CN215407517U - Keel hanging component - Google Patents
Keel hanging component Download PDFInfo
- Publication number
- CN215407517U CN215407517U CN202121451807.9U CN202121451807U CN215407517U CN 215407517 U CN215407517 U CN 215407517U CN 202121451807 U CN202121451807 U CN 202121451807U CN 215407517 U CN215407517 U CN 215407517U
- Authority
- CN
- China
- Prior art keywords
- hanging
- hook
- hanger assembly
- assembly according
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 31
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 14
- 229910052742 iron Inorganic materials 0.000 claims description 7
- 239000004677 Nylon Substances 0.000 claims description 3
- 238000005452 bending Methods 0.000 claims description 3
- 229920001778 nylon Polymers 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 description 19
- 239000010959 steel Substances 0.000 description 19
- 238000010276 construction Methods 0.000 description 14
- 238000000034 method Methods 0.000 description 8
- 238000005034 decoration Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 241000700647 Variola virus Species 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 239000002390 adhesive tape Substances 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Landscapes
- Holders For Apparel And Elements Relating To Apparel (AREA)
Abstract
The utility model relates to a keel hanger assembly. The utility model provides a keel hanger component, comprising: the hanging piece comprises a hanging piece body, wherein the hanging piece body comprises a hook, and a clamping part is arranged on the hook; the binding assembly is wound on the hanging piece body; the top of the installation rod and the lower part of the hanging piece body are provided with detachable structures. The keel hanging component has the advantages of convenience in installation and capability of clamping and preventing falling.
Description
Technical Field
The utility model relates to the technical field of keel installation, in particular to a keel hanging piece assembly.
Background
In recent years, with the steady development of society, more and more business owners pay attention to the decoration of factory buildings, wherein the construction of factory ceilings is an indispensable part. The suspended ceiling of the factory building refers to ceiling decoration of the factory building roof, has the functions of heat preservation, heat insulation, sound insulation and sound absorption, and is also a hidden layer of projects such as electric, ventilation, fire prevention, pipelines and the like. The suspended ceiling is a protective umbrella of a factory building, and has certain ornamental value while ensuring the self safety of enterprise staff. In the construction process of the suspended ceiling, the keel is usually assembled and adjusted and fixed, and then the gypsum board is fixed on the keel.
However, the manual keel positioning and binding are needed in the existing ceiling construction process, workers often move the ladder to climb up and down, and the construction efficiency is greatly reduced. Meanwhile, the conventional hanging piece is generally shown in fig. 1, and is a hook-shaped metal rod piece, when in construction, the hook part is hung on the C-shaped steel, an iron wire for binding the keel is sleeved outside the rod, and a limiting boss is arranged at the bottom of a straight rod part of the rod, so that the iron wire is prevented from falling off. However, such a hanger cannot be locked to the steel skeleton and is easily displaced or even unhooked during the process of binding the keel. Meanwhile, the hanging piece is of a round rod structure, and can rotate due to gravity when being inserted on the tool, so that the orientation of the hook part of the hanging piece can not be well fixed, the hanging piece needs to be manually climbed to a high place for installation, and the hanging piece can not be lifted to the high place through the tool.
SUMMERY OF THE UTILITY MODEL
Based on this, the utility model aims to provide a keel hanging piece assembly which has the advantages of convenience in installation and capability of clamping and preventing falling.
A keel hanger assembly comprising:
the hanging piece comprises a hanging piece body, wherein the hanging piece body comprises a hook, and a clamping part is arranged on the hook;
the binding assembly is wound on the hanging piece body;
the top of the installation rod and the lower part of the hanging piece body are provided with detachable structures.
The keel hanging component can be clamped on a steel structure, and the phenomenon of deviation or unhooking in the binding process is prevented. Simultaneously, this hang a body and can install and dismantle with the installation pole, installer only need stand subaerial, will hang a body through the installation pole and lift the eminence to can realize hanging the chucking cooperation of a body and steel construction through pulling installation pole and ligature subassembly, need not to climb from top to bottom repeatedly, reduce the cost of labor, improved the installation effectiveness who hangs a.
Further, detachable construction is grafting structure, including inserted sheet and slot, the inserted sheet sets up hang the lower part of a body, the slot sets up the top of installation pole. The structure of inserted sheet, slot can realize the quick assembly disassembly of installation pole and hanging a body, convenient operation is swift.
Further, the inserting sheet and the inserting groove are in interference fit. Guarantee that the inserted sheet can not drop at the lifting in-process, improve stability.
Further, hang a body and still include the connection piece, connection piece one end with the couple is connected, the other end with the inserted sheet is connected. The hanging piece body is simple in structure and production cost is reduced.
Further, the width of connection piece is less than couple and inserted sheet, ligature subassembly cover is established outside the connection piece and restricted between couple and inserted sheet. The width of guaranteeing the connection piece is less than couple and inserted sheet prevent that the ligature subassembly from breaking away from hanging a body, improve stability.
Furthermore, the hook comprises a hanging part, a clamping part and a supporting part, one end of the hanging part is connected with the connecting sheet, and the other end of the hanging part is of an arc semi-surrounding structure; the clamping part is connected with the other end of the hanging part, and the middle part of the clamping part protrudes towards the direction of the hook. The couple can realize with the fixed chucking of steel construction, takes place unhook and removal in the prevention installation.
Further, the free end of chucking portion is provided with the supporting part, the free end of supporting part is to keeping away from the direction of linkage extends. The supporting part can realize the fixation of the hanging part body and prevent shaking or moving.
Furthermore, the hanger body is integrally formed by stamping and bending. The hanger body is high in production efficiency and low in cost.
Furthermore, the hook is also provided with a positioning hole for punching and guiding. The positioning hole is used for installing the hanging piece body.
Further, the binding component is an iron wire or a nylon rope. The binding component can realize quick binding and has a simple structure.
For a better understanding and practice, the utility model is described in detail below with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic view of a prior art hanger;
figure 2 is a block diagram of the keel hanger assembly of the utility model;
FIG. 3 is a block diagram of the hanger body;
FIG. 4 is a schematic view of the primary positioning and matching of the hanger body and the steel structure;
FIG. 5 is a schematic view of the hanger body fully snapped into the steel structure;
description of reference numerals: 1. a hanger body; 11. hooking; 111. a hanging part; 112. a clamping part; 113. a support portion; 114. positioning holes; 12. connecting sheets; 13. inserting sheets; 2. a binding assembly; 3. mounting a rod; 31. a slot; 4. a steel structure.
Detailed Description
Referring to fig. 2, fig. 2 is a structural view of a keel hanger assembly according to the utility model. The utility model discloses a keel hanging component, comprising: hang a body 1, ligature subassembly 2 and installation pole 3, installation pole 3 top with hang 1 lower part of a body and be equipped with detachable construction, ligature subassembly 2 winding is in hang on the body 1. Preferably, the hanger body 1 is integrally formed by stamping and bending.
Example 1
Referring to fig. 3, fig. 3 is a structural view of the hanger body. The hanger body 1 comprises a hook 11, a connecting sheet 12 and an inserting sheet 13. The hook 11 comprises a hanging part 111, a clamping part 112 and a supporting part 113, one end of the hanging part 111 is connected with the connecting piece 12, and the other end of the hanging part is in an arc semi-surrounding structure; the clamping part 112 is connected with the other end of the hanging part 111, and the middle part of the clamping part protrudes towards the direction of the hook 11; the free end of the fastening part 112 is provided with a support part 113, and the free end of the support part 113 extends in a direction away from the hanging part 111. The hook 11 is further provided with a positioning hole 114 for punching and guiding. One end of the connecting piece 12 is connected with the hook 11, the other end of the connecting piece is connected with the inserting piece 13, and the width of the connecting piece is smaller than that of the hook 11 and the inserting piece 13.
The binding component 2 is sleeved outside the connecting sheet 12 and limited between the hook 11 and the inserting sheet 13, and can be specifically an iron wire or a nylon rope and the like.
The top of the mounting rod 3 is provided with a slot 31 detachably connected with the insertion sheet 13, preferably, the insertion sheet 13 is in interference fit with the slot 31. In actual site operation process, can process into installation pole 3 with on-the-spot building materials clout, installation pole 3 is rectangular flitch, the flitch top has been seted up slot 31, the flitch is corresponding the periphery winding of slot 31 has electrician's adhesive tape.
Referring to fig. 4-5, fig. 4 is a schematic view of the primary implementation of the positioning and matching between the hanger body and the steel structure; fig. 5 is a schematic view of the hanger body fully snapped into the steel structure. When the binding assembly is used, the binding assembly is cut into a proper length and wound on the hanging piece body, and then the inserting piece of the hanging piece body is inserted into the inserting groove. The installation rod is held by an installer, the hanging part body is lifted to a steel structure at a high position, the steel structure is usually formed by C-shaped steel, angle iron, flat iron and other sectional materials, and a hook surface for installing the hanging part is arranged. Installer control installation pole will the couple card is gone into on the face that colludes of steel construction to pulling installation pole makes its slot with the inserted sheet breaks away from downwards, tentatively realizes this moment hang the location cooperation of a body and steel construction. Then, installer pulling the ligature subassembly that hangs down makes in hanging the body card is gone into the steel construction completely, this moment the clamping part, supporting part contradict on the steel construction, consequently hang the body and can not take place to rock. After all hang a body installation completion, installer can continue to carry out the ligature work of smallpox or fossil fragments.
Example 2
This example is substantially the same as example 1, except that: hang a body and make by iron or its alloy, installation pole 3 top is equipped with the magnetic path, the magnetic path is adsorbable thereby the realization of inserted sheet 13 installation pole 3 with hang a detachable connection of body 1. During the use, will hang a body and adsorb on the magnetic path, installer can be with through the installation pole hang a body lifting eminence and carry out the installation operation.
The keel hanging component can be clamped on a steel structure, and the phenomenon of deviation or unhooking in the binding process is prevented. Simultaneously, this hang a body and can install and dismantle with the installation pole, installer only need stand subaerial, will hang a body through the installation pole and lift the eminence to can realize hanging the chucking cooperation of a body and steel construction through pulling installation pole and ligature subassembly, need not to climb from top to bottom repeatedly, reduce the cost of labor, improved the installation effectiveness who hangs a.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the utility model. It should be noted that, to those skilled in the art, changes and modifications may be made without departing from the spirit of the present invention, and it is intended that the present invention encompass such changes and modifications.
Claims (10)
1. A keel hanger assembly, comprising:
the hanging piece comprises a hanging piece body, wherein the hanging piece body comprises a hook, and a clamping part is arranged on the hook;
the binding assembly is wound on the hanging piece body;
the top of the installation rod and the lower part of the hanging piece body are provided with detachable structures.
2. A keel hanger assembly according to claim 1, wherein: the detachable structure is of an inserting structure and comprises an inserting piece and a slot, the inserting piece is arranged on the lower portion of the hanging piece body, and the slot is arranged at the top of the installation rod.
3. A keel hanger assembly according to claim 2, wherein: the inserting sheet is in interference fit with the slot.
4. A keel hanger assembly according to claim 2 or 3, wherein: the hanging piece body further comprises a connecting piece, one end of the connecting piece is connected with the hook, and the other end of the connecting piece is connected with the inserting piece.
5. A keel hanger assembly according to claim 4, wherein: the width of connection piece is less than couple and inserted sheet, ligature subassembly cover is established outside the connection piece and restricted be in between couple and the inserted sheet.
6. A keel hanger assembly according to claim 5, wherein: the hook comprises a hanging part, a clamping part and a supporting part, one end of the hanging part is connected with the connecting sheet, and the other end of the hanging part is of an arc semi-surrounding structure; the clamping part is connected with the other end of the hanging part, and the middle part of the clamping part protrudes towards the direction of the hook.
7. A keel hanger assembly according to claim 6, wherein: the free end of chucking portion is provided with the supporting part, the free end of supporting part is to keeping away from the direction of linkage extends.
8. A keel hanger assembly according to claim 6 or 7, wherein: the hanging piece body is integrally formed by stamping and bending.
9. A keel hanger assembly according to claim 8, wherein: the hook is also provided with a positioning hole for punching and guiding.
10. A keel hanger assembly according to claim 9, wherein: the binding component is an iron wire or a nylon rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121451807.9U CN215407517U (en) | 2021-06-28 | 2021-06-28 | Keel hanging component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121451807.9U CN215407517U (en) | 2021-06-28 | 2021-06-28 | Keel hanging component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215407517U true CN215407517U (en) | 2022-01-04 |
Family
ID=79642801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121451807.9U Expired - Fee Related CN215407517U (en) | 2021-06-28 | 2021-06-28 | Keel hanging component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215407517U (en) |
-
2021
- 2021-06-28 CN CN202121451807.9U patent/CN215407517U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2507828C (en) | Accessible ceiling grid system | |
EP1052753A2 (en) | Bar hanger and mounting clip assembly | |
CN210597835U (en) | Vertical installation component of furred ceiling decorative board | |
CN112049310A (en) | Ceiling connecting component and mounting method | |
CN215407517U (en) | Keel hanging component | |
CN112962853B (en) | Connecting structure, mounting structure and mounting method of air corridor ceiling | |
JP6625443B2 (en) | Ceiling mounting bracket and construction method | |
CN211548319U (en) | Indoor suspended ceiling structure | |
CN212427740U (en) | Suspended ceiling connecting component | |
CN212897506U (en) | Aerial construction platform device based on steel construction special-shaped curtain that encorbelments | |
CN210563152U (en) | Stone dry-hanging structure | |
CN210012531U (en) | Ground wire lifting device for construction and maintenance of power transmission line | |
JPH08120935A (en) | External wall plate fitting method and corner bead to be used therefore | |
CN207260411U (en) | A kind of fixed structure of installation of ceiling connector and furred ceiling section bar | |
JP3816358B2 (en) | Hollow exterior panel hanger | |
CN212773082U (en) | Ceiling access hole repairing structure | |
JP2006322208A (en) | Fixing method of lightweight cellular concrete panel | |
CN217782493U (en) | Metal mesh curtain wall hoisting structure | |
CN218668100U (en) | Indoor wall perforation aluminium veneer section bar mounting structure | |
CN108591967A (en) | A kind of falling proof device suitable for embedded panel lamp | |
CN220186676U (en) | Detachable lock catch of lamp and lamp | |
CN218668141U (en) | Indoor ceiling aluminum square tube hammer sheet mounting structure | |
CN220504678U (en) | Novel hanging hoop pulley for sunshade sail | |
CN215907165U (en) | Assembled metal furred ceiling structure | |
CN217379475U (en) | Suspended ceiling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220104 |
|
CF01 | Termination of patent right due to non-payment of annual fee |