CN215407602U - GIS removes dust removal workshop - Google Patents

GIS removes dust removal workshop Download PDF

Info

Publication number
CN215407602U
CN215407602U CN202121550018.0U CN202121550018U CN215407602U CN 215407602 U CN215407602 U CN 215407602U CN 202121550018 U CN202121550018 U CN 202121550018U CN 215407602 U CN215407602 U CN 215407602U
Authority
CN
China
Prior art keywords
gis
supporting frame
dust
dustproof
control box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121550018.0U
Other languages
Chinese (zh)
Inventor
麻晓军
曹懿
朱转军
周帆
卢伟星
马建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Transmission & Substation Engineering Co ltd
Gansu Chengxin Electric Power Technology Co Ltd
State Grid Gansu Electric Power Co Ltd
Original Assignee
Gansu Transmission & Substation Engineering Co ltd
Gansu Chengxin Electric Power Technology Co Ltd
State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Transmission & Substation Engineering Co ltd, Gansu Chengxin Electric Power Technology Co Ltd, State Grid Gansu Electric Power Co Ltd filed Critical Gansu Transmission & Substation Engineering Co ltd
Priority to CN202121550018.0U priority Critical patent/CN215407602U/en
Application granted granted Critical
Publication of CN215407602U publication Critical patent/CN215407602U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model belongs to the technical field of dust removal of transformer substations, and particularly relates to a GIS mobile dust removal workshop. The dustproof shed comprises a dustproof shed mounting base and a dustproof shed supporting frame, wherein the dustproof shed supporting frame is divided into a cross rod and a vertical rod, a connecting piece is arranged between the cross rod and the vertical rod, and each cross rod and each vertical rod can be detached; a dehumidifier and a master control box are arranged in the mounting base; and an air shower, a dust remover and an air cooler are arranged on the periphery of the mounting base. The mobile G I S dust removal workshop is maximized in design space, convenient to move and excellent in performance.

Description

GIS removes dust removal workshop
Technical Field
The utility model belongs to the technical field of dust removal of transformer substations, and particularly relates to a GIS mobile dust removal workshop.
Background
The GIS equipment is one of the most important equipment of the transformer substation, and the safe operation of the GIS equipment is not only related to the quality of products, but also very important when the GIS equipment is installed, the temperature and humidity of the external environment, the air quality and the like. The installation of GIS equipment has strict requirements on external environment, and partial parts can be discharged due to overlarge air humidity and overlarge dust degree in the air, so that the safe operation of the GIS equipment is influenced. Therefore, when the GIS is installed, the installation environment is improved, the installation requirement of the GIS equipment is met, and the dust-free positive pressure installation system is favorable for long-term safe operation of the GIS equipment.
Because the construction mainly adopts the installation room of setting up simple and easy worker's canopy or using GIS equipment producer to provide by the construction unit before, if adopt the requirement that simple and easy worker's canopy form can't guarantee the installation environment strictly, seriously influence construction quality, if the installation room that the lease producer provided, there is with high costs, supply of goods cycle length, commonality subalternation factor, brought very big difficulty for actual construction.
At present, a dust removal chamber is installed on the market for GIS in the power industry, the function is single relatively, the reliability is low, the intelligent degree is low, the existing equipment needs to be improved in various aspects such as product completion degree and standardization, and a construction site has practical requirements on the equipment, so that the GIS mobile dust removal workshop is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a GIS mobile dust removal workshop, which is used for solving the problems of high cost, poor general performance, single function, low reliability and low intelligent degree of the existing dust removal equipment.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows:
a GIS mobile dust removal workshop comprises a dust shed mounting base and a dust shed supporting frame, wherein the dust shed supporting frame is divided into a cross rod and a vertical rod, a connecting piece is arranged between the cross rod and the vertical rod, and each cross rod and each vertical rod can be detached; a dehumidifier and a master control box are arranged in the mounting base; and an air shower, a dust remover and an air cooler are arranged on the periphery of the mounting base.
Preferably, the dustproof shed supporting frame is covered with organic glass or an anti-static grid curtain.
Further, the left and right sides of dustproof canopy support frame be equipped with the butt joint passageway, the door curtain of butt joint passageway adopts PVC curtain that hangs down, the compliance is high, makes things convenient for personnel to get into, article get into easily, the separation is effectual, prevents that the air from losing.
Preferably, the bottom of the dustproof shed supporting frame is provided with a directional wheel which can be operated by a plurality of people to move forwards.
Preferably, the master control box is equipped with integration digital networking monitored control system, and integration digital networking monitored control system is through the sensor that is furnished with surely detect temperature, humidity and cleanliness factor each item parameter in the dustproof facility, and the digital networking monitored control system of while integration is furnished with the camera, and the real-time video of installation is taken a photograph to the camera, and all videos and parameter information upload to the master control box in real time and store and show.
Furthermore, the master control box is provided with a display instrument and an alarm lamp, the display instrument and the alarm lamp can be observed in real time, in addition, any networking equipment can view video pictures in real time after being authorized by the master control box, the installation condition is monitored, the installation pictures are captured, the current indoor air parameters are known or historical records are consulted, and the whole process remote monitoring of installation and construction is realized.
Furthermore, nozzles are arranged on two sides of the air shower, and the air shower is cleaned by adopting a bilateral face blowing and showering mode.
To sum up, owing to adopted above-mentioned technical scheme, utility model's beneficial technological effect is:
1. the device design space maximize, every singleton all can be dismantled, also the module is dismantled, light in weight, and the installation is convenient, and sealing performance is good.
2. The dust removal chamber lower part is equipped with the gyro wheel, can be very convenient removal through the guide rail for after current point installation work is accomplished, can convenient and fast's whole removal carry out the installation work to next mounting point.
3. The performance is excellent, and through setting up dustless malleation installing the system, the cooperative control of equipment such as combination air purification equipment, industrial air conditioner, dehumidification generator provides clear installation environment for GIS equipment.
4. Being equipped with integration digital networking monitored control system, each item parameter such as temperature, humidity, cleanliness factor in can the accurate dustproof facility of detection, simultaneously through the real-time video of indoor camera shooting installation, all videos and parameter information upload to the server in real time and store and show.
5. Besides real-time observation of a display instrument and an alarm lamp of a control box in the dust removal chamber, any networked computer can check video pictures in real time, monitor installation conditions, snapshot installation pictures, know current indoor air parameters or look up historical records, realize the overall process remote monitoring of installation and construction and ensure the construction quality.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a top view of FIG. 2 in accordance with the present invention;
FIG. 4 is a left side schematic view of FIG. 3 in accordance with the present invention;
fig. 5 is a right side view of fig. 3 according to the present invention.
In the figure: dustproof canopy installation base 1, dustproof canopy support frame 2, butt joint passageway 3, wind shower 4, air-cooler 5, dust shaker 6, dehumidifier 7, total control box 8, connecting piece 9.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Example 1
In the embodiment, the GIS movable dust removal workshop comprises a dust shed mounting base 1 and a dust shed support frame 2, wherein the dust shed support frame 2 is divided into a cross rod and a vertical rod, a connecting piece 9 is arranged between the cross rod and the vertical rod, and each cross rod and each vertical rod can be detached; a dehumidifier 7 and a master control box 8 are arranged in the mounting base 1; and an air shower 4, a dust remover 6 and an air cooler 5 are arranged on the periphery of the mounting base 1. The dustproof shed support frame 2 uses section bars (50-60-75 and the like) and various mature splicing pieces, and each single piece can be detached or detached in a module mode. Light weight, close linkage, flexibility and convenience. In addition, considering the field operation environment, I-shaped steel can be added inside, so that the wind and snow resistance of the steel is greatly improved. Organic glass or prevent static grid curtain, cover organic glass or prevent static grid curtain on dustproof canopy support frame 2, increased the device sealing performance.
Example 2
In this embodiment dustproof canopy support frame 2's the left and right sides be equipped with butt joint passageway 3, butt joint passageway 3's door curtain adopts PVC curtain that hangs down, and PVC hangs down curtain compliance height, makes things convenient for personnel to get into, and article get into easily, and the separation is effectual, prevents the air loss, preferably, dustproof canopy support frame 2's bottom dress directional wheel can many people operate and push away the removal forward, preferably, dustproof canopy support frame 2's top is equipped with detachable skylight, and the crane hoist and mount is made things convenient for in detachable skylight.
Example 3
In this embodiment master control box 8 is equipped with integration digital networking monitored control system, and integration digital networking monitored control system is equipped with the camera through the sensor that is furnished with really detecting temperature, humidity and cleanliness factor each item parameter in the dustproof facility, and integration digital networking monitored control system is furnished with simultaneously, and real-time video of installation is taken photograph to the camera, and all videos and parameter information upload to master control box 8 in real time and store and show. The master control box 8 is provided with a display instrument and an alarm lamp, the display instrument and the alarm lamp can be observed in real time, in addition, any networking electric equipment can view video pictures in real time after passing through the authorization of the master control box 8, monitors installation conditions, takes a candid photograph of the installation pictures, knows current indoor air parameters or refers to historical records, and the whole process remote monitoring of installation and construction is realized.
Example 4
In the embodiment, nozzles are arranged on two sides of the air shower 4, and the air shower 4 cleans operators in a bilateral face blowing and showering mode.
The above description is not intended to limit the present invention, but rather, the present invention is intended to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the present invention.

Claims (7)

1. A GIS mobile dust removal workshop comprises a dust shed mounting base (1) and a dust shed supporting frame (2), and is characterized in that the dust shed supporting frame (2) is divided into a cross rod and a vertical rod, a connecting piece (9) is arranged between the cross rod and the vertical rod, and each cross rod and each vertical rod can be detached; a dehumidifier (7) and a master control box (8) are arranged in the mounting base (1); the periphery of the installation base (1) is provided with an air shower (4), a dust remover (6) and an air cooler (5).
2. The GIS mobile dedusting plant of claim 1, wherein: organic glass or an anti-static grid curtain is covered on the dustproof shed supporting frame (2).
3. The GIS mobile dedusting plant of claim 1, wherein: the left side and the right side of the dustproof shed supporting frame (2) are provided with butt joint channels (3), and door curtains of the butt joint channels (3) are made of PVC vertical curtains.
4. The GIS mobile dedusting plant of claim 1, wherein: the bottom of the dustproof shed supporting frame (2) is provided with a directional wheel which can be operated by a plurality of people to move forwards.
5. The GIS mobile dedusting plant of claim 1, wherein: the master control box (8) is equipped with integration digital networking monitored control system, integration digital networking monitored control system is through the sensor that is furnished with and really detects temperature, humidity and cleanliness factor each item parameter in the dustproof facility, is furnished with the camera with integration digital networking monitored control system simultaneously, and the camera is used for making a photograph real-time video of installation.
6. The GIS mobile dedusting plant of claim 1, wherein: the master control box (8) is provided with a display instrument and an alarm lamp, the display instrument and the alarm lamp can carry out real-time observation, and in addition, any networking equipment can view video pictures in real time after being authorized by the master control box (8).
7. The GIS mobile dedusting plant of claim 1, wherein: the two sides of the air shower (4) are provided with nozzles, and the air shower (4) cleans operators in a bilateral blowing and showering mode.
CN202121550018.0U 2021-07-08 2021-07-08 GIS removes dust removal workshop Expired - Fee Related CN215407602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121550018.0U CN215407602U (en) 2021-07-08 2021-07-08 GIS removes dust removal workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121550018.0U CN215407602U (en) 2021-07-08 2021-07-08 GIS removes dust removal workshop

Publications (1)

Publication Number Publication Date
CN215407602U true CN215407602U (en) 2022-01-04

Family

ID=79647879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121550018.0U Expired - Fee Related CN215407602U (en) 2021-07-08 2021-07-08 GIS removes dust removal workshop

Country Status (1)

Country Link
CN (1) CN215407602U (en)

Similar Documents

Publication Publication Date Title
CN206789957U (en) A kind of switch gear room's track machine people's cruising inspection system
CN110866993A (en) Intelligent track inspection machine and method thereof
CN104424785B (en) Distributed wireless video signal contact line switches monitoring system and monitoring method
CN204030727U (en) A kind of valve Room converter valve inspection device
CN205378109U (en) Device is tourd in indoor control of transformer substation
CN206863889U (en) The anti-external force of power cable destroys intelligent monitor system
CN113606437A (en) All-weather inspection device for computer room
CN216142512U (en) Intelligent dustproof system for outdoor GIS equipment installation
CN215407602U (en) GIS removes dust removal workshop
CN109119923A (en) Transformer and distribution station device intelligence cruising inspection system and its method for inspecting
CN112422906A (en) BIM-based remote monitoring and maintaining system and method for subway machine room equipment
CN112324628A (en) Wind turbine generator system hanger rail formula cabin system of patrolling and examining
CN208202668U (en) It is a kind of to provide the system of clean installation environment for gas-insulating and fully-enclosed combined electrical apparatus
CN215601308U (en) Non-intrusive optical fiber link cloud monitoring system
CN108471062A (en) A kind of power transmission and transformation power distribution cabinet
CN213072924U (en) Novel monitoring data superposition video monitoring and measuring system
CN212275075U (en) Power distribution cabinet operation monitoring equipment for power distribution room
CN103986107A (en) Intelligent control system for transformer substation cable trench see-through safeguard device
CN208236049U (en) A kind of simple lifting stereo garage
CN208209350U (en) A kind of distribution line state panorama intelligent monitoring device
CN208296889U (en) A kind of solar energy temperature-humidity detecting device Internet-based
CN111404038A (en) Protection switch board is used in public construction of municipal administration
CN207380543U (en) Self-supporting energy regulator control system
CN206725415U (en) A kind of general monitor station of collector
CN112930050A (en) Electrical equipment general control table

Legal Events

Date Code Title Description
GR01 Patent grant