CN215406597U - Steel structure column base embedded structure for complex node - Google Patents

Steel structure column base embedded structure for complex node Download PDF

Info

Publication number
CN215406597U
CN215406597U CN202120645330.1U CN202120645330U CN215406597U CN 215406597 U CN215406597 U CN 215406597U CN 202120645330 U CN202120645330 U CN 202120645330U CN 215406597 U CN215406597 U CN 215406597U
Authority
CN
China
Prior art keywords
shear
column base
column foot
nut
foot plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120645330.1U
Other languages
Chinese (zh)
Inventor
隗合新
郭颖
李晓波
于海龙
杜洪宝
张振禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co ltd Of China Construction Sixth Engineering Bureau
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Installation Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN202120645330.1U priority Critical patent/CN215406597U/en
Application granted granted Critical
Publication of CN215406597U publication Critical patent/CN215406597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a steel structure column foot embedded structure for a complex node, which comprises an anchor bolt, a shear-resistant key slot and a column foot plate, wherein the anchor bolt, the shear-resistant key slot and the column foot plate are embedded in reinforced concrete at the complex node; and three nuts are arranged on each foundation bolt, wherein two nuts are arranged on the column foot plate and respectively comprise a locking nut and a locknut, and the other nut is arranged below the column foot plate and is an adjusting nut. The utility model solves the problem of difficult installation of the anchor bolts and the shear keys at the dense steel bar positions at the complex nodes by adopting the structures of embedding the anchor bolts and the shear key grooves and assembling the column foot plates and the shear keys, has simple and convenient construction, can improve the construction efficiency and saves the construction cost.

Description

Steel structure column base embedded structure for complex node
Technical Field
The utility model relates to a steel structure column base pre-buried structure, in particular to a steel structure column base pre-buried structure for a complex node.
Background
With the development of industrial and civil buildings towards large-span, high-space and novel structures, steel structure buildings emerge many examples of large-span and high-space beams in structural form, which undoubtedly puts higher requirements on construction. As steel structure building space spans increase, there is often an accompanying demand for higher steel structure foundations. The traditional construction method of the steel structure foundation comprises the following steps: the method comprises the following steps of measurement paying-off, binding of column pier reinforcing steel bars, installation of column pier templates, installation and fixation of positioning plates, installation of bolt groups, rechecking, welding and fixation of bolts, concrete pouring, rechecking of bolts and finished product protection.
SUMMERY OF THE UTILITY MODEL
The utility model provides the steel structure column base embedded structure for the complex node for solving the technical problems in the known technology, the construction is simple and convenient, the construction efficiency can be improved, and the construction cost can be saved.
The technical scheme adopted by the utility model for solving the technical problems in the prior art is as follows: a steel structure column base embedded structure for complex nodes comprises foundation bolts, a shear-resistant key groove and a column base plate, wherein the foundation bolts, the shear-resistant key groove and the column base plate are embedded in reinforced concrete of the complex nodes, a shear-resistant key fixedly connected with the column base plate is arranged below the column base plate, the shear-resistant key is matched in the shear-resistant key groove, and the column base plate is locked on the foundation bolts through nuts.
The foundation bolts are provided with three nuts, two of the nuts are arranged on the column foot plate and respectively are a locking nut and a locknut, the locknut is positioned on the locking nut, a gasket is arranged between the locking nut and the column foot plate, and the other nut is positioned below the column foot plate and is an adjusting nut.
The utility model has the advantages and positive effects that: by adopting the structure that the foundation bolts and the shear key grooves are embedded and the column foot plates and the shear keys are assembled, the problem that the foundation bolts and the shear keys at the dense steel bar positions at the complex nodes are difficult to install is solved, the construction method is simple and convenient, the construction efficiency can be improved, and the construction cost can be saved.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a left side view of the present invention;
FIG. 3 is a top view of the present invention;
fig. 4 is a perspective view of the present invention.
In the figure: 1. anchor bolts; 2.1, a locknut; 2.2, locking a nut; 2.3, adjusting the nut; 3. a reinforced concrete solid; 4. a toe plate; 5. a gasket; 6. a shear key groove; 7. a shear key.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings:
referring to fig. 1 to 4, the steel structure column foot embedded structure for the complex node comprises an anchor bolt 1, a shear-resistant key slot 6 and a column foot plate 4, wherein the anchor bolt 1, the shear-resistant key slot 6 and the column foot plate 4 are embedded in a reinforced concrete entity 3 at the complex node, a shear-resistant key 7 fixedly connected with the column foot plate 4 is arranged below the column foot plate 4, the shear-resistant key 7 is inosculated in the shear-resistant key slot 6, and the column foot plate 4 is locked on the anchor bolt 1 by adopting a nut.
More specifically, be equipped with three nut on every rag bolt 1, wherein two the nut is in on the toe board 4, be lock nut 2.2 and locknut 2.1 respectively, locknut 2.1 is located lock nut 2.2 is above, be equipped with gasket 5 between lock nut 2.2 with the toe board 4, the other one the nut is located under the toe board 4, for adjusting nut 2.3, be used for adjusting the level of toe board 4.
The construction method of the embedded structure comprises the following steps:
1) connecting all foundation bolts 1 and all shear key grooves 6 into a combined component by using reinforcing steel bars according to the designed size;
2) placing the components at set positions, and then binding reinforcing steel bars at nodes;
3) correcting the position size of the combined member as required;
4) pouring concrete;
5) and (4) mounting a column foot plate.
Although the preferred embodiments of the present invention have been described above with reference to the accompanying drawings, the present invention is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and those skilled in the art can make many modifications without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims (2)

1. The steel structure column base embedded structure for the complex node is characterized by comprising an anchor bolt, a shear-resistant key groove and a column base plate, wherein the anchor bolt, the shear-resistant key groove and the column base plate are embedded in reinforced concrete at the complex node, a shear-resistant key fixedly connected with the column base plate is arranged below the column base plate, the shear-resistant key is matched in the shear-resistant key groove, and the column base plate is locked on the anchor bolt through a nut.
2. The steel structure column base embedded structure for the complex node as claimed in claim 1, wherein three nuts are provided on each anchor bolt, two of the nuts are provided on the column base plate and respectively include a lock nut and a locknut, the locknut is provided on the lock nut, a spacer is provided between the lock nut and the column base plate, and the other nut is provided below the column base plate and is an adjusting nut.
CN202120645330.1U 2021-03-30 2021-03-30 Steel structure column base embedded structure for complex node Active CN215406597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120645330.1U CN215406597U (en) 2021-03-30 2021-03-30 Steel structure column base embedded structure for complex node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120645330.1U CN215406597U (en) 2021-03-30 2021-03-30 Steel structure column base embedded structure for complex node

Publications (1)

Publication Number Publication Date
CN215406597U true CN215406597U (en) 2022-01-04

Family

ID=79669664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120645330.1U Active CN215406597U (en) 2021-03-30 2021-03-30 Steel structure column base embedded structure for complex node

Country Status (1)

Country Link
CN (1) CN215406597U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467469A (en) * 2022-10-26 2022-12-13 长江生态环保集团有限公司 Steel structure column base and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467469A (en) * 2022-10-26 2022-12-13 长江生态环保集团有限公司 Steel structure column base and construction method thereof

Similar Documents

Publication Publication Date Title
CN113202219B (en) Fully prefabricated assembled steel-concrete composite floor system and design calculation method
CN202925762U (en) Novel reinforced concrete superposed beam
CN212200750U (en) Assembled building frame structure combination braced system
CN210857510U (en) Beam tenon-and-mortise joint unit and connector of beam tenon-and-mortise joint unit and profile steel concrete beam
CN110792025A (en) Connection structure of assembled precast concrete decking and girder steel
CN215406597U (en) Steel structure column base embedded structure for complex node
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN212000571U (en) Connection structure of assembled precast concrete decking and girder steel
CN112211098B (en) Bolt connection device between prefabricated bridge floor boards of assembled bridge
CN111893900B (en) Assembled bridge of turning
CN112663788B (en) Assembled rapid construction method
CN110258790B (en) Vertical dry type connecting node with shear key groove for prefabricated frame column and construction method
CN109629682B (en) Special-shaped shear key of steel-concrete combined hollow sandwich plate structure
CN211472958U (en) Integral concrete structure of steel frame shear wall structure
CN209907927U (en) Assembled beam column node mold sealing system capable of being installed and dismantled quickly
CN209891418U (en) Pre-buried connecting piece and concrete member
CN219118519U (en) Superimposed sheet of belted steel connecting piece
CN209040286U (en) Steel concrete assembled connected node
CN112127515A (en) Connecting device for precast concrete external wall panels
CN112502023A (en) Slot-connected steel-concrete combined rigid frame bridge and construction method thereof
CN217106285U (en) Prefabricated assembled post
CN214994874U (en) Prefabricated coincide wallboard bottom piece formwork structure
CN214246715U (en) Box type steel pipe reinforced concrete frame beam
CN204825958U (en) Concrete foundation for outdoor distributing box
CN219411222U (en) Installation node of precast secondary beam and cast-in-place concrete girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 300451 no.4919, Tanggu new North Road, Binhai New Area, Tianjin

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.