7U CN215414224U (en) 2021-07-23 2021-07-23 Engineering is managed with building outer wall infiltration testing arrangement

Publications (1)

Publication Number Publication Date
CN215414224U true CN215414224U (en) 2022-01-04

Family

ID=79652287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121690569.7U Active CN215414224U (en) 2021-07-23 2021-07-23 Engineering is managed with building outer wall infiltration testing arrangement

Country Status (1)

Country Link
CN (1) CN215414224U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115493756A (en) * 2022-11-21 2022-12-20 济南工程职业技术学院 Device for testing water tightness of building wall
CN117030571A (en) * 2023-10-07 2023-11-10 南京建凯建设项目管理有限公司 Waterproof acceptance device for supervision of building engineering
CN117268645A (en) * 2023-11-22 2023-12-22 中铁一局集团电务工程有限公司 Waterproof detection device for wall body for transformation of old community

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115493756A (en) * 2022-11-21 2022-12-20 济南工程职业技术学院 Device for testing water tightness of building wall
CN117030571A (en) * 2023-10-07 2023-11-10 南京建凯建设项目管理有限公司 Waterproof acceptance device for supervision of building engineering
CN117030571B (en) * 2023-10-07 2023-12-26 南京建凯建设项目管理有限公司 Waterproof acceptance device for supervision of building engineering
CN117268645A (en) * 2023-11-22 2023-12-22 中铁一局集团电务工程有限公司 Waterproof detection device for wall body for transformation of old community
CN117268645B (en) * 2023-11-22 2024-03-01 中铁一局集团电务工程有限公司 Waterproof detection device for wall body for transformation of old community

Similar Documents

Publication Publication Date Title
CN215414224U (en) Engineering is managed with building outer wall infiltration testing arrangement
CN110302611A (en) A kind of anticlogging air cleaning unit for Urban Underground piping lane
CN110999761A (en) Municipal works greenbelt irrigation system
CN113000463B (en) Cleaning device for all-dimensional cleaning agricultural machinery
CN211407115U (en) Irrigation device with regulatory function
CN211215806U (en) Environment-friendly energy-saving building water supply and drainage system
CN215531104U (en) Ornamental trees and shrubs are with spouting medicine device convenient to adjust
CN211519463U (en) Intelligent network car washer
CN210676143U (en) Automobile wheel hub circulating water washs case
CN211678976U (en) Automatic cleaning device for cylinder cover
CN219581169U (en) Cleaning equipment of sand-stone separator
CN112426800A (en) Acid liquor collecting device for polar plate production
CN111672639A (en) Filter hole cleaning device for centrifugal dehydrator
CN111622306A (en) Intelligent remote monitoring water supply system
CN215505824U (en) Impurity removal and filtration device for waterproof coating production
CN218553651U (en) Spray dilution waste gas collection device
CN217550572U (en) Novel colliery electromechanical device maintains and uses washing device
CN216510419U (en) Novel multi-functional powder hopper
CN219956795U (en) Fill waterproof test equipment of electric pile
CN220730700U (en) Bulky concrete temperature control device
CN213823728U (en) Filter equipment is used in formaldehyde scavenging agent production
CN217472809U (en) Self-cleaning filter with back-flushing function
CN212347898U (en) Foaming machine for PU foaming
CN217141446U (en) Cleaning equipment is used in bearing production